Page 1: Indigo Energy at ACEF 2014

Asia Clean Energy Forum 201417 June 2014

Indigo|EnergyElectrifying Myanmar

Page 2: Indigo Energy at ACEF 2014

You can see the need for electricity! Our lighting solution alleviates this exact problem

Page 3: Indigo Energy at ACEF 2014

Myanmar is Ripe for Off-grid Electricity

45,000 out of 65,000 villages

are not connected to

the grid

25-30% of people

connected to national

grid, leaving some 45 million without reliable access

Page 4: Indigo Energy at ACEF 2014

We have Already Installed Two Projects

KPN 1Installation complete in mid November 201327 houses out of 38 signed up (71%)Total installation time: 420 man-hours

KPN 2Installation complete in mid December 201326 houses out of 32 signed up (81%)Total installation time: 216 man-hours

Page 5: Indigo Energy at ACEF 2014

We Have a Streamlined Project Development Process

• Get support from the village by meeting with headman and villagers.

• Give the flier to villager.

• Sign LOI • Collect list of

houses • Identify possible

solar sites.

• Headman collects half the connection fee to prove seriousness of the village.

• Villagers decide which house will have solar panels.

We can develop a project in two visits

1st Visit

Interim

• Sign contract with villagers.

• Give signed rule document and receipt card to villagers.

• Assign customer number.

• Retrieve “NO” surveys.

• Collect the remaining connection fee and install the project.

• Sign land lease contract

2nd Visit

Page 6: Indigo Energy at ACEF 2014

We Use Proven Technology to Eliminate Technology Risk

Page 7: Indigo Energy at ACEF 2014

100% Collection Rate Validates Villagers’ Interest in Indigo Energy

• 100% collection rate when we provide full service

• All connection fees were collected for each village

• We used a central money collection box to deal with scheduling issues with farmers and our money collector

Page 8: Indigo Energy at ACEF 2014

Installation Day in KPN1

Page 9: Indigo Energy at ACEF 2014

The End of a Successful Installation

Page 10: Indigo Energy at ACEF 2014

We are seeking 120k USD to grow

What we will do with it. • Build 35 more projects to prove collections

model• Open branch office in Bago Division• Hire qualified management staff:

engineering and money collection (microfinance experience)

• Register company locally and in Singapore• Secure operations for the next year while

optimizing engineering, money collection, and maintenance

Page 11: Indigo Energy at ACEF 2014

Thinn Thuzar Htet, Electrical Engineer

Jeff Moore, Advisor

The Indigo Energy TeamAllen Himes,

Managing Director

Operations Manager Position to be filled upon

investment

Engineering ManagerPosition to be filled upon

investment

Various Interns

• Public Relations• Engineering Research x 2• Cell Phone Development

Page 12: Indigo Energy at ACEF 2014