IndustrialHeating & Piping Co.
Madawaska School Department Energy upgrades to the heating system at the
Madawaska High and Middle School
IndustrialHeating & Piping Co.
Madawaska Town MeetingHeating Project Special meeting
February 16th, 2011
Introductions
Todd Leroy, Superintendent, Madawaska School Department
Mike McCormick, Owner, McCormick Facilities Management, Construction Manager for this project
Maynard Pelletier, President, Industrial Heating & Piping, Prime Contractor for this project
IndustrialHeating & Piping Co.
Organizational structure for our“team approach”
Todd LeRoySchool Superintendent
(Primary school contact)
Mike McCormickConstruction Manager
(overall project responsibility)
Maynard PelletierGeneral Contractor
(mechanical installation and sub trades management)
IndustrialHeating & Piping Co.
Role of our team members
Mike McCormick will meet with your Board committee
• Discuss what you would like to do in this project
• Long-term building goals• Energy conservation• Alternative/Renewable opportunities• Financing the project• Operations and Maintenance goals• Review previous studies and efforts
IndustrialHeating & Piping Co.
Role of our team members
Industrial Heating & Piping will be instrumental to the ultimate success of this project
They will:• work with the committee and CM to obtain an
understanding of the desired outcomes• investigate existing project conditions within
the building• perform the construction and manage sub
tradesCondensate return tank steam escaping
IndustrialHeating & Piping Co.
We are a team specifically assembled to best serve the districts interests
• We aspire to make this YOUR project• We are here to assist and advise what will work for building
systems• We will meet with your Board and Committees to fully
understand your needs and desired direction• We will fully investigate the existing conditions• We will explore multiple solutions and present them to you
with the pros and cons of each
IndustrialHeating & Piping Co.
Approach to the project
1. Meet with the Board Committees
2. Perform thorough building and systems investigations
3. Conduct an energy audit and heating load calculations
4. Review green and alternative energy opportunities
5. Design final solution (s)
6. Construction complete before end of 2011
IndustrialHeating & Piping Co.
Existing conditions
• Aged and inefficient heat generation, distribution, and terminal devices
• No mechanical air exchanges within building
• Higher than average utility costs
IndustrialHeating & Piping Co.
There are 2 projects:• #1 is the installation of a wood chip fired
boiler and accessories to be the primary heat source• Budgeted at $1.4 million
• #2 is to convert the steam system to a hot water system, and other energy improvements• Budgeted at $2.7 million
• Together they will provide a comfortable and energy efficient school environment
IndustrialHeating & Piping Co.
Bio mass project description
• Construct a new boiler house to accommodate the wood boiler and wood chip storage
• Install a 4.3 MMBTU wood chip boiler and new oil fired back up boiler
• Install thermal storage tank and roof top solar units for domestic water and heating water supplement
• Connect wood fired system to new building distribution system
IndustrialHeating & Piping Co.
Steam to hot water conversion project
• Replace both existing boilers with one oil fired hot water boiler
• Reuse as much existing piping as possible and replace as needed
• Replace univents and terminal device• Add fresh air systems with heat recovery• Rebuild exhaust fans and air handlers, café and gym
• Install solid state direct digital building controls• Remove equipment from existing boiler room• Remove brick chimney• Install new lights and sensor in gym
IndustrialHeating & Piping Co.
Fuel savings
Fuel savings spreadsheet
Annual 1st year – $196,704
10 year savings – $1,967,036
15 year savings – $2,950,554
Savings over oil