Informe Final (Volumen II) Supervisión de los Estudios de Costos del Valor Agregado de Distribución (VAD) Electronoroeste S.A. Sector Típico 4 Concurso Público Internacional No 003-2004-OSINERG Energy Advisory Services Consorcio conformado por: - Ernst & Young Asesores S. Civil de R. L. - Ernst & Young Auditores Independentes S/S - Procetradi S.A.C.

Upload: others

Post on 02-Apr-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

4to Informe Parcial – Supervisor VAD 1

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

Informe Final (Volumen II) Supervisión de los Estudios de Costos del Valor Agregado

de Distribución (VAD)

Electronoroeste S.A.

Sector Típico 4

Concurso Público Internacional No 003-2004-OSINERG

Energy Advisory Services

Consorcio conformado por:

- Ernst & Young Asesores S. Civil de R. L.

- Ernst & Young Auditores Independentes S/S

- Procetradi S.A.C.

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

2

Contenido (Volumen II)

1. Anexo I – Informe de los Resultados Relevantes del Estudio de Costos del VAD _ 3 1.1 Introducción _________________________________________________________ 3 1.2 Características del Sector Típico _________________________________________ 5 1.3 Balance de Energía y Potencia (Empresa Real) ______________________________ 9 1.4 Valor Nuevo de Reemplazo______________________________________________ 9 1.5 Costos Estándar de Operación y Mantenimiento____________________________ 12

1.5.1. Técnica ____________________________________________________ 12 1.5.2. Comercial __________________________________________________ 12

1.6 Pérdidas Estándar de Energía y Potencia _________________________________ 13 1.7 Calidad del Servicio Eléctrico___________________________________________ 14 1.8 Resultados __________________________________________________________ 15

2. Anexo II – Costo Fijo______________________________________________ 17 2.1.1. Proceso de Cálculo de Costos Fijo de las Tarifas Monomias ____________ 18 2.1.2. Proceso de Cálculo de Costos Fijo de las Tarifas Binomias _____________ 20 2.1.3. Resumen de Costos Anuales del Cargo Fijo Semestral_________________ 21

3. Anexo III – Costos de Mantenimiento _________________________________ 22

4. Anexo IV – Análisis Técnico de la Red MT _____________________________ 81 4.1 Modelamiento de la Red Eléctrica _______________________________________ 81

4.1.1. Definiciones ________________________________________________ 81 4.1.2. Modelo de Centro de Transformación _____________________________ 82 4.1.3. Modelo de Cables y Conductores en Media Tensión __________________ 82 4.1.4. Modelo de Demanda __________________________________________ 86

4.2 Metodología de Cálculo________________________________________________ 87 4.2.1. Interfaces de Cálculo __________________________________________ 95

4.3 Simulación del Flujo de Carga en la Red de Media Tensión ___________________ 97 5. Anexo V – Análisis Técnico de la Red BT _____________________________ 117

5.1 Cálculo de Pérdidas Técnicas de Potencia en Baja Tensión___________________ 140

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

3

1. Anexo I Informe de los Resultados Relevantes del Estudio

de Costos del VAD

Regulación de las Tarifas de Distribución Eléctrica Periodo Noviembre 2005 – Octubre 2009

Informe de los Resultados Relevantes del Estudio de Costos del VAD

Sector Típico: 4

1.1 Introducción

La Ley de Concesiones Eléctricas, en adelante LCE, y su reglamento, señalan que las tarifas a usuarios finales comprenden las tarifas en barra y el Valor Agregado de Distribución (VAD). La Gerencia Adjunta de Regulación Tarifaria del Organismo Supervisor de la Energía, en adelnte “OSINERG-GART”, fija las tarifas en barra cada año y establece en noviembre cada 4 años el VAD. La tarifa vigente fue establecida con el VAD el primeo de noviembre de 2001 y, en consecuencia, a partir del 01 de noviembre de 2005 se requieren establecer nuevos valores. En forma previa a que el OSINERG-GART establezca el VAD, la LCE señala que los concesionarios de distribución encargarán los estudios del VAD a empresas consultoras precalificadas por el OSINERG-GART, entidad que elaborará los Términos de Referencia de los estudios, supervisará su avance y comunicará sus observaciones a los concesionarios una vez recibidos los informes correspondientes, quienes deberán absolverlas en un plazo máximo de diez días.

Para la supervisión El OSINERG – GART , mediante concurso público internacional, calificó a las empresas consultoras, asignando la labor de supervisión del sector típico 4 al consorcio Ernst & Young Asesores S. Civil de R.L., Ernst & Young Auditores Independentes S/S y Procetradi S.A.C. El sistema eléctrico modelo para el sector típico 4 es Chulucanas el cual pertenece a la empresa de distribución eléctrica Electronoroeste S.A.

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

4

Para el cálculo del VAD se utiliza el método de regulación basado en una empresa modelo eficiente, de la cual, a partir de su estruccturación, se determinan los costos asociados al cliente, independientes de sus consumos de energía y potencia; las pérdidas estándar de distribución en energía y potencia; los costos estándar de inversión, operación y mantenimiento. La estructuración de la empresa modelo fue realizada utilizando criterios de eficiencia de operación y gestión para que ésta sea capaz de brindar servicios públicos de distribución. El sistema eléctrico real atiende a mercados de bajo consumo con redes extensas que tiene una inversión considerable. A esto también podemos sumarle los costos medios de operación y mantenimiento, comerciales y administrativos. Consideramos que el ratio potencia suministrada por inversión es baja la cual refleja la realidad de los sectores urbano – rural del país. Es importante mencionar que, de acuedo a el OSINERG, el sistema eléctrico modelo no está sujeto a la Norma de Calidad de los Servicios Eléctricos “NTCSE”, a pesar de esto, para su diseño, se consideraron algunos indicadores de calidad. Los resultados del estudio fueron los costos del VAD en media y baja tensión, los costos fijos de atención al cliente, las pérdidas estándar de distribución de energía y potencia, los factores de economía de escala y los factores de indexación.

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

5

1.2 Características del Sector Típico A continuación presentamos la información técnica y comercial del sistema eléctrico modelo existente (empresa real): § Área de Influencia

Vista del Sistema Eléctrico Modelo Chulucanas y Centros de Transformación

Área de Influencia 5,716 km2

Sistema Eléctrico Chulucanas

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

6

§ Número de Clientes y Ventas de Energía

Tipo de Consumo Opción Tarifaria

Número de Clientes a Diciembre

2004

Ventas de Energía año 2004

MWh

2P2E MT2 26 2.637 1P2E, Presente en Punta MT3P 7 1.206 1P2E, Presente Fuera de Punta MT3FP 11 740 1P1E, Presente en Punta MT4P 20 707 1P1E, Presente Fuera de Punta MT4FP 11 186

TOTAL MEDIA TENSIÓN 75 5.475

2P2E BT2 3 281 1P2E, Presente en Punta BT3P 0 12 1P2E, Presente Fuera de Punta BT3FP 1 12 1P1E, Presente en Punta BT4P 6 35 1P1E, Presente Fuera de Punta BT4FP 0 0 1P1E, Presente Fuera de Punta BT4AP 0 2.430 2E BT5A 0 0 1E, Residensial Total BT5B 0 0 De 1 a 30 Kw.h BT5R1 15.460 2.667 De 31 a 100 Kw.h BT5R2 7.411 4.157 De 101 a 150 Kw.h BT5R3 879 983 De 151 a 300 Kw.h BT5R4 350 615 De 301 a 500 Kw.h BT5R5 69 236 De 501 a 750 Kw.h BT5R6 21 121

De 701 a 1000 Kw.h BT5R7 6 48 Exceso de 1000 Kw.h BT5R8 6 298 1E-BT, No Residencial BT5 1.009 1.944 1P, Pensión Fija BT6 3 2

TOTAL BAJA TENSIÓN 25.224 13.840

TOTAL 25.299 19.315

§ Demanda máxima (kW) a nivel de MT y BT:

kW Demanda Máxima Sistema Eléctrico 6,643 Ventas de Potencia Coincidente MT 881 Ventas de Potencia Coincidente BT 3,515

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

7

§ Número y potencia instalada de los centros de transformación AT/MT

Número 1 (C.T. Chulucanas) Potencia (MVA) 10

Número 3 (C.T. Huapalas, C.H. Quiroz, C.H. Sicacate) Potencia (MVA) 4.55

§ Información de las instalaciones de distribución eléctrica

Media Tensión

Tensión (kV) 10 kV y 22,9 kV

Red Aérea (km) 500.377 Red Subterránea (km) 0.816 Total Red MT (km) 501.193

Equipos de P&S (unidad) 70.000

Subestaciones de Distribución MT/BT y Seccionamiento

Relación de Transformación: 10 kV / 0,22 kV; 10 kV / 0,38 kV; 13,2 kV / 0,22 kV; 13,2 kV / 0,44

kV; 22,9 kV / 0,22 kV; 22,9 kV / 0,38 kV; 22,9 kV / 0,44 kV

Tipo Número Potencia Instalada kVA

Monoposte 137 4,043 Biposte 104 9,150 Convencional 1 100 Compacta Pedestal

Compacta Bóveda Seccionamiento Total 242 13,293

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

8

Baja Tensión

Tensión (V) 220 V, 380/220 V, 440/220 V

Servicio Particular (SP)

Red Aérea (km) 418.000

Red Subterránea (km) 0.463

Total Red BT SP (km) 418.463

Alumbrado Público (AP)

Red Aérea (km) 305.162

Red Subterránea (km) 2.496

Total Red BT AP (km) 307.658 Número de Luminarias (conectadas en red aérea) 7,000.000

Número de Luminarias (conectadas en red subterránea)

128.000

§ Información de las pérdidas de energía y potencia existentes

Porcentaje (*) Nivel de Tensión

Tipo Energía Potencia

Técnica 6.07% 6.38% MT

No Técnica 0.00% 0.00% Técnica 12.23% 11.24% BT No Técnica 4.00% 8.27%

(*) Porcentaje referido al ingreso en cada nivel de tensión

§ Información de la calidad de servicio eléctrico y tasas de averías de las instalaciones

Descripción Unidad Valor

Número de interrupciones interrupciones / semestre 80.00

Duración de las interrupciones Horas/semestre 2.16

Caída de tensión en MT % de la tensión nominal

Exceden la Norma

Caída de tensión en BT % de la tensión nominal

Exceden la Norma

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

9

1.3 Balance de Energía y Potencia (Empresa Real) Con la información, recopilada y validada, se elaboró el balance real el cual presentamos a continuación: Energía anual

(MW.h)Factor de

carga/pérdidasFactor de

coincidencia Potencia (kW)

Ingreso MT 23,439 6,526.7Pérdidas MT 1,169 0.233 570.1Ventas MT 5,475 658.6

MT1MT2 2,637 0.514 0.438 255.8

MT3P 1,206 0.874 0.915 143.7MT3FP 740 0.357 0.359 84.7

MT4P 707 0.533 0.987 149.0MT4FP 186 0.359 0.430 25.4

Ingreso BT 16,795 5,298.0Pérdidas BT 2,955 0.233 1,441.0Ventas BT 13,840 3,857.0

BT2 281 0.238 0.003 0.4BT3P 12 0.440 0.762 2.3

BT3FP 12 0.364 0.155 0.6BT4P 35 0.655 0.978 5.9

BT4FPBT4AP 2,430 0.500 1.000 553.3

BT5ABT5B 11,068 0.383 1.000 3,294.0

BT6 2 0.383 1.000 0.553 Se observa que la empresa presenta pérdidas que superan las reconocidas por las tarifas vigentes, 11% para la energía.

1.4 Valor Nuevo de Reemplazo El Valor Nuevo de Reemplazo, en adelante VNR, se obtuvo de la optimización técnico – económica de las instalaciones eléctricas y no eléctricas. Para realizar la optimización técnico económica de las instalaciones del sistema eléctrico modelo, se contó con la siguiente información base:

§ Resultados de la zonificación del mercado, incluyendo áreas con característica

geográfica. § Base de datos de las instalaciones existentes reportada por la empresa. § Costo unitario de la inversión de las instalaciones. § Costos de materiales, stock, mano de obra e indirectos. § Descripción de armados que componen cada costo de inversión.

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

10

También se realizaron visitas en campo con la finalidad de observar la operación y configuración de las instalaciones. Con la información mencionada y la aplicación de criterios técnicos se obtuvo el VNR del sistema eléctrico modelo, el cual es mostrado en la siguiente tabla:

Media TensiónRed Aérea km 488.280 2,634.135 5,394.723 Red Subterránea kmEquipos de P&S cantidad 73.000 75.056 1,028.158 Equipos de Compensación

Total MT 2,709.191 Subestaciones de Distribución

Monoposte unidad 245.000 419.600 1,712.652 Biposte unidad 20.000 113.638 5,681.888 Convencional unidadCompacta Pedestal unidadCompacta Bóveda unidad

Total SE 533.238 Baja Tensión

Red AéreaServicio Particular km 419.700 1,681.187 4,005.687 Alumbrado Público km 227.000 143.250 631.057 Luminarias unidad 6,487.000 516.489 79.619 Equipos de Control AP unidad 112.000 6.871 61.350

Total red aérea 2,347.797 Red Subterránea

Servicio Particular kmAlumbrado Público kmLuminarias unidadEquipos de Control AP unidadPostes AP unidad

Total red subterránea - Total BT 2,347.797 Instalaciones No Eléctricas

INE asignadas a MT 61.479 INE asignadas a BT 65.378

Total INE 126.857 VALOR NUEVO DE REEMPLAZO (miles US$) 5,717

Costo Unitario promedio US$/unidadSistema de Distribución Eléctrica Chulucanas Unidad Metrado VNR miles

US$

El VNR y la anualidad determinados para el cálculo del VAD son los siguientes:

Media Tensión Baja Tensión

Valor Nuevo de Reemplazo miles US$ 2,770.67 2,946.41Costo Anual de Inversión (Anualidad del VNR) miles US$ 343.96 365.78

VADDescripción Unidad

A continuación se presenta el resumen de los costos de materiales utilizados para la valorización del VRN:

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

11

Media Tensión

Red de MT

Material Recursos Indirectos TotalRED AEREA CONDUCTOR DE AA O SIMIL. 3x25 mm2 C (ESTRUCTURA DE CONCRETO) 22.9 kV. US $/km 2,789 1,877 1,199 5,865RED AEREA CONDUCTOR DE AA O SIMIL. 3x35 mm2 C (ESTRUCTURA DE CONCRETO) 22.9 kV. US $/km 2,851 1,877 1,217 5,945RED AEREA CONDUCTOR DE AA O SIMIL. 3.50 mm2 C (ESTRUCTURA DE CONCRETO) 22.9 kV. US $/km 3,068 1,971 1,300 6,339RED AEREA CONDUCTOR DE AA O SIMIL. 3x70 mm2 C (ESTRUCTURA DE CONCRETO) 22.9 kV. US $/km 3,596 1,971 1,453 7,020RED AEREA CONDUCTOR DE AA O SIMIL. 3x95 mm2 C (ESTRUCTURA DE CONCRETO) 22.9 kV. US $/km 4,648 2,031 1,771 8,450RED AEREA CONDUCTOR DE AA O SIMIL. 3x25 mm2 A (ESTRUCTURA DE MADERA) 22.9 kV. US $/km 1,929 1,680 909 4,519RED AEREA CONDUCTOR DE AA O SIMIL. 3x35 mm2 A (ESTRUCTURA DE MADERA) 22.9 kV. US $/km 1,991 1,680 927 4,599RED AEREA CONDUCTOR DE AA O SIMIL. 3x50 mm2 A (ESTRUCTURA DE MADERA) 22.9 kV. US $/km 2,209 1,774 1,010 4,992RED AEREA CONDUCTOR DE AA O SIMIL. 3x70 mm2 A (ESTRUCTURA DE MADERA) 22.9 kV. US $/km 2,736 1,774 1,163 5,673RED AEREA CONDUCTOR DE AA O SIMIL. 3x95 mm2 A (ESTRUCTURA DE MADERA) 22.9 kV. US $/km 3,788 1,835 1,480 7,104RED AEREA CONDUCTOR DE AA O SIMIL. 3x25 mm2 C (ESTRUCTURA DE CONCRETO) 10 kV. US $/km 2,679 1,877 1,168 5,724RED AEREA CONDUCTOR DE AA O SIMIL. 3x35 mm2 C (ESTRUCTURA DE CONCRETO) 10 kV. US $/km 2,742 1,877 1,186 5,804RED AEREA CONDUCTOR DE AA O SIMIL. 3x25 mm2 A (ESTRUCTURA DE MADERA) 10 kV. US $/km 1,921 1,680 907 4,508RED AEREA CONDUCTOR DE AA O SIMIL. 3x35 mm2 A (ESTRUCTURA DE MADERA) 10 kV. US $/km 1,983 1,680 925 4,588RED AEREA CONDUCTOR DE AA O SIMIL. 2x25 mm2 A (ESTRUCTURA DE MADERA) 10 kV. US $/km 1,625 1,449 772 3,846RED AEREA CONDUCTOR DE AA O SIMIL. 2x25 mm2 C (ESTRUCTURA DE CONCRETO) 10 kV. US $/km 2,381 1,653 1,034 5,068RED AEREA CONDUCTOR DE AA O SIMIL. 1x16 mm2 C (ESTRUCTURA DE CONCRETO) 13.2 kV. US $/km 1,847 1,354 817 4,019RED AEREA CONDUCTOR DE AA O SIMIL. 1x25 mm2 C (ESTRUCTURA DE CONCRETO) 13.2 kV. US $/km 1,868 1,354 823 4,045RED AEREA CONDUCTOR DE AA O SIMIL. 1x16 mm2 A (ESTRUCTURA DE MADERA) 13.2 kV. US $/km 1,222 1,158 595 2,974RED AEREA CONDUCTOR DE AA O SIMIL. 1x25 mm2 A (ESTRUCTURA DE MADERA) 13.2 kV. US $/km 1,242 1,158 601 3,001CONDUCTOR NEUTRO DE AA O SIMIL. 1x16 mm2 13.2 kV. US $/km 226 279 124 629CONDUCTOR NEUTRO DE AA O SIMIL. 1x25 mm2 13.2 kV. US $/km 247 279 130 656CONDUCTOR NEUTRO DE AA O SIMIL. 1x35 mm2 13.2 kV. US $/km 267 279 136 682CONDUCTOR NEUTRO DE AA O SIMIL. 1x50 mm2 13.2 kV. US $/km 340 311 163 814

Costo Soporte TensiónDescripcion Unidad

Equipos de Protección

Material Recursos Indirectos TotalSECCIONADOR FUSIBLE (CUT-OUT), UNIPOLAR x 3, 7.8/13.5 kV, 100 A 10 kV. US $/Unidad 159 50 57 266SECCIONADOR FUSIBLE (CUT-OUT), UNIPOLAR x 1, 15 kV, 100 A 13.2 kV. US $/Unidad 83 34 31 148SECCIONADOR FUSIBLE (CUT-OUT), UNIPOLAR x 3, 15/26 kV, 100 A 22.9 kV. US $/Unidad 314 50 102 466SECCIONADOR BAJO CARGA, FUSIBLE LIMITADOR, TRIPOLAR 22,9Kv 400/630 A22.9kV US $/Unidad 2,813 95 836 3,744

Costo Descripcion Tensión Unidad

Baja Tensión Subestaciones de distribución

Material Recursos Indirectos TotalS.E. AEREA MONOPOSTE 1x50 kVA 13.2 kV. 440/220 V. US $/Unidad 1,642 249 528 2,419S.E. AEREA MONOPOSTE 1x50 kVA 10 kV. 440/220 V. US $/Unidad 1,703 249 546 2,497S.E. AEREA MONOPOSTE 1x37 kVA 13.2 kV. 440/220 V. US $/Unidad 914 249 317 1,480S.E. AEREA MONOPOSTE 1x25 kVA 13.2 kV. 440/220 V. US $/Unidad 895 249 311 1,455S.E. AEREA MONOPOSTE 1x15 kVA 13.2 kV. 440/220 V. US $/Unidad 761 249 273 1,283S.E. AEREA MONOPOSTE 1x10 kVA 13.2 kV. 440/220 V. US $/Unidad 716 249 259 1,224S.E. AEREA MONOPOSTE 1x5 kVA 10 kV. 440/220 V. US $/Unidad 655 249 242 1,146S.E. AEREA MONOPOSTE 1x5 kVA 13.2 kV. 440/220 V. US $/Unidad 666 249 245 1,160S.E. AEREA BIPOSTE 100 kVA (3F) 22.9 kV. 380/220 V. US $/Unidad 4,231 422 1,315 5,969S.E. AEREA BIPOSTE 100 kVA (3F) 10 kV. 380/220 V. US $/Unidad 3,675 422 1,154 5,251

Descripcion Nivel de Tensión (V1)

Nivel de Tensión (V2)

Costo (US$)Unidad

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

12

Red BT

Material Recursos Indirectos TotalRED AEREA SP AUTOPORTANTE DE AL O SIMIL. 2x16 mm2 + portante A (ESTRUCTURA DE MADERA) US $/km 1,839 1,337.78 811.59 3,988.32RED AEREA SP AUTOPORTANTE DE AL O SIMIL. 2x16 mm2 + portante C (ESTRUCTURA DE CONCRETO)US $/km 2,038 1,337.78 869.48 4,245.75RED AEREA SP + AP AUTOPORTANTE DE AL O SIMIL. 3x16 mm2 + portante C (ESTRUCTURA DE CONCRETO)US $/km 2,142 1,337.78 899.51 4,379.28RED AEREA SP+AP AUTOPORTANTE DE AL 3x16 mm2 + 1x16 mm2 + portante C (ESTRUCTURA DE CONCRETO)US $/km 2,835 1,968.25 1,231.73 6,035.42RED AEREA SP+AP AUTOPORTANTE DE AL 3x25 mm2 + 1x16 mm2 + portante C (ESTRUCTURA DE CONCRETO)US $/km 3,363 1,968.25 1,384.87 6,716.41

Descripcion Soporte Costo Unidad

Equipos de Alumbrado Público

Material Recursos Indirectos TotalEQUIPO DE CONTROL AP COMPUESTO POR INTERRUPTOR HORARIO Y CONTACTOR US $/Unidad 40.90 7.11 13.34 61.35LUMINARIA CON LAMPARA DE 50W VAPOR DE SODIO US $/Unidad 54.05 8.19 17.38 79.62ESTRUCTURA 9 m ALINEAMIENTO US $/Unidad 61.66 32.43 24.63 118.72

Costo Descripcion Unidad

1.5 Costos Estándar de Operación y Mantenimiento

1.5.1. Técnica

La siguiente tabla muestra los costos de operación y mantenimiento técnico los cuales están determinados según: § Costos directos § Costo de Mantenimiento § Costo de Operación § Costos de supervisión directa § Asignación de los costos indirectos

% Miles (US$) % Miles (US$) % Miles (US$) % Miles (US$) % Miles (US$)Distribución MT 63% 84.64 10% 13.12 17% 22.92 10% 13.75 100% 134.43Distribución BT 61% 138.83 9% 19.61 19% 43.65 11% 26.19 100% 228.28Alumbrado Público 81% 22.37 19% 5.37 0% 0.00 0% 0.00 100% 27.74

Total 245.83 38.10 66.57 39.94 390.44

DirectoDescripción TotalAsignación Operación Comercial

Asignación Gestión ComercialIndirecto

1.5.2. Comercial

El Cargo Fijo representa los costos directos en que debe incurrir la empresa modelo para realizar la toma de lecturas de consumos de los usuarios, el procesamiento de las facturas, la emisión, distribución y cobranzas.

Su determinación contempla la realización de actividades con personal propio y tercerizado. Los recursos necesarios para las actividades con personal propio han sido determinados del diseño de la estructura organizacional.

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

13

Para las actividades tercerizadas se ha considerado lo siguiente: § Lecturas de consumos de energía § Reparto de recibos § Cobranza de recibos

El costo fijo ha sido determinado, a solicitud de OSINERG, considerando lecturas, procesamiento, emisión y repartos semestral, y cobranza mensual. Los cargos para las tarifas binomias han considerado todas las actividades mensuales

Opción Tarifaria Número de Clientes

Costo Anual Miles US$

Costo Unitario US$ / cliente - mes

Simple Medición de Energía 25,326 105.181 0.346

Simple o Doble Medición de Energía y/o una medición de Potencia

56 1.153 1.716

Doble Medición de Energía y Potencia 29 0.597 1.716

Total 25,411 106.931 0.351

1.6 Pérdidas Estándar de Energía y Potencia Para determinar las pérdidas de energía y potencia en media tensión, se simuló la red eléctrica del sistema eléctrico modelo en una plataforma GIS, de ésta se obtuvieron las pérdidas en conductores Las pérdidas en baja tensión fueron obtenidas del modelamiento del módulo teórico óptimo. A dichas pérdidas se les añadieron las pérdidas que se originan en los transformadores de distribución, medidores y acometidas. Para el caso de las pérdidas comerciales (no técnicas) se consideraron las reconocidas por el OSINERG. A continuación presentamos los resultados obtenidos:

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

14

Energía PotenciaTécnica 1.90% 3.90%

No Técnica 0.00% 0.00%Técnica 8.07% 13.16%

No Técnica 2.00% 2.00%(*) Porcentaje referido al ingreso en cada nivel de tensión

BT

Porcentaje (*) Nivel Tipo

MT

1.7 Calidad del Servicio Eléctrico Los resultados de la simulación de operación de las instalaciones eléctricas modeladas están dentro de los estándares de calidad de servicio exigidos por la Norma Técnica de Calidad de Los Servicios, en adelante la NTCSE.

Las tolerancias consideradas son las siguientes:

Parámetro Eléctrico Tolerancia

Tensión MT 5% Tensión BT 7.5% Número de Interrupciones MT 6 Horas de interrupciones MT 14 Número de Interrupciones BT 9 Horas de interrupciones BT 20

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

15

1.8 Resultados Los resultados elaborados por el Supervisor VAD son los siguientes:

§ VAD y Cargos Fijos

Cargo Fijo

Media Tensión Baja Tensión Total CFE CFS CFH

Valor Nuevo de Reemplazo miles US$ 2,770.67 2,946.41Costo Anual de Inversión (Anualidad del VNR) miles US$ 343.96 365.78Costo Anual de OyM miles US$ 134.43 256.01Total Costo Anual miles US$ 478.39 621.79 106.931 105.181 1.153 0.597Demanda kW 4,993 3,677Número de Clientes Unidad 25,411 25,326 56 29Valor Agregado de Distribución

Inversión US$/kW-mes 5.447 7.865OyM US$/kW-mes 2.243 5.801Total US$/kW-mes 7.690 13.666

Cargo Fijo Mensual US$/mes 0.351 0.346 1.716 1.716

VADDescripción Unidad

El tipo de cambio utilizado corresponde al valor de venta del dólar publicado por la Superintendencia de Banca y Seguros al 31/12/2004, equivale a S/ 3.283 por 1 US$.

Cargo FijoMedia

Tensión Baja Tensión Total CFE CFS CFH

Valor Nuevo de Reemplazo miles S/. 9,096.11 9,673.07Costo Anual de Inversión (Anualidad del VNR) miles S/. 1,129.23 1,200.85Costo Anual de OyM miles S/. 441.32 840.49Total Costo Anual miles S/. 1,570.55 2,041.34 351.05 345.31 3.78 1.96Demanda kW 4,993 3,677Número de Clientes Unidad 25,411 25,326 56 29Valor Agregado de Distribución

Inversión S/./kW-mes 17.883 25.821OyM S/./kW-mes 7.364 19.045Total S/./kW-mes 25.246 44.865

Cargo Fijo Mensual S/. /mes 1.151 1.136 5.632 5.632

Descripción UnidadVAD

§ Factores de Economía de Escala

Período VADMT VADBT Cargo Fijo

Noviembre 2005 - Octubre 2006 1.0000 1.0000 1.0000Noviembre 2006 - Octubre 2007 0.9948 0.9949 0.9971Noviembre 2007 - Octubre 2008 0.9897 0.9899 0.9943Noviembre 2008 - Octubre 2009 0.9846 0.9849 0.9915

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

16

§ Fórmulas de Actualización

Parámetro Valor Parámetro Indicador AsociadoAMT 95.00% Índice de Precios al por Mayor (IPM)BMT 0.87% Índice de Productos ImportadosCMT 0.00% Índice del Precio del CobreDMT 4.12% Índice del Precio del Aluminio

Parámetro Valor Parámetro Indicador AsociadoABT 84.83% Índice de Precios al por Mayor (IPM)BBT 4.11% Índice de Productos ImportadosCBT 3.20% Índice del Precio del CobreDBT 7.86% Índice del Precio del Aluminio

Parámetro Valor Parámetro Indicador AsociadoACF 100.00% Índice de Precios al por Mayor (IPM)

La desagregación del rubro de productos importados por partidas arancelarias es:

Partidas Arancelarias MT 0.87% Tasa Arancelaria84.7130.0000 Equipos de Computo 0.04% 7%85.2520.1900 Equipos de Radio 0.03% 7%85.3620.9000 Interruptores 0.32% 4%85.3650.9000 Secc. / Reconectadores 0.47% 4%

Partidas Arancelarias BT 4.11% Tasa Arancelaria84.7130.0000 Equipos de Computo 0.43% 7%85.2520.1900 Equipos de Radio 0.43% 7%85.3650.9000 Secc. / Reconectadores 3.25% 4%

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

17

2. Anexo II Costo Fijo

Los costos fijos representan los costos directos en que debe incurrir la empresa modelo para realizar la toma de lecturas de consumos de los usuarios, el procesamiento de las facturas, la emisión, distribución y cobranzas. Para su determinación se contempla la realización de actividades con personal propio y tercerizado. Los recursos necesarios para las actividades con personal propio han sido determinados del diseño de la estructura organizacional. Para las actividades tercerizadas se ha considerado lo siguiente:

§ Lecturas de consumos de energía § Reparto de recibos § Cobranza de recibos

El costo fijo ha sido determinado, a solicitud de OSINERG, considerando lecturas, procesamiento, emisión y repartos semestral, y cobranza mensual.

Los cargos para las tarifas binomias han considerado todas las actividades mensuales A continuación mostramos los resultados:

Opción Tarifaria Número de Clientes

Costo Anual Miles US$

Costo Unitario US$ / cliente - mes

Simple Medición de Energía 25,326 105.181 0.346

Simple o Doble Medición de Energía y/o una medición de Potencia

56 1.153 1.716

Doble Medición de Energía y Potencia 29 0.597 1.716

Total 25,411 106.931 0.351

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

18

2.1.1. Proceso de Cálculo de Costos Fijo de las Tarifas Monomias

En el siguiente cuadro se muestra la asignación de costos a cada proceso involucrado en la determinación del cargo fijo.

COSTO FIJO MONOMIOS

Emisión de Listados para Lecturas

Costo de Personal

Costo no Personal

Costo de Terceros

Recursos Cantidad P.Unit Total (S/.) (S/.) (S/.) (S/.)Servidor H-M 4.00 2.89 11.57 11.57Estación de Trabajo H-M 8.00 0.58 4.63 4.63Impresora H-M 1.50 0.96 1.45 1.45Papel Millar 0.42 106.06 44.57 44.57Software H-Lic 5.00 0.27 1.35 1.35Operador H-H 8.00 15.78 126.23 126.23

189.80 189.80Procesamiento de Lectura de MedidoresRecursos Cantidad P.Unit Total (S/.) (S/.) (S/.) (S/.)Servidor H-M 4 2.89 11.57 11.57Estación de Trabajo H-M 16 0.58 9.26 9.26Impresora H-M 0.5 0.96 0.48 0.48Papel Millar 0.21 106.06 22.29 22.29

Especialista Facturación H-H 48 15.78 757.36 757.36Lecturadores Unid 25,214 0.9 22,692.60 22,692.60

24,882.07 24,882.07Proceso de FacturaciónRecursos Cantidad P.Unit Total (S/.) (S/.) (S/.) (S/.)Servidor H-M 4 2.89 11.57 11.57Estación de Trabajo H-M 16 0.58 9.26 9.26Software H-Soft 10 0.69 6.85 6.85Operador H-H 48 15.78 757.36 757.36Supervisor H-H 4 15.78 63.11 63.11Especialista en Facturación H-H 136 15.78 2,145.86 2,145.86

2,994.03 2,994.03Emisión de RecibosRecursos Cantidad P.Unit Total (S/.) (S/.) (S/.) (S/.)Servidor H-M 4 2.89 11.57 11.57Estación de Trabajo H-M 16 0.58 9.26 9.26Impresora H-M 48 0.96 46.30 46.30Formatos Pre Impresos Millar 166.4124 175.09 29,137.70 29,137.70Papel Millar 6 106.06 636.38 636.38Operador H-H 120 15.78 1893.41 1893.41

31,734.63 31,734.63Reparto de RecibosRecursos Cantidad P.Unit Total (S/.) (S/.) (S/.) (S/.)Contratista de Reparto Unidad 25214 0.675 17,019.45 17,019.45Supervisor H-H 576 15.78 9,088.36 9,088.36

26,107.81 26,107.81CobranzaRecursos Cantidad P.Unit Total (S/.) (S/.)Contratista de Cobranzas Unidad 151284 0.5 75,642.00 75,642.00Supervisor H-H 576 15.78 9,088.36 9,088.36

84,730.36 84,730.36Cantidad P.Unit Total (S/.) (S/.)

Lecturas AP en Subestaciones 672 3.00 2,016.00 2016

Total Costo Fijo Semestral 172,654.69 25,308.57 29,976.08 117,370.05Total Costo Fijo Semestral 172,654.69Número de Clientes 25,326.00Costo Fijo por Cliente (S/. / semestre) 6.82Costo Fijo por Cliente (US$ / semestre) 2.08Costo Fijo por Cliente (US$ / mes) 0.346 4,218.09 4,996.01 19,561.68

1,388.501,388.50

Cálculo detallado

Operador (para digitación, consistencia y análisis de lecturas)

H-H 88.00 15.78

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

19

Las siguientes tablas muestran los costos unitarios de los equipos, insumos y recursos.

Hardware y Software

Equipo H-M(S/.) H-M ($) Inversión Mantto Vida UtilServidor 2.89 0.88 6000 600 7488Estación de Trabajo 0.58 0.18 1200 120 7488Impresora 0.96 0.29 2000 200 7488Software 0.69 0.21 5000 1250 29952

Impresión en papel formato A-4Insumos S/. / Millar $ / Millar $ / Hoja Inversión Duración

Toner 87.55 26.67 0.026666667 80 3,000 Papel 18.52 5.64 0.0185 18.5 1,000 Total 106.06 32.31

Impresión en formato pre impreso /recibos)Insumos S/. / Millar $ / Millar $ / Hoja Inversión Duración

Toner 43.77 13.33 0.013333333 80 6,000 Papel 131.32 40.00 0.04 40 1,000 Total 175.09 53.33

Recursos HumanosRecurso H-H(S/.) S/.-mes H-mesOperador 15.78 2,777 176Supervisor 15.78 2,777 176Especialista 15.78 2,777 176

Servicios de TercerosSevicio S/. / UnidLectura de consumo 0.90 0.40 0.60Reparto de recibos 0.68 0.30 0.45Cobranza de recibos 0.50 0.45 0.50

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

20

2.1.2. Proceso de Cálculo de Costos Fijo de las Tarifas Binomias En el siguiente cuadro se muestra la asignación de costos a cada proceso involucrado en la determinación del cargo fijo.

COSTO FIJO BINOMIOS

Lectura de MedidoresCosto de Personal

Costo no Personal Costo de Terceros

Recursos Cantidad P.Unit Total (S/.) (S/.) (S/.) (S/.)Servidor H-M 0.5 2.89 1.45 1.45Estación de Trabajo H-M 1 0.58 0.58 0.58Papel Millar 0.10 106.06 10.61 10.61Especialista Facturación H-H 2 15.78 31.56 31.56Lecturadores Unid 85 3 255.00 255.00

299.19Proceso de FacturaciónRecursos Cantidad P.Unit Total (S/.) (S/.) (S/.) (S/.)Proceso de FacturaciónServidor H-M 0.5 2.89 1.45 1.45Estación de Trabajo H-M 1 0.58 0.58 0.58Software H-Soft 1 0.69 0.69 0.69Especialista en Facturación H-H 1 15.78 15.78 15.78

18.49Emisión de ListadosRecursos Cantidad P.Unit Total (S/.) (S/.) (S/.) (S/.)Servidor H-M 0.5 2.89 1.45 1.45Estación de Trabajo H-M 1 0.58 0.58 0.58Impresora H-M 1 0.96 0.96 0.96Formatos Pre Impresos Millar 0.1 175.09 17.51 17.51Papel Millar 0.05 106.06 5.30 5.30Operador H-H 0.5 15.78 7.89 7.89

33.69Reparto de RecibosRecursos Cantidad P.Unit Total (S/.) (S/.) (S/.) (S/.)Contratista de Reparto Unidad 85 0.72 61.20 61.20Supervisor H-H 0.5 15.78 7.89 7.89

69.09CobranzaRecursos Cantidad P.Unit Total (S/.) (S/.) (S/.) (S/.)Contratista de Cobranzas Unidad 85 0.5 42.50 42.50Supervisor H-H 1 15.78 15.78 15.78

58.28

Total Costo Fijo 478.74 78.89 41.15 358.70Total Costo Fijo Anual 5,744.85Número de Clientes 85.00Costo Fijo por Cliente (S/. / mes) 5.63Costo Fijo por Cliente (US$ / mes) 1.72

Tipo de Cliente Cantidad % Costo Anual S/. / Cliente US$ / ClienteClientes 1P1E,1P2E 56 66% 315.40 5.63 1.72Clientes 2P2E 29 34% 163.33 5.63 1.72Total 85 100% 478.74 5.63 1.72

Cálculo detallado

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

21

§ Costos Unitarios Las siguientes tablas muestran los costos unitarios de los equipos, insumos y recursos.

2.1.3. Resumen de Costos Anuales del Cargo Fijo Semestral La siguiente tabla muestra los costos anuales del personal, no personales y terceros.

TarifaCosto de Personal

(S/.)

Costo no Personal (S/.)

Costo de Terceros (S/.) Total Costo Fijo S/.

Monomios 4,218 4,996 19,562 28,776 Binomios 79 41 359 479Total - mes 4,297 5,037 19,920 29,255Total - año 51,564 60,446 239,045 351,054

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

22

3. Anexo III Costos de Mantenimiento

En este anexo presentamos los costos unitarios, para las diferentes actividades, utilizando para determinar los costos de mantenimiento.

ANALISIS DE COSTOS UNITARIOS ACTIVIDADES ESTANDARES DE MANTENIMIENTO SISTEMA DE MEDIA TENSION- REDES PRIMARIAS

CODIGO: 1.01.01.01

Supervisor 0,25ACTIVIDAD: Inspección minuciosa de la red primaria Capataz 0,00

Operario 4,00RENDIMIENTO DIARIO: 20 km Oficial 0,00

Peón 0,00

Camioneta simple 1,00 Escalera 4Binoculares 4

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,10 3,10 0,31Capataz HH 0,00 3,36 0,00Operario HH 1,60 3,05 4,88Oficial HH 0,00 2,74 0,00Peón HH 0,00 2,48

5,19 73,33

Camioneta simple HM 0,40 4,20 1,68

1,68 23,74

Escalera HE 1,60 0,08 0,13Binoculares HE 1,60 0,05 0,08

0,21 2,947,08 100,00TOTAL

DESCRIPCION

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

MAQUINARIA EQUIPOS -HERRAMIENTAS

METRADO COSTO ($) % INCIDENCIA

PERSONAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

23

CODIGO: 1.02.01.01

Supervisor 0,50ACTIVIDAD: Mantenimiento de franja de servidumbre Capataz 0,00

Operario 1,00RENDIMIENTO DIARIO: 10 km Oficial 1,00

Peón 4,00

Camioneta simple 1,00 Motosierra 1Machete 4

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,40 3,10 1,24Capataz HH 0,00 3,36 0,00Operario HH 0,80 3,05 2,44Oficial HH 0,80 2,74 2,19Peón HH 3,20 2,48 7,94

13,81 80,20

Camioneta simple HM 0,80 4,20 3,36

3,36 19,51

Motosierra HE 0,80 0,05 0,04Machete HE 3,20 0,00 0,01

0,05 0,2917,22 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

24

CODIGO: 1.02.01.02

Supervisor 0,25ACTIVIDAD: Mantenimiento de señalización Capataz 0,00

Operario 0,00RENDIMIENTO DIARIO: 48 u Oficial 2,00

Peón 0,00

Camioneta simple 1,00 Brocha 2

UNIDAD CANTIDAD UNITARIO PARCIAL

Pintura esmalte Gln 0,03 9,02 0,27Thiner Lts 0,03 2,88 0,09

0,36 17,00

Supervisor HH 0,04 3,10 0,13Capataz HH 0,00 3,36 0,00Operario HH 0,00 3,05 0,00Oficial HH 0,33 2,74 0,91Peón HH 0,00 2,48 0,00

1,04 49,65

Camioneta simple HM 0,17 4,20 0,70

0,70 33,34

Brocha HE 0,33 0,00 0,00

0,00 0,022,10 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

25

CODIGO: 1.02.01.03

Supervisor 0,25ACTIVIDAD: Mantenimiento de puesta a tierra Capataz 0,00

Operario 1,00RENDIMIENTO DIARIO: 8 u Oficial 0,00

Peón 2,00

Camioneta simple 1,00 Maletín de herramientas 1Lampa tipo cuchara 1Barreta de 3 m 1Pico 1Telurómetro 1

UNIDAD CANTIDAD UNITARIO PARCIAL

Saco de carbón U 1,00 2,18 2,18Conector de bronce tipo AB U 1,00 1,10 1,10Sal industrial Bls 1,00 6,00 6,00

9,28 41,33

Supervisor HH 0,25 3,10 0,78Capataz HH 0,00 3,36 0,00Operario HH 1,00 3,05 3,05Oficial HH 0,00 2,74 0,00Peón HH 2,00 2,48 4,96

8,79 39,13

Camioneta simple HM 1,00 4,20 4,20

4,20 18,71

Maletín de herramientas HE 1,00 0,02 0,02Lampa tipo cuchara HE 1,00 0,01 0,01Barreta de 3 m HE 1,00 0,01 0,01Pico HE 1,00 0,00 0,00Telurómetro HE 1,00 0,15 0,15

0,19 0,8422,45 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

26

CODIGO: 1.02.01.04Supervisor 0,25

ACTIVIDAD: Ajuste de conectores Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 120 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Maletín de herramientas 1Escalera 1

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,02 3,10 0,05Capataz HH 0,00 3,36 0,00Operario HH 0,07 3,05 0,20Oficial HH 0,07 2,74 0,18Peón HH 0,00 2,48 0,00

0,44 60,42

Camioneta simple HM 0,07 4,20 0,28

0,28 38,66

Maletín de herramientas HE 0,07 0,02 0,00Escalera HE 0,07 0,08 0,01

0,01 0,920,72 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

27

CODIGO: 1.02.01.05Supervisor 0,25

ACTIVIDAD: Ajuste de ferretería Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 40 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Maletín de herramientas 2Llave francesa de 10" 2Escalera 1

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,05 3,10 0,16Capataz HH 0,00 3,36 0,00Operario HH 0,20 3,05 0,61Oficial HH 0,20 2,74 0,55Peón HH 0,00 2,48 0,00

1,31 60,26

Camioneta simple HM 0,20 4,20 0,84

0,84 38,55

Maletín de herramientas HE 0,40 0,02 0,01Llave francesa de 10" HE 0,40 0,01 0,00Escalera HE 0,20 0,08 0,02

0,03 1,192,18 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

28

CODIGO: 1.02.01.06Supervisor 1,00

ACTIVIDAD: Retemplado de conductores Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 2000 m Oficial 1,00Peón 2,00

Camioneta simple 1,00 Escalera 4Tirfor 2.5 T 2Radio walkie talkie 2

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,00 3,10 0,01Capataz HH 0,00 3,36 0,00Operario HH 0,00 3,05 0,01Oficial HH 0,00 2,74 0,01Peón HH 0,01 2,48 0,02

0,06 73,95

Camioneta simple HM 0,00 4,20 0,02

0,02 22,42

Escalera HE 0,02 0,08 0,00Tirfor 2.5 T HE 0,01 0,15 0,00Radio walkie talkie HE 0,01 0,03 0,00

0,00 3,630,07 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

29

CODIGO: 1.02.01.07Supervisor 0,25

ACTIVIDAD: Retemplado de retenidas Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 20 u Oficial 1,00Peón 0,00

Camioneta simple 0,50 Escalera 1Maletín de herramientas 1

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,10 3,10 0,31Capataz HH 0,00 3,36 0,00Operario HH 0,40 3,05 1,22Oficial HH 0,40 2,74 1,10Peón HH 0,00 2,48 0,00

2,63 74,90

Camioneta simple HM 0,20 4,20 0,84

0,84 23,96

Escalera HE 0,40 0,08 0,03Maletín de herramientas HE 0,40 0,02 0,01

0,04 1,143,51 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

30

CODIGO: 1.02.02.01Supervisor 0,25

ACTIVIDAD: Limpieza de elementos extraños de la red Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 15 km Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 2Pértiga 2

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,13 3,10 0,41Capataz HH 0,00 3,36 0,00Operario HH 0,53 3,05 1,63Oficial HH 0,53 2,74 1,46Peón HH 0,00 2,48 0,00

3,50 59,55

Camioneta simple HM 0,53 4,20 2,24

2,24 38,10

Escalera HE 1,07 0,08 0,09Pértiga HE 1,07 0,05 0,05

0,14 2,365,88 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

31

CODIGO: 1.02.02.02Supervisor 0,50

ACTIVIDAD: Limpieza de seccionador unipolar Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 40 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 1

UNIDAD CANTIDAD UNITARIO PARCIAL

Trapo Kg 0,10 1,24 0,12Solvente SS-25 Lts 0,15 3,30 0,50

0,62 21,03

Supervisor HH 0,10 3,10 0,31Capataz HH 0,00 3,36 0,00Operario HH 0,20 3,05 0,61Oficial HH 0,20 2,74 0,55Peón HH 0,00 2,48 0,00

1,47 49,88

Camioneta simple HM 0,20 4,20 0,84

0,84 28,54

Escalera HE 0,20 0,08 0,02

0,02 0,542,94 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

32

CODIGO: 1.02.02.03Supervisor 0,50

ACTIVIDAD: Limpieza de seccionador tripolares Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 20 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 1

UNIDAD CANTIDAD UNITARIO PARCIAL

Trapo Kg 0,20 1,24 0,25Solvente SS-25 Lts 0,20 3,30 0,66

0,91 16,34

Supervisor HH 0,20 3,10 0,62Capataz HH 0,00 3,36 0,00Operario HH 0,40 3,05 1,22Oficial HH 0,40 2,74 1,10Peón HH 0,00 2,48 0,00

2,94 52,84

Camioneta simple HM 0,40 4,20 1,68

1,68 30,24

Escalera HE 0,40 0,08 0,03

0,03 0,585,56 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

33

CODIGO: 1.02.02.04Supervisor 0,50

ACTIVIDAD: Limpieza de pararrayos Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 40 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 1

UNIDAD CANTIDAD UNITARIO PARCIAL

Trapo Kg 0,10 1,24 0,12Solvente SS-25 Lts 0,15 3,30 0,50

0,62 21,03

Supervisor HH 0,10 3,10 0,31Capataz HH 0,00 3,36 0,00Operario HH 0,20 3,05 0,61Oficial HH 0,20 2,74 0,55Peón HH 0,00 2,48 0,00

1,47 49,88

Camioneta simple HM 0,20 4,20 0,84

0,84 28,54

Escalera HE 0,20 0,08 0,02

0,02 0,542,94 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

34

CODIGO: 1.02.02.05Supervisor 0,50

ACTIVIDAD: Limpieza de aisladores tipo PIN Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 48 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 1Maletín de herramientas 2

UNIDAD CANTIDAD UNITARIO PARCIAL

Trapo Kg 0,10 1,24 0,12Solvente SS-25 Lts 0,10 3,30 0,33

0,45 18,94

Supervisor HH 0,08 3,10 0,26Capataz HH 0,00 3,36 0,00Operario HH 0,17 3,05 0,51Oficial HH 0,17 2,74 0,46Peón HH 0,00 2,48 0,00

1,22 51,03

Camioneta simple HM 0,17 4,20 0,70

0,70 29,20

Escalera HE 0,17 0,08 0,01Maletín de herramientas HE 0,33 0,02 0,01

0,02 0,832,40 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

35

CODIGO: 1.02.02.06Supervisor 0,25

ACTIVIDAD: Limpieza de aisladores tipo campana Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 32 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 1Maletín de herramientas 2

UNIDAD CANTIDAD UNITARIO PARCIAL

Trapo Kg 0,10 1,24 0,12Solvente SS-25 Lts 0,10 3,30 0,33

0,45 14,30

Supervisor HH 0,06 3,10 0,19Capataz HH 0,00 3,36 0,00Operario HH 0,25 3,05 0,76Oficial HH 0,25 2,74 0,69Peón HH 0,00 2,48 0,00

1,64 51,69

Camioneta simple HM 0,25 4,20 1,05

1,05 33,07

Escalera HE 0,25 0,08 0,02Maletín de herramientas HE 0,50 0,02 0,01

0,03 0,943,18 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

36

CODIGO: 1.03.01.01Supervisor 0,25

ACTIVIDAD: Medición de resistencia de puesta a tierra Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 24 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Telurómetro 1Maletín de herramientas 1Escalera 1

UNIDAD CANTIDAD UNITARIO PARCIAL

0,10 0,10

0,00 0,00

Supervisor HH 0,08 3,10 0,26Capataz HH 0,00 3,36 0,00Operario HH 0,33 3,05 1,02Oficial HH 0,33 2,74 0,91Peón HH 0,00 2,48 0,00

2,19 59,60

Camioneta simple HM 0,33 4,20 1,40

1,40 38,13

Telurómetro HE 0,33 0,15 0,05Maletín de herramientas HE 0,33 0,02 0,01Escalera HE 0,33 0,08 0,03

0,08 2,273,67 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

37

CODIGO: 1.03.01.02Supervisor 0,50

ACTIVIDAD: Medición de resistencia de aislamiento de la red Capataz 0,00Operario 2,00

RENDIMIENTO DIARIO: 15 km Oficial 2,00Peón 0,00

Camión 4 T 1,00 Escalera 2Megóhmetro 1

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,27 3,10 0,83Capataz HH 0,00 3,36 0,00Operario HH 1,07 3,05 3,25Oficial HH 1,07 2,74 2,92Peón HH 0,00 2,48 0,00

7,00 60,96

Camión 4 T HM 0,53 8,00 4,27

4,27 37,14

Escalera HE 1,07 0,08 0,09Megóhmetro HE 0,53 0,25 0,13

0,22 1,9011,49 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

38

CODIGO: 2.01.01.01Supervisor 1,00

ACTIVIDAD: Inspección minuciosa de equipos de protección y maniobra Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 24 Equipo Oficial 0,00Peón 0,00

Camioneta simple 1,00 Escalera 1Binoculares 1

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,33 3,10 1,03Capataz HH 0,00 3,36 0,00Operario HH 0,33 3,05 1,02Oficial HH 0,00 2,74 0,00Peón HH 0,00 2,48 0,00

2,05 58,68

Camioneta simple HM 0,33 4,20 1,40

1,40 40,08

Escalera HE 0,33 0,08 0,03Binoculares HE 0,33 0,05 0,02

0,04 1,243,49 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

39

CODIGO: 2.02.01.01Supervisor 0,25

ACTIVIDAD: Mantenimiento de señalización Capataz 0,00Operario 0,00

RENDIMIENTO DIARIO: 48 u Oficial 2,00Peón 0,00

Camioneta simple 1,00 Brocha 2

UNIDAD CANTIDAD UNITARIO PARCIAL

Pintura esmalte Gln 0,03 9,02 0,27Thiner Lts 0,03 2,88 0,09

0,36 17,00

Supervisor HH 0,04 3,10 0,13Capataz HH 0,00 3,36 0,00Operario HH 0,00 3,05 0,00Oficial HH 0,33 2,74 0,91Peón HH 0,00 2,48 0,00

1,04 49,65

Camioneta simple HM 0,17 4,20 0,70

0,70 33,34

Brocha HE 0,33 0,00 0,00

0,00 0,022,10 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

40

CODIGO: 2.02.01.02Supervisor 0,25

ACTIVIDAD: Mantenimiento de puesta a tierra Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 8 u Oficial 0,00Peón 2,00

Camioneta simple 1,00 Lampa tipo cuchara 1Barreta de 3 m 1Maletín de herramientas 1Pico 1Telurómetro 1

UNIDAD CANTIDAD UNITARIO PARCIAL

Saco de carbón U 1,00 2,18 2,18Sal industrial Bls 1,00 6,00 6,00Conector de bronce tipo AB U 1,00 1,10 1,10

9,28 41,33

Supervisor HH 0,25 3,10 0,78Capataz HH 0,00 3,36 0,00Operario HH 1,00 3,05 3,05Oficial HH 0,00 2,74 0,00Peón HH 2,00 2,48 4,96

8,79 39,13

Camioneta simple HM 1,00 4,20 4,20

4,20 18,71

Lampa tipo cuchara HE 1,00 0,01 0,01Barreta de 3 m HE 1,00 0,01 0,01Maletín de herramientas HE 1,00 0,02 0,02Pico HE 1,00 0,00 0,00Telurómetro HE 1,00 0,15 0,15

0,19 0,8422,45 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

41

CODIGO: 2.02.01.03Supervisor 0,25

ACTIVIDAD: Ajuste de conecciones Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 120 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 1Maletín de herramientas 1

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,02 3,10 0,05Capataz HH 0,00 3,36 0,00Operario HH 0,07 3,05 0,20Oficial HH 0,07 2,74 0,18Peón HH 0,00 2,48 0,00

0,44 60,42

Camioneta simple HM 0,07 4,20 0,28

0,28 38,66

Escalera HE 0,07 0,08 0,01Maletín de herramientas HE 0,07 0,02 0,00

0,01 0,920,72 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

42

CODIGO: 2.02.01.04Supervisor 0,25

ACTIVIDAD: Ajuste de ferreteria Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 48 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 1Maletín de herramientas 2Llave francesa de 10" 2

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,04 3,10 0,13Capataz HH 0,00 3,36 0,00Operario HH 0,17 3,05 0,51Oficial HH 0,17 2,74 0,46Peón HH 0,00 2,48 0,00

1,09 60,26

Camioneta simple HM 0,17 4,20 0,70

0,70 38,55

Escalera HE 0,17 0,08 0,01Maletín de herramientas HE 0,33 0,02 0,01Llave francesa de 10" HE 0,33 0,01 0,00

0,02 1,191,82 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

43

CODIGO: 2.02.02.01Supervisor 0,50

ACTIVIDAD: Limpieza de seccionador unipolar Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 40 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 1

UNIDAD CANTIDAD UNITARIO PARCIAL

Trapo Kg 0,10 1,24 0,12Solvente SS-25 Lts 0,15 3,30 0,50

0,62 21,03

Supervisor HH 0,10 3,10 0,31Capataz HH 0,00 3,36 0,00Operario HH 0,20 3,05 0,61Oficial HH 0,20 2,74 0,55Peón HH 0,00 2,48 0,00

1,47 49,88

Camioneta simple HM 0,20 4,20 0,84

0,84 28,54

Escalera HE 0,20 0,08 0,02

0,02 0,542,94 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

44

CODIGO: 2.02.02.02Supervisor 0,50

ACTIVIDAD: Limpieza de pararrayo Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 40 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 1

UNIDAD CANTIDAD UNITARIO PARCIAL

Trapo Kg 0,10 1,24 0,12Solvente SS-25 Lts 0,15 3,30 0,50

0,62 21,03

Supervisor HH 0,10 3,10 0,31Capataz HH 0,00 3,36 0,00Operario HH 0,20 3,05 0,61Oficial HH 0,20 2,74 0,55Peón HH 0,00 2,48 0,00

1,47 49,88

Camioneta simple HM 0,20 4,20 0,84

0,84 28,54

Escalera HE 0,20 0,08 0,02

0,02 0,542,94 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

45

CODIGO: 2.03.01.01Supervisor 0,25

ACTIVIDAD: Medición de resistencia de puesta a tierra Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 24 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Telurómetro 1Maletín de herramientas 1Escalera 1

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,08 3,10 0,26Capataz HH 0,00 3,36 0,00Operario HH 0,33 3,05 1,02Oficial HH 0,33 2,74 0,91Peón HH 0,00 2,48 0,00

2,19 59,60

Camioneta simple HM 0,33 4,20 1,40

1,40 38,13

Telurómetro HE 0,33 0,15 0,05Maletín de herramientas HE 0,33 0,02 0,01Escalera HE 0,33 0,08 0,03

0,08 2,273,67 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

46

CODIGO: 2.03.01.02Supervisor 0,50

ACTIVIDAD: Medición de resistencia de aislamiento de equipos Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 30 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Megóhmetro 1Maletín de herramientas 1

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,13 3,10 0,41Capataz HH 0,00 3,36 0,00Operario HH 0,27 3,05 0,81Oficial HH 0,27 2,74 0,73Peón HH 0,00 2,48 0,00

1,96 62,15

Camioneta simple HM 0,27 4,20 1,12

1,12 35,56

Megóhmetro HE 0,27 0,25 0,07Maletín de herramientas HE 0,27 0,02 0,01

0,07 2,293,15 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

47

ANALISIS DE COSTOS UNITARIOS ACTIVIDADES ESTANDARES DE MANTENIMIENTO

SUB ESTACIONES CODIGO: 1.01.01.01

Supervisor 0,25ACTIVIDAD: Inspección minuciosa de subestaciones de distribución Capataz 0,00

Operario 2,00RENDIMIENTO DIARIO: 24 SE Oficial 2,00

Peón 0,00

Camioneta simple 1,00 Escalera 2

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,08 3,10 0,26Capataz HH 0,00 3,36 0,00Operario HH 0,67 3,05 2,03Oficial HH 0,67 2,74 1,83Peón HH 0,00 2,48 0,00

4,12 73,92

Camioneta simple HM 0,33 4,20 1,40

1,40 25,13

Escalera HE 0,67 0,08 0,05

0,05 0,965,57 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

METRADO COSTO ($) % INCIDENCIA

TOTAL

DESCRIPCION

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

48

CODIGO: 1.02.01.01Supervisor 0,25

ACTIVIDAD: Mantenimiento de señalización Capataz 0,00Operario 0,00

RENDIMIENTO DIARIO: 48 u Oficial 2,00Peón 0,00

Camioneta simple 1,00 Brocha 2

UNIDAD CANTIDAD UNITARIO PARCIAL

Pintura esmalte Gln 0,03 9,02 0,27Thiner Lts 0,03 2,88 0,09

0,36 17,00

Supervisor HH 0,04 3,10 0,13Capataz HH 0,00 3,36 0,00Operario HH 0,00 3,05 0,00Oficial HH 0,33 2,74 0,91Peón HH 0,00 2,48 0,00

1,04 49,65

Camioneta simple HM 0,17 4,20 0,70

0,70 33,34

Brocha HE 0,33 0,00 0,00

0,00 0,022,10 100,00

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

49

CODIGO: 1.02.01.02Supervisor 0,25

ACTIVIDAD: Mantenimiento de tableros Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 6 u Oficial 1,00Peón 0,00

Escalera 1Pinza amperimétrica 1Maletín de herramientas 1

UNIDAD CANTIDAD UNITARIO PARCIAL

Trapo Kg 0,10 1,24 0,12Solvente SS-25 Lts 0,10 3,30 0,33Limpiador de contactos eléctricos Gln 0,05 0,89 0,04Grasa de contacto Kg 0,02 4,43 0,09Aflojatodo en spray Gln 0,01 7,21 0,07

0,66 6,89

Supervisor HH 0,33 3,10 1,03Capataz HH 0,00 3,36 0,00Operario HH 1,33 3,05 4,07Oficial HH 1,33 2,74 3,65Peón HH 0,00 2,48 0,00

8,75 91,44

0,00 0,00

Escalera HE 1,33 0,08 0,11Pinza amperimétrica HE 1,33 0,02 0,03Maletín de herramientas HE 1,33 0,02 0,03

0,16 1,679,57 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

50

CODIGO: 1.02.01.03Supervisor 0,25

ACTIVIDAD: Mantenimiento integral del transformador Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 4 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 1Megóhmetro 1Maletín de herramientas 1Pértiga 1Llave francesa de 10" 1Regenerador de aceite 1

UNIDAD CANTIDAD UNITARIO PARCIAL

Trapo Kg 0,10 1,24 0,12Solvente SS-25 Lts 0,10 3,30 0,33Aceite para transformador Gln 10,00 14,38 143,80

144,25 84,56

Supervisor HH 0,50 3,10 1,55Capataz HH 0,00 3,36 0,00Operario HH 2,00 3,05 6,10Oficial HH 2,00 2,74 5,48Peón HH 0,00 2,48 0,00

13,13 7,70

Camioneta simple HM 2,00 4,20 8,40

8,40 4,92

Escalera HE 2,00 0,08 0,16Megóhmetro HE 2,00 0,25 0,50Maletín de herramientas HE 2,00 0,02 0,04Pértiga HE 2,00 0,05 0,10Llave francesa de 10" HE 2,00 0,01 0,01Regenerador de aceite HE 2,00 2,00 4,00

4,81 2,82170,59 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

51

CODIGO: 1.02.01.04Supervisor 0,25

ACTIVIDAD: Mantenimiento de puesta a tierra Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 8 u Oficial 0,00Peón 2,00

Camioneta simple 1,00 Lampa tipo cuchara 1Barreta de 3 m 1Pico 1Maletín de herramientas 1Telurómetro 1

UNIDAD CANTIDAD UNITARIO PARCIAL

Saco de carbón U 1,00 2,18 2,18Sal industrial Bls 1,00 6,00 6,00Conector de bronce tipo AB U 1,00 1,10 1,10

9,28 41,33

Supervisor HH 0,25 3,10 0,78Capataz HH 0,00 3,36 0,00Operario HH 1,00 3,05 3,05Oficial HH 0,00 2,74 0,00Peón HH 2,00 2,48 4,96

8,79 39,13

Camioneta simple HM 1,00 4,20 4,20

4,20 18,71

Lampa tipo cuchara HE 1,00 0,01 0,01Barreta de 3 m HE 1,00 0,01 0,01Pico HE 1,00 0,00 0,00Maletín de herramientas HE 1,00 0,02 0,02Telurómetro HE 1,00 0,15 0,15

0,19 0,8422,45 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

52

CODIGO: 1.02.01.05Supervisor 0,25

ACTIVIDAD: Mantenimiento de interruptor Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 8 u Oficial 1,00Peón 0,00

Maletín de herramientas 1

UNIDAD CANTIDAD UNITARIO PARCIAL

Solvente SS-25 Lts 0,05 3,30 0,17Grasa de contacto Kg 0,01 4,43 0,04

0,21 3,08

Supervisor HH 0,25 3,10 0,78Capataz HH 0,00 3,36 0,00Operario HH 1,00 3,05 3,05Oficial HH 1,00 2,74 2,74Peón HH 0,00 2,48 0,00

6,57 96,63

0,00 0,00

Maletín de herramientas HE 1,00 0,02 0,02

0,02 0,296,79 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

53

CODIGO: 1.02.01.06Supervisor 0,25

ACTIVIDAD: Ajuste de conectores Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 120 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Maletín de herramientas 1Escalera 1

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,02 3,10 0,05Capataz HH 0,00 3,36 0,00Operario HH 0,07 3,05 0,20Oficial HH 0,07 2,74 0,18Peón HH 0,00 2,48 0,00

0,44 60,42

Camioneta simple HM 0,07 4,20 0,28

0,28 38,66

Maletín de herramientas HE 0,07 0,02 0,00Escalera HE 0,07 0,08 0,01

0,01 0,920,72 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

54

CODIGO: 1.02.01.07Supervisor 0,25

ACTIVIDAD: Ajuste de ferretería Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 48 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Maletín de herramientas 2Escalera 1Llave francesa de 10" 2

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,04 3,10 0,13Capataz HH 0,00 3,36 0,00Operario HH 0,17 3,05 0,51Oficial HH 0,17 2,74 0,46Peón HH 0,00 2,48 0,00

1,09 60,26

Camioneta simple HM 0,17 4,20 0,70

0,70 38,55

Maletín de herramientas HE 0,33 0,02 0,01Escalera HE 0,17 0,08 0,01Llave francesa de 10" HE 0,33 0,01 0,00

0,02 1,191,82 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

55

CODIGO: 1.02.02.01Supervisor 0,50

ACTIVIDAD: Limpieza de seccionador unipolar Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 40 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 1

UNIDAD CANTIDAD UNITARIO PARCIAL

Trapo Kg 0,10 1,24 0,12Solvente SS-25 Lts 0,15 3,30 0,50

0,62 21,03

Supervisor HH 0,10 3,10 0,31Capataz HH 0,00 3,36 0,00Operario HH 0,20 3,05 0,61Oficial HH 0,20 2,74 0,55Peón HH 0,00 2,48 0,00

1,47 49,88

Camioneta simple HM 0,20 4,20 0,84

0,84 28,54

Escalera HE 0,20 0,08 0,02

0,02 0,542,94 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

56

CODIGO: 1.02.02.02Supervisor 0,25

ACTIVIDAD: Limpieza de transformador Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 24 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 1

UNIDAD CANTIDAD UNITARIO PARCIAL

Trapo Kg 0,25 1,24 0,31Solvente SS-25 Lts 0,20 3,30 0,66

0,97 21,16

Supervisor HH 0,08 3,10 0,26Capataz HH 0,00 3,36 0,00Operario HH 0,33 3,05 1,02Oficial HH 0,33 2,74 0,91Peón HH 0,00 2,48 0,00

2,19 47,73

Camioneta simple HM 0,33 4,20 1,40

1,40 30,53

Escalera HE 0,33 0,08 0,03

0,03 0,584,59 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

57

CODIGO: 1.02.02.03Supervisor 0,50

ACTIVIDAD: Limpieza de pararrayo Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 40 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 1

UNIDAD CANTIDAD UNITARIO PARCIAL

Trapo Kg 0,10 1,24 0,12Solvente SS-25 Lts 0,15 3,30 0,50

0,62 21,03

Supervisor HH 0,10 3,10 0,31Capataz HH 0,00 3,36 0,00Operario HH 0,20 3,05 0,61Oficial HH 0,20 2,74 0,55Peón HH 0,00 2,48 0,00

1,47 49,88

Camioneta simple HM 0,20 4,20 0,84

0,84 28,54

Escalera HE 0,20 0,08 0,02

0,02 0,542,94 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

58

CODIGO: 1.03.01.01Supervisor 0,25

ACTIVIDAD: Medición de resistencia de puesta a tierra Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 24 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Telurómetro 1Maletín de herramientas 1Escalera 1

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,08 3,10 0,26Capataz HH 0,00 3,36 0,00Operario HH 0,33 3,05 1,02Oficial HH 0,33 2,74 0,91Peón HH 0,00 2,48 0,00

2,19 59,60

Camioneta simple HM 0,33 4,20 1,40

1,40 38,13

Telurómetro HE 0,33 0,15 0,05Maletín de herramientas HE 0,33 0,02 0,01Escalera HE 0,33 0,08 0,03

0,08 2,273,67 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

59

CODIGO: 1.03.01.02Supervisor 0,25

ACTIVIDAD: Medición de resistencia de aislamiento del transformador Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 16 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Megóhmetro 1Maletín de herramientas 1Llave francesa de 10" 1Escalera 1Pértiga 1

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,13 3,10 0,39Capataz HH 0,00 3,36 0,00Operario HH 0,50 3,05 1,53Oficial HH 0,50 2,74 1,37Peón HH 0,00 2,48 0,00

3,28 58,77

Camioneta simple HM 0,50 4,20 2,10

2,10 37,60

Megóhmetro HE 0,50 0,25 0,13Maletín de herramientas HE 0,50 0,02 0,01Llave francesa de 10" HE 0,50 0,01 0,00Escalera HE 0,50 0,08 0,04Pértiga HE 0,50 0,05 0,03

0,20 3,635,59 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

60

ANALISIS DE COSTOS UNITARIOS ACTIVIDADES ESTANDARES DE MANTENIMIENTO

SISTEMA DE BAJA TENSION - REDES SECUNDARIAS - SERVICIO PARTICULAR CODIGO: 1.01.01.01

Supervisor 0,25ACTIVIDAD: Inspección minuciosa de red secundaria Capataz 0,00

Operario 2,00RENDIMIENTO DIARIO: 18 Km Oficial 2,00

Peón 0,00

Camioneta simple 1,00 Escalera 4

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,11 3,10 0,34Capataz HH 0,00 3,36 0,00Operario HH 0,89 3,05 2,71Oficial HH 0,89 2,74 2,44Peón HH 0,00 2,48

5,49 73,21

Camioneta simple HM 0,44 4,20 1,87

1,87 24,89

Escalera HE 1,78 0,08 0,14

0,14 1,907,50 100,00

MAQUINARIA EQUIPOS -HERRAMIENTAS

METRADO COSTO ($) % INCIDENCIA

PERSONAL

Sub Total ($)MANO DE OBRA

Sub Total ($)

TOTAL

DESCRIPCION

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

61

CODIGO: 1.02.01.01Supervisor 0,25

ACTIVIDAD: Mantenimiento de franja de servidumbre Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 12 Km Oficial 1,00Peón 4,00

Camioneta simple 1,00 Escalera 1Motosierra 1Machete 4

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,17 3,10 0,52Capataz HH 0,00 3,36 0,00Operario HH 0,67 3,05 2,03Oficial HH 0,67 2,74 1,83Peón HH 2,67 2,48 6,61

10,99 79,15

Camioneta simple HM 0,67 4,20 2,80

2,80 20,17

Escalera HE 0,67 0,08 0,05Motosierra HE 0,67 0,05 0,03Machete HE 2,67 0,00 0,01

0,09 0,6813,88 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

62

CODIGO: 1.02.01.02Supervisor 0,25

ACTIVIDAD: Mantenimiento de señalización Capataz 0,00Operario 0,00

RENDIMIENTO DIARIO: 32 u Oficial 2,00Peón 0,00

Camioneta simple 0,25 Brocha 2

UNIDAD CANTIDAD UNITARIO PARCIAL

Pintura esmalte Gln 0,03 9,02 0,27Thiner Lts 0,03 2,88 0,09

0,36 16,35

Supervisor HH 0,06 3,10 0,19Capataz HH 0,00 3,36 0,00Operario HH 0,00 3,05 0,00Oficial HH 0,50 2,74 1,37Peón HH 0,00 2,48 0,00

1,56 71,61

Camioneta simple HM 0,06 4,20 0,26

0,26 12,02

Brocha HE 0,50 0,00 0,00

0,00 0,022,18 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

63

CODIGO: 1.02.01.03Supervisor 0,25

ACTIVIDAD: Mantenimiento de puesta a tierra Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 8 u Oficial 0,00Peón 2,00

Camioneta simple 1,00 Telurómetro 1Barreta de 3 m 1Lampa tipo cuchara 1Pico 1Maletín de herramientas 1

UNIDAD CANTIDAD UNITARIO PARCIAL

Saco de carbón U 1,00 2,18 2,18Sal industrial Bls 1,00 6,00 6,00Conector de bronce tipo AB U 1,00 1,10 1,10

9,28 41,33

Supervisor HH 0,25 3,10 0,78Capataz HH 0,00 3,36 0,00Operario HH 1,00 3,05 3,05Oficial HH 0,00 2,74 0,00Peón HH 2,00 2,48 4,96

8,79 39,13

Camioneta simple HM 1,00 4,20 4,20

4,20 18,71

Telurómetro HE 1,00 0,15 0,15Barreta de 3 m HE 1,00 0,01 0,01Lampa tipo cuchara HE 1,00 0,01 0,01Pico HE 1,00 0,00 0,00Maletín de herramientas HE 1,00 0,02 0,02

0,19 0,8422,45 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

64

CODIGO: 1.02.01.04Supervisor 0,25

ACTIVIDAD: Ajuste de conectores Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 150 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 1Maletín de herramientas 1

UNIDAD CANTIDAD UNITARIO PARCIAL

1,00 1,00 1,00

0,00 0,00

Supervisor HH 0,01 3,10 0,04Capataz HH 0,00 3,36 0,00Operario HH 0,05 3,05 0,16Oficial HH 0,05 2,74 0,15Peón HH 0,00 2,48 0,00

0,35 60,42

Camioneta simple HM 0,05 4,20 0,22

0,22 38,66

Escalera HE 0,05 0,08 0,00Maletín de herramientas HE 0,05 0,02 0,00

0,01 0,920,58 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

65

CODIGO: 1.02.01.05Supervisor 0,25

ACTIVIDAD: Ajuste de ferretería Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 48 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 1Maletín de herramientas 2Llave francesa de 10" 2

UNIDAD CANTIDAD UNITARIO PARCIAL

1,00 1,00 1,00

0,00 0,00

Supervisor HH 0,04 3,10 0,13Capataz HH 0,00 3,36 0,00Operario HH 0,17 3,05 0,51Oficial HH 0,17 2,74 0,46Peón HH 0,00 2,48 0,00

1,09 60,26

Camioneta simple HM 0,17 4,20 0,70

0,70 38,55

Escalera HE 0,17 0,08 0,01Maletín de herramientas HE 0,33 0,02 0,01Llave francesa de 10" HE 0,33 0,01 0,00

0,02 1,191,82 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

66

CODIGO: 1.02.01.06Supervisor 0,25

ACTIVIDAD: Retemplado de conductores Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 3000 m Oficial 1,00Peón 2,00

Camioneta simple 1,00 Escalera 2Tirfor 2.5 T 1Radio walkie talkie 2

UNIDAD CANTIDAD UNITARIO PARCIAL

1,00 1,00 1,00

0,00 0,00

Supervisor HH 0,00 3,10 0,00Capataz HH 0,00 3,36 0,00Operario HH 0,00 3,05 0,01Oficial HH 0,00 2,74 0,01Peón HH 0,01 2,48 0,01

0,03 71,61

Camioneta simple HM 0,00 4,20 0,01

0,01 26,10

Escalera HE 0,01 0,08 0,00Tirfor 2.5 T HE 0,00 0,15 0,00Radio walkie talkie HE 0,01 0,03 0,00

0,00 2,300,04 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

67

CODIGO: 1.02.01.07Supervisor 0,50

ACTIVIDAD: Retemplado de retenidas Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 22 u Oficial 1,00Peón 0,00

Camioneta simple 0,50 Tirfor 2.5 T 1Escalera 1Maletín de herramientas 1

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,18 3,10 0,56Capataz HH 0,00 3,36 0,00Operario HH 0,36 3,05 1,11Oficial HH 0,36 2,74 1,00Peón HH 0,00 2,48 0,00

2,67 75,75

Camioneta simple HM 0,18 4,20 0,76

0,76 21,67

Tirfor 2.5 T HE 0,36 0,15 0,05Escalera HE 0,36 0,08 0,03Maletín de herramientas HE 0,36 0,02 0,01

0,09 2,583,52 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

68

CODIGO: 1.02.02.01Supervisor 0,25

ACTIVIDAD: Limpieza de elementos extraños de la red Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 18 Km Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 1

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,11 3,10 0,34Capataz HH 0,00 3,36 0,00Operario HH 0,44 3,05 1,36Oficial HH 0,44 2,74 1,22Peón HH 0,00 2,48 0,00

2,92 60,53

Camioneta simple HM 0,44 4,20 1,87

1,87 38,73

Escalera HE 0,44 0,08 0,04

0,04 0,744,82 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)TOTAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

69

CODIGO: 1.03.01.01Supervisor 0,25

ACTIVIDAD: Medición resistencia de puesta a tierra Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 24 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 1Telurómetro 1Maletín de herramientas 1

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,08 3,10 0,26Capataz HH 0,00 3,36 0,00Operario HH 0,33 3,05 1,02Oficial HH 0,33 2,74 0,91Peón HH 0,00 2,48 0,00

2,19 59,60

Camioneta simple HM 0,33 4,20 1,40

1,40 38,13

Escalera HE 0,33 0,08 0,03Telurómetro HE 0,33 0,15 0,05Maletín de herramientas HE 0,33 0,02 0,01

0,08 2,273,67 100,00

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

70

ANALISIS DE COSTOS UNITARIOS ACTIVIDADES ESTANDARES DE MANTENIMIENTO

SISTEMA DE BAJA TENSION - REDES SECUNDARIAS - ALUMBRADO PUBLICO CODIGO: 2.01.01.01

Supervisor 0,25ACTIVIDAD: Inspección nocturna Capataz 0,00

Operario 0,00RENDIMIENTO DIARIO: 200 u Oficial 2,00

Peón 0,00

Camioneta simple 1,00

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,01 3,10 0,03Capataz HH 0,00 3,36 0,00Operario HH 0,00 3,05 0,00Oficial HH 0,08 2,74 0,22Peón HH 0,00 2,48 0,00

0,25 59,83

Camioneta simple HM 0,04 4,20 0,17

0,17 40,17

0,00 0,000,42 100,00TOTAL

DESCRIPCION

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

MAQUINARIA EQUIPOS -HERRAMIENTAS

METRADO COSTO ($) % INCIDENCIA

PERSONAL

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

71

CODIGO: 2.02.01.01Supervisor 0,25

ACTIVIDAD: Mantenimiento de franja de servidumbre Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 12 Km Oficial 1,00Peón 4,00

Camioneta simple 1,00 Escalera 1Motosierra 1Machete 4

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,17 3,10 0,52Capataz HH 0,00 3,36 0,00Operario HH 0,67 3,05 2,03Oficial HH 0,67 2,74 1,83Peón HH 2,67 2,48 6,61

10,99 79,15

Camioneta simple HM 0,67 4,20 2,80

2,80 20,17

Escalera HE 0,67 0,08 0,05Motosierra HE 0,67 0,05 0,03Machete HE 2,67 0,00 0,01

0,09 0,6813,88 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

72

CODIGO: 2.02.01.02Supervisor 0,25

ACTIVIDAD: Mantenimiento de interruptor de AP Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 16 u Oficial 0,00Peón 0,00

Camioneta simple 1,00 Maletín de herramientas 1

UNIDAD CANTIDAD UNITARIO PARCIAL

Solvente SS-25 Lts 0,10 3,30 0,33Trapo Kg 0,05 1,24 0,06Aflojatodo en spray Gln 0,01 7,21 0,07Grasa de contacto Kg 0,01 4,43 0,04Lija fina U 0,05 0,30 0,02

0,52 11,51

Supervisor HH 0,13 3,10 0,39Capataz HH 0,00 3,36 0,00Operario HH 0,50 3,05 1,53Oficial HH 0,00 2,74 0,00Peón HH 0,00 2,48 0,00

1,91 42,07

Camioneta simple HM 0,50 4,20 2,10

2,10 46,20

Maletín de herramientas HE 0,50 0,02 0,01

0,01 0,224,55 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

73

CODIGO: 2.02.01.03Supervisor 0,25

ACTIVIDAD: Mantenimiento de contactor Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 16 u Oficial 0,00Peón 0,00

Camioneta simple 1,00 Maletín de herramientas 1

UNIDAD CANTIDAD UNITARIO PARCIAL

Solvente SS-25 Lts 0,05 3,30 0,17Trapo Kg 0,05 1,24 0,06Aflojatodo en spray Gln 0,01 7,21 0,07Grasa de contacto Kg 0,01 4,43 0,04Lija fina U 0,05 0,30 0,02

0,36 8,18

Supervisor HH 0,13 3,10 0,39Capataz HH 0,00 3,36 0,00Operario HH 0,50 3,05 1,53Oficial HH 0,00 2,74 0,00Peón HH 0,00 2,48 0,00

1,91 43,66

Camioneta simple HM 0,50 4,20 2,10

2,10 47,94

Maletín de herramientas HE 0,50 0,02 0,01

0,01 0,234,38 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

74

CODIGO: 2.02.01.04Supervisor 0,25

ACTIVIDAD: Mantenimientro de interruptor horario Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 16 u Oficial 0,00Peón 0,00

Camioneta simple 1,00 Maletín de herramientas 1

UNIDAD CANTIDAD UNITARIO PARCIAL

Solvente SS-25 Lts 0,02 3,30 0,07Trapo Kg 0,03 1,24 0,04Aflojatodo en spray Gln 0,01 7,21 0,07Grasa de contacto Kg 0,01 4,43 0,04Lija fina U 0,03 0,30 0,01

0,23 5,38

Supervisor HH 0,13 3,10 0,39Capataz HH 0,00 3,36 0,00Operario HH 0,50 3,05 1,53Oficial HH 0,00 2,74 0,00Peón HH 0,00 2,48 0,00

1,91 44,99

Camioneta simple HM 0,50 4,20 2,10

2,10 49,40

Maletín de herramientas HE 0,50 0,02 0,01

0,01 0,244,25 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

75

CODIGO: 2.02.01.05Supervisor 0,25

ACTIVIDAD: Ajuste de conectores Capataz 0,00Operario 0,00

RENDIMIENTO DIARIO: 150 u Oficial 4,00Peón 0,00

Camioneta simple 1,00 Maletín de herramientas 4

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,01 3,10 0,04Capataz HH 0,00 3,36 0,00Operario HH 0,00 3,05 0,00Oficial HH 0,21 2,74 0,58Peón HH 0,00 2,48 0,00

0,63 73,28

Camioneta simple HM 0,05 4,20 0,22

0,22 26,23

Maletín de herramientas HE 0,21 0,02 0,00

0,00 0,500,85 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

76

CODIGO: 2.02.01.06Supervisor 0,25

ACTIVIDAD: Alineamiento de pastorales Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 48 u Oficial 1,00Peón 0,00

Camión Grúa 5 T 1,00 Maletín de herramientas 1Llave francesa de 10" 2

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,04 3,10 0,13Capataz HH 0,00 3,36 0,00Operario HH 0,17 3,05 0,51Oficial HH 0,17 2,74 0,46Peón HH 0,00 2,48 0,00

1,09 29,06

Camión Grúa 5 T HM 0,17 16,00 2,67

2,67 70,81

Maletín de herramientas HE 0,17 0,02 0,00Llave francesa de 10" HE 0,33 0,01 0,00

0,01 0,133,77 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

77

CODIGO: 2.02.01.07Supervisor 0,25

ACTIVIDAD: Ajuste de lámpara Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 80 u Oficial 1,00Peón 0,00

Camión Grúa 5 T 1,00

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,03 3,10 0,08Capataz HH 0,00 3,36 0,00Operario HH 0,10 3,05 0,31Oficial HH 0,10 2,74 0,27Peón HH 0,00 2,48 0,00

0,66 29,09

Camión Grúa 5 T HM 0,10 16,00 1,60

1,60 70,91

0,00 0,002,26 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

78

CODIGO: 2.02.01.08Supervisor 0,50

ACTIVIDAD: Retemplado de retenidas Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 24 u Oficial 1,00Peón 0,00

Camioneta simple 1,00 Tirfor 2.5 T 1Escalera 1Maletín de herramientas 1

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,17 3,10 0,52Capataz HH 0,00 3,36 0,00Operario HH 0,33 3,05 1,02Oficial HH 0,33 2,74 0,91Peón HH 0,00 2,48 0,00

2,45 62,26

Camioneta simple HM 0,33 4,20 1,40

1,40 35,62

Tirfor 2.5 T HE 0,33 0,15 0,05Escalera HE 0,33 0,08 0,03Maletín de herramientas HE 0,33 0,02 0,01

0,08 2,123,93 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

79

CODIGO: 2.02.01.09Supervisor 0,25

ACTIVIDAD: Retemplado de conductores Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 4000 m Oficial 1,00Peón 2,00

Camioneta simple 1,00 Tirfor 2.5 T 1Escalera 1Radio walkie talkie 1

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,00 3,10 0,00Capataz HH 0,00 3,36 0,00Operario HH 0,00 3,05 0,01Oficial HH 0,00 2,74 0,01Peón HH 0,00 2,48 0,01

0,02 72,10

Camioneta simple HM 0,00 4,20 0,01

0,01 26,27

Tirfor 2.5 T HE 0,00 0,15 0,00Escalera HE 0,00 0,08 0,00Radio walkie talkie HE 0,00 0,03 0,00

0,00 1,630,03 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

80

CODIGO: 2.02.02.01Supervisor 0,25

ACTIVIDAD: Limpieza de elementos extraños de la red Capataz 0,00Operario 1,00

RENDIMIENTO DIARIO: 20 Km Oficial 1,00Peón 0,00

Camioneta simple 1,00 Escalera 1

UNIDAD CANTIDAD UNITARIO PARCIAL

0,00 0,00

Supervisor HH 0,10 3,10 0,31Capataz HH 0,00 3,36 0,00Operario HH 0,40 3,05 1,22Oficial HH 0,40 2,74 1,10Peón HH 0,00 2,48 0,00

2,63 60,53

Camioneta simple HM 0,40 4,20 1,68

1,68 38,73

Escalera HE 0,40 0,08 0,03

0,03 0,744,34 100,00TOTAL

MAQUINARIA

Sub Total ($)EQUIPOS Y HERRAMIENTAS

Sub Total ($)

MATERIALES

Sub Total ($)MANO DE OBRA

Sub Total ($)

DESCRIPCION METRADO COSTO ($) % INCIDENCIA

PERSONAL

MAQUINARIA EQUIPOS -HERRAMIENTAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

81

4. Anexo IV Análisis Técnico de la Red MT

El presente anexo presenta la metodología de análisis técnico para el cálculo de pérdidas y caídas de tensión para sistemas eléctricos en media y baja tensión.

4.1 Modelamiento de la Red Eléctrica Para efectos del presente análisis, se entiende por red eléctrica al conjunto conformado por centros de transformación, alimentadores, subestación de distribución, tramo de red de media tensión. El modelo de cálculo propuesto, se basa en la característica radial de las redes de distribución donde se asume la linealidad de sus componentes. Las redes de distribución en MT y BT pueden tener configuración balanceada o desbalanceada. Por lo tanto, para analizar la red balanceada se predecirá su comportamiento a partir de su equivalente monofásico, extendiéndose los resultados a las demás fases de conexión. Los suministros trifásicos serán adaptados a un modelo por fase. En el caso de tener red desbalanceada, se realizará un cálculo por cada fase de conexión, llevando las redes a su correspondiente modelo por fase (RN, SN, TN). 4.1.1. Definiciones Nodo: Es todo punto de la red eléctrica en donde se unen físicamente dos o más elementos de la red (subestaciones, tramos de línea, acometidas, suministros) Suministro Monofásico: Suministro de energía eléctrica conectado a las fases RN, SN, TN. La máxima demanda o potencia correspondiente a cada suministro entra directamente al cálculo de caída de tensión. Suministro Trifásico: Suministro de energía eléctrica conectado a las fases R, S, T y neutro. Se denominarán por: RST, 3N. Impedancia: Característica eléctrica de los conductores o tramos de línea. Se tiene en cuenta su característica inductiva.

22 XRZ += Ω

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

82

4.1.2. Modelo de Centro de Transformación El centro de transformación (alimentadores) y subestación (circuitos) será representada como una fuente de tensión constante que no alterará su valor en todo el proceso de cálculo. El valor de la tensión permanecerá constante independientemente de las demandas existentes.

S3

1

IAC1

4.1.3. Modelo de Cables y Conductores en Media Tensión Los tramos de red conformados por cables y conductores, debido a sus características físicas y eléctricas, presentan una resistencia y una inductancia ante el paso de la corriente; por lo que se les modela como impedancias de su equivalente monofásico, cuyos parámetros dependerán del tipo de conductor (Aluminio o Cobre), longitud y configuración geométrica. Los parámetros eléctricos de los conductores y cables seleccionados se determinaron usando el Código Nacional de Electricidad (Suministro y Utilización) y Catálogos de proveedores y fabricantes. Las condiciones de operación que se adoptaron son las establecidas por el Código Nacional Eléctrico (CNE), o en caso contrario, en las especificaciones técnicas del fabricante. Para los tipos de cables y conductores de MT, se tiene la siguiente tabla:

Tipo de Cable (Red Subterránea) Según el CNE Según el fabricante

NKY 65°C 70°C N2XSY --- 90°C Tipo de Conductor (Red Aérea)

AA Desnudo 75°C 80°C CU Desnudo 75°C 20°C(*) AL Autoportante --- 90°C CU Autoportante --- 90°C

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

83

• Cálculo del valor de la resistencia a temperatura de operación. El valor de la resistencia varía en función de la temperatura a la que trabaje el conductor o cable, por lo tanto debe calcularse el valor de la resistencia a la temperatura de operación definida por el CNE, a partir el valor de la resistencia a la temperatura de operación dada por el fabricante. Para el cálculo del valor de la resistencia en función de la temperatura se emplea la siguiente formula:

( )[ ]fab.Top.Tα1C fab.tRC op.tR −×+×°=° --- Fórmula (1)

Donde:

C op.tR ° Valor de resistencia del conductor o cable a la temperatura de

operación designada por el CNE, expresado en ohm/km.

C fab.tR ° Valor de resistencia del conductor o cable dada por el fabricante a determinada temperatura, expresado en ohm/km.

α Coeficiente de variación de la resistencia con la temperatura, expresado en °C-1. Para evaluar este coeficiente tendremos en cuenta el material y la sección del conductor o cable, lo cual se resume en la siguiente tabla:

Según la Sección

Tipo de Cobre Mayor de 50 mm2 Menor de 50 mm2

Temple Blando 0.00393 0.00393 Temple Semiduro 0.00384 0.00380 Temple Duro 0.00382 0.00378

Tipo de Aluminio Para toda sección

Aluminio Puro 0.00403 Aleación de AL 0.00360

Donde :

op.T : Temperatura de operación, expresada en °C.

fab.T : Temperatura del fabricante, expresada en °C.

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

84

• Cálculo del valor de la reactancia de la configuración geométrica típica de

conductores en una red aérea. La reactancia por fase dependerá de la configuración geométrica del tendido de los conductores en un circuito alimentador del sistema de transmisión de redes primarias. Se utilizaran la siguiente relacione:

fasem //61075.3982 Ω−×=

×

RMGDMG

LogX

Donde:

3 RTDTSDSRD −×−×−=DMG En metros

2007788.0 D

=RMG En metro

D : Diámetro del Conductor en cm. DR-S : Distancia entre Fases R y S en m DS-T : Distancia entre Fases S y T en m DT-R : Distancia entre Fases T y R en m • Cables y Conductores en Baja Tensión Los tramos de red conformados por cables y conductores, debido a sus características físicas y eléctricas, presentan una resistencia y una inductancia ante el paso de la corriente; por lo que se les modela como impedancias de su equivalente monofásico, cuyos parámetros dependerán del tipo de conductor (Aluminio o Cobre), longitud y configuración geométrica. Los parámetros eléctricos y condiciones de operación de los conductores de baja tensión se determinaron usando el Código Nacional de Electricidad (Suministro y Utilización) y Catálogos de proveedores y fabricantes.

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

85

Para los tipos de cables y conductores de Baja Tensión seleccionados, se tiene la siguiente tabla:

Tipo de Cable (Red Subterránea) Según el CNE Según el fabricante

NKY 80°C 35°C NYY 80°C 35°C Tipo de Conductor (Red Aérea)

AA Desnudo 75°C 80°C CU Desnudo 75°C 20°C(*) CU Forrado 75°C AL Autoportante 90°C 20°C CU Autoportante 90°C 20°C

• Cálculo del valor de la resistencia a temperatura de operación. El valor de la resistencia varía en función de la temperatura a la que trabaje el conductor o cable, por lo tanto debe calcularse el valor de la resistencia a la temperatura de operación definida por el CNE, a partir el valor de la resistencia a la temperatura de operación dada por el fabricante. Para el cálculo del valor de la resistencia en función de la temperatura se emplea la siguiente formula:

( )[ ]fab.Top.Tα1C fab.tRC op.tR −×+×°=° --- Fórmula (1)

Donde las variables de la relación anterior estarán igualmente definidas como en media tensión. • Cálculo del valor de la reactancia de la configuración geométrica típica de

conductores en una red aérea. La reactancia por fase dependerá de la configuración geométrica del tendido de los conductores en un circuito alimentador del sistema de transmisión de redes primarias. Se utilizaran la siguiente relaciones:

fasem //61075.3982 Ω−×=

×

RMGDMG

LogX

Donde:

3 RTDTSDSRD −×−×−=DMG En metros

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

86

2007788.0 D

=RMG En metro

D : Diámetro del Conductor en cm. DR-S : Distancia entre Fases R y S en m DS-T : Distancia entre Fases S y T en m DT-R : Distancia entre Fases T y R en m 4.1.4. Modelo de Demanda Las demandas de los suministros, son valores constantes para un determinado instante o periodo, es decir, valores que en el transcurso del cálculo no se alterarán. La demanda será representada por su característica de Potencia Activa [P] y Potencia Reactiva [Q] y su correspondiente Factor de Potencia [cosφ].

44

S

P + jQ5P + jQ5

54 AC5

Según el nivel de tensión, se tendrá las siguientes consideraciones • Cálculo de Caída de Tensión en Baja Tensión El cálculo se realizará por fase RN, SN, y TN. Para los suministros monofásicos que se encuentren conectados en la fase analizada, su demanda será la obtenida de los análisis de balance de potencia. Para el caso de suministros trifásicos en baja tensión, su demanda será la correspondiente por fase, es decir su máxima demanda dividida entre tres. Todas las demandas de los suministros o clientes en baja tensión serán afectadas de un Factor de Simultaneidad de 0,5. • Cálculo de Caída de Tensión en Media Tensión El cálculo se realizará por fase RN, SN, y TN llevando todos los componentes a su equivalente monofásico. La demanda de las subestaciones se calculo en base al número de suministros atendidos y la demanda calculada para cada uno de ellos dependiendo de la zona en la que se encuentran. El factor de simultaneidad será de 0.8.

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

87

4.2 Metodología de Cálculo Las redes de distribución en MT y BT son representadas en el entorno GIS. Para el análisis de la caída de Tensión y pérdidas técnicas, se lleva la representación unifilar real del entorno GIS, a un modelo matemático circuital. El modelo circuital aprovecha la característica radial y lineal de las redes de distribución en MT y BT, asimismo, este considera el reconocimiento de los nodos, impedancia de tramo de línea y suministros o subestaciones. Red de Distribución de Media Tensión

Para un alimentador o circuito seleccionado se procede a reconocer sus elementos: nodos, impedancia de tramos, suministros o subestaciones. En el gráfico anterior, se selecciona el alimentador del centro de transformación, luego se reconoce las subestaciones conectadas y los correspondientes nodos de la red. Se tiene el siguiente diagrama:

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

88

39

38 37

36

35

34

33

32

31

302928

27010360

2625

24

23

22

21

010320T

010375 19

20 18 17010315T

2

1ACentro

13

14

010310T

010305T

15

010335

010345

010325

010315010305

010340

010310

010320

11 10

34

5

6

7

89

01033012

16

010365

010370

010355

010350

010380

010385

010390

010395

Transformación

El alimentador consta de 39 nodos, de los cuales 23 son nodos suministro que poseen la máxima demanda de la SED (ó clientes en baja tensión) y 16 nodos derivación que poseen demanda igual a cero. A continuación se muestra su representación circuital por fase de conexión.

38 3839 39P + jQ P + jQ

S S S

3535P + jQ

3535P + jQ

S

S

AC34S

2727P + jQ

SS

323233333030 P + jQP + jQP + jQ

P + jQ2929

S

S

26 26P + jQ

S

S

2424P + jQ

S

AC26S

AC31S

SS

22 22 2020P + jQ P + jQ

18 18P + jQ

AC22S AC20S AC18S

S S S

AC1S

1515P + jQ

99P + jQP + jQ16 16

1414P + jQ

1212P + jQP + jQ

1010

S

SS

SS

SSS

77P + jQ

44

S

S

S

S

AC2S

S S

P + jQ5P + jQ5

S3

1

23 54

76

8 10 11 12

1413

15

16

17

18

9

20

19

22

21

31

23242527

26

30

2829

34

3233

35

36 373839

AC17AC19AC21 AC4 AC5

AC7

AC10

AC9

AC16

AC11 AC12

AC14

AC15

AC3

AC32AC33

AC30

AC29 AC28

AC27 AC25 AC24 AC23

AC6

AC8

AC13

AC35

AC36

AC38AC39 AC37

A razón de que todas las subestaciones y suministros son trifásicas, la figura anterior es el modelo circuital para las tres fases de conexión RN, SN, TN.

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

89

Modelo Matemático de Flujo de Potencia y Caída de Tensión Dado el modelo circuital anterior

38 3839 39P + jQ P + jQ

S S S

3535P + jQ

3535P + jQ

S

S

AC34S

2727P + jQ

SS

323233333030 P + jQP + jQP + jQ

P + jQ2929

S

S

26 26P + jQ

S

S

2424P + jQ

S

AC26S

AC31S

SS

22 22 2020P + jQ P + jQ

18 18P + jQ

AC22S AC20S AC18S

S S S

AC1S

1515P + jQ

99P + jQP + jQ16 16

1414P + jQ

1212P + jQP + jQ

1010

S

SS

SS

SSS

77P + jQ

44

S

S

S

S

AC2S

S S

P + jQ5P + jQ5

S3

1

23 54

76

8 10 11 12

1413

15

16

17

18

9

20

19

22

21

31

23242527

26

30

2829

34

3233

35

36 373839

AC17AC19AC21 AC4 AC5

AC7

AC10

AC9

AC16

AC11 AC12

AC14

AC15

AC3

AC32AC33

AC30

AC29 AC28

AC27 AC25 AC24 AC23

AC6

AC8

AC13

AC35

AC36

AC38AC39 AC37

Se tiene:

nP : Demanda del nodo “n” en Watt

nQ : Demanda del nodo “n” en Var

nZ : Impedancia del tramo “n” y el nodo siguiente en Ohm

nV : Tensión en el Nodo “n” en Voltios

nS : Demanda requerida en el nodo “n” en VA

nAntV : Tensión en el Nodo Anterior al Nodo “n” en Voltios

nACS : Potencia Equivalente transmitida a través de nZ Se definen las siguientes relaciones: Para cada Nodo “n” se tiene su Pot. Activa P y Pot. Reactiva Q Nodo 1: 11,QP Nodo 2: 22 ,QP . . Nodo 39: 3939 ,QP Nodo n: nn QP ,

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

90

Para cada Nodo “n” se calcula su Potencia Acumulada Activa nAcumP − y Reactiva nAcumQ − Nodo 1:

39211 *1...*1*1 PPPPAcum +++=−

39211 *1...*1*1 QQQQAcum +++=− Nodo 2:

39212 *1...*1*0 PPPPAcum +++=−

39212 *1...*1*0 QQQQAcum +++=− . . Nodo n:

392139 *1...*0*0 PPPPAcum +++=−

392139 *1...*0*0 QQQQAcum +++=−

∑=

− =n

iiijAcum PkP

1

∑=

− =n

iiijAcum QkQ

1

Ecuación [1]

Donde

0=ik Si el nodo “i” no esta aguas abajo del nodo “j” 1=ik Si el nodo “i” esta aguas abajo del nodo “j”

Para cada Tramo k, formado por Nodo k y Nodo Anterior, se calculan sus Pérdidas Activa

LP y Reactiva LQ

2

22 )(*

k

kAcumkAcumkkL V

QPRP −− +=

2

22 )(*

k

kAcumkAcumkkL V

QPXQ −− +=

Nodo 1

21

21

211

1)(*

VQPRP AcumAcum

L−− +=

21

21

211

1)(*

VQPXQ AcumAcum

L−− +=

Nodo 2

22

22

222

2)(*

VQPRP AcumAcum

L−− +

=

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

91

22

21

212

2)(*

VQPXQ AcumAcum

L−− +=

.

. Nodo 39

239

239

23939

39)(*

VQPRP AcumAcum

L−− +=

239

239

23939

39)(*

VQPXQ AcumAcum

L−− +=

Nodo n

2

22 )(*

n

nAcumnAcumnnL V

QPRP −− +=

2

22 )(*

n

nAcumnAcumnnL V

QPXQ −− += Ecuación [2]

Para cada Nodo “n” se calcula su Pérdida Acumulada Activa LnAcumP − y Reactiva LnAcumQ − Nodo 1:

39211 *1...*1*1 LAcumLAcumLAcumLAcum PPPP −−−− +++=

39211 *1...*1*1 LAcumLAcumLAcumLAcum QQQQ −−−− +++= Nodo 2:

39212 *1...*1*0 LAcumLAcumLAcumLAcum PPPP −−−− +++=

39212 *1...*1*0 LAcumLAcumLAcumLAcum QQQQ −−−− +++= . . Nodo n:

392139 *1...*0*0 LAcumLAcumLAcumLAcum PPPP −−−− +++=

392139 *1...*0*0 LAcumLAcumLAcumLAcum QQQQ −−−− +++=

∑=

− =n

iLiiLjAcum PkP

1

∑=

− =n

iLiiLjAcum QkQ

1

Ecuación [3]

Donde

0=ik Si el nodo “i” no esta aguas abajo del nodo “j” 1=ik Si el nodo “i” esta aguas abajo del nodo “j”

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

92

Pc y Qc concentradas en cada Nodo “n” Nodo 1

111 LAcumAcumC PPP −− += 111 LAcumAcumC QQQ −− += Nodo 2

222 LAcumAcumC PPP −− += 222 LAcumAcumC QQQ −− += . . Nodo n

LnAcumnAcumnC PPP −− += LnAcumnAcumnC QQQ −− += Ecuación [4] Cálculo de Tensiones en cada Nodo “n” Partiendo de la fuente de tensión (Alimentador o Circuito) para cada nodo se debe resolver la ecuación: Nodo 1

[ ] 0))((*)(*2 21

21

21

21

411111

41 =+++−++ XRQPVVXQRPV CCSEDCC

Nodo 2

[ ] 0))((*)(*2 22

22

22

22

4212222

42 =+++−++ XRQPVVXQRPV CCCC

Nodo 3

[ ] 0))((*)(*2 23

23

23

23

4323333

43 =+++−++ XRQPVVXQRPV CCCC

.

. Nodo 39

[ ] 0))((*)(*2 239

239

239

239

4393839393939

439 =+++−++ XRQPVVXQRPV CCCC

Ecuación [5]

[ ] 0))((*)(*2 22224__

4 =+++−++ nnnCnCnnaAnteriornnCnnCn XRQPVVXQRPV Cálculo de Pérdidas Técnicas Las pérdidas técnicas para cada tramo por fase, se calcula de la siguiente forma: Ecuación [6] [ ]LnTécnicas PP = Donde:

nLP : Pérdida Técnica por fase en el Tramo “n” en Watt Solución por el Método de Gauss Seidel Resumiendo el conjunto de ecuaciones obtenido:

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

93

Ecuación [1]

∑=

− =n

iiijAcum PkP

1

∑=

− =n

iiijAcum QkQ

1

Ecuación [2]

2

22 )(*

n

nAcumnAcumnnL V

QPRP −− += 2

22 )(*

n

nAcumnAcumnnL V

QPXQ −− +=

Ecuación [3]

∑=

− =n

iLiiLjAcum PkP

1

∑=

− =n

iLiiLjAcum QkQ

1

Ecuación [4]

LnAcumnAcumnC PPP −− += LnAcumnAcumnC QQQ −− += Ecuación [5]

[ ] 0))((*)(*2 22224__

4 =+++−++ nnnCnCnnaAnteriornnCnnCn XRQPVVXQRPV Ecuación [6]

[ ]LnTécnicas PP = Se realizará un proceso iterativo siguiendo el método de Gauss Seidel: Paso 1 Evaluar Ecuación [1].para todos los nodos de la red con los datos de sus potencias activas y reactivas. Paso 2 Evaluar Ecuación [2] con los datos obtenidos de [1] para cada nodo de la red, asumiendo la tensión inicial, igual en todos los nodos. Paso 3 Evaluar Ecuación [3] con los resultados de la Ecuación [2] Paso 4 Evaluar Ecuación [4] (Potencias Concentradas) en cada nodo con los resultados obtenidos en el Paso 1 y Paso 3. Paso 5 Con los datos obtenidos de cada tramo (R, X) y la Ecuación [4] evaluada, se calcula para cada nodo los coeficientes de la Ecuación [5]. Se resuelve la ecuación.

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

94

Paso 6 Los valores de tensión obtenidos de la Ecuación [5], se comparan con los valores iniciales de tensión, hasta que se cumpla el criterio de convergencia.

eVV kn

kn ≤− −1

Si eVV k

nk

n ≤− −1 se cumple, entonces knV es el valor final de la tensión. En caso contrario

knV es el nuevo valor de tensión, y repetimos el Paso 3, Paso 4 y Paso 5 hasta que se cumpla

el criterio de convergencia. RESULTADOS OBTENIDOS Los resultados obtenidos por el modelo de cálculo de Caída de Tensión y Pérdidas se escriben en las correspondientes tablas. Para cada nodo de la red eléctrica en MT y BT se obtiene por fase:

nV : Tensión en cada Nodo por fase [V] Para cada tramo de la red eléctrica, por fase se obtiene:

TécnicasP : Pérdidas Técnicas en cada Tramo por fase[W] Para el Alimentador MT o Circuito BT se obtiene:

TNTécnicasSNTécnicasRNTécnicasTotalesTécnicas PPPP ++= : Pérdidas Técnicas Totales [W]

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

95

4.2.1. Interfaces de Cálculo Los algoritmos anteriormente descritos, se han implementado sobre la plataforma GE Smallworld, de tal forma que se tienen tres módulos para el análisis de optimización de la red eléctrica. Aplicación de Adaptación de la Red Esta aplicación permite la adaptación de diferentes parámetros para el proceso de adaptación, entre los cuales tenemos: tipo de conductor y de red, tipo de subestación monofásica o trifásica y demanda de los clientes.

Ventana de la Aplicación de Optimización MT

Aplicación de Caída de Tensión Esta aplicación el flujo de potencia sobre la red eléctrica de media y baja tensión. En la siguiente ventana es posible configurar los parámetros básicos de flujo de potencia y caída de tensión.

Ventana de la Aplicación de Caída de Tensión

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

96

Aplicación para el Análisis del Área de Influencia Esta aplicación permite realizar al análisis del área de influencia de las subestaciones.

Ventana de Análisis de Área de Influencia

Vista del Área de Influencia

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

97

4.3 Simulación del Flujo de Carga en la Red de Media Tensión Diagrama Unifilar Los alimentadores se simularon bajo condiciones de operación normal y siguiendo la topología radial existente.

SE Piura Oeste

220 kV

10 kV

60 kV 60 kV 22.9 kV

10 kV

SE Chulucanas

SE Castilla

1071

1933

C.H. Maria Auxiliadora

101722.9 kV

1402

1932

SISTEMA ELECTRICO MODELO CHULUCANAS

CHULUCANAS

C.T. Huapalas

2.4 kV

4.16 kV

4.16 kV

C.H. Sicacate

1016

Aplicando el modelo de cálculo anterior se obtuvieron los siguientes resultados

C.Transformación : S.E. Chulucanas C.H. Maria Auxiliadora Alimentador : A1071 A1402 A1932 A1933 A1016 A1017

Tensión Nominal (kV) : 22.9 22.9 22.9 22.9 22.9 22.9 Máxima Caída Tensión (%): 6.93% 8.50% 6.62% 4.96% 3.60% 8.40%

Imax (A) : 124.0 111.2 70.0 79.3 37.5 109.3 Demanda (kW) : 2430.2 1619.6 621.7 746.6 210.6 1024.1

Pérdidas Técnicas (kW) : 67.8 101.6 23.4 12.5 7.3 49.1 Pérdidas Técnicas (%) : 2.79% 6.27% 3.77% 1.67% 3.46% 4.79%

Sistema Chulucanas Ingreso MT (kW) 6652.87

Pérdidas Técnicas MT (kW) 261.70 Pérdidas Técnicas MT (%) 3.90%

A continuación se muestra los resultados por alimentador:

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

98

S.E. Chulucanas A1071 REPORTE DE CORRIENTES Y PERDIDAS TECNICAS

Nodo Nodo Anterior Longitud (m) R (ohm) X (ohm) I - RN (A) I - SN (A) I - TN (A) Pérdidas RN (W) Pérdidas SN (W) Pérdidas TN (W)1 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.002 1 2099.38 2.33 0.98 59.05 59.05 59.05 8247.42 8247.42 8247.423 2 1285.29 1.43 0.60 56.91 56.91 56.91 4737.61 4737.61 4737.614 3 57.01 0.06 0.03 0.78 0.78 0.78 0.04 0.04 0.045 4 642.08 0.71 0.30 0.76 0.76 0.76 0.45 0.45 0.456 3 761.78 0.85 0.36 55.91 55.91 55.91 2728.96 2728.96 2728.967 6 761.78 0.85 0.36 55.69 55.69 55.69 2701.90 2701.90 2701.908 7 127.58 0.14 0.06 2.07 2.07 2.07 0.65 0.65 0.659 7 246.48 0.27 0.12 53.37 53.37 53.37 809.41 809.41 809.4110 9 330.34 0.37 0.15 0.36 0.36 0.36 0.05 0.05 0.0511 9 156.88 0.17 0.07 0.99 0.99 0.99 0.18 0.18 0.1812 9 245.76 0.27 0.12 52.02 52.02 52.02 766.18 766.18 766.1813 12 160.33 0.18 0.08 32.37 32.37 32.37 193.93 193.93 193.9314 13 98.73 0.11 0.05 1.38 1.38 1.38 0.22 0.22 0.2215 13 31.09 0.03 0.01 30.96 30.96 30.96 34.44 34.44 34.4416 15 396.68 0.44 0.19 7.54 7.54 7.54 26.33 26.33 26.3317 16 23.35 0.03 0.01 3.29 3.29 3.29 0.30 0.30 0.3018 17 35.31 0.04 0.02 0.00 0.00 0.00 0.00 0.00 0.0019 17 288.30 0.32 0.13 3.29 3.29 3.29 3.65 3.65 3.6520 16 404.71 0.45 0.19 2.03 2.03 2.03 1.96 1.96 1.9621 16 2.93 0.00 0.00 2.21 2.21 2.21 0.02 0.02 0.0222 15 351.56 0.39 0.16 23.46 23.46 23.46 222.10 222.10 222.1023 22 351.56 0.39 0.16 21.48 21.48 21.48 185.99 185.99 185.9924 23 69.98 0.08 0.03 20.14 20.14 20.14 32.56 32.56 32.5625 24 548.15 0.61 0.26 20.17 20.17 20.17 255.01 255.01 255.0126 25 548.15 0.61 0.26 18.71 18.71 18.71 219.24 219.24 219.2427 26 280.89 0.31 0.13 17.00 17.00 17.00 92.79 92.79 92.7928 27 81.60 0.09 0.04 1.74 1.74 1.74 0.28 0.28 0.2829 28 1370.41 1.52 0.64 0.42 0.42 0.42 0.28 0.28 0.2830 28 63.10 0.07 0.03 1.31 1.31 1.31 0.13 0.13 0.1331 27 164.01 0.18 0.08 15.26 15.26 15.26 43.64 43.64 43.6432 31 128.87 0.14 0.06 1.33 1.33 1.33 0.26 0.26 0.2633 31 431.95 0.48 0.20 13.94 13.94 13.94 95.74 95.74 95.7434 33 431.95 0.48 0.20 10.78 10.78 10.78 57.14 57.14 57.1435 34 123.61 0.14 0.06 0.00 0.00 0.00 0.00 0.00 0.0036 34 291.01 0.32 0.14 10.77 10.77 10.77 38.50 38.50 38.5037 36 135.10 0.15 0.06 2.43 2.43 2.43 0.92 0.92 0.9238 36 900.58 1.00 0.42 8.35 8.35 8.35 71.29 71.29 71.2939 38 900.58 1.00 0.42 6.38 6.38 6.38 41.63 41.63 41.6340 39 1239.23 1.38 0.58 3.46 3.46 3.46 16.85 16.85 16.8541 40 109.08 0.12 0.05 0.00 0.00 0.00 0.00 0.00 0.0042 40 344.15 0.38 0.16 3.46 3.46 3.46 4.68 4.68 4.6843 42 805.49 0.89 0.38 0.87 0.87 0.87 0.70 0.70 0.7044 26 50.90 0.06 0.02 1.70 1.70 1.70 0.17 0.17 0.1745 24 94.45 0.10 0.04 0.00 0.00 0.00 0.00 0.00 0.0046 23 79.04 0.09 0.04 1.33 1.33 1.33 0.16 0.16 0.1647 12 272.62 0.30 0.13 19.60 19.60 19.60 120.87 120.87 120.8748 47 640.62 0.71 0.30 17.46 17.46 17.46 224.48 224.48 224.4849 48 640.62 0.71 0.30 14.36 14.36 14.36 151.62 151.62 151.6250 49 422.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0051 49 165.68 0.18 0.08 14.26 14.26 14.26 38.77 38.77 38.7752 51 691.40 0.77 0.32 13.79 13.79 13.79 150.77 150.77 150.7753 52 691.40 0.77 0.32 11.52 11.52 11.52 105.09 105.09 105.0954 53 691.40 0.77 0.32 10.16 10.16 10.16 81.76 81.76 81.7655 54 164.23 0.18 0.08 9.25 9.25 9.25 16.10 16.10 16.1056 55 502.08 0.56 0.23 9.13 9.13 9.13 47.91 47.91 47.9157 56 502.08 0.56 0.23 6.63 6.63 6.63 25.25 25.25 25.2558 57 698.44 0.78 0.33 4.29 4.29 4.29 14.70 14.70 14.7059 58 698.44 0.78 0.33 1.04 1.04 1.04 0.86 0.86 0.8660 59 79.61 0.09 0.04 0.10 0.10 0.10 0.00 0.00 0.0061 59 302.28 0.34 0.14 0.94 0.94 0.94 0.30 0.30 0.3062 57 2.50 0.00 0.00 2.34 2.34 2.34 0.02 0.02 0.0263 55 22.73 0.03 0.01 0.12 0.12 0.12 0.00 0.00 0.0064 54 91.21 0.10 0.04 0.91 0.91 0.91 0.09 0.09 0.0965 64 576.51 0.64 0.27 0.53 0.53 0.53 0.19 0.19 0.1966 64 296.93 0.33 0.14 0.38 0.38 0.38 0.05 0.05 0.0567 51 182.09 0.20 0.09 0.49 0.49 0.49 0.05 0.05 0.0568 47 81.17 0.09 0.04 2.16 2.16 2.16 0.44 0.44 0.4469 2 165.78 0.20 0.07 1.71 1.71 1.71 0.69 0.69 0.69

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

99

S.E. Chulucanas A1071 REPORTE DE CAIDA DE TENSIÓN

Nodo SED Estado MD (kW) F.P. Conexión V RS (V) V ST (V) V TR (V) ∆V RS (%) ∆V ST (%) ∆V TR (%)1 A1071 En Servicio 0.0 0.90 RST 22900 22900 22900 0.00% 0.00% 0.00%2 Derivación 0.0 0.90 RST 22400 22400 22400 2.19% 2.19% 2.19%3 Derivación 0.0 0.90 RST 22104 22104 22104 3.47% 3.47% 3.47%4 112000181 En Servicio 0.9 0.90 RSTN 22104 22104 22104 3.48% 3.48% 3.48%5 112000105 En Servicio 32.4 0.90 RSTN 22102 22102 22102 3.48% 3.48% 3.48%6 112000150 En Servicio 11.5 0.90 RSTN 21932 21932 21932 4.23% 4.23% 4.23%7 Derivación 0.0 0.90 RST 21761 21761 21761 4.97% 4.97% 4.97%8 112000012 En Servicio 87.2 0.90 RSTN 21760 21760 21760 4.98% 4.98% 4.98%9 Derivación 0.0 0.90 RST 21708 21708 21708 5.20% 5.20% 5.20%10 112000103 En Servicio 15.2 0.90 RSTN 21708 21708 21708 5.21% 5.21% 5.21%11 112000022 En Servicio 41.8 0.90 RSTN 21708 21708 21708 5.21% 5.21% 5.21%12 Derivación 0.0 0.90 RST 21657 21657 21657 5.43% 5.43% 5.43%13 Derivación 0.0 0.90 RST 21636 21636 21636 5.52% 5.52% 5.52%14 112000048 En Servicio 58.1 0.90 RSTN 21635 21635 21635 5.52% 5.52% 5.52%15 Derivación 0.0 0.90 RST 21632 21632 21632 5.54% 5.54% 5.54%16 Derivación 0.0 0.90 RST 21620 21620 21620 5.59% 5.59% 5.59%17 Derivación 0.0 0.90 RST 21619 21619 21619 5.59% 5.59% 5.59%18 Derivación 0.0 0.90 RST 21619 21619 21619 5.59% 5.59% 5.59%19 112000099 En Servicio 138.0 0.90 RSTN 21616 21616 21616 5.61% 5.61% 5.61%20 112000100 En Servicio 85.3 0.90 RSTN 21616 21616 21616 5.61% 5.61% 5.61%21 112000098 En Servicio 92.6 0.90 RSTN 21620 21620 21620 5.59% 5.59% 5.59%22 112000052 En Servicio 82.8 0.90 RSTN 21598 21598 21598 5.68% 5.68% 5.68%23 Derivación 0.0 0.90 RST 21568 21568 21568 5.82% 5.82% 5.82%24 Derivación 0.0 0.90 RST 21562 21562 21562 5.84% 5.84% 5.84%25 112000053 En Servicio 60.9 0.90 RSTN 21518 21518 21518 6.04% 6.04% 6.04%26 Derivación 0.0 0.90 RST 21476 21476 21476 6.22% 6.22% 6.22%27 Derivación 0.0 0.90 RST 21457 21457 21457 6.30% 6.30% 6.30%28 Derivación 0.0 0.90 RST 21456 21456 21456 6.30% 6.30% 6.30%29 112000044 En Servicio 17.5 0.90 RSTN 21454 21454 21454 6.31% 6.31% 6.31%30 112000054 En Servicio 54.7 0.90 RSTN 21456 21456 21456 6.31% 6.31% 6.31%31 Derivación 0.0 0.90 RST 21447 21447 21447 6.35% 6.35% 6.35%32 112000061 En Servicio 55.3 0.90 RSTN 21446 21446 21446 6.35% 6.35% 6.35%33 112000055 En Servicio 131.3 0.90 RSTN 21423 21423 21423 6.45% 6.45% 6.45%34 Derivación 0.0 0.90 RST 21404 21404 21404 6.53% 6.53% 6.53%35 Derivación 0.0 0.90 RST 21404 21404 21404 6.53% 6.53% 6.53%36 Derivación 0.0 0.90 RST 21391 21391 21391 6.59% 6.59% 6.59%37 112000093 En Servicio 101.0 0.90 RSTN 21390 21390 21390 6.59% 6.59% 6.59%38 112000094 En Servicio 81.4 0.90 RSTN 21361 21361 21361 6.72% 6.72% 6.72%39 112000126 En Servicio 120.6 0.90 RSTN 21338 21338 21338 6.82% 6.82% 6.82%40 Derivación 0.0 0.90 RST 21320 21320 21320 6.90% 6.90% 6.90%41 112000110 En Servicio 0.0 0.90 RSTN 21320 21320 21320 6.90% 6.90% 6.90%42 112000060 En Servicio 106.9 0.90 RSTN 21315 21315 21315 6.92% 6.92% 6.92%43 112000104 En Servicio 36.1 0.90 RSTN 21313 21313 21313 6.93% 6.93% 6.93%44 112000059 En Servicio 70.7 0.90 RSTN 21476 21476 21476 6.22% 6.22% 6.22%45 Derivación 0.0 0.90 RST 21562 21562 21562 5.84% 5.84% 5.84%46 112000151 En Servicio 55.5 0.90 RSTN 21568 21568 21568 5.82% 5.82% 5.82%47 Derivación 0.0 0.90 RST 21635 21635 21635 5.52% 5.52% 5.52%48 112000026 En Servicio 129.3 0.90 RSTN 21590 21590 21590 5.72% 5.72% 5.72%49 Derivación 0.0 0.90 RST 21553 21553 21553 5.88% 5.88% 5.88%50 112000127 En Servicio 3.4 0.90 RSTN 21553 21553 21553 5.88% 5.88% 5.88%51 Derivación 0.0 0.90 RST 21543 21543 21543 5.92% 5.92% 5.92%52 112000004 En Servicio 94.5 0.90 RSTN 21505 21505 21505 6.09% 6.09% 6.09%53 112000006 En Servicio 56.4 0.90 RSTN 21473 21473 21473 6.23% 6.23% 6.23%54 Derivación 0.0 0.90 RST 21444 21444 21444 6.36% 6.36% 6.36%55 Derivación 0.0 0.90 RST 21438 21438 21438 6.38% 6.38% 6.38%56 112000009 En Servicio 103.8 0.90 RSTN 21420 21420 21420 6.46% 6.46% 6.46%57 Derivación 0.0 0.90 RST 21406 21406 21406 6.52% 6.52% 6.52%58 112000058 En Servicio 134.9 0.90 RSTN 21394 21394 21394 6.58% 6.58% 6.58%59 Derivación 0.0 0.90 RST 21391 21391 21391 6.59% 6.59% 6.59%60 112000108 En Servicio 4.1 0.90 RSTN 21391 21391 21391 6.59% 6.59% 6.59%61 112000109 En Servicio 38.9 0.90 RSTN 21390 21390 21390 6.59% 6.59% 6.59%62 112000056 En Servicio 97.1 0.90 RSTN 21406 21406 21406 6.52% 6.52% 6.52%63 112000107 En Servicio 5.2 0.90 RSTN 21438 21438 21438 6.38% 6.38% 6.38%64 Derivación 0.0 0.90 RST 21444 21444 21444 6.36% 6.36% 6.36%65 112000153 En Servicio 22.0 0.90 RSTN 21443 21443 21443 6.36% 6.36% 6.36%66 112000091 En Servicio 15.7 0.90 RSTN 21443 21443 21443 6.36% 6.36% 6.36%67 112000106 En Servicio 20.5 0.90 RSTN 21543 21543 21543 5.93% 5.93% 5.93%68 112000024 En Servicio 90.6 0.90 RSTN 21634 21634 21634 5.53% 5.53% 5.53%69 112000125 En Servicio 76.2 0.90 RSTN 22398 22398 22398 2.19% 2.19% 2.19%

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

100

S.E. Chulucanas A1402 REPORTE DE CORRIENTES Y PERDIDAS TECNICAS

Nodo Nodo Anterior Longitud (m) R (ohm) X (ohm) I - RN (A) I - SN (A) I - TN (A) Pérdidas RN (W) Pérdidas SN (W) Pérdidas TN (W)1 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.002 1 73.15 0.03 0.03 65.98 50.25 51.82 116.32 69.77 74.403 2 1698.82 1.88 0.79 0.88 0.88 0.88 2.35 2.35 2.354 3 28.01 0.03 0.01 0.07 0.07 0.07 0.00 0.00 0.005 3 1836.97 2.04 0.86 0.81 0.81 0.81 2.15 2.15 2.156 2 2594.30 1.09 1.11 65.57 49.55 51.14 3976.52 2359.48 2519.927 6 1151.23 0.48 0.49 64.64 48.75 50.33 1729.75 1020.24 1090.538 7 3129.13 1.32 1.34 64.30 49.07 50.66 4561.91 2773.08 2964.139 8 262.58 0.11 0.11 63.60 48.64 47.46 382.81 232.70 220.75

10 9 382.67 0.60 0.01 2.13 0.00 0.00 5.95 0.00 0.0011 9 17.26 0.01 0.01 60.37 48.61 47.43 22.54 15.30 14.5112 11 315.15 0.49 0.01 0.00 2.54 0.00 0.00 7.02 0.0013 11 159.84 0.07 0.07 60.41 44.86 47.45 208.73 119.32 134.3814 13 14.64 0.02 0.00 0.00 0.00 2.14 0.00 0.00 0.2315 13 5126.57 2.15 2.20 61.64 45.53 44.92 6694.66 3827.11 3718.7016 15 154.89 0.24 0.00 0.72 0.00 0.00 0.26 0.00 0.0017 15 158.92 0.07 0.07 0.00 0.00 0.00 0.00 0.00 0.0018 15 726.92 0.31 0.31 59.60 44.98 44.39 914.13 542.66 527.2919 18 41.45 0.02 0.02 0.00 0.57 0.00 0.00 0.01 0.0020 18 4612.70 1.94 1.98 60.57 44.89 44.91 5800.62 3345.95 3345.9521 20 1698.40 0.71 0.73 57.59 44.54 44.56 1964.13 1231.98 1231.9822 21 3274.90 1.38 1.40 57.49 44.77 44.79 3719.82 2375.54 2375.5423 22 220.00 0.09 0.09 55.54 44.38 44.40 238.05 159.58 159.5824 23 296.00 0.74 0.01 0.56 0.00 0.00 0.45 0.00 0.0025 23 195.60 0.08 0.08 54.71 44.38 44.40 205.21 141.88 141.8826 25 350.00 0.48 0.01 0.86 0.00 0.00 0.68 0.00 0.0027 25 1837.60 0.77 0.79 53.77 44.61 44.63 1837.28 1332.96 1332.9628 27 50.00 0.08 0.00 0.49 0.00 0.00 0.04 0.00 0.0029 27 785.10 0.33 0.34 52.87 44.48 44.50 763.40 569.49 569.4930 29 705.00 0.15 0.05 0.47 0.00 0.00 0.05 0.00 0.0031 29 492.80 0.21 0.21 52.23 44.44 44.47 468.14 357.47 357.4732 31 272.89 0.26 0.01 0.18 0.00 0.00 0.02 0.00 0.0033 31 2173.10 0.91 0.93 52.29 44.68 44.70 2042.75 1576.32 1576.3234 33 449.00 0.19 0.19 50.75 44.46 44.48 401.90 325.69 325.6935 34 4066.40 1.71 1.74 50.41 44.97 45.00 3495.52 2949.68 2949.6836 35 212.20 0.33 0.00 1.78 0.00 0.00 1.90 0.00 0.0037 35 621.40 0.26 0.27 48.78 46.04 46.06 496.69 467.70 467.7038 37 2040.40 0.86 0.88 47.59 46.26 46.28 1535.73 1535.73 1535.7339 38 380.30 0.16 0.16 31.46 30.58 30.60 126.21 126.21 126.2140 39 380.30 0.95 0.19 20.31 19.74 19.75 574.97 574.97 574.9741 40 14.00 0.03 0.01 17.99 17.48 17.49 16.67 16.67 16.6742 41 109.50 0.27 0.05 1.53 1.49 1.49 0.96 0.96 0.9643 41 277.30 0.69 0.14 16.49 16.02 16.03 276.11 276.11 276.1144 43 277.30 0.69 0.14 14.36 13.95 13.96 209.17 209.17 209.1745 44 112.00 0.28 0.06 1.66 1.61 1.61 1.13 1.13 1.1346 44 248.10 0.62 0.12 11.10 10.79 10.79 111.82 111.82 111.8247 46 357.20 0.89 0.18 6.19 6.02 6.02 50.10 50.10 50.1048 47 786.70 1.96 0.39 3.67 3.57 3.57 38.70 38.70 38.7049 48 786.70 1.96 0.39 2.19 2.13 2.13 13.80 13.80 13.8050 49 786.70 1.96 0.39 0.17 0.17 0.17 0.08 0.08 0.0851 47 434.40 1.08 0.22 2.52 2.45 2.45 10.13 10.13 10.1352 51 434.40 1.08 0.22 1.02 0.99 0.99 1.64 1.64 1.6453 46 746.29 1.86 0.37 4.91 4.77 4.78 65.77 65.77 65.7754 53 709.39 1.77 0.35 3.19 3.10 3.10 26.33 26.33 26.3355 54 709.39 1.77 0.35 1.28 1.24 1.24 4.23 4.23 4.2356 44 303.00 0.76 0.15 1.59 1.55 1.55 2.82 2.82 2.8257 56 144.70 0.23 0.07 0.00 0.00 0.00 0.00 0.00 0.0058 40 227.00 0.57 0.11 2.27 2.21 2.21 4.34 4.34 4.3459 38 974.89 0.41 0.42 15.88 15.44 15.45 82.83 82.83 82.8360 59 974.89 0.41 0.42 15.89 15.44 15.45 82.83 82.83 82.8361 60 32.32 0.04 0.02 1.01 0.98 0.98 0.05 0.05 0.0562 60 145.97 0.06 0.06 14.62 14.21 14.22 10.52 10.52 10.5263 62 184.80 0.08 0.08 11.41 11.09 11.09 8.11 8.11 8.1164 63 23.70 0.03 0.01 0.33 0.32 0.32 0.00 0.00 0.0065 63 237.00 0.10 0.10 11.00 10.69 10.69 9.66 9.66 9.6666 65 47.48 0.02 0.02 10.97 10.66 10.67 1.93 1.93 1.9367 66 65.91 0.07 0.03 0.17 0.16 0.16 0.00 0.00 0.0068 66 573.04 0.24 0.25 10.77 10.47 10.47 22.38 22.38 22.3869 68 224.71 0.09 0.10 10.77 10.46 10.47 8.78 8.78 8.7870 69 303.30 0.34 0.14 0.55 0.53 0.53 0.12 0.12 0.1271 69 146.60 0.06 0.06 9.91 9.63 9.63 4.85 4.85 4.8572 71 349.40 0.15 0.15 7.27 7.07 7.07 6.23 6.23 6.23

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

101

72 71 349.40 0.15 0.15 7.27 7.07 7.07 6.23 6.23 6.2373 72 37.20 0.02 0.02 6.97 6.77 6.78 0.61 0.61 0.6174 73 93.50 0.04 0.04 6.95 6.75 6.76 1.52 1.52 1.5275 74 63.23 0.06 0.03 2.07 2.01 2.01 0.33 0.33 0.3376 74 534.37 0.47 0.24 3.65 3.55 3.55 7.22 7.22 7.2277 76 348.87 0.39 0.16 1.46 1.42 1.42 1.01 1.01 1.0178 73 107.90 0.17 0.05 0.02 0.02 0.02 0.00 0.00 0.0079 72 25.40 0.01 0.01 0.28 0.27 0.27 0.00 0.00 0.0080 71 30.10 0.01 0.00 2.26 2.19 2.19 0.03 0.03 0.0381 69 2.56 0.00 0.00 0.18 0.18 0.18 0.00 0.00 0.0082 68 136.79 0.34 0.07 0.00 0.00 0.00 0.00 0.00 0.0083 65 81.50 0.09 0.04 0.02 0.02 0.02 0.00 0.00 0.0084 62 952.90 1.06 0.45 2.59 2.52 2.52 8.76 8.76 8.7685 84 952.90 1.06 0.45 1.24 1.20 1.20 2.00 2.00 2.0086 37 250.00 0.39 0.00 0.96 0.00 0.00 0.65 0.00 0.0087 34 167.90 0.26 0.00 0.68 0.00 0.00 0.22 0.00 0.0088 33 183.97 0.46 0.00 0.84 0.00 0.00 0.60 0.00 0.0089 22 351.50 0.55 0.01 0.89 0.00 0.00 0.85 0.00 0.0090 21 155.10 0.24 0.00 0.33 0.00 0.00 0.05 0.00 0.0091 90 1279.10 0.48 0.07 0.30 0.00 0.00 0.08 0.00 0.0092 91 1124.00 0.24 0.07 0.20 0.00 0.00 0.01 0.00 0.0093 20 1279.70 2.00 0.02 1.58 0.00 0.00 10.07 0.00 0.0094 93 1279.70 2.00 0.02 0.73 0.00 0.00 2.17 0.00 0.0095 8 30.78 0.05 0.00 0.00 0.00 1.85 0.00 0.00 0.3696 7 20.34 0.03 0.00 0.60 0.00 0.00 0.03 0.00 0.0097 6 272.33 0.30 0.13 0.48 0.48 0.48 0.11 0.11 0.11

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

102

S.E. Chulucanas A1402 REPORTE DE CAIDA DE TENSIÓN

Nodo SED Estado MD (kW) F.P. Conexión V RS (V) V ST (V) V TR (V) ∆V RS (%) ∆V ST (%) ∆V TR (%)1 Alimentador - A1402 En Servicio 0.0 0.90 RST 22900 22900 22900 0.00% 0.00% 0.00%2 Derivación 0.0 0.90 RST 22894 22895 22894 0.03% 0.02% 0.03%3 Derivación 0.0 0.90 RST 22889 22890 22889 0.05% 0.05% 0.05%4 112000189 En Servicio 2.9 0.90 RSTN 22889 22890 22889 0.05% 0.05% 0.05%5 112000154 En Servicio 32.3 0.90 RSTN 22883 22884 22883 0.07% 0.07% 0.07%6 Derivación 0.0 0.90 RST 22685 22717 22692 0.94% 0.80% 0.91%7 Derivación 0.0 0.90 RST 22599 22639 22599 1.31% 1.14% 1.31%8 Derivación 0.0 0.90 RST 22353 22427 22357 2.39% 2.07% 2.37%9 Derivación 0.0 0.90 RST 22339 22409 22332 2.45% 2.15% 2.48%

10 112000179 En Servicio 33.1 0.90 RN 22338 22409 22329 2.46% 2.15% 2.49%11 Derivación 0.0 0.90 RST 22338 22407 22331 2.46% 2.15% 2.49%12 112000073 En Servicio 39.6 0.90 SN 22335 22406 22330 2.47% 2.16% 2.49%13 Derivación 0.0 0.90 RST 22326 22397 22319 2.51% 2.19% 2.54%14 112000072 En Servicio 33.4 0.90 TN 22326 22397 22319 2.51% 2.20% 2.54%15 Derivación 0.0 0.90 RST 21941 22080 21957 4.19% 3.58% 4.12%16 112000101 En Servicio 10.9 0.90 RN 21951 22081 21946 4.14% 3.58% 4.17%17 Derivación 0.0 0.90 RST 21951 22081 21946 4.14% 3.58% 4.17%18 Derivación 0.0 0.90 RST 21898 22036 21896 4.37% 3.77% 4.38%19 112000102 En Servicio 6.3 0.90 SN 21900 22037 21894 4.37% 3.77% 4.39%20 Derivación 0.0 0.90 RST 21558 21754 21572 5.86% 5.00% 5.80%21 Derivación 0.0 0.90 RST 21446 21651 21447 6.35% 5.46% 6.34%22 Derivación 0.0 0.90 RST 21215 21450 21222 7.36% 6.33% 7.33%23 Derivación 0.0 0.90 RST 21206 21437 21201 7.40% 6.39% 7.42%24 115000449 En Servicio 8.2 0.90 RN 21205 21437 21200 7.40% 6.39% 7.42%25 Derivación 0.0 0.90 RST 21192 21425 21188 7.46% 6.44% 7.48%26 115000451 En Servicio 12.5 0.90 RN 21192 21425 21187 7.46% 6.44% 7.48%27 Derivación 0.0 0.90 RST 21067 21313 21067 8.01% 6.93% 8.01%28 115000446 En Servicio 7.1 0.90 RN 21069 21313 21064 7.99% 6.93% 8.02%29 Derivación 0.0 0.90 RST 21016 21266 21013 8.23% 7.14% 8.24%30 115000447 En Servicio 5.8 0.90 RN 21017 21266 21012 8.22% 7.14% 8.25%31 Derivación 0.0 0.90 RST 20984 21236 20980 8.37% 7.27% 8.38%32 115000448 En Servicio 2.6 0.90 RN 20985 21236 20979 8.36% 7.27% 8.39%33 Derivación 0.0 0.90 RST 21568 21842 21568 5.82% 4.62% 5.82%34 Derivación 0.0 0.90 RST 21540 21814 21535 5.94% 4.74% 5.96%35 CAP En Servicio -64.7 0.90 RST 21262 21555 21265 7.15% 5.87% 7.14%36 115000464 En Servicio 25.1 0.90 RN 21266 21555 21259 7.14% 5.87% 7.16%37 Derivación 0.0 0.90 RST 21224 21515 21219 7.32% 6.05% 7.34%38 Derivación 0.0 0.90 RST 21089 21381 21084 7.91% 6.63% 7.93%39 115000011 En Servicio 109.4 0.90 RSTN 21073 21365 21067 7.98% 6.70% 8.00%40 Derivación 0.0 0.90 RST 21009 21302 21003 8.26% 6.98% 8.28%41 Derivación 0.0 0.90 RST 21007 21300 21001 8.27% 6.99% 8.29%42 115000028 En Servicio 58.8 0.90 RSTN 21005 21298 21000 8.27% 6.99% 8.30%43 115000009 En Servicio 81.4 0.90 RSTN 20969 21263 20963 8.43% 7.15% 8.46%44 Derivación 0.0 0.90 RST 20936 21230 20930 8.58% 7.29% 8.60%45 115000031 En Servicio 63.3 0.90 RSTN 20935 21229 20929 8.58% 7.30% 8.61%46 Derivación 0.0 0.90 RST 20913 21208 20908 8.67% 7.39% 8.70%47 Derivación 0.0 0.90 RST 20895 21190 20889 8.75% 7.47% 8.78%48 115000335 En Servicio 56.3 0.90 RSTN 20871 21166 20865 8.86% 7.57% 8.88%49 115000088 En Servicio 76.9 0.90 RSTN 20857 21152 20851 8.92% 7.63% 8.95%50 115000089 En Servicio 6.5 0.90 RSTN 20856 21151 20850 8.93% 7.64% 8.95%51 115000064 En Servicio 57.4 0.90 RSTN 20886 21181 20880 8.79% 7.51% 8.82%52 115000181 En Servicio 38.7 0.90 RSTN 20882 21177 20877 8.81% 7.52% 8.84%53 115000005 En Servicio 65.6 0.90 RSTN 20883 21178 20877 8.81% 7.52% 8.83%54 115000461 En Servicio 72.7 0.90 RSTN 20864 21159 20859 8.89% 7.60% 8.91%55 115000087 En Servicio 48.6 0.90 RSTN 20857 21152 20851 8.92% 7.63% 8.95%56 115000086 En Servicio 60.8 0.90 RSTN 20932 21226 20926 8.59% 7.31% 8.62%57 115000153 En Servicio 0.0 0.90 RSTN 20932 21226 20926 8.59% 7.31% 8.62%58 115000030 En Servicio 87.1 0.90 RSTN 21005 21298 20999 8.28% 7.00% 8.30%59 115000020 En Servicio 0.0 0.90 RSTN 21068 21360 21062 8.00% 6.72% 8.03%60 Derivación 0.0 0.90 RST 21046 21339 21041 8.10% 6.82% 8.12%61 115000004 En Servicio 35.3 0.90 RSTN 21046 21339 21040 8.10% 6.82% 8.12%62 Derivación 0.0 0.90 RST 21043 21336 21038 8.11% 6.83% 8.13%63 Derivación 0.0 0.90 RST 21040 21333 21035 8.12% 6.84% 8.15%64 115000084 En Servicio 11.7 0.90 RSTN 21040 21333 21035 8.12% 6.84% 8.15%65 Derivación 0.0 0.90 RST 21037 21329 21031 8.14% 6.86% 8.16%66 Derivación 0.0 0.90 RST 21036 21329 21030 8.14% 6.86% 8.16%67 115000083 En Servicio 5.8 0.90 RSTN 21036 21329 21030 8.14% 6.86% 8.16%68 Derivación 0.0 0.90 RST 21027 21320 21022 8.18% 6.90% 8.20%69 Derivación 0.0 0.90 RST 21024 21317 21018 8.19% 6.91% 8.22%70 115000104 En Servicio 19.1 0.90 RSTN 21023 21316 21018 8.19% 6.92% 8.22%71 Derivación 0.0 0.90 RST 21022 21315 21016 8.20% 6.92% 8.23%72 Derivación 0.0 0.90 RST 21019 21311 21013 8.22% 6.94% 8.24%

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

103

72 Derivación 0.0 0.90 RST 21019 21311 21013 8.22% 6.94% 8.24%73 Derivación 0.0 0.90 RST 21018 21311 21012 8.22% 6.94% 8.24%74 Derivación 0.0 0.90 RST 21017 21310 21011 8.22% 6.94% 8.25%75 115000101 En Servicio 72.7 0.90 RSTN 21017 21310 21011 8.22% 6.94% 8.25%76 115000096 En Servicio 72.0 0.90 RSTN 21012 21304 21006 8.25% 6.97% 8.27%77 115000097 En Servicio 50.9 0.90 RSTN 21010 21303 21004 8.25% 6.98% 8.28%78 115000468 En Servicio 0.6 0.90 RSTN 21018 21311 21012 8.22% 6.94% 8.24%79 115000102 En Servicio 8.6 0.90 RSTN 21019 21311 21013 8.22% 6.94% 8.24%80 115000103 En Servicio 74.1 0.90 RSTN 21022 21315 21016 8.20% 6.92% 8.23%81 115000308 En Servicio 5.1 0.90 RSTN 21024 21317 21018 8.19% 6.91% 8.22%82 Derivación 0.0 0.90 RST 21027 21320 21022 8.18% 6.90% 8.20%83 115000467 En Servicio 0.6 0.90 RSTN 21037 21329 21031 8.14% 6.86% 8.16%84 115000018 En Servicio 47.2 0.90 RSTN 21034 21327 21028 8.15% 6.87% 8.17%85 115000144 En Servicio 43.3 0.90 RSTN 21030 21323 21024 8.17% 6.89% 8.19%86 115000463 En Servicio 13.5 0.90 RN 21224 21515 21218 7.32% 6.05% 7.34%87 115000465 En Servicio 9.7 0.90 RN 21540 21814 21534 5.94% 4.74% 5.96%88 115000441 En Servicio 12.0 0.90 RN 21570 21842 21564 5.81% 4.62% 5.83%89 115000450 En Servicio 13.1 0.90 RN 21220 21450 21215 7.33% 6.33% 7.36%90 115000452 En Servicio 0.8 0.90 RN 21449 21651 21444 6.33% 5.46% 6.36%91 115000439 En Servicio 1.5 0.90 RN 21449 21651 21444 6.34% 5.46% 6.36%92 115000440 En Servicio 2.6 0.90 RN 21449 21651 21444 6.34% 5.46% 6.36%93 115000016 En Servicio 12.6 0.90 RN 21564 21754 21556 5.83% 5.01% 5.87%94 115000142 En Servicio 10.9 0.90 RN 21561 21754 21554 5.85% 5.01% 5.88%95 112000071 En Servicio 28.8 0.90 TN 22359 22426 22352 2.36% 2.07% 2.39%96 112000124 En Servicio 9.4 0.90 RN 22601 22639 22597 1.30% 1.14% 1.32%97 112000115 En Servicio 18.9 0.90 RSTN 22690 22716 22687 0.92% 0.80% 0.93%

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

104

S.E. Chulucanas A1932 REPORTE DE CORRIENTES Y PERDIDAS TECNICAS

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

105

Nodo Nodo Anterior Longitud (m) R (ohm) X (ohm) I - RN (A) I - SN (A) I - TN (A) Pérdidas RN (W) Pérdidas SN (W) Pérdidas TN (W)1 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.002 1 5772.02 2.43 2.48 54.31 55.97 54.58 2176.62 2303.40 2196.833 2 373.30 0.47 0.17 0.69 1.04 1.04 0.12 0.27 0.284 3 279.23 0.44 0.13 0.33 1.01 1.02 0.03 0.25 0.265 4 485.71 0.50 0.09 0.00 0.49 0.00 0.00 0.08 0.006 4 403.07 0.63 0.37 0.37 0.55 1.14 0.04 0.09 0.377 6 244.17 0.38 0.00 0.29 0.00 0.89 0.02 0.00 0.228 7 1238.54 1.86 0.05 0.29 0.00 0.00 0.12 0.00 0.009 7 324.77 0.51 0.01 0.00 0.00 0.89 0.00 0.00 0.30

10 6 264.29 0.41 0.01 0.00 0.43 0.00 0.00 0.06 0.0011 2 3306.24 1.39 1.42 53.12 54.30 52.93 1205.10 1254.84 1194.9412 11 343.64 0.54 0.01 0.00 0.00 0.29 0.00 0.00 0.0313 11 2695.12 1.13 1.16 53.04 54.23 52.41 982.35 1022.90 957.5414 13 11.21 0.02 0.00 0.30 0.00 0.00 0.00 0.00 0.0015 13 426.90 0.18 0.18 52.32 53.94 52.14 152.92 162.02 151.6716 15 2878.32 4.49 1.38 0.58 1.05 1.11 0.83 2.75 3.0817 16 2878.32 4.49 1.38 0.58 0.58 1.11 0.83 0.83 3.0818 17 120.83 0.19 0.06 0.58 0.58 0.58 0.03 0.03 0.0319 17 2048.38 3.20 0.04 0.00 0.00 0.47 0.00 0.00 0.5120 15 2566.62 1.08 1.10 51.82 52.82 50.48 892.52 924.10 845.3721 20 3356.56 1.41 1.44 44.21 45.21 42.88 843.02 878.17 790.7422 21 323.12 0.50 0.15 3.04 1.01 1.57 2.52 0.28 0.6723 22 51.15 0.08 0.02 0.59 0.59 0.59 0.01 0.01 0.0124 22 1015.57 1.59 0.49 2.45 0.42 0.98 5.15 0.15 0.8225 24 1091.68 1.70 0.02 1.44 0.37 0.00 2.50 0.16 0.0026 25 1091.68 1.70 0.02 0.00 0.37 0.00 0.00 0.16 0.0027 24 379.93 0.59 0.01 0.70 0.00 0.86 0.21 0.00 0.3128 27 329.52 0.51 0.01 0.00 0.00 0.86 0.00 0.00 0.2729 27 94.78 0.15 0.00 0.70 0.00 0.00 0.05 0.00 0.0030 21 3498.23 1.47 1.50 40.22 43.90 40.83 725.35 861.76 745.8031 30 404.73 0.17 0.17 39.30 41.81 40.15 80.97 91.43 84.3632 31 313.26 0.49 0.01 0.00 0.92 0.00 0.00 0.29 0.0033 31 479.22 0.20 0.21 39.31 40.45 40.16 95.88 101.23 99.8934 33 1853.89 0.77 0.79 7.71 7.27 7.81 13.99 12.37 14.3435 34 157.89 0.25 0.00 0.00 0.00 0.31 0.00 0.00 0.0236 34 1375.70 0.58 0.59 7.67 7.23 7.30 10.56 9.34 9.5637 36 13642.45 5.73 5.85 7.18 7.26 7.33 90.90 92.61 94.8238 37 706.12 0.30 0.30 6.77 6.85 7.30 4.22 4.30 4.9139 38 32.32 0.05 0.00 0.00 0.00 0.37 0.00 0.00 0.0040 38 2773.20 1.17 1.19 6.77 6.85 6.75 16.56 16.89 16.4641 40 2413.90 1.01 1.04 6.77 6.85 6.30 14.41 14.70 12.4942 41 93.59 0.15 0.00 0.31 0.00 0.00 0.01 0.00 0.0043 41 3443.92 1.45 1.48 6.31 6.85 6.30 17.82 20.97 17.8244 43 325.33 0.30 0.15 1.82 1.83 1.82 0.46 0.46 0.4645 44 253.05 0.28 0.12 1.01 1.01 1.01 0.14 0.14 0.1446 45 142.97 0.16 0.07 0.48 0.48 0.48 0.02 0.02 0.0247 45 104.60 0.12 0.05 0.53 0.53 0.53 0.02 0.02 0.0248 43 15.43 0.02 0.01 3.30 3.74 3.30 0.09 0.11 0.0949 48 96.74 0.11 0.05 0.32 0.32 0.32 0.01 0.01 0.0150 48 2588.51 2.87 1.21 2.98 3.42 2.98 12.16 15.94 12.1651 50 175.42 0.14 0.08 0.73 0.73 0.73 0.03 0.03 0.0352 50 1719.11 1.91 0.80 2.30 2.73 2.30 4.79 6.76 4.7953 52 4915.37 5.45 2.30 2.30 2.30 2.30 13.71 13.71 13.7154 53 1036.65 1.15 0.49 1.49 1.49 1.49 1.22 1.22 1.2255 54 1036.65 1.15 0.49 0.65 0.65 0.65 0.23 0.23 0.2356 55 1036.65 1.15 0.49 0.00 0.00 0.00 0.00 0.00 0.0057 52 30.79 0.03 0.01 0.00 0.43 0.00 0.00 0.00 0.0058 40 23.38 0.04 0.00 0.00 0.00 0.30 0.00 0.00 0.0059 37 1965.61 3.07 0.04 0.26 0.26 0.00 0.14 0.14 0.0060 59 1965.61 3.07 0.04 0.00 0.26 0.00 0.00 0.14 0.0061 36 137.33 0.21 0.00 0.35 0.00 0.00 0.02 0.00 0.0062 33 137.44 0.06 0.06 31.61 33.20 32.37 17.78 19.56 18.6063 62 300.77 0.47 0.01 0.31 0.00 0.00 0.03 0.00 0.0064 62 173.01 0.07 0.07 31.15 33.20 32.37 21.72 24.62 23.4165 64 5.37 0.01 0.00 0.00 0.41 0.00 0.00 0.00 0.0066 64 1962.28 0.82 0.84 31.23 32.67 32.45 246.37 268.83 265.5267 66 3780.61 1.59 1.62 29.93 29.99 31.34 433.83 433.83 474.4668 67 253.88 0.11 0.11 29.79 29.85 31.19 29.13 29.13 31.8669 68 715.89 0.30 0.31 27.21 27.25 28.60 68.36 68.36 75.4070 69 4080.72 4.47 1.89 8.54 8.56 9.68 151.77 151.77 193.7571 70 4108.88 4.56 1.92 8.18 8.20 9.31 141.75 141.75 182.8272 71 3601.22 4.00 1.69 5.92 5.93 7.05 65.03 65.03 91.70

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

106

72 71 3601.22 4.00 1.69 5.92 5.93 7.05 65.03 65.03 91.7073 72 3601.22 4.00 1.69 5.56 5.57 6.69 57.30 57.30 82.4874 73 129.62 0.14 0.06 1.15 1.16 1.16 0.09 0.09 0.0975 73 63.01 0.07 0.03 4.39 4.40 5.51 0.63 0.63 0.9976 75 387.88 0.31 0.18 3.86 3.87 5.05 1.90 1.90 3.2277 76 84.75 0.07 0.04 1.24 1.24 1.24 0.04 0.04 0.0478 76 540.03 0.43 0.25 2.62 2.63 3.81 1.22 1.22 2.5579 78 540.03 0.43 0.25 1.19 1.19 2.37 0.25 0.25 0.9980 79 540.03 0.43 0.25 0.00 0.00 1.18 0.00 0.00 0.2481 80 5.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0082 80 221.46 0.18 0.10 0.00 0.00 1.18 0.00 0.00 0.1083 80 7.03 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.0084 75 2.70 0.00 0.00 0.80 0.80 0.80 0.00 0.00 0.0085 71 802.21 0.63 0.36 2.39 2.39 2.39 1.51 1.51 1.5186 85 420.18 0.33 0.19 1.21 1.21 1.21 0.20 0.20 0.2087 85 351.70 0.28 0.16 1.18 1.18 1.18 0.16 0.16 0.1688 69 470.60 0.40 0.21 13.89 13.91 13.89 34.55 34.55 34.5589 88 70.46 0.08 0.03 1.38 1.38 1.38 0.07 0.07 0.0790 88 342.73 0.29 0.16 12.60 12.62 12.60 19.91 19.91 19.9191 90 343.57 0.29 0.16 10.30 10.32 10.31 13.36 13.36 13.3692 91 1209.63 1.34 0.57 3.51 3.52 3.51 7.87 7.87 7.8793 92 1209.63 1.34 0.57 2.14 2.15 2.14 2.93 2.93 2.9394 93 1209.63 1.34 0.57 0.77 0.77 0.77 0.38 0.38 0.3895 91 194.35 0.22 0.09 6.32 6.33 6.32 4.11 4.11 4.1196 95 194.35 0.22 0.09 4.48 4.49 4.48 2.06 2.06 2.0697 96 275.98 0.31 0.13 1.33 1.33 1.33 0.26 0.26 0.2698 96 83.30 0.09 0.04 3.15 3.16 3.15 0.44 0.44 0.4499 98 133.64 0.15 0.06 1.38 1.38 1.38 0.13 0.13 0.13100 98 98.62 0.11 0.05 1.78 1.78 1.78 0.16 0.16 0.16101 100 234.83 0.26 0.11 0.66 0.66 0.66 0.05 0.05 0.05102 100 62.68 0.07 0.03 1.12 1.12 1.12 0.04 0.04 0.04103 68 60.02 0.03 0.03 2.60 2.61 2.60 0.05 0.05 0.05104 67 119.00 0.13 0.06 0.00 0.00 0.00 0.00 0.00 0.00105 66 107.50 0.17 0.05 1.04 2.10 0.91 0.10 0.39 0.07106 105 469.02 0.73 0.01 0.53 0.00 0.00 0.14 0.00 0.00107 105 46.00 0.07 0.02 0.44 2.10 0.91 0.01 0.17 0.03108 107 46.69 0.07 0.00 0.00 0.00 0.41 0.00 0.00 0.01109 107 253.02 0.40 0.12 0.44 2.10 0.44 0.04 0.93 0.04110 109 325.72 0.51 0.16 0.44 0.44 0.44 0.05 0.05 0.05111 109 2.70 0.00 0.00 0.00 1.67 0.00 0.00 0.01 0.00112 30 209.09 0.33 0.19 0.60 1.57 0.39 0.05 0.34 0.02113 112 521.53 0.81 0.01 0.47 0.62 0.30 0.13 0.22 0.05114 113 521.53 0.81 0.01 0.47 0.00 0.30 0.13 0.00 0.05115 114 85.60 0.13 0.00 0.00 0.00 0.30 0.00 0.00 0.01116 114 80.52 0.13 0.00 0.47 0.00 0.00 0.02 0.00 0.00117 112 16.91 0.03 0.00 0.00 0.60 0.00 0.00 0.01 0.00118 20 177.05 0.28 0.08 0.63 0.63 0.63 0.06 0.06 0.06119 20 392.34 0.61 0.19 5.21 5.21 5.20 9.09 9.09 9.09120 119 148.53 0.23 0.07 4.54 4.54 4.54 2.62 2.62 2.62121 120 357.91 0.56 0.17 4.43 4.43 4.43 6.01 6.01 6.01122 121 357.91 0.56 0.17 3.27 3.27 3.27 3.27 3.27 3.27123 122 329.21 0.51 0.16 2.09 2.10 2.09 1.23 1.23 1.23124 123 507.37 0.79 0.24 1.15 1.15 1.15 0.57 0.57 0.57125 123 102.26 0.16 0.05 0.95 0.95 0.95 0.08 0.08 0.08126 125 37.42 0.06 0.02 0.00 0.00 0.00 0.00 0.00 0.00127 125 182.27 0.28 0.09 0.95 0.95 0.95 0.14 0.14 0.14128 125 22.14 0.03 0.01 0.00 0.00 0.00 0.00 0.00 0.00129 122 176.16 0.28 0.08 0.00 0.00 0.00 0.00 0.00 0.00130 122 456.03 0.71 0.22 1.18 1.18 1.18 0.54 0.54 0.54131 120 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00132 119 237.03 0.37 0.11 0.67 0.67 0.66 0.09 0.09 0.09133 15 1029.04 1.61 0.02 0.00 0.00 0.30 0.00 0.00 0.10

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

107

S.E. Chulucanas A1932 REPORTE DE CAIDA DE TENSIÓN

Nodo SED Estado MD (kW) F.P. Conexión V RS (V) V ST (V) V TR (V) ∆V RS (%) ∆V ST (%) ∆V TR (%)1 Alimentador - A1932 En Servicio 0.00 0.90 RST 22900 22900 22900 0.00% 0.00% 0.00%2 Derivación 0.00 0.90 RST 22611 22609 22614 1.26% 1.27% 1.25%3 112000018 En Servicio 1.75 0.90 RN 22610 22609 22613 1.27% 1.27% 1.25%4 Derivación 0.00 0.90 RST 22609 22608 22613 1.27% 1.28% 1.26%5 112000043 En Servicio 2.69 0.90 SN 22609 22607 22613 1.27% 1.28% 1.26%6 Derivación 0.00 0.90 RST 22608 22607 22611 1.27% 1.28% 1.26%7 Derivación 0.00 0.90 RST 22608 22606 22611 1.27% 1.28% 1.26%8 112000176 En Servicio 1.71 0.90 RN 22608 22606 22610 1.28% 1.28% 1.27%9 112000157 En Servicio 5.26 0.90 TN 22608 22606 22611 1.27% 1.29% 1.26%

10 112000156 En Servicio 2.53 0.90 SN 22608 22606 22611 1.28% 1.28% 1.26%11 Derivación 0.00 0.90 RST 22449 22448 22455 1.97% 1.97% 1.95%12 112000158 En Servicio 1.71 0.90 TN 22449 22448 22454 1.97% 1.97% 1.95%13 Derivación 0.00 0.90 RST 22318 22317 22325 2.54% 2.55% 2.51%14 112000120 En Servicio 1.75 0.90 RN 22317 22318 22325 2.54% 2.54% 2.51%15 Derivación 0.00 0.90 RST 22297 22297 22305 2.63% 2.63% 2.60%16 112000020 En Servicio 2.41 0.90 SN 22288 22286 22297 2.67% 2.68% 2.63%17 Derivación 0.00 0.90 RST 22283 22278 22289 2.69% 2.72% 2.67%18 112000197 En Servicio 8.82 0.90 RSTN 22283 22278 22288 2.70% 2.72% 2.67%19 112000066 En Servicio 2.73 0.90 TN 22283 22276 22287 2.69% 2.72% 2.68%20 Derivación 0.00 0.90 RST 22175 22176 22186 3.17% 3.16% 3.12%21 Derivación 0.00 0.90 RST 22038 22041 22053 3.76% 3.75% 3.70%22 Derivación 0.00 0.90 RST 22036 22040 22050 3.77% 3.75% 3.71%23 112000191 En Servicio 8.86 0.90 RSTN 22036 22040 22050 3.77% 3.75% 3.71%24 Derivación 0.00 0.90 RST 22031 22038 22044 3.79% 3.76% 3.74%25 112000188 En Servicio 8.29 0.90 RN 22028 22038 22041 3.81% 3.77% 3.75%26 112000162 En Servicio 2.11 0.90 SN 22027 22037 22041 3.81% 3.77% 3.75%27 Derivación 0.00 0.90 RST 22030 22037 22043 3.80% 3.77% 3.74%28 112000175 En Servicio 4.94 0.90 TN 22030 22037 22043 3.80% 3.77% 3.74%29 112000161 En Servicio 4.04 0.90 RN 22030 22037 22043 3.80% 3.77% 3.74%30 Derivación 0.00 0.90 RST 21905 21906 21923 4.34% 4.34% 4.27%31 Derivación 0.00 0.90 RST 21889 21892 21909 4.41% 4.40% 4.33%32 112000174 En Servicio 5.24 0.90 SN 21888 21892 21909 4.42% 4.40% 4.33%33 Derivación 0.00 0.90 RST 21872 21874 21891 4.49% 4.48% 4.40%34 Derivación 0.00 0.90 RST 21859 21862 21879 4.55% 4.53% 4.46%35 112000049 En Servicio 1.78 0.90 TN 21859 21862 21879 4.54% 4.53% 4.46%36 Derivación 0.00 0.90 RST 21850 21853 21869 4.59% 4.57% 4.50%37 Derivación 0.00 0.90 RST 21760 21762 21779 4.98% 4.97% 4.90%38 Derivación 0.00 0.90 RST 21756 21758 21775 5.00% 4.99% 4.91%39 112000155 En Servicio 2.11 0.90 TN 21756 21758 21775 5.00% 4.99% 4.91%40 Derivación 0.00 0.90 RST 21739 21740 21758 5.07% 5.06% 4.99%41 Derivación 0.00 0.90 RST 21724 21726 21743 5.14% 5.13% 5.05%42 112000166 En Servicio 1.78 0.90 RN 21724 21726 21743 5.14% 5.13% 5.05%43 Derivación 0.00 0.90 RST 21703 21705 21723 5.23% 5.22% 5.14%44 112000031 En Servicio 10.90 0.90 RSTN 21702 21704 21722 5.23% 5.22% 5.14%45 Derivación 0.00 0.90 RST 21701 21704 21722 5.23% 5.22% 5.15%46 112000123 En Servicio 6.85 0.90 RSTN 21701 21703 21721 5.24% 5.23% 5.15%47 112000117 En Servicio 7.49 0.90 RSTN 21701 21703 21722 5.24% 5.23% 5.15%48 Derivación 0.00 0.90 RST 21703 21705 21723 5.23% 5.22% 5.14%49 112000128 En Servicio 4.55 0.90 RSTN 21703 21705 21723 5.23% 5.22% 5.14%50 Derivación 0.00 0.90 RST 21683 21685 21705 5.31% 5.30% 5.22%51 112000114 En Servicio 9.70 0.90 RSTN 21683 21685 21705 5.32% 5.31% 5.22%52 Derivación 0.00 0.90 RST 21673 21675 21695 5.36% 5.35% 5.26%53 112000014 En Servicio 11.44 0.90 RSTN 21645 21648 21668 5.48% 5.47% 5.38%54 112000047 En Servicio 11.93 0.90 RSTN 21642 21644 21664 5.49% 5.48% 5.40%55 112000041 En Servicio 9.18 0.90 RSTN 21640 21642 21663 5.50% 5.49% 5.40%56 Derivación 0.00 0.90 RST 21640 21642 21663 5.50% 5.49% 5.40%57 112000019 En Servicio 2.04 0.90 SN 21673 21675 21695 5.36% 5.35% 5.26%58 112000165 En Servicio 1.71 0.90 TN 21739 21740 21758 5.07% 5.06% 4.99%59 112000177 En Servicio 1.45 0.90 RN 21759 21762 21778 4.98% 4.97% 4.90%60 112000164 En Servicio 1.45 0.90 SN 21757 21761 21778 4.99% 4.98% 4.90%61 112000180 En Servicio 2.00 0.90 RN 21850 21853 21869 4.59% 4.57% 4.50%62 Derivación 0.00 0.90 RST 21868 21870 21887 4.51% 4.50% 4.42%63 112000172 En Servicio 1.78 0.90 RN 21867 21870 21887 4.51% 4.50% 4.42%64 Derivación 0.00 0.90 RST 21863 21865 21882 4.53% 4.52% 4.44%65 112000171 En Servicio 2.36 0.90 SN 21863 21865 21882 4.53% 4.52% 4.44%66 Derivación 0.00 0.90 RST 21806 21807 21825 4.78% 4.77% 4.69%67 Derivación 0.00 0.90 RST 21702 21702 21720 5.23% 5.23% 5.15%68 Derivación 0.00 0.90 RST 21696 21694 21713 5.26% 5.26% 5.18%69 Derivación 0.00 0.90 RST 21678 21676 21695 5.34% 5.34% 5.26%70 112000092 En Servicio 5.09 0.90 RSTN 21595 21588 21607 5.70% 5.73% 5.65%71 Derivación 0.00 0.90 RST 21514 21501 21521 6.05% 6.11% 6.02%72 112000168 En Servicio 5.08 0.90 RSTN 21463 21445 21464 6.28% 6.35% 6.27%

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

108

72 112000168 En Servicio 5.08 0.90 RSTN 21463 21445 21464 6.28% 6.35% 6.27%73 Derivación 0.00 0.90 RST 21415 21392 21411 6.49% 6.58% 6.50%74 112000005 En Servicio 16.18 0.90 RSTN 21414 21392 21411 6.49% 6.59% 6.50%75 Derivación 0.00 0.90 RST 21414 21392 21411 6.49% 6.59% 6.50%76 Derivación 0.00 0.90 RST 21411 21389 21408 6.50% 6.60% 6.52%77 112000062 En Servicio 16.37 0.90 RSTN 21411 21388 21407 6.50% 6.60% 6.52%78 112000007 En Servicio 18.96 0.90 RSTN 21409 21386 21405 6.51% 6.61% 6.53%79 112000008 En Servicio 15.67 0.90 RSTN 21408 21384 21403 6.52% 6.62% 6.54%80 Derivación 0.00 0.90 RST 21408 21383 21402 6.52% 6.62% 6.54%81 Derivación 0.00 0.90 RST 21408 21383 21402 6.52% 6.62% 6.54%82 112000010 En Servicio 5.18 0.90 TN 21408 21383 21402 6.52% 6.62% 6.54%83 Derivación 0.00 0.90 RST 21408 21383 21402 6.52% 6.62% 6.54%84 112000003 En Servicio 10.55 0.90 RSTN 21414 21392 21411 6.49% 6.59% 6.50%85 Derivación 0.00 0.90 RST 21511 21498 21517 6.07% 6.12% 6.04%86 112000078 En Servicio 16.01 0.90 RSTN 21510 21497 21516 6.07% 6.13% 6.04%87 112000133 En Servicio 15.64 0.90 RSTN 21510 21497 21516 6.07% 6.12% 6.04%88 Derivación 0.00 0.90 RST 21666 21664 21683 5.39% 5.40% 5.32%89 112000080 En Servicio 19.58 0.90 RSTN 21665 21664 21683 5.39% 5.40% 5.32%90 112000081 En Servicio 31.02 0.90 RSTN 21658 21656 21675 5.42% 5.43% 5.35%91 Derivación 0.00 0.90 RST 21651 21650 21668 5.45% 5.46% 5.38%92 112000036 En Servicio 19.35 0.90 RSTN 21641 21639 21658 5.50% 5.50% 5.42%93 112000040 En Servicio 19.43 0.90 RSTN 21635 21633 21652 5.52% 5.53% 5.45%94 112000045 En Servicio 10.92 0.90 RSTN 21633 21631 21650 5.53% 5.54% 5.46%95 112000077 En Servicio 26.11 0.90 RSTN 21648 21647 21666 5.47% 5.47% 5.39%96 Derivación 0.00 0.90 RST 21646 21645 21663 5.48% 5.48% 5.40%97 112000064 En Servicio 18.81 0.90 RSTN 21645 21644 21663 5.48% 5.49% 5.40%98 Derivación 0.00 0.90 RST 21646 21644 21663 5.48% 5.48% 5.40%99 112000021 En Servicio 19.51 0.90 RSTN 21645 21644 21662 5.48% 5.49% 5.40%

100 Derivación 0.00 0.90 RST 21645 21644 21662 5.48% 5.49% 5.40%101 112000025 En Servicio 9.33 0.90 RSTN 21645 21643 21662 5.48% 5.49% 5.41%102 112000023 En Servicio 15.82 0.90 RSTN 21645 21643 21662 5.48% 5.49% 5.41%103 112000082 En Servicio 29.76 0.90 RSTN 21695 21694 21713 5.26% 5.27% 5.18%104 112000190 En Servicio 0.00 0.90 RSTN 21702 21701 21720 5.23% 5.23% 5.15%105 Derivación 0.00 0.90 RST 21805 21806 21825 4.78% 4.78% 4.69%106 112000170 En Servicio 3.02 0.90 RN 21805 21806 21825 4.78% 4.78% 4.70%107 Derivación 0.00 0.90 RST 21805 21806 21825 4.78% 4.78% 4.69%108 112000050 En Servicio 2.35 0.90 TN 21805 21806 21825 4.78% 4.78% 4.69%109 Derivación 0.00 0.90 RST 21804 21805 21825 4.79% 4.78% 4.70%110 112000187 En Servicio 6.55 0.90 RSTN 21803 21805 21824 4.79% 4.78% 4.70%111 112000169 En Servicio 8.29 0.90 SN 21804 21805 21825 4.79% 4.78% 4.70%112 Derivación 0.00 0.90 RST 21903 21906 21923 4.35% 4.34% 4.27%113 112000051 En Servicio 3.56 0.90 SN 21902 21906 21922 4.36% 4.34% 4.27%114 Derivación 0.00 0.90 RST 21902 21905 21922 4.36% 4.34% 4.27%115 112000173 En Servicio 1.73 0.90 TN 21902 21905 21922 4.36% 4.34% 4.27%116 112000116 En Servicio 2.69 0.90 RN 21902 21905 21922 4.36% 4.34% 4.27%117 112000160 En Servicio 3.46 0.90 SN 21903 21906 21923 4.35% 4.34% 4.27%118 112000178 En Servicio 9.57 0.90 RSTN 22174 22176 22185 3.17% 3.16% 3.12%119 Derivación 0.00 0.90 RST 22168 22169 22179 3.20% 3.19% 3.15%120 Derivación 0.00 0.90 RST 22165 22167 22176 3.21% 3.20% 3.16%121 112000015 En Servicio 17.64 0.90 RSTN 22160 22162 22171 3.23% 3.22% 3.18%122 Derivación 0.00 0.90 RST 22156 22158 22167 3.25% 3.24% 3.20%123 Derivación 0.00 0.90 RST 22154 22156 22165 3.26% 3.25% 3.21%124 112000167 En Servicio 17.44 0.90 RSTN 22152 22154 22163 3.27% 3.26% 3.22%125 Derivación 0.00 0.90 RST 22153 22155 22164 3.26% 3.25% 3.21%126 Derivación 0.00 0.90 RST 22153 22155 22164 3.26% 3.25% 3.21%127 112000067 En Servicio 14.37 0.90 RSTN 22153 22155 22164 3.26% 3.25% 3.22%128 Derivación 0.00 0.90 RST 22153 22155 22164 3.26% 3.25% 3.21%129 Derivación 0.00 0.90 RST 22156 22158 22167 3.25% 3.24% 3.20%130 112000118 En Servicio 17.86 0.90 RSTN 22154 22156 22165 3.26% 3.25% 3.21%131 112000192 En Servicio 1.67 0.90 RSTN 22165 22167 22176 3.21% 3.20% 3.16%132 112000163 En Servicio 10.11 0.90 RSTN 22167 22169 22178 3.20% 3.19% 3.15%133 112000159 En Servicio 1.73 0.90 TN 22297 22296 22305 2.63% 2.64% 2.60%

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

109

S.E. Chulucanas A1933 REPORTE DE CORRIENTES Y PERDIDAS TECNICAS

Nodo Nodo Anterior Longitud (m) R (ohm) X (ohm) I - RN (A) I - SN (A) I - TN (A) Pérdidas RN (W) Pérdidas SN (W) Pérdidas TN (W)1 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.002 1 4466.62 1.88 1.92 19.87 28.31 12.42 630.17 1162.79 250.403 2 1047.73 1.05 0.42 13.12 0.00 0.00 241.55 0.00 0.004 3 112.81 0.28 0.00 0.79 0.00 0.00 0.35 0.00 0.005 3 1570.59 1.36 0.72 12.82 0.00 0.00 269.02 0.00 0.006 5 681.98 0.54 0.31 0.00 0.00 0.00 0.00 0.00 0.007 5 681.98 0.54 0.31 13.02 0.00 0.00 107.03 0.00 0.008 7 1960.75 1.82 0.85 12.05 0.00 0.00 333.57 0.00 0.009 8 1202.15 1.02 0.55 11.88 0.00 0.00 172.31 0.00 0.00

10 9 1964.44 1.55 0.89 11.70 0.00 0.00 247.10 0.00 0.0011 10 2056.91 1.70 0.94 9.33 0.00 0.00 174.49 0.00 0.0012 11 177.91 0.14 0.08 6.32 0.00 0.00 6.55 0.00 0.0013 12 4508.61 7.05 2.15 2.41 0.00 0.00 58.59 0.00 0.0014 13 1078.45 1.68 0.52 1.69 0.00 0.00 6.89 0.00 0.0015 14 1311.85 2.06 0.62 1.40 0.00 0.00 5.77 0.00 0.0016 15 379.53 0.95 0.01 0.90 0.00 0.00 1.44 0.00 0.0017 16 379.53 0.95 0.01 0.41 0.00 0.00 0.30 0.00 0.0018 15 287.00 0.72 0.01 0.32 0.00 0.00 0.14 0.00 0.0019 14 44.47 0.07 0.00 0.25 0.00 0.00 0.01 0.00 0.0020 13 867.01 2.16 0.02 0.63 0.00 0.00 1.60 0.00 0.0021 12 366.81 0.91 0.01 2.86 0.00 0.00 14.18 0.00 0.0022 9 177.36 0.44 0.00 0.28 0.00 0.00 0.07 0.00 0.0023 8 245.00 0.61 0.00 0.39 0.00 0.00 0.18 0.00 0.0024 7 5.51 0.00 0.00 0.49 0.00 0.00 0.00 0.00 0.0025 2 3596.50 1.51 1.54 3.33 28.26 12.40 14.82 936.27 201.6226 25 49.06 0.05 0.02 0.00 0.00 0.00 0.00 0.00 0.0027 25 3146.55 2.64 1.44 2.82 23.99 10.50 25.87 1634.74 352.0328 27 2192.19 2.64 0.91 2.60 22.20 4.92 25.83 1632.35 90.4029 28 4779.38 3.94 2.18 1.23 20.38 4.09 7.30 1703.29 79.0330 29 1274.65 1.01 0.58 0.90 19.97 3.78 0.99 421.25 17.0631 30 1328.18 1.05 0.60 0.68 19.75 3.55 0.58 428.35 15.7032 31 146.11 0.12 0.07 0.68 2.77 3.55 0.06 0.95 1.7333 32 539.39 0.43 0.24 0.00 2.05 2.87 0.00 1.92 4.1534 33 228.99 0.18 0.10 0.00 0.93 0.00 0.00 0.17 0.0035 33 195.17 0.15 0.09 0.00 1.12 2.87 0.00 0.21 1.5036 35 1589.75 1.26 0.72 0.00 0.00 2.87 0.00 0.00 12.2437 36 1589.75 1.26 0.72 0.00 0.00 1.88 0.00 0.00 5.2438 37 1589.75 1.26 0.72 0.00 0.00 0.99 0.00 0.00 1.4639 35 666.76 0.53 0.30 0.00 1.12 0.00 0.00 0.70 0.0040 32 1684.22 1.33 0.76 0.68 0.72 0.68 0.74 0.74 0.7441 40 749.73 0.59 0.34 0.00 0.00 0.00 0.00 0.00 0.0042 40 762.43 0.60 0.35 0.68 0.72 0.68 0.33 0.33 0.3343 42 2128.30 1.68 0.97 0.35 0.37 0.35 0.25 0.25 0.2544 42 58.53 0.05 0.03 0.33 0.35 0.33 0.01 0.01 0.0145 31 2648.02 2.14 1.20 0.00 16.98 0.00 0.00 642.28 0.0046 45 75.05 0.12 0.04 0.00 1.28 0.00 0.00 0.25 0.0047 45 950.93 0.75 0.43 0.00 14.51 0.00 0.00 164.90 0.0048 47 950.93 0.75 0.43 0.00 11.20 0.00 0.00 98.17 0.0049 48 950.93 0.75 0.43 0.00 8.10 0.00 0.00 51.32 0.0050 49 950.93 0.75 0.43 0.00 3.79 0.00 0.00 11.25 0.0051 50 1849.91 1.99 0.86 0.00 0.84 0.00 0.00 1.63 0.0052 50 141.38 0.11 0.06 0.00 2.90 0.00 0.00 0.98 0.0053 45 44.46 0.04 0.02 0.00 1.03 0.00 0.00 0.04 0.0054 30 32.85 0.03 0.01 0.23 0.24 0.23 0.00 0.00 0.0055 28 746.93 0.59 0.34 1.61 3.85 1.26 1.85 9.86 1.1256 55 61.20 0.05 0.03 0.32 0.33 0.32 0.01 0.01 0.0157 55 1586.72 1.62 0.74 1.23 3.36 0.89 3.25 22.55 1.6958 57 689.56 1.08 0.01 0.00 0.64 0.00 0.00 0.81 0.0059 57 1393.49 1.10 0.63 1.29 2.70 0.93 2.21 9.03 1.1560 59 4107.84 6.41 0.08 0.00 1.17 0.00 0.00 15.89 0.0061 60 3850.74 6.01 0.07 0.00 0.54 0.00 0.00 3.22 0.0062 59 4627.19 3.66 2.10 1.29 1.22 0.93 7.34 6.07 3.8263 62 2951.22 2.34 1.34 0.94 0.86 0.59 2.50 1.92 0.9664 63 731.18 1.14 0.01 0.74 0.00 0.00 1.22 0.00 0.0065 64 731.18 1.14 0.01 0.39 0.00 0.00 0.34 0.00 0.0066 63 2507.58 2.46 1.16 0.00 0.82 0.56 0.00 2.02 1.0167 66 538.17 0.84 0.01 0.00 0.67 0.00 0.00 0.69 0.0068 66 3323.74 5.19 0.06 0.00 0.00 0.46 0.00 0.00 2.1369 27 751.95 1.88 0.01 0.00 0.00 4.09 0.00 0.00 60.7770 69 1074.99 2.68 0.02 0.00 0.00 3.09 0.00 0.00 49.4071 70 2.51 0.01 0.00 0.00 0.00 1.46 0.00 0.00 0.0372 70 468.71 1.17 0.01 0.00 0.00 1.62 0.00 0.00 5.97

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

110

S.E. Chulucanas A1933 REPORTE DE CAIDA DE TENSIÓN

Nodo SE D E stado M D (kW ) F.P . Conexión V R S (V ) V ST (V ) V T R (V ) ∆ V R S (% ) ∆ V ST (% ) ∆ V T R (% )1 A limentador - A1933 En Servicio 0.0 0.90 R ST 22900 22900 22900 0.00% 0.00% 0.00%2 D erivación 0.0 0.90 R ST 22688 22700 22760 0.92% 0.87% 0.61%3 D erivación 0.0 0.90 R ST 22649 22715 22718 1.10% 0.81% 0.79%4 112000090 En Servicio 15.1 0.90 R N 22647 22715 22719 1.11% 0.81% 0.79%5 D erivación 0.0 0.90 R ST 22604 22715 22678 1.29% 0.81% 0.97%6 D erivación 0.0 0.90 R ST 22605 22715 22678 1.29% 0.81% 0.97%7 D erivación 0.0 0.90 R ST 22587 22715 22661 1.36% 0.81% 1.04%8 D erivación 0.0 0.90 R ST 22536 22715 22607 1.59% 0.81% 1.28%9 D erivación 0.0 0.90 R ST 22505 22715 22579 1.72% 0.81% 1.40%

10 112000011 En Servicio 33.7 0.90 R N 22460 22715 22536 1.92% 0.81% 1.59%11 112000001 En Servicio 45.2 0.90 R N 22422 22715 22497 2.09% 0.81% 1.76%12 D erivación 0.0 0.90 R ST 22421 22715 22494 2.09% 0.81% 1.77%13 D erivación 0.0 0.90 R ST 22384 22715 22449 2.25% 0.81% 1.97%14 D erivación 0.0 0.90 R ST 22374 22715 22445 2.30% 0.81% 1.99%15 D erivación 0.0 0.90 R ST 22367 22715 22438 2.33% 0.81% 2.02%16 112000030 En Servicio 9.1 0.90 R N 22365 22715 22436 2.34% 0.81% 2.02%17 112000087 En Servicio 7.7 0.90 R N 22364 22715 22436 2.34% 0.81% 2.03%18 112000086 En Servicio 6.0 0.90 R N 22366 22715 22438 2.33% 0.81% 2.02%19 112000088 En Servicio 4.7 0.90 R N 22373 22715 22446 2.30% 0.81% 1.98%20 112000029 En Servicio 11.7 0.90 R N 22378 22715 22449 2.28% 0.81% 1.97%21 112000002 En Servicio 53.7 0.90 R N 22417 22715 22486 2.11% 0.81% 1.81%22 112000089 En Servicio 5.4 0.90 R N 22505 22715 22578 1.72% 0.81% 1.41%23 112000194 En Servicio 7.4 0.90 R N 22535 22715 22607 1.60% 0.81% 1.28%24 112000085 En Servicio 7.4 0.90 R N 22588 22715 22661 1.36% 0.81% 1.05%25 D erivación 0.0 0.90 R ST 22584 22554 22688 1.38% 1.51% 0.92%26 112000195 En Servicio 0.0 0.90 R STN 22565 22566 22695 1.46% 1.46% 0.89%27 D erivación 0.0 0.90 R ST 22397 22343 22609 2.19% 2.43% 1.27%28 D erivación 0.0 0.90 R ST 22227 22180 22563 2.94% 3.14% 1.47%29 112000111 En Servicio 15.1 0.90 R STN 22037 21935 22510 3.77% 4.21% 1.70%30 D erivación 0.0 0.90 R ST 21982 21880 22500 4.01% 4.45% 1.75%31 D erivación 0.0 0.90 R ST 21931 21821 22489 4.23% 4.71% 1.80%32 D erivación 0.0 0.90 R ST 21928 21821 22488 4.25% 4.71% 1.80%33 D erivación 0.0 0.90 R ST 21926 21816 22485 4.25% 4.73% 1.81%34 112000016 En Servicio 13.1 0.90 SN 21925 21816 22485 4.26% 4.74% 1.81%35 D erivación 0.0 0.90 R ST 21925 21814 22484 4.26% 4.74% 1.82%36 112000017 En Servicio 14.7 0.90 TN 21925 21806 22475 4.26% 4.78% 1.86%37 112000182 En Servicio 13.1 0.90 TN 21925 21800 22469 4.26% 4.80% 1.88%38 112000183 En Servicio 14.7 0.90 TN 21925 21797 22466 4.26% 4.82% 1.89%39 112000184 En Servicio 15.8 0.90 SN 21924 21813 22484 4.26% 4.75% 1.82%40 D erivación 0.0 0.90 R ST 21923 21816 22483 4.26% 4.73% 1.82%41 D erivación 0.0 0.90 R ST 21923 21816 22483 4.26% 4.73% 1.82%42 D erivación 0.0 0.90 R ST 21921 21814 22481 4.27% 4.74% 1.83%43 112000186 En Servicio 15.8 0.90 R STN 21918 21811 22479 4.29% 4.75% 1.84%44 112000185 En Servicio 14.7 0.90 R STN 21921 21814 22481 4.27% 4.74% 1.83%45 D erivación 0.0 0.90 R ST 21845 21832 22489 4.61% 4.66% 1.79%46 112000196 En Servicio 19.9 0.90 SN 21841 21835 22489 4.62% 4.65% 1.79%47 112000068 En Servicio 46.1 0.90 SN 21817 21808 22489 4.73% 4.77% 1.79%48 112000130 En Servicio 43.1 0.90 SN 21796 21788 22489 4.82% 4.85% 1.79%49 112000131 En Servicio 59.9 0.90 SN 21781 21774 22489 4.88% 4.92% 1.79%50 D erivación 0.0 0.90 R ST 21774 21767 22489 4.92% 4.95% 1.79%51 112000065 En Servicio 12.4 0.90 SN 21770 21764 22489 4.94% 4.96% 1.79%52 112000132 En Servicio 40.4 0.90 SN 21773 21767 22489 4.92% 4.95% 1.79%53 112000193 En Servicio 14.5 0.90 SN 21842 21775 22489 4.62% 4.91% 1.79%54 112000152 En Servicio 10.1 0.90 R STN 21980 21882 22500 4.02% 4.45% 1.75%55 D erivación 0.0 0.90 R ST 22228 22165 22558 2.93% 3.21% 1.49%56 112000084 En Servicio 14.5 0.90 R STN 22228 22165 22558 2.93% 3.21% 1.49%57 D erivación 0.0 0.90 R ST 22210 22148 22550 3.01% 3.28% 1.53%58 112000112 En Servicio 11.9 0.90 SN 22208 22147 22550 3.02% 3.29% 1.53%59 D erivación 0.0 0.90 R ST 22200 22138 22544 3.06% 3.33% 1.56%60 112000144 En Servicio 11.5 0.90 SN 22176 22125 22544 3.16% 3.38% 1.56%61 112000070 En Servicio 10.0 0.90 SN 22171 22115 22544 3.18% 3.43% 1.56%62 112000145 En Servicio 15.6 0.90 R STN 22177 22119 22524 3.16% 3.41% 1.64%63 D erivación 0.0 0.90 R ST 22167 22111 22515 3.20% 3.44% 1.68%64 112000057 En Servicio 6.6 0.90 R N 22166 22111 22513 3.21% 3.44% 1.69%65 112000069 En Servicio 7.5 0.90 R N 22164 22111 22512 3.21% 3.44% 1.70%66 D erivación 0.0 0.90 R ST 22162 22103 22512 3.22% 3.48% 1.69%67 112000113 En Servicio 12.4 0.90 SN 22160 22102 22512 3.23% 3.48% 1.69%68 112000146 En Servicio 8.7 0.90 TN 22162 22096 22508 3.22% 3.51% 1.71%69 112000095 En Servicio 19.1 0.90 TN 22394 22321 22597 2.21% 2.53% 1.32%70 D erivación 0.0 0.90 R ST 22394 22301 22577 2.21% 2.62% 1.41%71 112000096 En Servicio 27.7 0.90 TN 22394 22306 22571 2.21% 2.59% 1.43%72 112000097 En Servicio 30.8 0.90 TN 22394 22300 22568 2.21% 2.62% 1.45%

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

111

C.H. Maria Auxiliadora A1016 REPORTE DE CORRIENTES Y PERDIDAS TECNICAS

Nodo Nodo Anterior Longitud (m) R (ohm) X (ohm) I - RN (A) I - SN (A) I - TN (A) Pérdidas RN (W) Pérdidas SN (W) Pérdidas TN (W)1 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.002 1 3.54 0.00 0.00 5.09 24.48 3.61 0.08 1.64 0.043 2 42.74 0.05 0.02 4.83 24.48 2.58 0.83 19.75 0.244 3 6701.90 7.44 3.14 4.83 24.99 2.57 129.18 3092.55 37.175 4 1925.68 2.14 0.90 4.82 24.27 2.57 37.12 859.12 10.686 5 89.20 0.22 0.00 0.17 0.00 0.00 0.01 0.00 0.007 5 1899.43 2.11 0.89 4.61 24.28 2.57 33.57 847.41 10.538 7 619.59 1.55 0.01 0.00 3.40 0.00 0.00 18.37 0.009 8 588.09 1.47 0.01 0.00 1.88 0.00 0.00 5.34 0.0010 7 395.50 0.44 0.19 4.61 20.10 2.57 6.99 120.98 2.1911 10 2778.55 3.08 1.30 1.59 16.49 1.41 5.84 562.32 4.6312 11 1577.50 2.46 0.03 0.00 0.00 1.17 0.00 0.00 3.7013 12 87.30 0.14 0.00 0.00 0.00 1.10 0.00 0.00 0.1814 13 26.90 0.04 0.00 0.00 0.00 0.61 0.00 0.00 0.0215 14 528.20 0.82 0.01 0.00 0.00 0.16 0.00 0.00 0.0216 14 2.50 0.00 0.00 0.00 0.00 0.45 0.00 0.00 0.0017 13 1738.20 2.71 0.03 0.00 0.00 0.50 0.00 0.00 0.7318 17 1701.70 2.66 0.03 0.00 0.00 0.19 0.00 0.00 0.1119 12 692.90 1.08 0.01 0.00 0.00 0.07 0.00 0.00 0.0120 11 436.26 0.48 0.20 1.59 16.42 0.00 0.92 88.29 0.0021 20 78.61 0.09 0.04 0.00 0.00 0.00 0.00 0.00 0.0022 20 5438.07 6.03 2.55 1.59 16.60 0.00 11.44 1100.55 0.0023 22 3822.71 4.24 1.79 0.00 16.57 0.00 0.00 773.64 0.0024 23 86.47 0.14 0.00 0.00 2.14 0.00 0.00 0.60 0.0025 24 2108.50 3.29 0.04 0.00 0.44 0.00 0.00 0.61 0.0026 25 2017.70 3.15 0.04 0.00 0.15 0.00 0.00 0.07 0.0027 24 2.70 0.00 0.00 0.00 1.71 0.00 0.00 0.01 0.0028 23 628.05 0.98 0.01 0.00 11.62 0.00 0.00 127.34 0.0029 28 628.05 0.98 0.01 0.00 9.04 0.00 0.00 77.14 0.0030 29 116.38 0.18 0.00 0.00 1.32 0.00 0.00 0.31 0.0031 29 385.39 0.60 0.01 0.00 7.71 0.00 0.00 34.47 0.0032 31 385.39 0.60 0.01 0.00 5.16 0.00 0.00 15.45 0.0033 32 504.50 0.79 0.01 0.00 1.42 0.00 0.00 1.53 0.0034 33 1975.42 3.08 0.04 0.00 0.05 0.00 0.00 0.01 0.0035 33 2263.94 3.53 0.04 0.00 1.37 0.00 0.00 6.34 0.0036 35 44.04 0.07 0.00 0.00 0.88 0.00 0.00 0.05 0.0037 36 2263.94 3.53 0.04 0.00 0.00 0.00 0.00 0.00 0.0038 32 64.18 0.10 0.00 0.00 3.74 0.00 0.00 1.35 0.0039 22 2682.30 4.19 0.05 1.33 0.00 0.00 7.94 0.00 0.0040 39 422.96 0.66 0.01 0.50 0.00 0.00 0.18 0.00 0.0041 39 2044.89 3.19 0.04 0.83 0.00 0.00 2.36 0.00 0.0042 41 135.10 0.21 0.00 0.32 0.00 0.00 0.02 0.00 0.0043 41 911.22 1.42 0.02 0.51 0.00 0.00 0.40 0.00 0.0044 43 258.70 0.40 0.00 0.35 0.00 0.00 0.05 0.00 0.0045 43 1637.83 2.56 0.03 0.16 0.00 0.00 0.07 0.00 0.0046 10 794.60 0.88 0.37 3.02 3.69 1.16 6.03 8.46 0.9047 46 3557.80 5.56 1.70 2.61 3.52 1.11 30.98 53.32 5.6748 47 42.80 0.11 0.00 0.00 0.48 0.00 0.00 0.02 0.0049 47 1877.60 2.93 0.90 2.61 2.97 1.11 16.35 20.04 2.9950 49 529.90 1.32 0.01 0.00 0.00 0.97 0.00 0.00 1.3551 49 1618.04 2.53 0.78 2.61 2.97 0.00 14.09 17.27 0.0052 51 721.54 1.80 0.01 0.00 0.63 0.00 0.00 0.72 0.0053 51 2195.40 3.43 1.05 2.61 2.25 0.00 19.12 13.48 0.0054 53 2842.70 7.09 0.05 0.00 1.97 0.00 0.00 27.88 0.0055 54 1678.40 4.19 0.03 0.00 0.60 0.00 0.00 1.54 0.0056 55 797.85 1.99 0.02 0.00 0.16 0.00 0.00 0.05 0.0057 55 2.50 0.01 0.00 0.00 0.44 0.00 0.00 0.00 0.0058 54 9.73 0.02 0.00 0.00 1.37 0.00 0.00 0.05 0.0059 53 1100.20 2.74 0.02 2.28 0.00 0.00 15.30 0.00 0.0060 59 1100.20 2.74 0.02 1.65 0.00 0.00 7.98 0.00 0.0061 60 1100.20 2.74 0.02 0.76 0.00 0.00 1.68 0.00 0.0062 46 1150.14 2.87 0.02 0.24 0.00 0.00 0.18 0.00 0.0063 4 242.75 0.61 0.00 0.00 0.33 0.00 0.00 0.07 0.0064 3 9.50 0.01 0.00 0.01 0.01 0.01 0.00 0.00 0.0065 2 4439.52 11.01 0.10 0.22 0.00 0.86 0.57 0.00 8.9966 65 394.72 0.98 0.01 0.00 0.00 0.86 0.00 0.00 0.8067 65 1789.02 4.46 0.03 0.22 0.00 0.00 0.23 0.00 0.00

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

112

C.H. Maria Auxiliadora A1016 REPORTE DE CAIDA DE TENSIÓN

Nodo SED Estado MD (kW) F.P. Conexión V RS (V) V ST (V) V TR (V) ∆V RS (%) ∆V ST (%) ∆V TR (%)1 Alimentador - A1016 En Servicio 0.00 0.90 RST 22900 22900 22900 0.00% 0.00% 0.00%2 Derivación 0.00 0.90 RST 22900 22900 22900 0.00% 0.00% 0.00%3 Derivación 0.00 0.90 RST 22898 22898 22899 0.01% 0.01% 0.00%4 Derivación 0.00 0.90 RST 22605 22638 22827 1.29% 1.14% 0.32%5 Derivación 0.00 0.90 RST 22528 22560 22807 1.62% 1.49% 0.40%6 115000329 En Servicio 1.50 0.90 RN 22530 22558 22807 1.62% 1.49% 0.40%7 Derivación 0.00 0.90 RST 22449 22486 22788 1.97% 1.81% 0.49%8 115000109 En Servicio 13.05 0.90 SN 22442 22480 22788 2.00% 1.83% 0.49%9 115000060 En Servicio 16.15 0.90 SN 22439 22475 22788 2.01% 1.85% 0.49%

10 Derivación 0.00 0.90 RST 22436 22472 22784 2.02% 1.87% 0.51%11 Derivación 0.00 0.90 RST 22363 22402 22772 2.35% 2.17% 0.56%12 Derivación 0.00 0.90 RST 22365 22396 22769 2.34% 2.20% 0.57%13 Derivación 0.00 0.90 RST 22365 22397 22768 2.34% 2.20% 0.58%14 Derivación 0.00 0.90 RST 22365 22397 22768 2.34% 2.20% 0.58%15 115000100 En Servicio 1.39 0.90 TN 22365 22396 22768 2.34% 2.20% 0.58%16 115000156 En Servicio 3.96 0.90 TN 22365 22397 22768 2.34% 2.20% 0.58%17 115000412 En Servicio 2.67 0.90 TN 22365 22394 22766 2.34% 2.21% 0.58%18 115000453 En Servicio 1.71 0.90 TN 22365 22394 22766 2.34% 2.21% 0.59%19 115000351 En Servicio 0.64 0.90 TN 22365 22397 22768 2.34% 2.20% 0.58%20 Derivación 0.00 0.90 RST 22353 22391 22771 2.39% 2.22% 0.56%21 Derivación 0.00 0.90 RST 22353 22390 22771 2.39% 2.23% 0.56%22 Derivación 0.00 0.90 RST 22208 22265 22758 3.02% 2.77% 0.62%23 Derivación 0.00 0.90 RST 22118 22173 22758 3.41% 3.17% 0.62%24 Derivación 0.00 0.90 RST 22120 22170 22758 3.40% 3.19% 0.62%25 115000075 En Servicio 2.35 0.90 SN 22118 22169 22758 3.41% 3.19% 0.62%26 115000099 En Servicio 1.28 0.90 SN 22118 22168 22758 3.42% 3.20% 0.62%27 115000499 En Servicio 14.22 0.90 SN 22121 22170 22758 3.40% 3.19% 0.62%28 115000353 En Servicio 21.39 0.90 SN 22102 22160 22758 3.48% 3.23% 0.62%29 Derivación 0.00 0.90 RST 22092 22148 22758 3.53% 3.29% 0.62%30 115000107 En Servicio 11.01 0.90 SN 22094 22144 22758 3.52% 3.30% 0.62%31 115000354 En Servicio 21.17 0.90 SN 22087 22140 22758 3.55% 3.32% 0.62%32 Derivación 0.00 0.90 RST 22084 22136 22758 3.56% 3.34% 0.62%33 Derivación 0.00 0.90 RST 22083 22134 22758 3.57% 3.35% 0.62%34 115000472 En Servicio 0.45 0.90 SN 22083 22133 22758 3.57% 3.35% 0.62%35 115000141 En Servicio 4.06 0.90 SN 22076 22129 22758 3.60% 3.37% 0.62%36 115000025 En Servicio 7.27 0.90 SN 22077 22127 22758 3.59% 3.38% 0.62%37 Derivación 0.00 0.90 RST 22077 22127 22758 3.59% 3.38% 0.62%38 115000222 En Servicio 31.12 0.90 SN 22084 22134 22758 3.56% 3.34% 0.62%39 Derivación 0.00 0.90 RST 22206 22261 22749 3.03% 2.79% 0.66%40 115000411 En Servicio 4.38 0.90 RN 22204 22261 22751 3.04% 2.79% 0.65%41 Derivación 0.00 0.90 RST 22202 22261 22747 3.05% 2.79% 0.67%42 115000475 En Servicio 2.78 0.90 RN 22201 22261 22748 3.05% 2.79% 0.67%43 Derivación 0.00 0.90 RST 22200 22261 22746 3.06% 2.79% 0.67%44 115000392 En Servicio 3.10 0.90 RN 22200 22261 22746 3.06% 2.79% 0.67%45 115000350 En Servicio 1.39 0.90 RN 22199 22261 22746 3.06% 2.79% 0.67%46 Derivación 0.00 0.90 RST 22429 22466 22779 2.06% 1.89% 0.53%47 Derivación 0.00 0.90 RST 22384 22435 22751 2.25% 2.03% 0.65%48 115000373 En Servicio 4.10 0.90 SN 22385 22433 22752 2.25% 2.04% 0.65%49 Derivación 0.00 0.90 RST 22363 22418 22737 2.34% 2.10% 0.71%50 115000131 En Servicio 8.55 0.90 TN 22364 22415 22737 2.34% 2.12% 0.71%51 Derivación 0.00 0.90 RST 22345 22409 22729 2.42% 2.15% 0.75%52 115000288 En Servicio 5.35 0.90 SN 22343 22407 22729 2.43% 2.15% 0.74%53 Derivación 0.00 0.90 RST 22324 22399 22717 2.52% 2.19% 0.80%54 Derivación 0.00 0.90 RST 22300 22385 22718 2.62% 2.25% 0.80%55 Derivación 0.00 0.90 RST 22301 22377 22718 2.61% 2.28% 0.80%56 115000024 En Servicio 1.39 0.90 SN 22302 22376 22718 2.61% 2.29% 0.80%57 115000118 En Servicio 3.74 0.90 SN 22302 22377 22718 2.61% 2.29% 0.80%58 115000514 En Servicio 11.66 0.90 SN 22305 22380 22718 2.60% 2.27% 0.80%59 115000254 En Servicio 5.56 0.90 RN 22318 22398 22707 2.54% 2.19% 0.84%60 115000133 En Servicio 7.81 0.90 RN 22311 22398 22702 2.57% 2.19% 0.86%61 115000255 En Servicio 6.63 0.90 RN 22308 22398 22700 2.59% 2.19% 0.87%62 115000289 En Servicio 2.14 0.90 RN 22428 22466 22778 2.06% 1.89% 0.53%63 115000328 En Servicio 2.89 0.90 SN 22610 22632 22828 1.27% 1.17% 0.31%64 115000187 En Servicio 0.32 0.90 RSTN 22898 22898 22899 0.01% 0.01% 0.00%65 Derivación 0.00 0.90 RST 22898 22884 22887 0.01% 0.07% 0.06%66 115000021 En Servicio 7.65 0.90 TN 22897 22886 22884 0.01% 0.06% 0.07%67 115000125 En Servicio 1.92 0.90 RN 22896 22888 22883 0.02% 0.05% 0.07%

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

113

C.H. Maria Auxiliadora A1017 REPORTE DE CORRIENTES Y PERDIDAS TECNICAS

Nodo Nodo Anterior Longitud (m) R (ohm) X (ohm) I - RN (A) I - SN (A) I - TN (A) Pérdidas RN (W) Pérdidas SN (W) Pérdidas TN (W)1 0 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.02 1 1008.40 0.51 0.41 43.93 41.69 21.56 826.0 798.7 205.93 2 319.10 0.17 0.14 43.85 41.61 21.54 282.7 273.3 70.54 3 6642.20 4.83 2.99 41.94 40.01 20.41 7686.3 7549.7 1946.55 4 264.40 0.41 0.01 0.00 10.26 0.00 0.0 78.2 0.06 5 898.20 1.40 0.02 0.00 9.74 0.00 0.0 238.7 0.07 6 853.60 1.33 0.02 0.00 8.79 0.00 0.0 185.1 0.08 7 157.60 0.25 0.00 0.00 3.57 0.00 0.0 5.7 0.09 7 260.10 0.41 0.00 0.00 5.20 0.00 0.0 19.8 0.0

10 9 260.10 0.41 0.00 0.00 3.43 0.00 0.0 8.6 0.011 5 100.90 0.16 0.00 0.00 0.53 0.00 0.0 0.1 0.012 4 495.00 0.55 0.23 38.02 23.90 18.67 874.2 364.8 221.413 12 793.80 0.88 0.37 19.36 16.24 17.72 376.0 267.1 317.114 13 1285.03 3.21 0.02 0.00 0.00 0.00 0.0 0.0 0.015 14 1285.03 3.21 0.02 0.00 0.00 0.00 0.0 0.0 0.016 13 11621.20 6.58 5.13 22.71 18.98 20.74 2806.6 1993.8 2367.017 16 1979.80 1.08 0.87 21.98 18.87 20.61 440.7 328.9 390.518 17 927.94 1.45 0.02 0.35 0.65 0.00 0.3 1.1 0.019 18 329.70 0.51 0.01 0.00 0.65 0.00 0.0 0.4 0.020 18 579.20 1.44 0.01 0.35 0.00 0.00 0.3 0.0 0.021 17 4106.90 2.25 1.81 21.60 18.03 20.70 873.4 616.7 810.122 21 472.90 0.26 0.21 21.47 17.94 20.58 100.6 71.0 93.323 22 1972.00 1.08 0.87 21.53 17.99 20.64 419.4 296.1 389.024 23 964.60 0.53 0.43 20.52 17.96 20.61 186.6 144.9 190.325 24 158.20 0.09 0.07 20.06 17.94 20.58 29.3 23.8 31.226 25 509.80 0.28 0.22 17.81 17.95 20.60 74.1 76.6 100.627 26 1978.41 0.66 0.11 0.72 0.00 0.00 0.5 0.0 0.028 27 1797.41 0.38 0.11 0.42 0.00 0.00 0.1 0.0 0.029 26 2293.90 1.26 1.01 16.94 18.01 20.67 299.3 344.5 452.530 29 4007.30 2.20 1.77 15.85 18.07 20.75 454.2 601.8 790.531 30 1829.30 1.00 0.81 15.81 15.39 20.68 207.3 200.1 360.832 31 1129.66 2.82 0.02 0.00 0.00 0.22 0.0 0.0 0.233 32 784.22 1.96 0.01 0.00 0.00 0.13 0.0 0.0 0.134 31 1783.50 0.98 0.79 15.81 15.40 20.38 202.2 195.1 341.135 34 331.10 0.83 0.01 0.71 0.00 0.00 0.7 0.0 0.036 34 3137.70 1.72 1.38 14.85 15.43 20.44 312.4 343.2 600.137 36 120.40 0.27 0.06 9.85 9.76 9.67 33.7 33.7 33.738 37 367.70 0.29 0.17 1.07 1.06 1.05 0.3 0.3 0.339 37 249.40 0.30 0.12 8.01 7.93 7.86 21.8 21.8 21.840 39 516.00 0.41 0.23 5.53 5.48 5.42 12.2 12.2 12.241 40 516.00 0.41 0.23 4.29 4.24 4.20 7.3 7.3 7.342 41 78.50 0.06 0.04 0.99 0.98 0.97 0.1 0.1 0.143 41 186.70 0.15 0.08 1.51 1.49 1.48 0.3 0.3 0.344 41 220.65 0.17 0.10 1.79 1.77 1.76 0.5 0.5 0.545 39 106.61 0.08 0.05 2.06 2.04 2.02 0.4 0.4 0.446 45 239.90 0.19 0.11 1.16 1.15 1.14 0.3 0.3 0.347 45 22.47 0.02 0.01 0.84 0.83 0.83 0.0 0.0 0.048 47 82.71 0.09 0.04 0.42 0.42 0.41 0.0 0.0 0.049 39 106.61 0.08 0.05 1.03 1.02 1.01 0.1 0.1 0.150 37 242.60 0.19 0.11 1.68 1.66 1.65 0.5 0.5 0.551 36 360.60 0.20 0.16 2.44 3.13 8.21 1.0 1.6 10.952 51 155.60 0.12 0.07 1.21 1.20 1.19 0.2 0.2 0.253 51 1650.70 1.65 0.76 0.99 1.61 6.11 1.7 4.6 63.854 53 1324.90 1.47 0.62 0.97 1.58 6.01 1.5 4.1 56.955 54 1324.90 1.47 0.62 0.97 1.58 6.01 1.5 4.1 56.956 55 6250.40 9.76 2.99 0.93 1.51 5.78 10.1 27.2 377.957 56 42.90 0.11 0.00 0.00 0.00 0.00 0.0 0.0 0.058 56 363.40 0.91 0.01 0.00 0.00 0.00 0.0 0.0 0.059 56 1932.60 3.02 0.93 0.93 1.51 5.76 3.1 8.4 116.860 59 1932.60 3.02 0.93 0.93 1.51 5.76 3.1 8.4 116.861 60 79.30 0.09 0.04 0.19 0.81 5.25 0.0 0.1 2.662 61 829.30 2.07 0.02 0.00 0.00 0.00 0.0 0.0 0.063 62 829.30 2.07 0.02 0.00 0.00 0.00 0.0 0.0 0.064 61 4184.10 6.53 2.00 0.19 0.77 5.03 0.3 4.8 191.065 64 2374.00 3.71 1.14 0.17 0.76 5.01 0.1 2.6 107.766 65 2497.93 3.90 1.20 0.02 0.02 0.02 0.0 0.0 0.067 65 2577.10 4.02 1.23 0.15 0.74 5.00 0.1 2.7 116.168 67 2577.10 4.02 1.23 0.15 0.74 5.00 0.1 2.7 116.169 68 2577.10 2.86 1.21 0.16 0.78 5.24 0.1 1.9 82.570 69 268.90 0.30 0.13 0.13 0.13 0.13 0.0 0.0 0.071 69 101.40 0.11 0.05 0.03 0.65 5.10 0.0 0.1 3.172 71 151.60 0.17 0.07 0.02 0.02 0.02 0.0 0.0 0.0

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

114

72 71 151.60 0.17 0.07 0.02 0.02 0.02 0.0 0.0 0.073 71 2888.90 4.51 1.38 0.02 0.60 4.87 0.0 2.0 123.074 73 1507.92 2.35 0.72 0.00 0.59 0.00 0.0 1.0 0.075 74 2156.30 3.37 1.03 0.00 0.54 0.00 0.0 1.2 0.076 75 2722.00 6.79 0.05 0.00 0.47 0.00 0.0 2.4 0.077 75 1020.00 1.59 0.49 0.00 0.00 0.00 0.0 0.0 0.078 77 5734.50 8.95 2.75 0.00 0.00 0.00 0.0 0.0 0.079 77 1463.38 2.28 0.03 0.00 0.00 0.00 0.0 0.0 0.080 74 120.00 0.19 0.06 0.00 0.05 0.00 0.0 0.0 0.081 73 416.30 0.46 0.19 0.02 0.02 5.09 0.0 0.0 12.682 81 416.30 0.46 0.19 0.00 0.00 5.08 0.0 0.0 12.583 82 115.90 0.13 0.05 0.00 0.00 5.08 0.0 0.0 3.584 83 90.00 0.14 0.04 0.00 0.00 0.05 0.0 0.0 0.085 83 1088.40 1.21 0.51 0.00 0.00 5.03 0.0 0.0 32.086 85 190.50 0.21 0.09 0.00 0.00 0.05 0.0 0.0 0.087 85 368.00 0.41 0.17 0.00 0.00 4.97 0.0 0.0 10.688 87 62.20 0.07 0.03 0.00 0.00 0.00 0.0 0.0 0.089 87 877.80 0.97 0.41 0.00 0.00 4.98 0.0 0.0 25.390 82 186.13 0.21 0.09 0.00 0.00 0.00 0.0 0.0 0.091 64 60.00 0.15 0.03 0.02 0.02 0.02 0.0 0.0 0.092 60 495.70 0.55 0.23 0.78 0.77 0.78 0.4 0.4 0.493 55 114.21 0.28 0.06 0.00 0.00 0.00 0.0 0.0 0.094 30 839.70 0.93 0.02 0.00 1.90 0.00 0.0 5.5 0.095 94 839.70 0.93 0.02 0.00 0.00 0.00 0.0 0.0 0.096 29 299.63 0.47 0.01 0.82 0.00 0.00 0.5 0.0 0.097 25 1674.80 4.18 0.03 1.63 0.00 0.00 18.4 0.0 0.098 97 1568.70 3.91 0.03 0.89 0.00 0.00 5.1 0.0 0.099 98 85.10 0.21 0.00 0.58 0.00 0.00 0.1 0.0 0.0

100 98 283.10 0.71 0.01 0.30 0.00 0.00 0.1 0.0 0.0101 24 193.20 0.19 0.01 0.32 0.00 0.00 0.0 0.0 0.0102 23 122.25 0.19 0.00 0.71 0.00 0.00 0.2 0.0 0.0103 22 190.93 0.21 0.09 0.00 0.00 0.00 0.0 0.0 0.0104 21 99.79 0.11 0.05 0.00 0.00 0.00 0.0 0.0 0.0105 16 468.03 1.17 0.01 0.39 0.00 0.00 0.3 0.0 0.0106 105 113.51 0.28 0.00 0.10 0.00 0.00 0.0 0.0 0.0107 105 640.59 1.60 0.01 0.29 0.00 0.00 0.2 0.0 0.0108 107 640.59 1.60 0.01 0.17 0.00 0.00 0.1 0.0 0.0109 12 10369.74 11.51 4.85 19.29 7.77 0.97 4256.6 803.5 14.0110 109 767.50 0.85 0.36 16.63 7.68 0.97 242.6 59.5 1.0111 110 496.98 1.24 0.01 0.15 0.15 0.15 0.0 0.0 0.0112 110 4965.00 5.51 2.32 16.67 7.54 0.79 1532.3 366.6 4.5113 112 4965.00 5.51 2.32 16.55 7.37 0.62 1496.7 349.3 2.8114 113 4965.00 5.51 2.32 16.47 7.24 0.49 1469.1 336.0 1.7115 114 485.90 0.54 0.23 15.15 7.20 0.49 123.6 32.9 0.2116 115 2671.10 2.96 1.25 15.26 0.33 0.00 679.6 0.4 0.0117 116 186.10 0.46 0.00 0.00 0.19 0.00 0.0 0.0 0.0118 116 614.00 0.68 0.29 15.20 0.09 0.00 156.2 0.0 0.0119 118 241.60 0.60 0.00 0.00 0.08 0.00 0.0 0.0 0.0120 118 4812.40 5.34 2.25 15.40 0.00 0.00 1224.4 0.0 0.0121 120 1214.40 3.03 0.02 11.29 0.00 0.00 537.7 0.0 0.0122 121 3188.50 7.95 0.06 9.44 0.00 0.00 966.3 0.0 0.0123 122 300.30 0.75 0.01 8.37 0.00 0.00 73.2 0.0 0.0124 123 272.30 0.68 0.01 8.33 0.00 0.00 65.7 0.0 0.0125 123 455.20 1.14 0.01 0.04 0.00 0.00 0.0 0.0 0.0126 122 2979.40 7.43 0.06 0.96 0.00 0.00 9.6 0.0 0.0127 126 2979.40 7.43 0.06 0.27 0.00 0.00 0.7 0.0 0.0128 121 1397.90 3.49 0.03 1.92 0.00 0.00 18.4 0.0 0.0129 128 1397.90 3.49 0.03 1.39 0.00 0.00 9.7 0.0 0.0130 129 1397.90 3.49 0.03 0.87 0.00 0.00 3.7 0.0 0.0131 120 8004.40 19.97 0.15 1.52 0.00 0.00 66.0 0.0 0.0132 131 7837.70 19.55 0.15 0.67 0.00 0.00 12.4 0.0 0.0133 115 736.40 0.82 0.34 0.00 6.88 0.49 0.0 45.4 0.3134 133 6657.57 5.33 2.99 0.00 0.00 0.51 0.0 0.0 1.6135 134 3346.74 2.65 1.52 0.00 0.00 0.52 0.0 0.0 0.8136 135 1164.25 2.90 0.02 0.00 0.00 0.20 0.0 0.0 0.2137 135 1775.76 4.43 0.03 0.00 0.00 0.20 0.0 0.0 0.3138 134 345.32 0.38 0.01 0.00 0.00 0.00 0.0 0.0 0.0139 133 441.50 0.69 0.01 0.00 0.70 0.00 0.0 0.6 0.0140 139 80.00 0.12 0.00 0.00 0.00 0.00 0.0 0.0 0.0141 139 247.20 0.39 0.00 0.00 0.70 0.00 0.0 0.3 0.0142 133 26.60 0.04 0.00 0.00 5.05 0.00 0.0 1.8 0.0143 142 361.70 0.56 0.01 0.00 4.55 0.00 0.0 19.7 0.0144 143 361.70 0.56 0.01 0.00 2.60 0.00 0.0 6.5 0.0 144 143 361.70 0.56 0.01 0.00 2.60 0.00 0.0 6.5 0.0145 144 155.07 0.24 0.00 0.00 2.13 0.00 0.0 1.8 0.0146 144 396.85 0.62 0.01 0.00 0.47 0.00 0.0 0.2 0.0147 142 232.10 0.36 0.00 0.00 0.49 0.00 0.0 0.1 0.0148 114 343.00 0.38 0.16 1.15 0.00 0.00 0.5 0.0 0.0149 109 3780.50 9.43 0.07 1.83 0.00 0.00 52.4 0.0 0.0150 149 3780.50 9.43 0.07 1.02 0.00 0.00 16.2 0.0 0.0151 150 3780.50 9.43 0.07 0.62 0.00 0.00 6.0 0.0 0.0152 3 49.70 0.12 0.00 0.23 0.00 0.00 0.0 0.0 0.0153 2 143.70 0.16 0.07 0.00 0.00 0.00 0.0 0.0 0.0

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

115

C.H. Maria Auxiliadora A1017 REPORTE DE CAIDA DE TENSIÓN

Nodo SED Estado MD (kW) F.P. Conexión V RS (V) V ST (V) V TR (V) ∆V RS (%) ∆V ST (%) ∆V TR (%)1 Alimentador - A1017 En Servicio 0.0 0.90 RST 22900 22900 22900 0.00% 0.00% 0.00%2 Derivación 0.0 0.90 RST 22824 22842 22845 0.33% 0.25% 0.24%3 Derivación 0.0 0.90 RST 22798 22824 22823 0.44% 0.33% 0.34%4 Derivación 0.0 0.90 RST 22110 22308 22310 3.45% 2.58% 2.58%5 Derivación 0.0 0.90 RST 22102 22313 22299 3.49% 2.57% 2.62%6 115000252 En Servicio 13.0 0.90 SN 22074 22293 22299 3.61% 2.65% 2.62%7 Derivación 0.0 0.90 RST 22054 22272 22299 3.69% 2.74% 2.62%8 115000246 En Servicio 49.2 0.90 SN 22058 22266 22299 3.68% 2.77% 2.62%9 115000029 En Servicio 24.4 0.90 SN 22055 22264 22299 3.69% 2.78% 2.62%

10 115000114 En Servicio 47.3 0.90 SN 22053 22261 22299 3.70% 2.79% 2.62%11 115000326 En Servicio 7.4 0.90 SN 22103 22310 22299 3.48% 2.57% 2.62%12 Derivación 0.0 0.90 RST 22052 22278 22245 3.70% 2.72% 2.86%13 Derivación 0.0 0.90 RST 21998 22226 22189 3.94% 2.95% 3.11%14 115000532 En Servicio 0.0 0.90 TN 21998 22226 22189 3.94% 2.95% 3.11%15 115000531 En Servicio 0.0 0.90 TN 21998 22226 22189 3.94% 2.95% 3.11%16 Derivación 0.0 0.90 RST 21518 21775 21697 6.04% 4.91% 5.25%17 Derivación 0.0 0.90 RST 21445 21699 21614 6.35% 5.24% 5.61%18 Derivación 0.0 0.90 RST 21444 21698 21613 6.36% 5.25% 5.62%19 115000143 En Servicio 8.8 0.90 SN 21443 21697 21613 6.36% 5.25% 5.62%20 115000273 En Servicio 4.7 0.90 RN 21443 21697 21612 6.36% 5.25% 5.62%21 Derivación 0.0 0.90 RST 21290 21549 21450 7.03% 5.90% 6.33%22 Derivación 0.0 0.90 RST 21274 21531 21430 7.10% 5.98% 6.42%23 Derivación 0.0 0.90 RST 21199 21459 21352 7.43% 6.29% 6.76%24 Derivación 0.0 0.90 RST 21165 21423 21314 7.58% 6.45% 6.93%25 Derivación 0.0 0.90 RST 21159 21417 21308 7.60% 6.47% 6.95%26 Derivación 0.0 0.90 RST 21142 21399 21289 7.68% 6.56% 7.04%27 115000528 En Servicio 3.9 0.90 RN 21141 21399 21288 7.68% 6.56% 7.04%28 115000459 En Servicio 4.9 0.90 RN 21331 21591 21479 6.85% 5.72% 6.20%29 Derivación 0.0 0.90 RST 21447 21700 21590 6.35% 5.24% 5.72%30 Derivación 0.0 0.90 RST 21316 21551 21446 6.92% 5.89% 6.35%31 Derivación 0.0 0.90 RST 21260 21487 21383 7.16% 6.17% 6.62%32 115000458 En Servicio 1.3 0.90 TN 21071 21293 21193 7.99% 7.02% 7.46%33 115000527 En Servicio 1.7 0.90 TN 21071 21292 21192 7.99% 7.02% 7.46%34 Derivación 0.0 0.90 RST 21017 21234 21131 8.22% 7.27% 7.73%35 115000033 En Servicio 9.3 0.90 RN 21017 21233 21130 8.22% 7.28% 7.73%36 Derivación 0.0 0.90 RST 20926 21127 21023 8.62% 7.74% 8.19%37 Derivación 0.0 0.90 RST 20917 21116 21016 8.66% 7.79% 8.23%38 115000262 En Servicio 32.6 0.90 RSTN 20916 21115 21015 8.66% 7.79% 8.23%39 Derivación 0.0 0.90 RST 20909 21108 21008 8.70% 7.83% 8.26%40 115000162 En Servicio 37.9 0.90 RSTN 20901 21100 21000 8.73% 7.86% 8.30%41 Derivación 0.0 0.90 RST 20895 21094 20994 8.76% 7.89% 8.32%42 115000352 En Servicio 30.0 0.90 RSTN 20895 21094 20994 8.76% 7.89% 8.32%43 115000348 En Servicio 46.0 0.90 RSTN 20894 21093 20993 8.76% 7.89% 8.33%44 115000269 En Servicio 54.6 0.90 RSTN 20894 21093 20993 8.76% 7.89% 8.33%45 Derivación 0.0 0.90 RST 20908 21107 21008 8.70% 7.83% 8.26%46 115000161 En Servicio 35.5 0.90 RSTN 20907 21106 21007 8.70% 7.83% 8.27%47 115000541 En Servicio 13.6 0.90 RSTN 20908 21107 21007 8.70% 7.83% 8.26%48 115000542 En Servicio 13.6 0.90 RSTN 20908 21107 21007 8.70% 7.83% 8.26%49 115000148 En Servicio 31.4 0.90 RSTN 20909 21108 21008 8.70% 7.83% 8.26%50 115000184 En Servicio 51.2 0.90 RSTN 20916 21115 21015 8.66% 7.79% 8.23%51 Derivación 0.0 0.90 RST 20924 21121 21022 8.63% 7.77% 8.20%52 115000436 En Servicio 37.0 0.90 RSTN 20924 21121 21021 8.63% 7.77% 8.20%53 115000437 En Servicio 0.0 0.90 RN 20917 21099 21001 8.66% 7.87% 8.29%54 115000022 En Servicio 0.0 0.90 RSTN 20910 21079 20984 8.69% 7.95% 8.37%55 Derivación 0.0 0.90 RST 20904 21060 20966 8.72% 8.04% 8.45%56 Derivación 0.0 0.90 RST 21238 21308 21235 7.26% 6.95% 7.27%57 115000462 En Servicio 0.0 0.90 RN 21239 21314 21228 7.25% 6.93% 7.30%58 115000442 En Servicio 0.0 0.90 RN 21239 21314 21228 7.25% 6.93% 7.30%59 115000145 En Servicio 0.0 0.90 RN 21037 21083 21005 8.14% 7.93% 8.27%60 Derivación 0.0 0.90 RST 21024 21045 20970 8.19% 8.10% 8.43%61 Derivación 0.0 0.90 RST 21024 21046 20966 8.19% 8.10% 8.44%62 115000443 En Servicio 0.0 0.90 RSTN 21024 21046 20966 8.19% 8.10% 8.44%63 115000444 En Servicio 0.0 0.90 RSTN 21024 21046 20966 8.19% 8.10% 8.44%64 Derivación 0.0 0.90 RST 21012 20975 20911 8.24% 8.41% 8.68%65 Derivación 0.0 0.90 RST 21195 21127 21063 7.44% 7.74% 8.02%66 115000215 En Servicio 0.5 0.90 RSTN 21196 21129 21060 7.44% 7.73% 8.03%67 115000543 En Servicio 0.0 0.90 RN 21189 21086 21027 7.47% 7.92% 8.18%68 115000274 En Servicio 0.0 0.90 RN 21183 21045 20990 7.50% 8.10% 8.34%69 Derivación 0.0 0.90 RST 21178 21016 20960 7.52% 8.23% 8.47%70 115000432 En Servicio 4.1 0.90 RSTN 21178 21017 20959 7.52% 8.22% 8.48%71 Derivación 0.0 0.90 RST 21178 21016 20958 7.52% 8.23% 8.48%72 115000486 En Servicio 0.5 0.90 RSTN 21178 21016 20958 7.52% 8.23% 8.48%

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

116

72 115000486 En Servicio 0.5 0.90 RSTN 21178 21016 20958 7.52% 8.23% 8.48%73 Derivación 0.0 0.90 RST 21173 20969 20923 7.54% 8.43% 8.63%74 Derivación 0.0 0.90 RST 21170 20970 20919 7.55% 8.43% 8.65%75 Derivación 0.0 0.90 RST 21167 20967 20919 7.57% 8.44% 8.65%76 115000435 En Servicio 6.1 0.90 SN 21160 20962 20919 7.60% 8.46% 8.65%77 Derivación 0.0 0.90 RST 21167 20966 20919 7.57% 8.44% 8.65%78 Derivación 0.0 0.90 RST 21167 20966 20919 7.57% 8.44% 8.65%79 115000147 En Servicio 0.0 0.90 SN 21167 20966 20919 7.57% 8.44% 8.65%80 115000470 En Servicio 0.5 0.90 SN 21171 20970 20919 7.55% 8.43% 8.65%81 115000157 En Servicio 0.5 0.90 RSTN 21173 20968 20915 7.54% 8.44% 8.67%82 Derivación 0.0 0.90 RST 21173 20964 20911 7.54% 8.46% 8.69%83 Derivación 0.0 0.90 RST 21173 20963 20910 7.54% 8.46% 8.69%84 115000471 En Servicio 0.5 0.90 TN 21173 20963 20910 7.54% 8.46% 8.69%85 Derivación 0.0 0.90 RST 21173 20952 20899 7.54% 8.51% 8.74%86 115000433 En Servicio 0.5 0.90 TN 21173 20952 20899 7.54% 8.51% 8.74%87 Derivación 0.0 0.90 RST 21173 20948 20895 7.54% 8.52% 8.75%88 Derivación 0.0 0.90 RST 21173 20948 20895 7.54% 8.52% 8.75%89 115000434 En Servicio 52.3 0.90 TN 21173 20939 20887 7.54% 8.56% 8.79%90 115000172 En Servicio 0.0 0.90 TN 21173 20964 20911 7.54% 8.46% 8.69%91 115000216 En Servicio 0.5 0.90 RSTN 21202 21168 21094 7.42% 7.56% 7.88%92 115000095 En Servicio 25.1 0.90 RSTN 21212 21235 21154 7.37% 7.27% 7.62%93 115000210 En Servicio 0.0 0.90 RSTN 21282 21441 21344 7.07% 6.37% 6.79%94 115000483 En Servicio 24.9 0.90 SN 21503 21741 21642 6.10% 5.06% 5.49%95 Derivación 0.0 0.90 RST 21504 21740 21642 6.10% 5.06% 5.49%96 115000460 En Servicio 10.8 0.90 RN 21639 21895 21784 5.51% 4.39% 4.87%97 115000287 En Servicio 9.8 0.90 RN 21727 22001 21873 5.12% 3.93% 4.49%98 Derivación 0.0 0.90 RST 21719 22001 21868 5.16% 3.93% 4.51%99 115000342 En Servicio 7.6 0.90 RN 21717 22001 21870 5.16% 3.93% 4.50%100 115000343 En Servicio 4.0 0.90 RN 21717 22001 21869 5.17% 3.93% 4.50%101 115000517 En Servicio 4.1 0.90 RN 21548 21810 21699 5.91% 4.76% 5.25%102 115000017 En Servicio 9.3 0.90 RN 21583 21846 21737 5.75% 4.60% 5.08%103 Derivación 0.0 0.90 RST 21659 21920 21818 5.42% 4.28% 4.73%104 115000393 En Servicio 0.0 0.90 RSTN 21872 22135 22033 4.49% 3.34% 3.78%105 Derivación 0.0 0.90 RST 22109 22366 22284 3.46% 2.33% 2.69%106 115000457 En Servicio 1.3 0.90 RN 22109 22366 22284 3.46% 2.33% 2.69%107 115000368 En Servicio 1.6 0.90 RN 22108 22366 22283 3.46% 2.33% 2.69%108 115000456 En Servicio 2.3 0.90 RN 22107 22366 22283 3.46% 2.33% 2.70%109 Derivación 0.0 0.90 RST 22105 22710 22430 3.47% 0.83% 2.05%110 Derivación 0.0 0.90 RST 22063 22693 22412 3.65% 0.90% 2.13%111 115000295 En Servicio 6.1 0.90 RSTN 22062 22692 22412 3.66% 0.91% 2.13%112 115000132 En Servicio 6.0 0.90 RSTN 21828 22614 22239 4.68% 1.25% 2.89%113 115000250 En Servicio 4.7 0.90 RSTN 21594 22536 22073 5.70% 1.59% 3.61%114 Derivación 0.0 0.90 RST 21363 22461 21909 6.71% 1.92% 4.33%115 Derivación 0.0 0.90 RST 21339 22451 21898 6.82% 1.96% 4.38%116 Derivación 0.0 0.90 RST 21260 22450 21817 7.16% 1.97% 4.73%117 115000455 En Servicio 2.6 0.90 SN 21257 22449 21819 7.17% 1.97% 4.72%118 Derivación 0.0 0.90 RST 21240 22449 21801 7.25% 1.97% 4.80%119 115000367 En Servicio 1.0 0.90 SN 21239 22449 21801 7.25% 1.97% 4.80%120 Derivación 0.0 0.90 RST 21099 22449 21654 7.87% 1.97% 5.44%121 Derivación 0.0 0.90 RST 21241 22652 21775 7.24% 1.09% 4.91%122 Derivación 0.0 0.90 RST 21129 22652 21623 7.73% 1.09% 5.58%123 Derivación 0.0 0.90 RST 21083 22652 21647 7.93% 1.09% 5.47%124 115000248 En Servicio 100.9 0.90 RN 21073 22652 21637 7.98% 1.09% 5.51%125 115000487 En Servicio 0.5 0.90 RN 21080 22652 21650 7.95% 1.09% 5.46%126 115000310 En Servicio 8.4 0.90 RN 21082 22652 21645 7.94% 1.09% 5.48%127 115000034 En Servicio 3.2 0.90 RN 21076 22652 21644 7.96% 1.09% 5.48%128 115000282 En Servicio 6.5 0.90 RN 21216 22652 21778 7.36% 1.09% 4.90%129 115000247 En Servicio 6.5 0.90 RN 21206 22652 21770 7.40% 1.09% 4.93%130 115000346 En Servicio 10.6 0.90 RN 21200 22652 21766 7.42% 1.09% 4.95%131 115000137 En Servicio 10.5 0.90 RN 21246 22652 21784 7.22% 1.09% 4.87%132 115000290 En Servicio 8.2 0.90 RN 21214 22652 21770 7.36% 1.09% 4.93%133 Derivación 0.0 0.90 RST 21329 22441 21898 6.86% 2.00% 4.38%134 Derivación 0.0 0.90 RST 21329 22436 21893 6.86% 2.03% 4.40%135 Derivación 0.0 0.90 RST 21329 22433 21890 6.86% 2.04% 4.41%136 115000403 En Servicio 2.9 0.90 TN 21329 22432 21889 6.86% 2.04% 4.41%137 115000402 En Servicio 2.9 0.90 TN 21329 22431 21889 6.86% 2.05% 4.41%138 Derivación 0.0 0.90 RST 21329 22436 21893 6.86% 2.03% 4.40%139 Derivación 0.0 0.90 RST 21328 22440 21898 6.87% 2.01% 4.38%140 Derivación 0.0 0.90 RST 21328 22440 21898 6.86% 2.01% 4.38%141 115000052 En Servicio 9.3 0.90 SN 21327 22439 21898 6.87% 2.01% 4.38%142 Derivación 0.0 0.90 RST 21328 22440 21898 6.86% 2.01% 4.38%143 115000046 En Servicio 26.0 0.90 SN 21323 22437 21898 6.89% 2.02% 4.38%144 Derivación 0.0 0.90 RST 21321 22434 21898 6.90% 2.04% 4.38% 144 Derivación 0.0 0.90 RST 21321 22434 21898 6.90% 2.04% 4.38%145 115000347 En Servicio 28.3 0.90 SN 21320 22432 21898 6.90% 2.04% 4.38%146 115000270 En Servicio 6.3 0.90 SN 21321 22433 21898 6.90% 2.04% 4.38%147 115000249 En Servicio 6.6 0.90 SN 21328 22440 21898 6.86% 2.01% 4.38%148 115000454 En Servicio 12.2 0.90 RN 21360 22459 21912 6.73% 1.93% 4.31%149 115000023 En Servicio 10.7 0.90 RN 21880 22504 22200 4.45% 1.73% 3.06%150 115000283 En Servicio 5.3 0.90 RN 21860 22504 22187 4.54% 1.73% 3.11%151 115000251 En Servicio 8.2 0.90 RN 21848 22504 22179 4.59% 1.73% 3.15%152 115000327 En Servicio 3.2 0.90 RN 22798 22825 22822 0.44% 0.33% 0.34%153 Derivación 0.0 0.90 RST 22824 22844 22842 0.33% 0.24% 0.25%

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

117

5. Anexo V Análisis Técnico de la Red BT

Para el análisis de la red de baja tensión se conformó la creación de módulos, conformados por 6, 9, 12 y 16 manzanas. Los módulos respetaron los criterios y especificaciones de diseño de la red de baja tensión para las zonas dispersas existentes. 1) Módulo 6 Manzanas Este tiene una subestación de 25 kVA, suministrando energía a 6 manzanas a través de 2 circuitos; considera dos equipos de alumbrado público por calle, las cuales iluminan ambos frentes de la calle. El análisis se realizó para dos tipos de tecnología (tensión en el secundario del transformador 440-220 V y 220 V), siendo el siguiente diagrama unifilar válido para ambos análisis. Diagrama Unifilar Se observa que el punto A es el punto con mayor caída de tensión en el circuito, también denominado cola de los alimentadores. Una característica del análisis será que la caída de tensión en el punto A no supere lo establecido por la NTCSE (± 7.5% del VN):

P

P

P P

P

P

P

P

P

P

P

P

P

P PP

P

P P

P P P

P

P

6 Manzanas

A

P + AP

2P + 2AP

7P + 8AP

2P + 2AP

L

L/2

L

C1

A

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

118

Donde: P: Demanda por Frente (kW) AP: Demanda de Equipo de Alumbrado Público (kW)

Opción 1Manzanas 6

Nº Clientes por Manzana 16Nº Clientes 96

MD Cliente (kW) 0.300Demanda por Manzana (kW) 4.8

Demanda por Frente (kW) 1.2Factor Simultaneidad 0.5

Luminarias AP 26MD Lampara (kW) 0.07

MD AP (kW) 1.82MD Total (AP+SP) (kW) 16.22

Factor de Utilización 0.75Factor de Potencia SP 0.90Factor de Potencia AP 0.70Potencia Total (kVA) 18.60Potencia SED (kVA) 24.80

Longitud de la Manzana (m) 65Ancho Vía (m) 15L - Longitud de diseño (m) 75P - Demanda por Frente (kW) 1.2AP - Demanda por Unidad AP (kW) 0.07

Resultados del Flujo de Potencia para la Tecnología 440-220 V

CorrientesNodo Nodo Anterior Longitud (m) R (ohm) X (ohm) I (A)

1 0 0.0000 0.0000 0.0000 0.002 1 19.3125 0.0463 0.0022 17.933 2 10.0000 0.0240 0.0011 1.484 2 19.3125 0.0463 0.0022 16.445 4 10.0000 0.0240 0.0011 10.476 4 38.6250 0.0926 0.0044 5.957 6 10.0000 0.0240 0.0011 2.978 6 77.2500 0.1852 0.0089 2.989 8 10.0000 0.0240 0.0011 2.97

Tensión

Nodo Suministro Estado MD (kW) FP Conexión V (Volt) ∆V(%)1 Circuito - C_ELNO_06 En Servicio 0 0.90 1φ 440.002 Derivación 0 0.90 1φ 439.17 0.19%3 CL CONECTADO 0.635 0.90 1φ 439.13 0.20%4 Derivación 0 0.90 1φ 438.41 0.36%5 CL CONECTADO 4.48 0.90 1φ 438.16 0.42%6 Derivación 0 0.90 1φ 437.86 0.49%7 CL CONECTADO 1.27 0.90 1φ 437.79 0.50%8 Derivación 0 0.90 1φ 437.31 0.61%9 CL CONECTADO 1.27 0.90 1φ 437.23 0.63%

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

119

Pérdidas TécnicasNodo Nodo Anterior Longitud (m) R (ohm) X (ohm) Pérdidas (W)

1 0 0.000 0.000 0.000 0.0002 1 19.313 0.046 0.002 17.3023 2 10.000 0.024 0.001 0.0624 2 19.313 0.046 0.002 14.5515 4 10.000 0.024 0.001 3.0686 4 38.625 0.093 0.004 3.8107 6 10.000 0.024 0.001 0.2478 6 77.250 0.185 0.009 1.9059 8 10.000 0.024 0.001 0.247

Total (kW) 0.041 Resultados del Flujo de Potencia para la Tecnología 220 V

CorrientesNodo Nodo Anterior Longitud (m) R (ohm) X (ohm) I (A)

1 0 0.0 0.0000 0.0000 0.002 1 19.3 0.0463 0.0022 36.663 2 10.0 0.0240 0.0011 2.984 2 19.3 0.0463 0.0022 33.605 4 10.0 0.0240 0.0011 21.266 4 38.6 0.0926 0.0044 12.177 6 10.0 0.0240 0.0011 6.048 6 77.3 0.1852 0.0089 6.109 8 10.0 0.0240 0.0011 6.07

TensiónNodo Suministro Estado MD (kW) FP Conexión V (Volt) ∆V(%)

1 Circuito - C_ELNO_06 En Servicio 0 0.90 1φ 220.002 Derivación 0 0.90 1φ 218.30 0.77%3 CL CONECTADO 0.635 0.90 1φ 218.23 0.80%4 Derivación 0 0.90 1φ 216.75 1.48%5 CL CONECTADO 4.48 0.90 1φ 216.24 1.71%6 Derivación 0 0.90 1φ 215.62 1.99%7 CL CONECTADO 1.27 0.90 1φ 215.47 2.06%8 Derivación 0 0.90 1φ 214.49 2.50%9 CL CONECTADO 1.27 0.90 1φ 214.34 2.57%

Pérdidas Técnicas

Nodo Nodo Anterior Longitud (m) R (ohm) X (ohm) Pérdidas (W)1 0 0.000 0.000 0.000 0.0002 1 19.313 0.046 0.002 69.2083 2 10.000 0.024 0.001 0.2474 2 19.313 0.046 0.002 58.2025 4 10.000 0.024 0.001 12.2746 4 38.625 0.093 0.004 15.2397 6 10.000 0.024 0.001 0.9868 6 77.250 0.185 0.009 7.6209 8 10.000 0.024 0.001 0.986

Total (kW) 0.165

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

120

Comparación de Resultados de Tecnologías 440-220 V y 220 V

Opción 440-220 V 220 VMD (kW) 16.2 16.2

Red BT (km) 0.975 0.975Conductor AS01613 AS01613

Sección (mm2) 16 16∆V (%) 0.63% 2.57%∆P (%) 0.54% 2.15%

F.C. 0.284 0.284∆Pe (%) 0.42% 1.69%

I. Costo de Redes BT

440-220 VSección (mm2) 16 16 25

Red Urbana BT (km) 0.975 0.975 0.0Inversión (S/.) 13,050.91 13,050.91 0.00

Inversión Total (S/.) 13,050.91

220 V

13,050.91

II. Costo de Subestación + Red MT440-220 V 220 V

Potencia (kVA) 25 kVA 25 kVATipo Monofásico Monofásico

Costo de SED (S/.) 4,916.65 4,916.65

III. Costo de Mantenimiento440-220 V 220V

Costo Mantto. (S./) 236.38 236.38

IV. Costo de PérdidasPérdidas Energía Anuales

440-220 V 220V∆Pe (%) 0.42% 1.69%

F.C. 0.284 0.284Horas 8,640 8,640

MD (kW) 16.2 16.2Pe Anual (kWh) 168.16 672.63

440-220 V 220VPe Anual (kWh) 168.16 672.63

Nº SED 1 1Costo de la Energía (S/./kWh) 0.35 0.35

Total de Pe (S/.) 58.86 235.42

Resumen ENOSA - 6 ManzanasAnálisis 440-220 V S/./kW 220V S/./kWI. Costo de Red BT

Inversión (S/.) : 13,050.91 13,050.91Tasa Anual (%) : 12% 12%

Periodo Años : 30.00 30.00Amortización Anual (S/.) 1,620.19 99.89 1,620.19 99.89

II. Costo de Subestación + Red MTInversión (S/.) : 4,916.65 5,408.32

Tasa : 12% 12%Periodo Años : 30 30

Amortización Anual (S/.) 610.37 37.63 671.41 41.39III. Costo de Mantenimiento Anual (S/.) 236.38 14.57 236.38 14.57IV. Costo de Pérdidas Anual (S/.) 58.86 3.63 235.42 14.51

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

121

2) Módulo 9 Manzanas Este tiene una subestación de 37.5 kVA, suministrando energía a 9 manzanas a través de 2 circuitos; se considera dos equipos de alumbrado público por calle, las cuales iluminan ambos frentes de la calle. El análisis se realizó para dos tipos de tecnología (tensión en el secundario del transformador 440-220 V y 220 V), siendo el siguiente diagrama unifilar válido para ambos análisis. Diagrama Unifilar Se observa que el punto A es el punto con mayor caída de tensión en el circuito, también denominado cola de los alimentadores. Una característica del análisis será que la caída de tensión en el punto A no supere lo establecido por la NTCSE (± 7.5% del VN):

P

P

PPP

P

P P

P

P

P P

P

P

PP

P

P

P

P

P

P

P

PP

P

P

P

P

P

P

P

P

P

P

P

9 Manzanas

A

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

122

L 2P + 2AP

2P + 2APL

9P + 10AP

P + APL/2

C1

L

3P + 3AP

P + 2AP

A

Donde : P: Demanda por Frente (kW) AP: Demanda de Equipo de Alumbrado Público (kW)

Opción 2Manzanas 9

Nº Clientes por Manzana 16Nº Clientes 144

MD Cliente (kW) 0.300Demanda por Manzana (kW) 4.8

Demanda por Frente (kW) 1.2Factor Simultaneidad 0.5

Luminarias AP 40MD Lampara (kW) 0.07

MD AP (kW) 2.80MD Total (AP+SP) (kW) 24.40

Factor de Utilización 0.75Factor de Potencia SP 0.90Factor de Potencia AP 0.70Potencia Total (kVA) 28.00Potencia SED (kVA) 37.33

Longitud de la Manzana (m) 65Ancho Vía (m) 15L - Longitud de diseño (m) 75P - Demanda por Frente (kW) 1.2AP - Demanda por Unidad AP (kW) 0.07

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

123

Resultados del Flujo de Potencia para la Tecnología 440-220 V

CorrientesNodo Nodo Anterior Longitud (m) R (ohm) X (ohm) I (A)

1 0 0.00 0.0000 0.0000 0.002 1 19.31 0.0463 0.0022 27.073 2 10.00 0.0240 0.0011 1.484 2 19.31 0.0463 0.0022 25.575 4 10.00 0.0240 0.0011 13.476 4 38.63 0.0926 0.0044 12.067 6 10.00 0.0240 0.0011 2.988 6 38.63 0.0926 0.0044 9.069 8 10.00 0.0240 0.0011 4.4810 8 38.63 0.0926 0.0044 4.5711 10 10.00 0.0240 0.0011 2.9912 10 77.25 0.1852 0.0089 1.5813 12 10.00 0.0240 0.0011 1.58

TensiónNodo Suministro Estado MD (kW) FP Conexión V (Volt) ∆V(%)

1 Circuito - C_ELNO_09 En Servicio 0 0.90 1φ 440.002 Derivación 0 0.90 1φ 438.75 0.28%3 unset CONECTADO 0.635 0.90 1φ 438.71 0.29%4 Derivación 0 0.90 1φ 437.56 0.55%5 unset CONECTADO 5.75 0.90 1φ 437.24 0.63%6 Derivación 0 0.90 1φ 436.45 0.81%7 unset CONECTADO 1.27 0.90 1φ 436.37 0.82%8 Derivación 0 0.90 1φ 435.61 1.00%9 unset CONECTADO 1.905 0.90 1φ 435.50 1.02%

10 Derivación 0 0.90 1φ 435.18 1.09%11 unset CONECTADO 1.27 0.90 1φ 435.11 1.11%12 Derivación 0 0.90 1φ 434.89 1.16%13 unset CONECTADO 0.67 0.90 1φ 434.85 1.17%

Pérdidas TécnicasNodo Nodo Anterior Longitud (m) R (ohm) X (ohm) Pérdidas (W)

1 0 0.00 0.000 0.000 0.0002 1 19.31 0.046 0.002 39.0483 2 10.00 0.024 0.001 0.0624 2 19.31 0.046 0.002 34.8555 4 10.00 0.024 0.001 5.0556 4 38.63 0.093 0.004 15.4507 6 10.00 0.024 0.001 0.2478 6 38.63 0.093 0.004 8.7309 8 10.00 0.024 0.001 0.55510 8 38.63 0.093 0.004 2.22211 10 10.00 0.024 0.001 0.24712 10 77.25 0.185 0.009 0.53013 12 10.00 0.024 0.001 0.069

Total (kW) : 0.107

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

124

Resultados del Flujo de Potencia para la Tecnología 220 V

CorrientesNodo Nodo Anterior Longitud (m) R (ohm) X (ohm) I (A)

1 0 0.00 0.0000 0.0000 0.002 1 19.31 0.0463 0.0022 56.163 2 10.00 0.0240 0.0011 2.994 2 19.31 0.0463 0.0022 53.045 4 10.00 0.0240 0.0011 27.566 4 38.63 0.0926 0.0044 25.177 6 10.00 0.0240 0.0011 6.128 6 38.63 0.0926 0.0044 18.919 8 10.00 0.0240 0.0011 9.2710 8 38.63 0.0926 0.0044 9.5211 10 10.00 0.0240 0.0011 6.2012 10 77.25 0.1852 0.0089 3.2913 12 10.00 0.0240 0.0011 3.28

TensiónNodo Suministro Estado MD (kW) FP Conexión V (Volt) ∆V(%)

1 Circuito - C_ELNO_09 En Servicio 0 0.90 1φ 220.002 Derivación 0 0.90 1φ 217.40 1.18%3 unset CONECTADO 0.635 0.90 1φ 217.33 1.21%4 Derivación 0 0.90 1φ 214.94 2.30%5 unset CONECTADO 5.75 0.90 1φ 214.28 2.60%6 Derivación 0 0.90 1φ 212.61 3.36%7 unset CONECTADO 1.27 0.90 1φ 212.47 3.42%8 Derivación 0 0.90 1φ 210.86 4.15%9 unset CONECTADO 1.905 0.90 1φ 210.64 4.25%10 Derivación 0 0.90 1φ 209.98 4.55%11 unset CONECTADO 1.27 0.90 1φ 209.83 4.62%12 Derivación 0 0.90 1φ 209.37 4.83%13 unset CONECTADO 0.67 0.90 1φ 209.29 4.87%

Pérdidas TécnicasNodo Nodo Anterior Longitud (m) R (ohm) X (ohm) Pérdidas (W)

1 0 0.000 0.000 0.000 0.002 1 19.313 0.046 0.002 156.193 2 10.000 0.024 0.001 0.254 2 19.313 0.046 0.002 139.425 4 10.000 0.024 0.001 20.226 4 38.625 0.093 0.004 61.807 6 10.000 0.024 0.001 0.998 6 38.625 0.093 0.004 34.929 8 10.000 0.024 0.001 2.22

10 8 38.625 0.093 0.004 8.8911 10 10.000 0.024 0.001 0.9912 10 77.250 0.185 0.009 2.1213 12 10.000 0.024 0.001 0.27

Total (kW) : 0.428

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

125

Comparación de Resultados de Tecnologías 440-220 V y 220 V

Opción 440-220 V 220 VMD (kW) 24.4 24.4

Red BT (km) 1.500 1.500Conductor AS01613 AS01613

Sección (mm2) 16 16∆V (%) 1.17% 4.87%∆P (%) 0.93% 3.72%

F.C. 0.284 0.284∆Pe (%) 0.73% 2.92%

I. Costo de Redes BT

440-220 VSección (mm2) 16 16 25

Red Urbana BT (km) 1.500 1.500 0.0Inversión (S/.) 20,078.32 20,078.32 0.00

Inversión Total (S/.) 20,078.32

220 V

20,078.32

II. Costo de Subestación440-220 V 220 V

Potencia (kVA) 37.00 37.00Tipo Monofásico Monofásico

Costo de SED (S/.) 5,567.97 5,567.97

III. Costo de Mantenimiento440-220 V 220V

Costo Mantto. (S/.) 236.38 236.38

IV. Costo de PérdidasPérdidas Energía Anuales

440-220 V 220V∆Pe (%) 0.73% 2.92%

F.C. 0.284 0.284Horas 8,640 8,640

MD (kW) 24.4 24.4Pe Anual (kWh) 437.69 1,750.77

440-220 V 220VPe Anual (kWh) 437.69 1,750.77

Nº SED 1 1Costo de la Energía (S/./kWh) 0.35 0.35

Total de Pe (S/.) 153.19 612.77

Resumen ENOSA - 9 ManzanasAnálisis 440-220 V S/./kW 220V S/./kWI. Costo de Red BT

Inversión (S/.) : 20,078.32 20,078.32Tasa Anual (%) : 12% 12%

Periodo Años : 30.00 30.00Amortización Anual (S/.) 2,492.60 102.16 2,492.60 102.16

II. Costo de Subestación + Red MTInversión (S/.) : 5,567.97 6,124.76

Tasa : 12% 12%Periodo Años : 30 30

Amortización Anual (S/.) 691.23 28.33 760.35 31.16III. Costo de Mantenimiento Anual (S/.) 236.38 9.69 236.38 9.69IV. Costo de Pérdidas Anual (S/.) 153.19 6.28 612.77 25.11

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

126

3) Módulo 12 Manzanas Este tiene una subestación de 50 kVA, suministrando energía a 12 manzanas a través de 2 circuitos; se considera dos equipos de alumbrado público por calle, las cuales iluminan ambos frentes de la calle. El análisis se realizó para dos tipos de tecnología (tensión en el secundario del transformador 440-220 V y 220 V), siendo el siguiente diagrama unifilar válido para ambos análisis. Diagrama Unifilar Se observa que el punto A es el punto con mayor caída de tensión en el circuito, también denominado cola de los alimentadores. Una característica del análisis será que la caída de tensión en el punto A no supere lo establecido por la NTCSE (± 7.5% del VN):

PPP

P

P

P

P

P

P

P P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P P

P

P

P

P

P

P P

P

PP P

P P

P P

P

P

P

P

P P

12 Manzanas

A

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

127

P + 2APL

4P + 4AP

13P + 14AP

2P + 2AP

P + AP

2P + 2AP

L

L

L/2

C1

P + 2AP

A Donde: P: Demanda por Frente (kW) AP: Demanda de Equipo de Alumbrado Público (kW)

Opción 3Manzanas 12

Nº Clientes por Manzana 16Nº Clientes 192

MD Cliente (kW) 0.300Demanda por Manzana (kW) 4.8

Demanda por Frente (kW) 1.2Factor Simultaneidad 0.5

Luminarias AP 54MD Lampara (kW) 0.07

MD AP (kW) 3.78MD Total (AP+SP) (kW) 32.58

Factor de Utilización 0.75Factor de Potencia SP 0.90Factor de Potencia AP 0.70Potencia Total (kVA) 37.40Potencia SED (kVA) 49.87

Longitud de la Manzana (m) 65Ancho Vía (m) 15L - Longitud de diseño (m) 75P - Demanda por Frente (kW) 1.2AP - Demanda por Unidad AP (kW) 0.07

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

128

Resultados del Flujo de Potencia para la Tecnología 440-220 V

CorrientesNodo Nodo Anterior Longitud (m) R (ohm) X (ohm) I (A)

1 0 0.00 0.0000 0.0000 0.002 1 19.31 0.0463 0.0022 36.273 2 10.00 0.0240 0.0011 1.484 2 19.31 0.0463 0.0022 34.765 4 10.00 0.0240 0.0011 19.476 4 38.63 0.0926 0.0044 15.207 6 10.00 0.0240 0.0011 2.998 6 38.63 0.0926 0.0044 12.199 8 10.00 0.0240 0.0011 5.9910 8 38.63 0.0926 0.0044 6.1711 10 10.00 0.0240 0.0011 3.0012 10 38.63 0.0926 0.0044 3.1713 12 10.00 0.0240 0.0011 1.5814 12 38.63 0.0926 0.0044 1.5815 14 10.00 0.0240 0.0011 1.58

Tensión

Nodo Suministro Estado MD (kW) FP Conexión V (Volt) ∆V(%)1 Circuito - C_ELNO_12 En Servicio 0 0.90 1φ 440.002 Derivación 0 0.90 1φ 438.32 0.383 CL CONECTADO 0.635 0.90 1φ 438.29 0.394 Derivación 0 0.90 1φ 436.71 0.755 CL CONECTADO 8.29 0.90 1φ 436.24 0.856 Derivación 0 0.90 1φ 435.30 1.077 CL CONECTADO 1.27 0.90 1φ 435.23 1.088 Derivación 0 0.90 1φ 434.17 1.329 CL CONECTADO 2.54 0.90 1φ 434.03 1.3610 Derivación 0 0.90 1φ 433.60 1.4511 CL CONECTADO 1.27 0.90 1φ 433.53 1.4712 Derivación 0 0.90 1φ 433.31 1.5213 CL CONECTADO 0.67 0.90 1φ 433.27 1.5314 Derivación 0 0.90 1φ 433.16 1.5515 CL CONECTADO 0.67 0.90 1φ 433.12 1.56

Pérdidas Técnicas

Nodo Nodo Anterior Longitud (m) R (ohm) X (ohm) Pérdidas (W)1 0 0.000 0.000 0.000 0.0002 1 19.313 0.046 0.002 69.5253 2 10.000 0.024 0.001 0.0624 2 19.313 0.046 0.002 63.8905 4 10.000 0.024 0.001 10.5076 4 38.625 0.093 0.004 24.3397 6 10.000 0.024 0.001 0.2478 6 38.625 0.093 0.004 15.6629 8 10.000 0.024 0.001 0.986

10 8 38.625 0.093 0.004 4.02311 10 10.000 0.024 0.001 0.24712 10 38.625 0.093 0.004 1.06013 12 10.000 0.024 0.001 0.06914 12 38.625 0.093 0.004 0.26515 14 10.000 0.024 0.001 0.069

Total (kW) : 0.191

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

129

Resultados del Flujo de Potencia para la Tecnología 220 V

CorrientesNodo Nodo Anterior Longitud (m) R (ohm) X (ohm) I (A)

1 0 0.00 0.0000 0.0000 0.002 1 19.31 0.0463 0.0022 76.173 2 10.00 0.0240 0.0011 3.004 2 19.31 0.0463 0.0022 73.015 4 10.00 0.0240 0.0011 40.206 4 38.63 0.0926 0.0044 32.207 6 10.00 0.0240 0.0011 6.198 6 38.63 0.0926 0.0044 25.839 8 10.00 0.0240 0.0011 12.5510 8 38.63 0.0926 0.0044 13.0511 10 10.00 0.0240 0.0011 6.3012 10 38.63 0.0926 0.0044 6.6913 12 10.00 0.0240 0.0011 3.3314 12 38.63 0.0926 0.0044 3.3415 14 10.00 0.0240 0.0011 3.34

Tensión

Nodo Suministro Estado MD (kW) FP Conexión V (Volt) ∆V(%)1 Circuito - C_ELNO_12 En Servicio 0 0.90 1φ 220.002 Derivación 0 0.90 1φ 216.47 1.603 CL CONECTADO 0.635 0.90 1φ 216.40 1.644 Derivación 0 0.90 1φ 213.09 3.145 CL CONECTADO 8.29 0.90 1φ 212.13 3.586 Derivación 0 0.90 1φ 210.11 4.507 CL CONECTADO 1.27 0.90 1φ 209.96 4.568 Derivación 0 0.90 1φ 207.72 5.589 CL CONECTADO 2.54 0.90 1φ 207.42 5.7210 Derivación 0 0.90 1φ 206.51 6.1311 CL CONECTADO 1.27 0.90 1φ 206.36 6.2012 Derivación 0 0.90 1φ 205.89 6.4113 CL CONECTADO 0.67 0.90 1φ 205.81 6.4514 Derivación 0 0.90 1φ 205.58 6.5515 CL CONECTADO 0.67 0.90 1φ 205.50 6.59

Pérdidas Técnicas

Nodo Nodo Anterior Longitud (m) R (ohm) X (ohm) Pérdidas (W)1 0 0.000 0.000 0.000 0.002 1 19.313 0.046 0.002 278.103 2 10.000 0.024 0.001 0.254 2 19.313 0.046 0.002 255.565 4 10.000 0.024 0.001 42.036 4 38.625 0.093 0.004 97.367 6 10.000 0.024 0.001 0.998 6 38.625 0.093 0.004 62.659 8 10.000 0.024 0.001 3.9510 8 38.625 0.093 0.004 16.0911 10 10.000 0.024 0.001 0.9912 10 38.625 0.093 0.004 4.2413 12 10.000 0.024 0.001 0.2714 12 38.625 0.093 0.004 1.0615 14 10.000 0.024 0.001 0.27

Total (kW) : 0.764

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

130

Resultados Comparativos de Tecnología 440-220 V y 220 V

Opción 440-220 V 220 VMD (kW) 32.6 32.6

Red BT (km) 2.025 2.025Conductor AS01613 AS01613

Sección (mm2) 16 16∆V (%) 1.56% 6.59%∆P (%) 1.24% 4.98%

F.C. 0.284 0.284∆Pe (%) 0.98% 3.91%

I. Costo de Redes BT

440-220 VSección (mm2) 16 16 25

Red Urbana BT (km) 2.025 2.025 0.0Inversión (S/.) 27,105.73 27,105.73 0.00

Inversión Total (S/.) 27,105.73

220 V

27,105.73

II. Costo de Subestación440-220 V 220 V

Potencia (kVA) 50.00 50.00Tipo Monofásico Monofásico

Costo de SED (S/.) 5,944.79 5,944.79

III. Costo de Mantenimiento440-220 V 220V

Costo Mantto. (S./) 236.38 236.38

IV. Costo de PérdidasPérdidas Energía Anuales

440-220 V 220V∆Pe (%) 0.98% 3.91%

F.C. 0.284 0.284Horas 8,640 8,640

MD (kW) 32.6 32.6Pe Anual (kWh) 781.12 3,124.46

440V 220VPe Anual (kWh) 781.12 3,124.46

Nº SED 1 1Costo de la Energía (S/./kWh) 0.35 0.35

Total de Pe (S/.) 273.39 1,093.56

Resumen ENOSA - 12 ManzanasAnálisis 440-220 V S/./kW 220V S/./kWI. Costo de Red BT

Inversión (S/.) : 27,105.73 27,105.73Tasa Anual (%) : 12% 12%

Periodo Años : 30.00 30.00Amortización Anual (S/.) 3,365.00 103.28 3,365.00 103.28

II. Costo de Subestación + Red MTInversión (S/.) : 5,944.79 6,539.27

Tasa : 12% 12%Periodo Años : 30 30

Amortización Anual (S/.) 738.01 22.65 811.81 24.92III. Costo de Mantenimiento Anual (S/.) 236.38 7.26 236.38 7.26IV. Costo de Pérdidas Anual (S/.) 273.39 8.39 1,093.56 33.57

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

131

4) Módulo 16 Manzanas Este tiene una subestación de 75 kVA, suministrando energía a 16 manzanas a través de 4 circuitos; se considera dos equipos de alumbrado público por calle, las cuales iluminan ambos frentes de la calle. El análisis se realizó para dos tipos de tecnología (tensión en el secundario del transformador 440-220 V y 220 V), siendo el siguiente diagrama unifilar válido para ambos análisis. Diagrama Unifilar Se observa que el punto A es el punto con mayor caída de tensión en el circuito, también denominado cola de los alimentadores. Una característica del análisis será que la caída de tensión en el punto A no supere lo establecido por la NTCSE (± 7.5% del VN):

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P P P

P

P

P

16 Manzanas

P

P

P

P

P

P

P

P P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

PP P

P

P

P

P

P PP P

P

P

P

P

P

A

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

132

2P + 4AP

P + 2APL

P + 2APL

L 2P + 2AP

2P + 2AP

8P + 8AP

L

C1

A Donde: P: Demanda por Frente (kW) AP: Demanda de Equipo de Alumbrado Público (kW)

Opción 4Manzanas 16

Nº Clientes por Manzana 16Nº Clientes 256

MD Cliente (kW) 0.300Demanda por Manzana (kW) 4.8

Demanda por Frente (kW) 1.2Factor Simultaneidad 0.5

Luminarias AP 80MD Lampara (kW) 0.07

MD AP (kW) 5.60MD Total (AP+SP) (kW) 44.00

Factor de Utilización 0.75Factor de Potencia SP 0.90Factor de Potencia AP 0.70Potencia Total (kVA) 50.67Potencia SED (kVA) 67.56

Longitud de la Manzana (m) 65Ancho Vía (m) 15L - Longitud de diseño (m) 75P - Demanda por Frente (kW) 1.2AP - Demanda por Unidad AP (kW) 0.07

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

133

Resultados del Flujo de Potencia para la Tecnología 440-220 V

CorrientesNodo Nodo Anterior Longitud (m) R (ohm) X (ohm) I (A)

1 0 0.00 0.0000 0.0000 0.002 1 38.63 0.0926 0.0044 24.393 2 10.00 0.0240 0.0011 2.974 2 38.63 0.0926 0.0044 21.375 4 10.00 0.0240 0.0011 11.956 4 38.63 0.0926 0.0044 9.337 6 10.00 0.0240 0.0011 2.998 6 38.63 0.0926 0.0044 6.339 8 10.00 0.0240 0.0011 3.1610 8 38.63 0.0926 0.0044 3.1611 10 10.00 0.0240 0.0011 1.5812 10 77.25 0.1852 0.0089 1.5813 12 10.00 0.0240 0.0011 1.58

Tensión

Nodo Suministro Estado MD (kW) FP Conexión V (Volt) ∆V(%)1 Circuito - C_ELNO_16 En Servicio 0 0.90 1φ 440.002 Derivación 0 0.90 1φ 437.74 0.51%3 CL CONECTADO 1.27 0.90 1φ 437.67 0.53%4 Derivación 0 0.90 1φ 435.76 0.96%5 CL CONECTADO 5.08 0.90 1φ 435.48 1.03%6 Derivación 0 0.90 1φ 434.90 1.16%7 CL CONECTADO 1.27 0.90 1φ 434.83 1.18%8 Derivación 0 0.90 1φ 434.31 1.29%9 CL CONECTADO 1.34 0.90 1φ 434.24 1.31%

10 Derivación 0 0.90 1φ 434.02 1.36%11 CL CONECTADO 0.67 0.90 1φ 433.98 1.37%12 Derivación 0 0.90 1φ 433.73 1.43%13 CL CONECTADO 0.67 0.90 1φ 433.69 1.43%

Pérdidas TécnicasNodo Nodo Anterior Longitud (m) R (ohm) X (ohm) Pérdidas (W)

1 0 0.000 0.000 0.000 0.0002 1 38.625 0.093 0.004 62.6493 2 10.000 0.024 0.001 0.2474 2 38.625 0.093 0.004 48.1525 4 10.000 0.024 0.001 3.9456 4 38.625 0.093 0.004 9.2147 6 10.000 0.024 0.001 0.2478 6 38.625 0.093 0.004 4.2419 8 10.000 0.024 0.001 0.27510 8 38.625 0.093 0.004 1.06011 10 10.000 0.024 0.001 0.06912 10 77.250 0.185 0.009 0.53013 12 10.000 0.024 0.001 0.069

Total (kW) : 0.131

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

134

Resultados del Flujo de Potencia para la Tecnología 220 V

CorrientesNodo Nodo Anterior Longitud (m) R (ohm) X (ohm) I (A)

1 0 0.00 0.0000 0.0000 0.002 1 38.63 0.0926 0.0044 51.493 2 10.00 0.0240 0.0011 6.054 2 38.63 0.0926 0.0044 45.145 4 10.00 0.0240 0.0011 24.786 4 38.63 0.0926 0.0044 19.637 6 10.00 0.0240 0.0011 6.228 6 38.63 0.0926 0.0044 13.319 8 10.00 0.0240 0.0011 6.60

10 8 38.63 0.0926 0.0044 6.6511 10 10.00 0.0240 0.0011 3.3112 10 77.25 0.1852 0.0089 3.3313 12 10.00 0.0240 0.0011 3.32

TensiónNodo Suministro Estado MD (kW) FP Conexión V (Volt) ∆V(%)

1 Circuito - C_ELNO_16 En Servicio 0 0.90 1φ 220.002 Derivación 0 0.90 1φ 215.23 2.17%3 CL CONECTADO 1.27 0.90 1φ 215.09 2.23%4 Derivación 0 0.90 1φ 211.05 4.07%5 CL CONECTADO 5.08 0.90 1φ 210.46 4.34%6 Derivación 0 0.90 1φ 209.23 4.89%7 CL CONECTADO 1.27 0.90 1φ 209.08 4.96%8 Derivación 0 0.90 1φ 208.00 5.45%9 CL CONECTADO 1.34 0.90 1φ 207.84 5.53%

10 Derivación 0 0.90 1φ 207.39 5.73%11 CL CONECTADO 0.67 0.90 1φ 207.31 5.77%12 Derivación 0 0.90 1φ 206.77 6.01%13 CL CONECTADO 0.67 0.90 1φ 206.69 6.05%

Pérdidas TécnicasNodo Nodo Anterior Longitud (m) R (ohm) X (ohm) Pérdidas (W)

1 0 0.000 0.000 0.000 0.002 1 38.625 0.093 0.004 250.593 2 10.000 0.024 0.001 0.994 2 38.625 0.093 0.004 192.615 4 10.000 0.024 0.001 15.786 4 38.625 0.093 0.004 36.857 6 10.000 0.024 0.001 0.998 6 38.625 0.093 0.004 16.979 8 10.000 0.024 0.001 1.10

10 8 38.625 0.093 0.004 4.2411 10 10.000 0.024 0.001 0.2712 10 77.250 0.185 0.009 2.1213 12 10.000 0.024 0.001 0.27

Total (kW) : 0.523

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

135

Comparación de Resultados de Tecnologías 440-220 V y 220 V

Opción 440-220 V 220 V

MD (kW) 44.0 44.0Red BT (km) 2.753 2.753Conductor AS01613 AS01613

Sección (mm2) 16 16∆V (%) 1.43% 6.05%∆P (%) 2.10% 5.08%

F.C. 0.284 0.284∆Pe (%) 1.00% 3.99%

I. Costo de Redes BT

440-220 VSección (mm2) 16 16 25

Red Urbana BT (km) 2.753 2.753 0.0Inversión (S/.) 36,843.72 36,843.72 0.00

Inversión Total (S/.) 36,843.72

220 V

36,843.72

II. Costo de Subestación440-220 V 220 V

Potencia (kVA) 75.00 75.00Tipo Monofásico Monofásico

Costo de SED (S/.) 7,400.00 7,400.00

III. Costo de Mantenimiento440-220 V 220V

Costo Mantto. (S/.) 236.38 236.38

IV. Costo de PérdidasPérdidas Energía Anuales

440-220 V 220V∆Pe (%) 1.00% 3.99%

F.C. 0.284 0.284Horas 8,640 8,640

MD (kW) 44.0 44.0Pe Anual (kWh) 1,075.70 4,302.80

440-220 V 220VPe Anual (kWh) 1,075.70 4,302.80

Nº SED 1 1Costo de la Energía (S/./kWh) 0.35 0.35

Total de Pe (S/.) 376.49 1,505.98

Resumen ENOSA - 16 ManzanasAnálisis 440-220 V S/./kW 220V S/./kWI. Costo de Red BT

Inversión (S/.) : 36,843.72 36,843.72Tasa Anual (%) : 12% 12%

Periodo Años : 30.00 30.00Amortización Anual (S/.) 4,573.91 103.95 4,573.91 103.95

II. Costo de Subestación + Red MTInversión (S/.) : 7,400.00 8,140.00

Tasa : 12% 12%Periodo Años : 30 30

Amortización Anual (S/.) 918.66 20.88 1,010.53 22.97III. Costo de Mantenimiento Anual (S/.) 236.38 5.37 236.38 5.37IV. Costo de Pérdidas Anual (S/.) 376.49 8.56 1,505.98 34.23

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

136

5) Módulo 16 Manzanas considerando la conexión de un suministro trifásico Este tiene una subestación trifásica de 100 kVA, suministrando energía a 16 manzanas a través de 4 circuitos; se considera dos equipos de alumbrado público por calle, las cuales iluminan ambos frentes de la calle. El análisis se realizó considerando una subestación trifásica de 380/220 V, debido a que se alimentará un suministro trifásico, por lo tanto se ha considerado el diseño de redes trifásicas de baja tensión (380/220 V) en las troncales de los circuitos, conforme al siguiente diagrama. Diagrama Unifilar Se observa que el punto A es el punto con mayor caída de tensión en el circuito, también denominado cola de los alimentadores; y se asume que el suministro trifásico se conectará en el punto A. Una característica del análisis será que la caída de tensión en el punto A no supere lo establecido por la NTCSE (± 7.5% del VN). Tomando en cuenta la condición más desfavorable de conexión, se asume que el suministro trifásico (13.5 kW) se conectará en el punto A.

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P P P

P

P

P

16 Manzanas

P

P

P

P

P

P

P

P P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

PP P

P

P

P

P

P PP P

P

P

P

P

P

A

Analisis para Red Trifásica

PTrifásico

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

137

2P + 4AP

P + 2APL

P + 2APL

L 2P + 2AP

2P + 2AP

8P + 8AP

L

C1

A

+ P3Ø

Donde: P: Demanda por Frente (kW) AP: Demanda de Equipo de Alumbrado Público (kW) P3φ: Demanda del cliente trifásico (kW)

Opción 1Manzanas 16

Nº Clientes por Manzana 16Nº Clientes 256

MD Cliente 1φ (kW) 0.300MD Cliente 3φ (kW) 13.5

Demanda por Manzana (kW) 4.8Demanda por Frente (kW) 1.2

Factor Simultaneidad 0.5Luminarias AP 80

MD Lampara (kW) 0.07MD AP (kW) 5.60

MD Total (AP+SP) (kW) 57.50Factor de Utilización 0.75Factor de Potencia SP 0.90Factor de Potencia AP 0.70Potencia Total (kVA) 65.67Potencia SED (kVA) 87.56

Longitud de la Manzana (m) 65Ancho Vía (m) 15L - Longitud de diseño (m) 75P - Demanda por Frente (kW) 1.2AP - Demanda por Unidad AP (kW) 0.07

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

138

Resultados del Flujo de Potencia para la Tecnología 380-220 V

CorrientesNodo Nodo Anterior Longitud (m) R (ohm) X (ohm) I (A)

1 0 0.00 0.0000 0.0000 0.002 1 38.63 0.0584 0.0043 49.093 2 10.00 0.0151 0.0011 7.244 2 38.63 0.0584 0.0043 49.065 4 10.00 0.0151 0.0011 29.596 4 38.63 0.0584 0.0043 22.607 6 10.00 0.0151 0.0011 7.318 6 38.63 0.0584 0.0043 22.599 8 10.00 0.0151 0.0011 7.7810 8 38.63 0.0926 0.0044 18.7511 10 10.00 0.0240 0.0011 3.9212 10 77.25 0.1852 0.0089 14.8813 12 10.00 0.0240 0.0011 14.68

TensiónNodo Suministro Estado MD (kW) FP Conexión V (Volt) ∆V(%)

1 Circuito - C_ELNO_16 En Servicio 0 0.90 1φ 220.002 Derivación 0 0.90 1φ 217.13 1.30%3 CL CONECTADO 1.524 0.90 1φ 217.13 1.30%4 Derivación 0 0.90 1φ 214.26 2.61%5 CL CONECTADO 6.096 0.90 1φ 213.82 2.81%6 Derivación 0 0.90 1φ 213.16 3.11%7 CL CONECTADO 1.524 0.90 1φ 213.16 3.11%8 Derivación 0 0.90 1φ 212.05 3.61%9 CL CONECTADO 1.608 0.90 1φ 212.05 3.61%

10 Derivación 0 0.90 1φ 210.32 4.40%11 CL CONECTADO 0.804 0.90 1φ 210.22 4.44%12 Derivación 0 0.90 1φ 207.56 5.65%13 CL CONECTADO 8.904 0.90 3φ 207.21 5.81%

Pérdidas TécnicasNodo Nodo Anterior Longitud (m) R (ohm) X (ohm) Pérdidas (W)

1 0 0.000 0.000 0.000 0.02 1 38.625 0.058 0.004 230.73 2 10.000 0.015 0.001 0.94 2 38.625 0.058 0.004 206.45 4 10.000 0.015 0.001 14.36 4 38.625 0.058 0.004 82.57 6 10.000 0.015 0.001 0.98 6 38.625 0.058 0.004 65.59 8 10.000 0.015 0.001 1.010 8 38.625 0.093 0.004 75.211 10 10.000 0.024 0.001 0.412 10 77.250 0.185 0.009 124.813 12 10.000 0.024 0.001 16.2

Total (kW) : 0.819

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

139

Resultados del Análisis Económico para la Tecnología 380-220 V

Opción 380-220 VMD (kW) 57.5

Red BT (km) 2.700Conductor : Longitud (km)

AS025116 0.150AS016116 0.600

AS01613 1.950∆V (%) 5.81%∆P (%) 2.70%

F.C. 0.284∆Pe (%) 1.68%

I. Costo de Redes BT

Sección (mm2) AS01613 AS016116 AS025116Red Urbana BT (km) 0.1500 0.6000 1.9500

Inversión (S/.) 2,099.91 9,477.89 32,854.93Inversión Total (S/.)

380-220 V

44,432.73

II. Costo de Subestación380-220 V

Potencia (kVA) 100.00Tipo Trifásico

Costo de SED (S/.) 13,348.68

III. Costo de Mantenimiento380-220 V

Costo Mantto. (S/.) 236.38

IV. Costo de PérdidasPérdidas Energía Anuales

380-220 V∆Pe (%) 1.68%

F.C. 0.284Horas 8,640

MD (kW) 57.5Pe Anual (kWh) 2,370.74

380-220 VPe Anual (kWh) 2,370.74

Nº SED 1Costo de la Energía (S/./kWh) 0.35

Total de Pe (S/.) 829.76

Resumen ENOSA - 16 Manzanas 380-220 VAnálisis S/./kWI. Costo de Red BT

Inversión (S/.) : 44,432.73Tasa Anual (%) : 12%

Periodo Años : 30.00Amortización Anual (S/.) 5,516.04 95.93

II. Costo de Subestación + Red MTInversión (S/.) : 13,348.68

Tasa : 12%Periodo Años : 30

Amortización Anual (S/.) 1,657.15 28.82III. Costo de Mantenimiento Anual (S/.) 236.38 4.11IV. Costo de Pérdidas Anual (S/.) 829.76 14.43

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

140

5.1 Cálculo de Pérdidas Técnicas de Potencia en Baja Tensión Cálculo de Pérdidas Técnicas Potencia en la Zona Concentrada El calculo de pérdidas técnicas de potencia en la zona concentrada se calculó en base a los módulos adaptados y su correspondiente índice de pérdidas técnicas. El siguiente cuadro resume el cálculo realizado.

Monofásico TrifásicoPérdidas Técnicas (%) 2.1% 2.7%Número de Módulos 92 20

Pérdidas Técnicas PotenciaZona Concentrada (%)

2.21%

Modulo Teórico 16 Manzanas

Cálculo de Pérdidas Técnicas de Potencia en la Zona Dispersa En la zona dispersa debido a la separación de los suministros, se asume una configuración de red de baja tensión como la que se muestra en el figura. Este modelo de análisis está compuesto por tres circuitos, donde el punto más alejado se encuentra a 342 m de la subestación. Se asume que un circuito de baja tensión alimenta 20 clientes cuya demanda es 0.27 kW, los cuales se encuentran concentrados, diez en el punto medio y diez al final del circuito. Se considera la utilización de red aérea de aluminio autoportante de 16 mm2.

P P

P

P

P

P

342 m

Configuración modelo de red BT en las zonas dispersas

Donde : P: Demanda concentrada de 10 suministros monofásicos.

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

141

A continuación se presenta los resultados obtenidos en la simulación del flujo de potencia para un circuito.

Corrientes

Nodo Nodo Anterior Longitud (m) R (ohm) X (ohm) I (A)1 0 0.00 0.0000 0.0000 0.002 1 201.82 0.4839 0.0189 28.993 2 10.69 0.0256 0.0012 13.464 2 151.24 0.3626 0.0174 14.145 4 10.00 0.0240 0.0011 13.80

TensiónNodo Suministro Estado MD (kW) FP Conexión V (Volt) ∆V(%)

1 Circuito - C_ELNO En Servicio 0 0.90 1φ 220.002 Derivación 0 0.90 1φ 207.97 5.47%3 SM01 CONECTADO 1.35 0.90 1φ 207.63 5.62%4 Derivación 0 0.90 1φ 205.85 6.43%5 ELNO CONECTADO 1.35 0.90 1φ 205.51 6.58%

Pérdidas TécnicasNodo Nodo Anterior Longitud (m) R (ohm) X (ohm) Pérdidas (W)

1 0 0.00 0.0000 0.0000 0.002 1 201.82 0.4839 0.0189 163.503 2 10.69 0.0256 0.0012 7.804 2 151.24 0.3626 0.0174 57.005 4 10.00 0.0240 0.0011 6.60

Como resultado del flujo de potencia obtenemos que el índice de pérdidas técnicas de potencia para las zonas dispersas es de 8.7 %.

Máxima Demanda (kW) 2.70Pérdidas Técnicas (kW) 0.23

Pérdidas Técnicas Zona Dispersa (%) 8.70%

Resultado Cálculo de Pérdidas Técnicas

Cálculo de Pérdidas Técnicas de Potencia Totales en Baja Tensión Finalmente, y conforme a los resultados obtenidos de las pérdidas técnicas de potencia para la zona dispersa y concentrada, se calculó el nivel de pérdidas técnicas de potencia totales, cuyo valor es 4.93 %.

Informe Final – Supervisor VAD

Consorcio Ernst & Young Asesores S. Civil de R.L. – Ernst & Young Auditores Independentes S/S – Procetradi S.A.C.

142