infratransproject - itp.al · na - durrës own initiative 2004 8. pre-feasibility study of the...

66

Upload: others

Post on 03-Sep-2019

13 views

Category:

Documents


0 download

TRANSCRIPT

INFRATRANSPROJECT

VAT No.: J62305002A

Member of

Albanian Association of Consulting Engineers

Albanian Builders Association

Tirana Chamber of Commerce and Industry

American Chamber of Commerce in Albania

IntroductionStudy and ResearchFeasibility StudiesRoad Detailed DesignBridges, Tunnels, Airports, and PortsOil Industry, Energy and Environ-ment StudiesConstruction Works SupervisionProfessional Staff

1.2.3.4.5.6.

7.8.

CONTENT

2

CLIENTS

ALBANIANGOVERNMENT

KONSTRUKTOR United Arab Emirates Government

COWI IPFCONSORTIUM

Albanian Electro-Energetic

Corporation

NationalAir Traffic Agency

OMV Group

PetromanasAlbania

SALILLARI

DurresPort Authority

OccidentalPetroleum

Industrija Nafte

THE WORLDBANK

EUROPEANCOMMISSION

EUROPEAN BANK for Reconstruction and

Develpment

UNDP

IPF

AgriconsultingEurope SA

Institut IGH

3

HIGHLIGHTS

Over 2 100 km of designed Roadsand Motorways

Design of over 3 200 ml of Big Bridges

Over 14 500 ml of designed Tunnels

Over 3 200 km of Road Feasibility Studies

Over 350 km Of Road ConstructionSupervision

United Arab Emirates Government

4

5

Introduction Well known as the best company in Albania in transport infrastructure de-sign and supervision, InfraTransProject has long been the leading consulting and engineering firm as far as roads and transport infrastructure are concerned. It was the first consulting company es-tablished immediately after the collapse of the centralised economy in Albania.Together with some of the most expe-rienced engineers of Albania, the com-pany was created as a team of profes-sionals ready to face the new dramatic changes in the country’s development. Expertise, know-how, experience and most of all, passion, is what we look

for in our staff. We continuously en-courage innovation and study for newtechnologies. Keeping up with the global science development has made us known for our advanced solutions and ideas. With a large portfolio consisting of important clients like the Albanian Gov-ernment, World Bank etc., ITP has steadi-ly grown a considerable reputation in Albania and abroad over the years.

Our mission is: To design excellent sustainable en-gineering solutions through dedi-cated professional team work!

1.

6

7

Study & Research

Our know-how has been consistently growing with the years of experi-ence and our work has often been focused on public tenders or specific clients. In addition, we have often developed studies with our own initia-tive, studies that have helped private or public institutions in finding new more sustainable and more effective ways to realise their objectives.

2.

8

9

Study & Research

Name of study Client Period

1. Preparation and elaboration of the new Albanian Road and Highway Design Standards KTP22 2002

Ministry of Transport and Infrastructure

2002

2. Partial development of Transport Infrastructure Study - TIRS -

EC and EBRD 2002

3. Regional Balkans Infrastructure Study - Transport - REBIS EC 2003

4. Technical Assistance to the Government of Albania in Road Safety issues

World Bank 2003 - 2005

5. Basic Feasibility Study for Toll Motorway Concession of Thumanë - Rrogozhinë segment L=66km

Riviera JV (Concessionnaire)

2003

6. Pre-feasibility Study of the Toll Motorway Concession Thumanë - Rrogozhinë, L=66km

Strabag AG (Concessionnaire)

2004

7. Basic Feasibility Study for Toll Motorway Concession Tira-na - Durrës

Own initiative 2004

8. Pre-feasibility Study of the Tirana - Elbasan Toll Motorway Elbasan Municipality 2005

9. Conceptual idea of General Master Plan Study of Alba-nian Main Road Network

Own Initiative (based on the study of 1988 by the company ex-

perts in the then-State Institute)

2006

10. Prefeasibility study of the road segment Albanian Border with FYROM (Gjorice e Eperme) to Debar (in FYROM), (Part of Arberi Road)

Municipality of Debar (FYROM)

2013

11. Study for Tirana Tramway Line 16.0km opportunity and construction project

Own Initiative(presented in the 2nd

International Con-gress on Roads in

Albania)

2015

12. Basic Feasibility Study for the Elbasan - Qaf-Thane Motorway

SINOHYDRO(Chinese

Corporation)

2015

13. Update feasibility study of the project proposal for the concession motorway “Thumane - Tirane - Peze - Rogozhine”

SINOHYDRO(Chinese

Corporation)

2016

2.

10

11

Feasibility Studies

In the framework of the drastic developments of the last decades in Albania, especially in the field of transport infrastructure and roads, InfraT-ransProject has been substantially involved in important feasibility studies that have then produced essential data for future plans in infrastructure development. We have gathered the most prominent engineers and spe-cialists to ensure undisputed study results. InfraTransProject is today by far the most experienced consulting company in Albania as far as transport infrastructure feasibility studies are concerned.

3.

12

13

Project Name Feasibility Study and Detailed Design of North- South Corridor, Lezhë - Shkodër HighwaySegment Length 35km - Client/Financing World Bank - Study Year 1996 - 1997 - Construction Cost $ 85 M

Feasibility Studies3.

Organization & management Study of 2000km Rural Roads in Albania2000 kmWorld Bank1999N/A

Feasibility Study for the Railway connection be-tween Albania and Kosovo, L=108km (incl. 12km tunnel)108 kmGeneral Rails Directorate1999$ 756 M

Feasibility study of Rruga e Arbrit - Tirana - Debar

76 kmGeneral Roads Directorate2003€ 150 M

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

14

Feasibility Studies

Project Name Feasibility study of Toll Concession Motorway Thumanë - Rrogozhinë in JV with IGH Institute of ZagrebSegment Length 66km - Client/Financing Konstruktor Inženjering d.d. (Croatia) - Study Year 2007-2009 - Estimat-ed Construction Cost € 630 M

3.

Feasibility study and EIA for two road segments of the main road network of KosovoApp. 240 kmCOWI2006-2009€ 630 M

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Feasibility study of the Arbri Road (Tirana - Debar)

76 kmGeneral Roads Directory2003€ 150 M

15

Feasibility Studies

Pre-feasibility study for “Durrës - Tiranë - Elbasan” toll motorway 78 kmStrabag AG2009€ 468 M

Project Name Feasibility Study and Design of Berat By-pass, systematization of Osum River nearby and New Urban development of 36 Ha benefited areaSegment Length 4,2 km (incl. 800 m tunnel and 1 bridge) and 44 ha - Client/Financing Berat Municipality - Study Year 2013 - Estimated Construction Cost € 65,7 M

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

3.

Feasibility study of “Rrëshen - Klos - Bulqizë” national road44,95 kmGeneral Roads Directory2006€ 69 M

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

16

Feasibility study of “Shengjin - Velipoje - Derdhja e Bunes” Highway 29 kmGeneral Roads Directory2009€ 102 M

Feasibility Study for Railway “Thumane (Mamuras)-Ti-tan Cement Factory” -- kmTitan sh.p.k - Albania2009€ 27 M

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Feasibility Studies3.

Project Name WB7-ALB-TRA-12: Feasibility Study for Tirana By-passSegment Length 21 km - Client/Financing COWI IPF - Study Year 2013-2014 - Construction Cost € 108 M

17

Feasibility Studies3.

Project Name Feasibility study including ESIA & Preliminary Design of the national road segments between Çorovodë and Përmet, Gramsh and KorçëSegment Length 130km - Client/Financing Albanian Roads Authority - Study Year 2015 - Constr. Cost € 85 M

Feasibility Study SEETO Route 7, Section Pristina – Merdare, Component 1Stage 1- Inception / Scoping(W11-KOS-TRA-02) 27.4 kmCOWI IPF Consortium2016€ 174 M

Feasibility study for the rehabilitation of the railway line Durres – Elbasan – Pogradec and a new rail line link to border with the Former Yugoslav Republic of Macedonia (W13-ALB-TRA-01) 153 kmCOWI IPF Consortium2017

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingStudy Year

18

Feasibility Study for the Adriatic-Ionian Road Corridor (Route 1 and Route 2) - Montenegro and Albania (WB14-REG-TRA-01 )305 kmWYGCOWI-Atkins-Arup Joint-Venture2018-2019€ 3 Billion

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Feasibility Studies3.

19

Road Design

InfraTransProject is a record-holder in Albania. With about 1500km designed as a firm and over 3500km of roads designed individually by our experts, it stands well above any other road consulting and design com-petitors in Albania and beyond. Our experts impact and contribution in the country’s transport infra-structure planning and design was already considerable when the firm was first established in 1991. Our expert opinion has often been essential when important decisions were taken for the development of this sector in Albania.

We pride ourselves of our experts who have conceived in the last 5 decades most of the main road segments in the country, most of which have now been realised or are planned to be built soon, like the North - South Corridor (Hani i Hotit - Kakavije including the central segment Thu-manë - Rrogozhine), East - West Corridor, Milot - Morine (Rruga e Kombit), Tirana - Debar (Arbri Road) etc.

Using the latest technology for design, we dedicate our time and efforts based on the accumulated expertise to produce the most accurate and sustainable solutions.

4.

20

21

Deatiled design of the National Highway Kamza Turn - Tapizë9,5 kmWorld Bank19921 200 000 $

Study and detailed design of the road and slope protection from the discharge tunnels of Fierza H/P Station Albanian Electro-Energetic Corporation199712 000 000 $

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name Detailed design of Orikum - Dhërmi National Road segmentSegment Length 32 km - Client/Financing General Roads Directory - Study Year 2001 - Constr. Cost $ 22,4 M

Road Design4.

22

Road Design4.

Project Name Detailed design of Milot - Rrëshen Highway - Single carriagewaySegment Length 26 km - Client/Financing General Roads Directory - Study Year 2003 - Construction Cost $ 45 M

Detailed design of Rehabilitation of Berat-Ballaban road 66 kmGeneral Roads Directory2003€ 29,7 M

Double detailed design of Kukës - Morinë Motorway (single & double carriageway) 16,1 kmGeneral Roads Directory2004€ 32 M (single) - € 80 M (double)

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

23

Road Design4.

Project Name Review of detailed design for Milot - Rrëshen motorway, segment of the Durrës- Morinë corridorSegment Length 26 km - Client General Roads Directory - Study Year 2004 - 2005 - Construction Cost $ 45 M

Review and new detailed design for Milot - Rrëshen Highway - Single carriageway

26 kmGeneral Roads Directory2004$ 29 M

Detailed design of Arberi Road “Bulqizë - Bllatë - Ura e Çerenecit segment”

16,9 kmGeneral Roads Directory2005€ 13,5 M

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

24

Road Design4.

Design of 10 national road junctions in Lezhë, Patok, Tirane-Durres, Rrogozhine, Lushnje, Fier, Tepelene, Gjirokaster --General Roads Directory2006€ 5,4 M

Detailed Design of Qeparo – Metoq

37,7 kmGeneral Roads Directory2006€ 28,5 M

Detailed design of “Vasha Bridge Exit - Bulqizë” na-tional road segment, part of Rruga e Arbërit road 12,2 kmGeneral Roads Directory2008€ 46,4 M

Detailed design of Porto Romano road (Durres)

8,17 kmGeneral Roads Directory2008€ 14,8 M

Detailed design of 13.6 km road segment “Tre Urat - Leskovik” 13,6 kmGeneral Roads Directory2009€ 7,3 M

Detailed Design of Road network in Municipalities of Tirane, Kavaje, Sarande, Vore 32 kmRespective municipalities2005 - 2010€ 18,2 M

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

25

Road Design4.

Project Name Detailed design of road segment tunnel Entrance Qafë Murriz - Exit Ura e VashësSegment Length 13,1 km - Client General Roads Directory - Study Year 2009 - 2010 - Construction Cost $ 148 M

Detailed design for regional road Skrapar-Përmet

20 kmGeneral Roads Directory2016€ 32,43 M

Preliminary Design, for the Construction of the High-way Section E, Pristina - Merdare (SEETO Route 7)23 kmCOWI IPF - EIB2017-2018€ 182 M

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

26

27

Bridges, tunnels, railway, airports, ports

Bridges and in general major structures are always a challenge for any engineering firm, no matter its size and experience. For this reason, we have given this fact the right weight in building our team of experts. With the detailed design of over 3 000 m of major bridges and viaducts and over 14 000 m of tunnels we lead the local and regional market of structural design.

We have designed particularly difficult structures, in some cases even some first-time-experience for Albania like cantilever bridge etc., mainly for the central government but in some cases also for other clients.

Additionally, InfraTransProject has been involved in important airport and sea port projects. We pride ourselves for being the only Albanian firm to have ever developed a feasibility study and fully designed an airport. Meanwhile, our experience with ports is also important considering sever-al services we have provided in this area.

5.

28

Bridge Design5.

Project Name Design of pedestrian cable bridge - BeratLength 50 m - Client/Financing Albanian Development Fund - Study Year 1999 - Construction Cost $ 1 M

Detailed design of several bridges & viaducts with simple supported prestressed beams on the Kukes - Morine road segment90m; 120m; 190m; 240m; 240m; 480mGeneral Roads Directory2004€ 19 M

Detailed design of several bridges, viaducts & over-passes with simple supported prestressed beams on the Milot - Rrëshen road segment55.5m; 30m; 60m; 120m; 210m; 207m; 330mGeneral Roads Directory2004-2005€ 12 M

Project Name

LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

LengthClient/FinancingStudy YearEstimated Construction Cost

29

Bridge Design5.

Project Name Detailed design of Drini Bridge, part of Durrës- Morinë corridor, cantilever bridge double carriagewayLength 288m - Client General Roads Directory - Study Year 2009 - Construction Cost € 21 M

Detailed design of Vasha Bridge, part of the Arberi Road segment, cantilever bridge single carriageway

288 mAlbanian Roads Authority2010€ 10,6 M

Detailed design of pedestrian cable bridge with me-tallic truss at Fierza Hydropower Plant

75,4 mAlbanian Electro-energetic corporation2011€ 0,55 M

Project Name

LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

LengthClient/FinancingStudy YearEstimated Construction Cost

30

Bridge Design5.

Project Name Detailed design of Mati Bridge (Shoshaj - Burrel - Albania), with simple supported prestressed beamsLength 90mx9,44m (max H=16m) - Client Albanian Roads Authority - Study Year 2014 - Construction Cost € 1,42 M

Detailed design of several bridges, viaducts & over-passes with simple supported prestressed beams on Arberi road160m; 28m; 88m; 60m; 100m; 12mAlbanian Roads Authority2008-2011€ 6,3 M

Detailed design of Mursia Bridge, with simple sup-ported R/C beams48mx5,5mVodafone Albania Sh.a2011€ 0,23 M

Detailed design of Poloska Bridge, with simple sup-ported R/C beams48mx7mAlbanian Roads Authority2012€ 0,33 M

Detailed design of Velabisht Bridge, with simple sup-ported R/C beams48mx7mPetromanas Albania2013€ 0,34 M

Project Name

LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

LengthClient/FinancingStudy YearEstimated Construction Cost

31

Bridge Design5.

Project Name Detailed design of Rog Viaduct (Çorovode), with simple supported prestressed beams Length 30m x 9,44m (max.H=46m) - Client Albanian Roads Authority - Year 2015 - Construction Cost € 1,41 M

Study and design for the new concept of the chill-dren playground and 2-floor underground parking at the Rruga e Elbasanit junction6200m2

3100m2

2017€ 2,65 M

Project Name

Parking spaceChildren’s playground spaceStudy YearEstimated Construction Cost

32

Pre-Feasibility study for the rehabilitation of the rail-way line Durres – Elbasan – Pogradec and a new rail line link to border with the Former Yugoslav Republic of Macedonia (W13-ALB-TRA-01) 153 kmCOWI IPF Consortium2017

Pre-Feasibility study for the rehabilitation of the rail-way line Durres – Elbasan – Pogradec and a new rail line link to border with the Former Yugoslav Republic of Macedonia (W13-ALB-TRA-01-C2) - Component 2 - Feasibility Study and Preliminary Design of Railway section Durres - Rrogozhine33 kmCOWI IPF Consortium2018

Project Name

Segment LengthClient/FinancingStudy Year

Project Name

Segment LengthClient/FinancingStudy Year

Railway Study & Design5.

Feasibility Study for Railway “Thumane (Mamuras)-Ti-tan Cement Factory” -- kmTitan sh.p.k - Albania2009€ 27 M

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

Feasibility Study for the Railway connection be-tween Albania and Kosovo, L=108km (incl. 12km tunnel)108 kmGeneral Rails Directorate1999$ 756 M

Project Name

Segment LengthClient/FinancingStudy YearEstimated Construction Cost

33

34

Detailed Design of “Qafe Murriz” Tunnel, located on the road section “Tunnel Entrance Qafë Murriz - Exit Ura e Vashës” - Part of Arberi Road2680mAlbanian Roads Authority2010€ 82 M

Detailed Design of “Guri Bardhe” Tunnel, located on the road section “Tunnel Entrance Qafë Murriz - Exit Ura e Vashës” - Part of Arberi Road560mAlbanian Roads Authority2010€ 10,8 M

Project Name

LengthClient/FinancingStudy YearEstimated Construction Cost

Project Name

LengthClient/FinancingStudy YearEstimated Construction Cost

Tunnel Design5.

Project Name Detailed design of motorway double tube tunnel, part of Durrës- Morinë corridor Length 2x235m - Client Albanian Roads Authority - Study Year 2009 - Construction Cost € 16,2 M

Detailed Design of “Qafë Buall” Tunnel, located on the road section “Exit of Vasha Bridge-Exit Bulqizë” - Part of Arberi Road821mAlbanian Roads Authority2008€ 14,1 M

Project Name

LengthClient/FinancingStudy YearEstimated Construction Cost

35

Detailed design and supervision of works for the Mother Teresa international airport apron

AlbTransport2004€ 1,8 M

Study of the rehabilitation of the existing aerodrome of Vlore Airport

Albanian Civil Aviation Authority2003€ 11,1 M

Supervision of works in Mother Teresa International Airport air traffic control tower construction

Lockheed Martin2003€ 1,8 M

Airport Design5.

Project Name Detailed design and supervision of works in Kukës Airport, Phase IClient United Arab Emirates Armed Forces - Year 2001 - 2003 - Construction Cost € 19 M

Project Name

Client/FinancingStudy YearEstimated Construction Cost

Project Name

Client/FinancingStudy YearEstimated Construction Cost

Project Name

Client/FinancingStudy YearEstimated Construction Cost

36

Airport Design5.

Engineering Services for VHF&MSSR sites, in Kruja and Porto Romano

Lockheed Martin2005€ 2.9 M

Project Name: Detailed design of “Design of engineering of slope protection at ANTA officeClient/Financing National Agency of Air Transport - Year 2010 - Estimeted Construction Cost € 0,48 M

Project Name

Client/FinancingStudy YearEstimated Construction Cost

37

Supervision of works for the construction of Portal No. 4 and road to the Ferries Terminal

Durres Port Authority2012-2013

Detailed design and civil works supervision Access road and Eastern Quay drainage, pavement and lightening in Port of DurrësEuropean Commission2004

Seaport Design5.

Project Name 23. Study and design of the Eastern Quay road and platform of the Durres PortClient Durres Port Authority - Year 2003

Project Name

Client/FinancingStudy Year

Project Name

Client/FinancingStudy Year

38

39

Oil industry, Energy and Environ-ment studies

Having been for many years in the road design and supervision market, oil research and exploitation companies have trusted us several projects including roads, drilling locations and design of other oil industry structures for their needs.

Similary, we have developed different projects for hydro power plants around Albania. Recently we have been successfully involved not only in structural and road designs but also in complete hydro-power plants stud-ies.

To complete the wide spectre of services offered by our firm, we have been involved in different projects concerning the environment. We con-sider our environmental sector a key element of our team playing a very important role in the development of our projects.

6.

40

41

Civil works management for road, drilling location and camp in Palokastër - Gjirokastër, incl. 9.0 km of access road and 3X30 m Bridge, 90 000 m2 drilling pad, fences, offices locations, interior roads, water supply, sewerage, etc.AlbTransport2002€ 12 M

Detailed Design and full Supervision of works of Access Road and Drilling Locations for JUBAN and SHPIRAG, 3.2 km of access road, 80 000 m2 drilling pad, fences, offices locations, interior roads, water supply, sewerage, etc.PETROMANAS Albania2011-12€ 2,2 M

Detailed design and supervision of Construction and Civil Works for Drilling site in Nartë, Vlorë, 12.6 km of access roads, 110 000 m2 drilling pad, fences, offices locations, interior roads, water supply, sewerage, etc. INA - Naftaplin2001-2002€ 8,7 M

Detailed design and supervision of road construction (12km), drilling camp and location in Kaninë - Vlorë, access roads, 130 000 m2 drilling pad, fences, offices locations, interior roads, water supply, sewerage, et.OMV2003€ 14,25 M

Detailed design of civil works for Shpirag-3 drilling well, 8,2 km of access roads, 120 000 m2 drilling pad, fences, offices locations, interior roads, water supply, sewerage, etc.Occidental Petroleum2000€ 3,9 M

Oil Industry6.

Project Name

Client/FinancingStudy YearEstimated Construction Cost

Project Name

Client/FinancingStudy YearEstimated Construction Cost

Project Name

Client/FinancingStudy YearEstimated Construction Cost

Project Name

Client/FinancingStudy YearEstimated Construction Cost

Project Name

Client/FinancingStudy YearEstimated Construction Cost

42

Oil Industry6.

Project Name Detailed Design of Access Road and Drilling Locations for Shpirag-3, Shpirag-4, Molisht-1 drilling wells, 16km + 3.0km + 2.1km of access roads, about 350000m2 drilling pad, fences, offices locations, interior roads, water supply, sewerage, etc. Client/Financing PETROMANAS Albania - Study Year 2012-13 - Construction Cost € 22,8 M

Conceptual design and preparatory study for Drilling Location and 16.1 km Access Roads - Berat Area

Petromanas Albania2012€ 0,268 M

Project Name

Client/FinancingStudy YearEstimated Construction Cost

43

Slope protection of Tunnel 3 & 4 at Fierza HPP in very difficult terrain

Albanian Electro-energetic Corporation2011€ 0,95 M

Full Feasibility Study, design and business plan for the Lumzi river Hydro Power Plant, 12 MW project concession bidding

MC Interte2013€ 11,7 M

Full Feasibility Study, design and business plan for the Zagori river Hidro Power Plant project conces-sion bidding

Salillari sh.p.k2013€ 5 M

Detailed design of Fierza HPP linking road, including Mileve stream systematization, slope protection from discharge Tunnel no.4 and national road slope sta-bilization Albanian Electro-energetic Corporation1998$ 4,15 M

Review Design of 5 Hydro Power Plant Project in Albania on Shala, Cem, Okshtun, Suhe and Kardhiq rivers. Capacities from 30 to 75 Mw, acc. Feasibility Study ACI Corporation2011€ 100 M

Protection measures for the national road near wa-ter discharge tunnel of Fierza HPP

Albanian Electro-energetic Corporation1992$ 1,25 M

Energy Sector6.

Project Name

Client/FinancingStudy YearEstimated Construction Cost

Project Name

Client/FinancingStudy YearEstimated Construction Cost

Project Name

Client/FinancingStudy YearEstimated Construction Cost

Project Name

Client/FinancingStudy YearEstimated Construction Cost

Project Name

Client/FinancingStudy YearEstimated Construction Cost

Project Name

Client/FinancingStudy YearEstimated Construction Cost

44

Environmental clean-up and disposal of hazardous waste in selected hot spots around Albania

Agriconsulting Europe2007€ - M

Detailed design of Reps Rehabilitation Dam and Tail-ing facilities

UNDP2011 -2012€ 0,6 M

Project Name

Client/FinancingStudy YearEstimated Construction Cost

Project Name

Client/FinancingStudy YearEstimated Construction Cost

Environment6.

Project Name Feasibility Study, Detailed Design and Supervision works of Rubik and Fier Landfill Client/Financing European Commission - Study Year 2007 - Construction Cost € 4,2 M

Detailed design of slope stabilization, river systemati-zation, environment protection for four locations in Milot, Rubik, Kamez, Pllane General Roads Directory2004€ 1,1 M

Project Name

Client/FinancingStudy YearEstimated Construction Cost

45

Construction Works Supervision

InfraTransProject is among the most experienced consulting compa-nies in Albania in the road and infrastructure construction works supervi-sion. Working mainly with road design has enriched our expertise and en-larged our ability to perform high quality construction works supervision in infrastructure.

In addition, we have performed with very good results important supervision projects like the Kukes Airport financed by the Government of the United Arab Emirates and managed by its Armed Forces.

7.

46

47

Supervision of Road of Arbëri; section Bulqizë - Bllatë - Ura e Çerenecit

16,9 kmGeneral Roads Directory2005€ 21 M

Supervision of works for rehabilitation and paving of Orikum - Dhërmi national road segment

32 kmGeneral Roads Directory2001€ 22,4 M

Supervision of civil works for Shpirag-3 drilling well location construction

Occidental petroleum2000-

Supervision7.

Project Name

Client/FinancingService YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingService YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingService YearEstimated Construction Cost

Project Name Supervision of construction works in Kukës Airport, Phase IClient United Arab Emirates Armed Forces - Year 2001 - 2003 - Construction Cost € 19 M

48

Project Name Supervision Works of National Rreshen-Kalimash Motorway, double carriage-way 2x2, slope reinforcements with different technologies, bearing and retaining walls. Supervi-sion included also 5.6 km long double tube Tunnel, 24 long span Bridges (20.0m to 40.0 m), small bridges, drainage, access roads, 680, 000 m2 of pavement and engagement of a 31-expert team.Segment Length 57 km - Client IGH (subcontracting) - Service Year 2008-2010 - Construction Cost € 750 M

Supervision7.

Supervision of construction works for Milot - Rrëshen segment of Durrës - Morinë motorway

26.1 kmGeneral Roads Directory2007 - 2009€ 45 M

Project Name

Segment LengthClient/FinancingService YearEstimated Construction Cost

Supervision of construction works for Qeparo – Metoq national road segment in the Vlora district

34 kmGeneral Roads Directory2007€ 9 M

Supervision of construction works for Ura e Vashes Exit - Bulqize (Arbri Road segment)

13.2 kmGeneral Roads Directory2007-2008€ 17 M

Supervision of works for Shkodër entrance road

3 kmGeneral Roads Directory2006€ 3,45 M

Project Name

Segment LengthClient/FinancingService YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingService YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingService YearEstimated Construction Cost

49

Project Name Supervision of civil works for Outer Ring of Tirana segment, four-lane highway 2x2Segment Length 640 m - Client Albanian Roads Authority - Service Year 2014-2015 - Construction Cost € 5 M

Supervision Works of pedestrian cable bridge with metallic truss near Fierza Hydropower Plant

75,4 mAlbanian Electro-Energetic Corporation2011€ 0,55 M

Supervision Works of road Kucove-Belsh-Cerrik

8.32 kmAlbanian Roads Authority2009-2011€ 4,13 M

Project Name

LengthClient/FinancingService YearEstimated Construction Cost

Project Name

Segment LengthClient/FinancingService YearEstimated Construction Cost

Supervision of civil works for “Reconstruction of Mati Bridge, Shoshaj - Burrel, Albania)

Albanian Roads Authority2014 - 2015€ 1.52 M

Supervision7.

Project Name

Client/FinancingService YearEstimated Construction Cost

50

51

Professional Staff

Our firm’s expertise does not only rely on the experience acquired during the years of its activity. The founding experts, already had more than 2 decades of experience when InfraTransProject was first established in 1991. During the years of centralised economy (when private compa-nies didn’t exist in Albania), our main engineers played considerable roles in the state institutions especially because the ‘70s and ‘80s were years of important developments in the country’s infrastructure. Most of the major projects of the last 25 years in this field, were planned and masterminded already during those years by some of our most experienced experts and their colleagues in the state Institute No.2, Institute of Transports etc.

We take pride of our dynamic team composed of e very good com-bination of very experienced engineers with very promising young engi-neers who have already accumulated important expertise thanks to their close cooperation with the team.

8.

52

53

Professional Staff8.

Dr. Eng. Faruk KABA

Senior Technical Director

With 47 years of road and highway study and design experience, he is the most experienced engineer of this field in Albania. More than 3000km of road design hold his signature.

He graduated in 1968 from the Polytechnic University of Tirana in the Civil Engineering Faculty and was assigned the Paving department of the Roads and Railways Study and Design State Institute in 1972.

From 1980 until 1990 he was Director of the Study and Design Directory of the Ministry of Communications.He established InfraTransProject in 1991 with a group of experienced colleagues while still working in the state Institute of Roads and Railways Study and Design and the state Institute for Construction Technologies as Respon-

sible for Technical Standards in Road and Highway Design sector.In 1994, after several years of efforts to establish a state agency for managing the road network of the country, he

became the first General Director of the General Roads Directory.From 1995 to 2018 he holded the position of Managing Director and Senior Technical Director in the company.

He is permanent Member of the National Council of Roads headed by the Prime Minister.He established with a group of consulting engineers in 2000 the Albanian Association of Consulting Engineers and has been since then its President. AACE has organised so far the only two major international events on roads

(The First Albanian Congress on Roads and the Second International Congress of Roads in Albania).He has been member of the New York Science Academy since 2004.

Since 1985 he holds the Doctor of Science degree (PhD)From 1984 to 1993 he has lectured “Roads and their Construction” in the Polytechnic University of Tirana.

54

Econ. Brunilda TOPI Finance Manager Executive Secretary

Graduated in Economy in the University of Modena and Reggio Emilia in Italy in 2005, she has joined the company in 2018. Her long management experience is an asset to the growing activity of the firm not only in the financial sector but also thanks to her organizational skills. She plays a key role in preparation of bids in public and other procurement procedures. Ms. Topi is the Finance Mnager and Executive Secretary.

Dorian KABA Administrator (CEO)

Graduated in Management and Law he is the company’s official administrator since January 2018 covering operations management, PR & marketing, legal, human resources, biding/tendering procedures and logistics management. In addition he is the Quality Manager monitoring and applying the ISO standards (ISO 9001:2008 and ISO 14001:2004) in the company activities. Has taken active part in project management especially in international projects or with foreign clients and/or partners

Professional Staff8.

Eng. Piro BEDO Head of Structural Department

Eng. Bedo is together with Dr. Eng. Kaba one of the founders of InfraTransProject. He is also the most experienced engineer in the field of road and railway structures in Albania with over 50 years of experience, period in which he has contributed in various state institutions and private sector.He has graduated from the Polytechnic University of Tirana in the Civil Engineering Faculty. He has served as trans-port infrastructure project supervisor for more than two decades in different state institutions and then has been involved in the private sector. An extended expertise in structures and especially in bridges has put his name on the top of Albanian structural engineers. During the 2nd International Congress on Roads in Albania, he was awarded the “Karl Gega”- The Pride of Albanian Engineering prize for the special contribution in the development of the country’s structural engineering and the special contribution for future generations of structural engineers.

Eng. Rezart ARKAXHIU Deputy Managing Director Structural & Road Engineer

A young but already quite experienced engineer who has climbed the steps to the top of InfraT-ransProject thanks to his dedication and professional abilities. Graduated as MSc in Structural Engineering from the Polytechnic University of Tirana in the Civil Engineering Faculty in 2008, he has already accumulated a consider-able number of projects in his personal experience. In 2013 he also finished the MSC degree in Transport Systems Planning, Traffic Planning and Road Signage.

55

Eng. Kujtim PROSEKU Electrical Engineer

Eng. Proseku is an expert in electrical engineering. He graduated in 1968 from the Electric En-gineering Faculty of the University of Tirana. With an important and long experience in various sectors of the deffence and military sector he is one of the oldest members of InfraTransProject covering the electrical design in roads, airports, tunnels and other studies performed by the firm.

Eng. Agim KABA Land Surveyor Technical Director

Our land surveyor has more than 48 years of experience in geodesy studies. He graduated from the the Civil Engineering Faculty of the Polytechnic University of Tirana. He uses the lates technology in land suvey-ing and has an extended database on Albanian territory.

Eng. Tefik JEGENI Hydrology Engineer

Another from the founding members of the staff, Eng. Jegeni is an expert in Hydro-meteorology with an experience of 48 years. He has served for several decades in the state Hydrometeorologic Institute as en-gineer and more recently as member of the Scientific Council of this Institute. All InfraTransProject hydrometeoro-logic studies hold his signature since its establishment.

Professional Staff8.

Eng. Ermir GODO Structural & Road Engineer

One of the most talented young engineers of the firm who has developed design and project management skills in a very short time. Starting as support structural engineer he soon engaged in road projects while working closely with the more experienced staff to become one of the promissing values of the company.

Eng. Nermina TALLUSHI Structural Engineer

Another talented engineer that has already achieved excellent results in her work even though she is in the first steps of her career as engineer. Her focus in the near future are bridges and tunnel design

56

Professional Staff8.

Eng. Rezar KUMBARO Highway Engineer & Urban Planer Project Manager

Graduated in Urban Planning and Architechture from the Civil Engineering Faculty of the Poly-technic University of Tirana he has then specialized highway design and transport planning. He holds also a Masters Degree in Infrastructure Planning from the Technical University of Stutgart in Germany. Mr. Kumbar has a long experience in Project Management, covering this task in several projects, especially the ones financed by international bodies.

Eng. Elvis PAPAJ Hydro-technical Engineer

Graduated in Hydro-technical Engineering at Civil Engineering Faculty of the Polytechnic Universi-ty of Tirana he also holds a Masters Degree in this field. Eng. Papaj is experienced in planing, design and supervision of works for hydrotechnical infrastructure in urban and rural areas.

57

58

Design License

59

Supervision License

60

ISO 9001:2008

61

ISO 14001:2004

62

63

VAT No.: J62305002A

Rr. Q.Stafa, P.132, Ap. 1,1017 Tirana - ALBANIA

T: +355 4 22 25 650 | M: +355 68 20 93 568E: [email protected] | W: www.itp.al

INFRATRANSPROJECT LTD.CONSULTING.DESIGN.SUPERVISION

1991Since