innerbelt bridge contract group 2 tremont and gateway director/news... · 2012. 7. 11. · c s s...

38
Innerbelt Bridge Contract Group 2 Tremont and Gateway 7/10/2012

Upload: others

Post on 24-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • C S S

    Innerbelt Bridge Contract Group 2Tremont and Gateway

    7/10/2012

  • C S S

    March 7, 2012 Aesthetics Kickoff

    April 18, 2012 Internal Team Meeting

    May 2, 2012 Internal Team Meeting/Review

    May 10, 2012 Tremont and Towpath Trail Focus Group

    May 10, 2012 Gateway Focus Group

    June 13, 2012 Tremont and Towpath Focus Group

    June 13, 2012 Gateway Focus group

    June 28, 2012 Gateway Focus Group Special Meeting

    July 10, 2012 CCG2 Public Meeting

    July 11, 2012 Tremont and Towpath Focus Group

    July 11, 2012 Gateway Focus Group

    July 19, 2012 Cleveland Design Review Committee

    July 20, 2012 Cleveland Planning Commission

    Schedule

  • C S S

    CCG2 Tremont to Gateway 2012

  • C S S

    Gateway7/10/2012

  • C S S

    Gateway BASIC PLAN

  • C S S

    Gateway Components

    Entry Wall

    Infield

    Boulevard

  • C S S

    Gateway OVERALL PLAN

  • C S S

    Gateway OVERALL PERSPECTIVE

  • C S S

    Boulevard EXISTING SITE

    Cleveland Black Oxide

    City View Ramp B4

    ClevelandBlack Oxide

  • C S S

    Trees – 750’ FROM VIADUCT AT E 9TH ST., SUMMER

  • C S S

    Trees 750’ FROM VIADUCT, AT E 9TH ST., WINTER

  • C S S

    Trees AERIAL VIEW TOWARD TERMINAL TOWER

  • C S S

    Trees 250’ FROM VIADUCT

  • C S S

    Infield TERRACED with SLOPES

  • C S S

    Infield TERRACED with SLOPES

  • C S S

    Gateway Components ENTRY WALL and PORTALS

  • C S S

    Wall

  • C S S

    Ontario East 9th

    Portals DIMENSIONS / PROPORTIONS

    177’ 80’38’37’

    17’ 21’

  • C S S

    City / Landscape

  • C S S

    Portal ONTARIO

  • C S S

    Portal EAST 9TH

  • C S S

    Gateway OVERALL PLAN

  • C S S

    Tremont/Towpath Trail

    7/10/2012

  • C S S

    CCG1 Tremont 2009

    Existing Bridge Footprint

    CCG1 WBThe Bowl

  • C S S

    CCG2 Bridge 2012

  • C S S

    CCG2 Bridge 2012

  • C S S

    Tremont Basic Plan

  • C S S

    Tremont / Towpath Trail

    The Sideyard

    Towpath Trail

    13th STREETA

    BB

    EY A

    VE

    NU

    E

    Urban Farm

    Blueberry Hill

    City Overlook

    Old Central Viaduct Interpretive Zone

    Parking

    Tremont Terrace and Street Party

  • C S S

    Tremont Sideyard HILLS AND DALES WITH TREES

    Infiltration Swales

    Planted Hills and Dales

    Ditch

    Fence

    Vegetated Buffer Zone

    Chain Link Fence

    Rose Berm and Street Trees

    Rose Plantings

    Fruit Trees

  • C S S

    Tremont Sideyard NATURE PLAY

    Infiltration Swales

    Bocce Courts

    Planted Hills and Dales

    Ditch

    Fence

    Vegetated Buffer Zone

    Chain Link Fence

    ParkingEntrance

    Play Installations, With Age Group Variations

    Rose Berm and Street Trees

    Primary Entrance

    Rose Plantings

    Educational Gardens & Fruit Trees

    Improvements funded and maintained by others.

    Pathways

  • C S S

    Tremont Sideyard NATURE PLAY

    Improvements funded and maintained by others.

  • C S S

    Tremont Sideyard NATURE PLAY

    Improvements funded and maintained by others.

  • C S S

    Tremont Section at Old Central Viaduct Interpretive Strategy

  • C S S

    Tremont Towpath Section at Old Central Viaduct

  • C S S

    Tremont TERRACE / STREET PARTYTerrace

    STREET PARTYPLANTED BUFFER MOUNDS

    **

    **TERRACE

    W 13th STREET STREETPARTY

    AB

    BE

    Y A

    VE

    NU

    E

  • C S S

    Wayfinding Terrace

    STREET PARTYPLANTED BUFFER MOUNDS

    **

    *

    *

    *

    *

    *

    *

  • C S S

  • C S S

    Thank you