Innovations on FLNG pre-treatment technologies: Acid gas removal for LNG production from on-shore to floating unit design Christian Riemann, OASE® Gas Treating Excellence

Upload: others

Post on 01-May-2020

27 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Innovations on FLNG pre-treatment technologies: Acid gas ... · Innovations on FLNG pre-treatment technologies: Acid gas removal for LNG production from on-shore to floating unit

Innovations on FLNG pre-treatment

technologies: Acid gas removal

for LNG production from on-shore to

floating unit design

Christian Riemann, OASE® Gas Treating Excellence

Page 2: Innovations on FLNG pre-treatment technologies: Acid gas ... · Innovations on FLNG pre-treatment technologies: Acid gas removal for LNG production from on-shore to floating unit

2

Why is Gas Treatment important for

LNG production?

Gas Treatment is a “gas cleaning“ step upstream the liquefaction train

Cleaning means removal of acid gas components, especially CO2

CO2 is critical as it freezes out during natural gas liquefaction and may blocks lines – liquefaction train needs to be shut down for removal!

Typical limit for CO2 before liquefaction train: 50ppmv !!!

Dehydration Mercury

removal

Feed

gas Liquefaction LNG Primary

separation CO2 removal

CO2

Block scheme of typical onshore LNG plant

Page 3: Innovations on FLNG pre-treatment technologies: Acid gas ... · Innovations on FLNG pre-treatment technologies: Acid gas removal for LNG production from on-shore to floating unit

3

Onshore vs. Offshore

What is the difference?

Heave

Sway

Surge

Pitch

Yaw

Roll

A vessel is moving according to sea motion

Page 4: Innovations on FLNG pre-treatment technologies: Acid gas ... · Innovations on FLNG pre-treatment technologies: Acid gas removal for LNG production from on-shore to floating unit

4

Typical LNG Acid Gas Removal Unit

Page 5: Innovations on FLNG pre-treatment technologies: Acid gas ... · Innovations on FLNG pre-treatment technologies: Acid gas removal for LNG production from on-shore to floating unit

Offshore ...

How to assess motion?

5

Sea motion is of stochastic nature

Time [s]

How to treat stochastic information?

Transform in harmonic motion

Multiple harmonic waves Spectrum

Page 6: Innovations on FLNG pre-treatment technologies: Acid gas ... · Innovations on FLNG pre-treatment technologies: Acid gas removal for LNG production from on-shore to floating unit

Offshore ...

Frequencies

6

VESSEL RESPONSE AMPLITUDEs as function of period time

The spectra are important for pitch and roll

Short period times Accelerations

Long period times Fluid Maldistribution

Time [s]

Am

pli

tud

e [

-]

Eigen-

frequency

Page 7: Innovations on FLNG pre-treatment technologies: Acid gas ... · Innovations on FLNG pre-treatment technologies: Acid gas removal for LNG production from on-shore to floating unit

7

Model Development

Page 8: Innovations on FLNG pre-treatment technologies: Acid gas ... · Innovations on FLNG pre-treatment technologies: Acid gas removal for LNG production from on-shore to floating unit

Detailed Level Investigation

Ga

s

Ga

s

Liq

uid

Liq

uid

Ga

s

Ga

s

Liq

uid

Liq

uid

Page 9: Innovations on FLNG pre-treatment technologies: Acid gas ... · Innovations on FLNG pre-treatment technologies: Acid gas removal for LNG production from on-shore to floating unit

9

Motion Studies

Periodtime: 10 s 20 s 40 s 5 s

Column Height: 2.2 m

Column diameter: 1 m

Oscillation: +/- 8°

Page 10: Innovations on FLNG pre-treatment technologies: Acid gas ... · Innovations on FLNG pre-treatment technologies: Acid gas removal for LNG production from on-shore to floating unit

OASE® Gas Treating Excellence C

O2 t

rea

ted

ga

s

Periodtime [s]

50 ppmv

Long period times may lead to

Change in characteristics of dynamic tilt (quasi static)

Increase in design margins (sizing of equipment)

Page 11: Innovations on FLNG pre-treatment technologies: Acid gas ... · Innovations on FLNG pre-treatment technologies: Acid gas removal for LNG production from on-shore to floating unit

11

Comparison of different configurations

Configuration Absorber diameter

[m]

Regenerator diameter

[m]

LP Flash diameter

[m]

Reboiler Duty

[%]

Abs / HP / Str 3.50 4.60 X 100

Abs / HP / LP / Str 3.50 4.50 4.50 85

Membrane / Abs / HP / Str 3.50 3.40 X 35

Example

Feed gas flowrate: 20000 kmole/hr

Feed gas pressure: 65 bara

Acid gas content: 10 vol% CO2

Hybrid process: 10 vol% 3 vol%

Page 12: Innovations on FLNG pre-treatment technologies: Acid gas ... · Innovations on FLNG pre-treatment technologies: Acid gas removal for LNG production from on-shore to floating unit

12

Findings

BASF is able to design Acid Gas Removal based on Amines for FLNG

Reasonable motion pattern shall be taken into account

Optimization of design with respect to

OPEX/CAPEX

Footprint/weight

Hybrid processes – Bulk removal of acid gas by other technology

Lower energy consumption, but ...

High pressure parts of amine process the same

Additional high pressure equipment necessary

Additional pretreatment may be required, e.g. upstream dehydration

Page 13: Innovations on FLNG pre-treatment technologies: Acid gas ... · Innovations on FLNG pre-treatment technologies: Acid gas removal for LNG production from on-shore to floating unit

13

OASE® Gas Treating Excellence

300+ World scale reference plants

Page 14: Innovations on FLNG pre-treatment technologies: Acid gas ... · Innovations on FLNG pre-treatment technologies: Acid gas removal for LNG production from on-shore to floating unit

14

www.gastreatment.com

www.oase.basf.com