inspection requirements cp has - cpr.ca · 3,000 13,000 cp has bridges across miles of our network...

1
+ 3 , 000 13 ,000 CP HAS BRIDGES ACROSS MILES OF OUR NETWORK CP’S BRIDGES INSPECTION REGULATIONS ARE MET OR EXCEEDED TRANSPORT CANADA FEDERAL RAILROAD ADMINISTRATION HAVE A QUESTION ABOUT A BRIDGE? BRIDGE MANAGEMENT BY QUALIFIED BRIDGE MANAGERS & INSPECTORS HOW A BRIDGE LOOKS DOESN’T IMPACT ITS ABILITY TO SAFELY CARRY TRAFFIC. REST ASSURED, BRIDGE SAFETY IS SERIOUS BUSINESS AT CP. PROFESSIONAL ENGINEERS BRIDGE SUPERVISORS BRIDGE INSPECTORS CP’S BRIDGES ARE EVERY YEAR INSPECTED OUR LARGEST BRIDGE IS THE LETHBRIDGE VIADUCT IN ALBERTA 5,300 FT LONG We take bridge safety seriously at CP. We've invested billions of dollars in our infrastructure in recent years, to make sure that CP is doing everything we can to keep our communities and our employees safe. It’s part of the reason why CP has been the safest Class 1 railroad for 14 years in a row. Whether it’s crossing a small creek or a large viaduct, our bridge management program ensures that we’re meeting or exceeding both U.S. and Canadian safety regulations. That means our bridge inspectors are monitoring each of our 3,000+ bridges according to a strict regimen of annual and special inspections. CP BUILDS BRIDGES WHEN CONDITIONS OR TRAFFIC CONDITIONS REQUIRE IT. OUR SMALLEST BRIDGES ARE ACROSS CREEKS, UTILITIES AND LIVESTOCK CROSSINGS 10 FT LONG CPR.CA/BRIDGES , OUR BRIDGE MANAGEMENT PROGRAM MANDATES: Bridge design methods Safe operating capacity parameters Inspection requirements

Upload: others

Post on 16-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Inspection requirements CP HAS - cpr.ca · 3,000 13,000 cp has bridges across miles of our network cp’s bridges inspection regulations are met or exceeded transport canada federal

+3,00013,000

CP HAS

BRIDGES ACROSS

MILES OF OUR

NETWORK

CP’S BRIDGESINSPECTION REGULATIONS ARE MET OR EXCEEDED

TRANSPORT CANADA

FEDERAL RAILROAD ADMINISTRATION

HAVE A QUESTION ABOUT A BRIDGE?

BRIDGE MANAGEMENT BY QUALIFIED BRIDGE MANAGERS & INSPECTORS

HOW A BRIDGE LOOKS DOESN’T IMPACT ITS ABILITY TO SAFELY CARRY TRAFFIC. REST ASSURED, BRIDGE SAFETY IS SERIOUSBUSINESS AT CP.

PROFESSIONAL ENGINEERS

BRIDGE SUPERVISORS

BRIDGE INSPECTORS

CP’S BRIDGES ARE

EVERY YEARINSPECTED

OUR LARGEST BRIDGE IS THE LETHBRIDGE VIADUCT IN ALBERTA

5,300FT LONG

We take bridge safety seriously at CP.

We've invested billions of dollars in our infrastructure in recent years, to make sure that CP is doing everything we can to keep our communities and our employees safe. It’s part of the reason why CP has been the safestClass 1 railroad for 14 years in a row.

Whether it’s crossing a small creek or a large viaduct, our bridge management program ensures that we’re meeting or exceeding both U.S. and Canadian safety regulations. That means our bridge inspectors are monitoring eachof our 3,000+ bridges according to a strict regimen of annual and special inspections.

CP BUILDS BRIDGES WHEN CONDITIONS OR TRAFFIC CONDITIONS REQUIRE IT.

OUR SMALLEST BRIDGES ARE ACROSS CREEKS, UTILITIES AND LIVESTOCK CROSSINGS

10FT LONG

CPR.CA/BRIDGES

,

OUR BRIDGE MANAGEMENTPROGRAM MANDATES:

Bridge design methods

Safe operating capacity parameters

Inspection requirements