installation & instruction manual - radonaway · all wiring must be performed in accordance...

22
Installation & Instruction Manual All Residential & Small System Models (except EZ 95 ) RadonAway 3 Saber Way Ward Hill, MA 01835 radonaway.com IN063 Rev. C 1115

Upload: others

Post on 18-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Installation & Instruction ManualAll Residential & Small System Models

(except EZ95)

RadonAway3 Saber Way Ward Hill, MA 01835

radonaway.com

IN063 Rev. C 1115

Page 2: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 2 of 22IN063 Rev. C 1115

1. PRE-INSTALLATION............................................................................................................ 31.1.SafetyMatters........................................................................................................................................................................31.2.WaterFlowRequirements...................................................................................................................................................41.3.UnpackingandLocatingSystemComponents..................................................................................................................5

1.3.1.UnpackAllSystemComponents..................................................................................................................... 51.3.2.LocateAllComponents......................................................................................................................................5

1.4.UseQualifiedTechnicians...................................................................................................................................................51.5.FullWaterTest......................................................................................................................................................................5

2. INSTALLATION INSTRUCTIONS.....................................................................................62.1.SystemLocation....................................................................................................................................................................72.2.ReadyingtheAIRaiderTMforInstallation..........................................................................................................................72.3.PlumbingHook-up...............................................................................................................................................................92.4.ElectricalHook-up.............................................................................................................................................................11

2.5.VentLineInstallation..........................................................................................................................................................142.6.RemoteAirIntake..............................................................................................................................................................152.7.SystemStart-up.................................................................................................................................................................162.8.SystemCheck.......................................................................................................................................................................17

3. RETESTING..............................................................................................................................18

4. MAINTENANCE...................................................................................................................184.1.SixMonthService(recommended).................................................................................................................................184.2.AnnualService(required)..................................................................................................................................................19

5. TROUBLE SHOOTING........................................................................................................20

LIMITED WARRANTY.............................................................................................................21

APPENDICESA.1.PumpSpecification,433-S50Systems,pumpmodel20DOMO5121+1...............................................................insert

Figure 1 a,b,c-TypicalSystems(433-S,433,321)..................................................................................................................................6Figure 2 -Pump&BypassAssembly(433/321)....................................................................................................................................7Figure 3-InstalledSystem(433,321)......................................................................................................................................................8Figure 4-PlumbingInstallation(433-S50).............................................................................................................................................9Figure 5-PlumbingInstallation(433-S50X)........................................................................................................................................10Figure 6-WiringDiagram321 and 433115V........................................................................................................................................12Figure 7-WiringDiagram433S50(X) and 321-S50X 115V................................................................................................................13Figure 8-VentLineConnection............................................................................................................................................................14Figure 9-VentLineInstallation(2inch)..............................................................................................................................................14Figure 10-VentLineInstallation(3inch)............................................................................................................................................14Figure 11-AirFilter................................................................................................................................................................................15Figure 12-AirIntakeConnection.........................................................................................................................................................15Figure 13-InstalledAIRaiderTM(433-S50)...........................................................................................................................................16

Table of Figures

TABLE OF CONTENTS & FIGURES

Page 3: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 3 of 22IN063 Rev. C 1115

1. Pre-InstallationTheAIRaiderTMSystemsarediffusedbubbleaerationsystemsfortheremovalofradonandotherVOC’sfromresidentialandmunicipalwatersupplies.Thisinstallation/operationmanualisdesignedtoguideprofessionalsthroughthesafeandproperinstallationoftheAIRaiderTM Systems.

BeforebeginningtheinstallationoftheAIRaiderTMSystem,thereare5itemstobeconsidered.Theyare:

1. Safety2. InstallationSiteRequirements3. InspectionofSystemComponents4. NecessityforQualifiedTechnicians5. KnowledgeofallContaminantsintheWater

1.1. Safety Matters

Safetyisthemostimportantstepintheinstallationprocess.Neverperformanystepoftheinstallationthatyouarenotqualifiedtoperform(i.e.Electricalorplumbinghookup).Itisimportantthatyoureadthroughtheentiremanualpriortobeginningtheinstallation.Whenperformingtheinstallation,workslowlyanddeliberately.Followallinstructionscarefullyandnevertakeshortcuts.Ourteamoftechniciansisavailabletoansweryourquestionsat800-355-0901.

WORK SAFELY!

PRE-INSTALLATION1

Page 4: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 4 of 22IN063 Rev. C 1115

1.2. Water Flow Requirements

ThestandardresidentialAIRaiderTMSystemsaredesignedforusewithwaterflowsupto20gallonsperminute(GPM).*Thesystemcomesequippedwithanoutflowballvalve.Ifhigher/lowersystemoutflowisneeded,open/closetheballvalvebytheamountnecessarytobalancethesystem.Thewellpumpoutputmustproduceatleast1GPMmorethantheoutputoftheAIRaiderTM(i.e.welloutput=8GPM;AIRaiderTMoutflowsetting=7GPM)forpropersystemperformance.IfthewellpumpoutputislessthanthesystemoutputtheAIRaiderTMwillrundryandpossibledamagemayoccur.Topreventthisfromoccuringthewaterflowratemustbedeterminedbeforethesystemisinstalled.*Some AIRaiderTM Systems are not recommended for high flow residential properties. All repressurization systems(except for the AIRaiderTM EZ95,433-S50 & 433-S50X) are sold separately. Proper repressurization system sizing is required to meet water flow needs. Consult manufacturer if assistance is needed for system selection.

Inordertodetermineavailablewaterflowratethefollowingisneeded:• GardenHose• Five-GallonBucket• AStopWatchorWatchwithaSecondHand

Or• AWaterFlowMeter

Household water use must be discontinued during the following flow rate test.

Mid-Range Flow Rate Test:

1. AttachgardenhosetothedrainconnectiononthebaseoftheWellPressureTank.

2. Openthedrainvalveandrunwaterfor15minutes.

3. After15minutes,checkthepressuregaugeonthewellsystem.Adjustthedrainvalve(openorclose)asneededtomaintaintherequiredrunningsystempressure(constantpressureongauge)withthewellpumprunningcontinuously.

4. Runfor5minuteswhileensuringthatthepressureisnotfluctuating.

5. Runwaterfromthehoseintoafivegallonbucket.Usingastopwatch,timehowmanysecondsittakestofillthebucket(Zsec.).

6. DeterminetheGPMbydividing60secondsbythenumberofsecondsittooktofillthebucket(Zsec.).Multiplytheanswerby5gallons.ThisgivesyoutheGPM. GPM = ( 60 / Z ) x 5

7. Repeatsteps5and6andaveragethe2numbers.Theansweristhewellpumpoutputingallonsperminute.Itisrecommendedthatthisnumberbeindeliblyrecordedinanobviouslocation,togetherwiththedateoftest,asitwillberequiredwhensettingtheAIRaiderTM System and mayberequiredforfuturetroubleshootingofthewellpumpsystemortheAIRaiderTM System.

PRE-INSTALLATION1

Page 5: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 5 of 22IN063 Rev. C 1115

1.3. Unpacking and Locating System Components

1.3.1. UnpackAllSystemComponentsRemoveallpackingmaterialanddiscardappropriatelyawayfromtheworkarea.

1.3.2. LocateAllComponentsChecktoensureallcomponentsareintactandincludedinshipment.(SeeFigure5and8)Includedcomponentlist(mayvarywithorder):

• TankAssemblywithSolenoidAssembly• ControlPanel*andFloatSwitches• SubmersiblePump**• JetPumpandBladderTankAssembly***• Brass–BypassAssembly,PumpBrass,andTankBrass****• InstallationKit–Manual,PressureGauge,etc.

* Model321doesnotcomeequippedwithacontrolpanel**Mountedinternallyon433-S50and433-S75Systems,notsuppliedwith433and321Systems.***Pumppackagesaresoldseparatelyon321and433Systems,andwillvarywiththeorder.BladderTanksaresoldseparately.****Soldseparatelyon321and433Systems.Standardsystemsareequippedfora¾”

plumbingconnection.1”plumbingconnectionisavailableon433Systemsonly(Not433433-S50or433-S75).Pleasespecifyplumbingconnectionrequirementswhenordering.

BypassAssemblyisintegralon433-S50SystemsOnly.

1.4. Use Qualified Technicians

ALicensedPlumber,Electrician,Contractorand/orCertifiedWaterTreatmentSpecialistmayberequiredtoinstalltheAIRaiderTMSysteminaccordancewiththeinstallationinstructions.AllwiringmustbeperformedinaccordancewiththeNationalFireProtectionAssociation’s(NFPA)”NationalElectricalCode,Standard#70”-currenteditionforallcommercialandindustrialwork.Allwiringmustbeperformedbyaqualifiedandlicensedelectrician.CheckyourLocalandStateCodeandLicensingrequirements.Failuretofollowtheinstructionsmayleadtopoorsystemperformanceand/orpossiblesystemdamage.

The Installation must comply with all applicable Local and State Codes and NFPA National Electrical Code, Standard #70!

1.5. Full Water Test

AfullWaterSampleAnalysismustbeperformedtodeterminethequalityofthewaterthatrequirestreatment.Inmanywatersupplies,contaminantsotherthanradonarepresentandmayneedtobepre-treatedinorderfortheAIRaiderTMtoworkproperly.TheAIRaiderTMSystemisonlyeffectivefortheremovalofradonandsomeotherVOC’s.TheAerationProcessemployedbytheAIRaiderTM Systemandotherradonremovalsystemscanworsenproblemsduetoironormanganesecontaminantsinthewatersupply.ForoptimalremovalofradonorotherVOC’s,othercontaminantssuchasiron,ormanganesemustberemovedbeforethewatersupplyenterstheAIRaiderTM System.

Failure to remove other contaminants can reduce the effectiveness of the system and may result in system damage!

PRE-INSTALLATION1

Page 6: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 6 of 22IN063 Rev. C 1115

2. Installation InstructionsOVERVIEW

Nowyouarereadytobegintheinstallationprocess.TheeightstepstoproperlyinstalltheAIRaiderTM Systemarelistedbelow.Readallcomponentsofeachsteppriortobeginningtheactualinstallation.

1. SystemLocation2. ReadyingtheSystemforInstallation3. PlumbingHook-up4. ElectricalHook-up5. VentLineInstallation6. RemoteAirIntakeInstallation7. SystemStart-up8. SystemCheck

SAFETY TIP: Do Not undertake any step for which you are Not Qualified.

Figure 1 a,b,cTypicalSystem

(RepressurizationSystemsnotshown,soldseparatelyon321,433and433-1)

433-S50 321433 & 433-1

INSTALLATION INSTRUCTIONS1 2

Page 7: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 7 of 22IN063 Rev. C 1115

2.1. System Location

WhenselectingthelocationfortheAIRaiderTMSystem,fivefactorsshouldbeamongthoseconsidered:1. SystemPlumbingHook-up.Findalocationthatwillminimizetheamountofplumbingnecessary,thisistypicallyinproximitytothewelltank.2. ElectricalHook-up.Keepinmindtheneedforaccessibilitytoa20Ampdedicated120VACpowersupplyor30Ampdedicated230VACfor230V433Systems.3. ExhaustLineVenting.Thelocationofthesystemmustallowforoutsideventingofthe

systemexhaustabovetheeaveofthestructure.Themanufacturerrequiresthattheexhaustpipepitchbacktowardthesystem(seeSection2.6).

4. RemoteAirIntake.Ifthesystemmustbeinstalledinanareawithquestionableairquality(i.e.furnaceroom,garage,crawlspace)thenductingfromtheairintaketoaremotelocationhavinggoodairqualitymayberequired.5. SystemMustBeLevel.Thesystemshouldnotbelocatedonasignificantslopeasthismayimpedesystemperformance.

Placethesysteminthelocationacceptabletocustomerthatmaximizestheeaseofinstallation.AllLocalandStatecodesaswellasanyapplicableAARST,EPAand/orStateRadonstandardsmustbeadheredtowhenlocatingtheAIRaiderTM(i.e.awayfromelectricalpanel,furnace,exits,etc.).

2.2. Readying the AIRaiderTM for Installation For 433 and 321 systems (433 Illustrated). This section does not apply to Systems with integral pumps (433-S50 & 433-S50X Systems).

1. IfusingtheGrundfosMQ3-45PumpattachMount-ingBrackettowallasshowninFig.3(page8).NotebracketholeheightisspecifictotheGrundfosMQ3-45. IfusingadifferentpumpadjustbracketheightasrequiredtoplacepumpsuctionpipecenterlineatthesystemoutletcenterlineasspecifiedinFig.3.Note: Short horizontal pipe run from system outlet to pump inlet is optimal. If this pump location is impractical because of space constraints the pump may be located remotely at a higher location, but pump lift, pipe diameter, and equivalent pipe length must comply with limits specified in the pump installation instructions.

Do not mount pump lower than shown as removal of the pump for service may result in tank contents siphoning out onto the floor!

2. InstalltheSuctionCheckValveprovidedwiththeGrundfosMQ3Pumpintothepumpinletasshowninthepumpinstallationinstructions.Thiswillpreventlossofpumpprimeandpossibleinterruptionsinthewatersupplytothehouse.Removetheprimingplugfromthepumpandaddthespecifiedvolume(SeePumpInstallationInstructions)ofwatertothepump.Eitherre-installtheprimingplugorinstalla⅜”NPTx2”longpipenippleandattacha¼”NPTPressureGaugewith¼”x⅜”FNPTReducertothepipenipple(Fig.2).

Figure 2 Pump&BypassAssembly

INSTALLATION INSTRUCTIONS1 2

Page 8: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 8 of 22IN063 Rev. C 1115

3. Sitthepumpontothemountingbracketandconnectpumpinlettosystemoutlet.Thesystemoutletisprovidedwitha¾”SharkbiteConnectionsuitablefor¾”NominalCopperTubeorPexTube;insertionlengthintoSharkbiteFittingis1”.Additionalfittingswillberequiredtoconnectthetubetothe1”MNPTthreadedconnectionontheMQ3-45Pump.Fittingsrequiredmayvarywithpumpused.Cutthetubingtothelengthrequiredtoalignthepumpbasewiththemountingholesinthepumpmountingbracket.Boltthepumptothemountingbracket.

4. WiththeSystemlocatedasdesired,installthepipe/tubefromthepumpdischargetothedesiredlocationofsupplytohouse.AtthehouseendateeisrequiredtoaccommodatesupplytohouseandtoSystemBypassConnection.Fittingswillberequiredtoconnecttothe1”MNPTthreadedconnectionontheMQ3-45Pump.Fittingsrequiredmayvarywithpumpused.TheoptionalBladderTankhasa¾”MNPTthreadedconnection.Ateewillberequiredifthebladdertankisinstalled,otherwiseanelbowmaybeusedatthesamelocation.Tofacilitateremovalofpumpforservice,aquickdisconnect(sharkbiteasillustrated,orpipeunion)isrecommendedonthepumpsideoftherequiredSystemOutletValve(normallyopenballvalve).

5. Installpipe/tubefromSysteminlet(Fig.2)tothedesiredlocationofthesupplyfromthewelltank.Atthesupplyendateeisrequiredtoaccommodatesupplyfromthewellandthesystembypassconnection.Thesysteminletisprovidedwitha¾”SharkbiteElbowsuitablefor¾”NominalCopperTubeorPexTube,insertionlengthintoSharkbiteFittingis1”.ASystemInletValve(normallyopenballvalve)isrequiredbetweentheteeandSharkbiteElbow.

6. Installthepipe/tubebetweentheteesatthedesiredlocationsofthesupplytohouseandthesupplyfromwell.ASystemBypassValve(NormallyClosedBallValve)isrequiredbetweenthetees.

Figure 3 Installed433NDSystem

INSTALLATION INSTRUCTIONS1 2

Page 9: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 9 of 22IN063 Rev. C 1115

2.3. Plumbing Hook-up

All Plumbing should be performed in accordance with Local and State Codes by a Qualified Plumber.

1. Shutoffthewatermainvalvelocatedafterthepressuretank.

2. Drainthewaterline.

3. Plumbthesystemintothewaterlineafterthepressuretankandallotherwatertreatmentequipment.

4. PlumbthewaterlinefromtheexistingpressuretankintotheInletTee.

5. PlumbthewaterlinetothehouseintotheOutletTee(Fig.2,4or5dependingonSystemandPump).Aflowrestrictororgatevalveinthewaterlinetothehouseisrequiredforbalancingthesystemflow.ABladderTank,minimumcapacity5gallonsisrequiredfor433-S50Systems(20gal.min.for433-S50X).WARNING: Bladder Tank must be supported by hanger attached to wall or joist.

6. MakingsuretheBypassvalveisopenandInletandOutletValvesareclosed,slowlyopenthewatermainvalveandcheckforleaks.

7. Slowlychangebypasstothe“service”configuration,Bypassvalveclosed,inletandoutletvalvesopen.PrimejetpumpasperManufacturersInstructions(SeeenclosedJetPumpManual)ifnotpreviouslyprimed.Notethatintegralpumpon433-S75and433-S50systemswillselfprimewhenthesystemtankisfilled.

Figure 4 PlumbingInstallation433SNDSystem

INSTALLATION INSTRUCTIONS1 2

Page 10: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 10 of 22IN063 Rev. C 1115

INSTALLATION INSTRUCTIONS1 2

Figure 5PlumbingInstallation433-S50X

Page 11: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 11 of 22IN063 Rev. C 1115

2.4. Electrical Hook-up

All Electrical Work should be performed in accordance with Local and State Codes, and NFPA National Electrical Code, Standard #70 by a Qualified and Licensed Electrician .

WARNING: Never perform electrical work while standing in water. Do not attempt wiring on a live circuit.

WARNING: Power Supply Voltage must match the voltage marked on the System Nameplate. Improper wiring may result in system damage.

1. Turnmainpowerswitch,locatedontheAIRaiderTM,tothe“Off”position.

2. ConnecttheJetPumppowercordtotheJetPump.(DoesnotApplyto433-S50or433-S50XSystems,pumpisfactoryconnected)NotetheJetPumppowercordfromtheAIRaiderTMisprovidedwithanelectricalreceptacle.TheJetPumpmaybeconnectedeitherbyconnectingasuitablepowerleadwithplugandpluggingintothereceptacleorbyremovingthereceptaclefromtheJetPumppowercordandconnectingthepowercorddirectlytothepump.FollowwiringinstructionslocatedintheenclosedJetPumpManual.

Warning: Never remove the Receptacle from the Jet Pump Power Cord without connecting the wires thus exposed to the jet pump, inside the Jet Pump Electrical Enclosure. Always secure the Jet Pump Enclosure Cover after making electrical connections.

3. On433-S50XunitsonlytheinstallermayneedtodisconnecttheArmoredCablesuppliedinordertoinstallthePressureSwitch.TheArmoredCablemayrequiretrimmingtothedesiredlengthbeforereconnecting.ConnectperthewiringdiagramFigure8Page14.

4. Makesureallconnectionsinthecontrolpanelaretight.

5. Bringinpowertothecontrolpanelusingtheholeprovided,eitheranappropriatestrainreliefbushing,orelectricalconduitfitting(s),withcorrectlyratedelectricalwireorcablemustbeusedinaccordancewithallapplicableElectricalCodes.

6. Connectthepowerlinetothecontrolpanelasshownintheapplicablewiringdiagram(SeeFigures6,7,8,9-onpages12-15).

7. Connectpowerlinetopowersource*.TherequiredVoltageis120Vor240Vandisindicatedbyan“X”markedinthecheckboxnexttoeitherthe120Vor240Vmarkingonthenameplate.Followallcoderequirementsregardingwireandcircuitbreakersize.

* Manufacturer recommends that the AIRaiderTM System be directly wired to the panel on adedicated circuit.

INSTALLATION INSTRUCTIONS1 2

Page 12: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 12 of 22IN063 Rev. C 1115

TM

433ND 115/230V-1Ph-60Hz Power Supply

FIG 6AIRaider 321ND and 433ND Wiring

Diagram 115V

321ND and 433ND 115V - 1Ph-60Hz Power Supply

INSTALLATION INSTRUCTIONS1 2

Page 13: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 13 of 22IN063 Rev. C 1115

TMAIRaider 433-S50 ND Wiring Diagram 115V

433-S50 ND with 1/2HP Submersible Pump 115V-1Ph-60Hz Power Supply

Figure 7AIRaiderTM 433-S50(X) and 321-S50X Wiring Diagram 115V

433-S50(X)ND and 321-S50X with ½HP Submersible Pump 115V-1PH-60Hz Power Supply

INSTALLATION INSTRUCTIONS1 2

Page 14: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 14 of 22IN063 Rev. C 1115

2.5 Vent Line Installation

Useonly2”,3”or4”Schedule40PVCorequivalentpipeforventline.FollowallapplicableAARST,EPA,and/orStateStandardsforRadonorVOCventing.

1. PlacethelidoftheAIRaiderTMontothetankandclampintoplaceusingtheHexHeadScrewsandWashersprovided.

2. ConnectventlinetoAIRaiderTMlidusingtheenclosedrubbercoupling(SeeFig.8).

3. Theventlinemustberoutedinamannerthatallowsthesystemtoexhaustabovetheleveloftheroof(seeFig.9).Note: When “Freeze Up” is possible a minimum pipe diameter of 3” is recommended (See Fig. 10).

4. Theventlinemustbepitchedbacktowardthesystemtopreventcondensationbuildup.

5. Cementallfittingsinamannerthatensuresnoleakagewilloccur.Becertaintousecementthatissuitableforpotablewaterapplications.

6. Installweathercapontopoftheventline.Thiscapshouldnotrestrictairflowandmustpreventrain,snowandothercontaminantsfromenteringtheventline.

Failure to install a proper vent line may cause contamination of the water, outgassing of contaminants into the building, and/or limit system performance.

* The Manufacturer has found that vent lines less than 250 equivalentlinear feet do not cause a decrease in contaminant removal percentages.90° Bend = 15 Equiv. Linear Ft ; 45° Bend = 7 Equiv. Linear Ft.

Figure 9VentLineInstallation(2inch)

Figure 10VentLineInstallation(3inch)

Figure 8VentLineConnection

INSTALLATION INSTRUCTIONS1 2

Page 15: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 15 of 22IN063 Rev. C 1115

2.6 Install Air Filter

1. InstallairfilterprovidedusingthePVCpipeandfittingsprovided(Fig12).

2.6.1 Remote Air Intake (Fig. 11)If a Remote Air Intake is required because of Air Quality or Quantity issues then Use Only 1-¼” or larger Schedule 40 PVC or equivalent pipe for the air intake line.

1. Connectairintakelinetotheblowerusingtheproperreducercoupling.

2. Runtheintakelinefromthepipeconnectionontheblowertothelocationselectedforairintake.Note: A rubber coupling or similar means to disconnect the intake line from the is recommended.

3. ConnecttheAirFiltertotheventlineusingtheproperreducercoupling.

If the air intake is located outside, the filter or intake must be mounted high enough off the ground to prevent the drawing in of snow, water and other contaminants. Do not locate the air intake in the vicinity of vents from furnaces, barbecue grills, etc.Note: In-Line Air Filters are also available from the Manufacturer. Figure 12

AirIntakeConnection

Figure 11Remote AirFilter

INSTALLATION INSTRUCTIONS1 2

Page 16: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 16 of 22IN063 Rev. C 1115

2.7. System Start-Up

1. Removecoverandlidandpour¼cupofchlorineintothefirstchamber.(Thiswilldisinfectthesystem.)Replacethelidmakingsureallscrewsaresecure.

2. Checkthatallplumbingandelectricalconnectionshavebeenproperlycompleted.

3. Slowlychangebypasstothe“service”configuration.Checkforleaks.

4. TurnpowerswitchforAIRaiderTMto“On”.SolenoidValveswillnowopenallowingwaterintothesystem.Theaerationprocesswillalsostart.Checkforleaks.

5. AllowtheAIRaiderTMtofillwithwater.

6. On 433-S50 & 433-S50X SystemsthesubmersiblepumpinstalledintheAerationTankwillselfprimewhentherisingwaterlevelliftsthepumpfloatandthepumpstarts.Followpumpmanufac-turer'sinstructionstoprimeotherexternalpumps.Thenormaloperatingrangeisnominally40PSI–60PSI*butwillvary(PressureSwitcheson433-S50&433-S50Xfactorysetat38PSI-55PSIapprox.).

Do Not Attempt to Adjust the Pressure on 433-S50 or 433-S50X Systems, as this may result in the pump not shutting down as it attempts to reach too high a set pressure. This problem may not occur immediately but can occur later when a low voltage supply occurs due to high electrical demand or other external factors. The factory pressure setting is deliberately less than maximum to provide an allowance for a low voltage supply event. Continuous operation of the pump when there is no water demand will overheat the system causing the thermal overload to trip and consequent pump shut down.

Note: Priming process for the jet pump and pressure settings may vary with repressurization system.

Figure 13InstalledAIRaiderTM433-S50

INSTALLATION INSTRUCTIONS1 2

Page 17: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 17 of 22IN063 Rev. C 1115

2.8 System Check

1. Runthesystemthroughacoupleofcyclestoensureallcomponentsareworkingproperly.

2. Theblowertimerispresetfor5minutesdelay.Afterthesolenoidvalvesshut,checkthattheblowercontinuesrunningforthepresetnumberofminutesdelay.

3. Openthetankandcheckthesystem.

a. Removethetanklid.

b. Lowerthewaterlevelinthetankbyopeningabathtubtap,orsimilar,withintheresidence.Thefloatswillfallwiththewaterlevel.Theminimumwaterlevelisreachedwhenthelowerfloatdrops(excepton433-S50&433-S50Xsystemswhereminimumwaterleveloccurswhenthemiddlefloatdrops).Therewillbeanaudibleclickandthesolenoidswillopenallowingthetanktostartfilling;theblowershouldalsostartrunning.Thewaterlevelmustriseregardlessofhowmanytapsareopenwithintheresidence.

c. Whilethetankisfillingliftthelowerfloat(middlefloaton433-S50&433-S50X),waterinflowshouldstopandtheblowerwillremainrunning(untiltheendofthepresetdelay).Releasethelowerfloat.

d.Whilethetankisstillfillinglifttheupperfloat;waterinflowshouldstopandtheblowerwillremainrunning.Releasetheupperfloat.Pushingdownthelowerfloaton433-S50and433-S50XSystemswillshutoffthepump.

e. Remembertoshutoffanyopentapswithintheresidence.

4. Replacethelidandsecurewiththefastenersprovided.WiththeSystemrunningcheckthelidforairleaksbetweenlidgasketandtank.Ifleaksoccurthefastenersshouldbetighteneduntilleaksareeliminated.

5. Makesureyouhaveproperlylabeledthesystemwiththenecessaryinstallerinformation(i.e.companyname,phone#,dateinstalled,etc.)andyouhaveleftallsysteminformationwiththehomeowner.

6. TheAIRaiderTMSystemisnowoperational.

INSTALLATION INSTRUCTIONS1 2

Page 18: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 18 of 22IN063 Rev. C 1115

3. RetestingAftertheAIRaiderTMinstallation,theinstallershouldperformanotherwateranalysistoensurepropersystemperformance.Thissampleshouldbeperformedoneweekafterthedateofinstallation.

Sampling Procedure:1. Removeaeratorfromfaucetorspigot,ifapplicable.

2. RunwatersothattheAIRaiderTMoperatesfortwocycles.

3. Turnoffwaterfor5minutes.

4. Turnwateronandproceedwithsamplingasperthelaboratoryinstructions.

4. MaintenancePropermaintenanceoftheAIRaiderTMcanpreventpossiblesystemfailureandprovideyearsoftroublefreeservice.

4.1. Six Month Service (recommended)

ThefollowingproceduresshouldbefollowedtomaintaintheAIRaiderTM:• Checkand/orcleantheblowerairintakefilter.• Checkand/orcleananyfiltersorstrainerinstalledontheinletlinetotheAIRaiderTM.Ininstallationswithparticularlyhighlevelsofsediment,cleaningoffiltersmayberequiredmorefrequently.• Checkandcleaninletscreenonpump.• Usingawet/dryvac,cleansedimentfrombottomofaerationtankifnecessary.• Clean(ifnecessary)tankanddiffusersofallmineralbuildup.• Chlorinatetankandlinesbypouring¼cupofchlorineintothefirstaerationchamber.• Checkallcontrolpanelconnectionsandelectricalcomponents(blower,pump,timer,fuses,etc.)forproperoperation.• Checkfloatswitchesforproperoperation.• Inspectventlineforpossibleobstructions.• Runsystemthroughtwocyclestoensuregoodworkingorder.

RETESTING AND MAINTENANCE1 2 3 4

Page 19: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 19 of 22IN063 Rev. C 1115

4.2 Annual Service (required)

ThefollowingproceduresshouldbefollowedannuallytomaintaintheAIRaiderTM:

• Cleansolenoidsandswitchcoillocations.

• Checkallhoseconnections.

• Checkand/orcleantheblowerairintakefilter.

• Checkand/orcleananyfiltersorstrainerinstalledontheinletlinetotheAIRaiderTM.

• Checkandcleaninletscreenonpump.

• Usingawet/dryvac,cleansedimentfrombottomofaerationtankifnecessary.

• Clean(ifnecessary)tankanddiffusersofallmineralbuildup.

• Chlorinatetankandlinesbypouring¼cupofchlorineintothefirstaerationchamber.

• Checkallcontrolpanelconnectionsandelectricalcomponents(blower,pump,timer,fuses,etc.)forproperoperation.

• Checkfloatswitchesforproperoperation.

• Inspectventlineforpossibleobstructions.

• Runsystemthroughtwocyclestoensuregoodworkingorder.

• PerformWaterTest.

* Every 3 years during the annual service replace all hoses.** Every 5 years during the annual service replace the solenoid valves.

MAINTENANCE1 2 3 4

Page 20: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 20 of 22IN063 Rev. C 1115

Symptom Solution

Nowaterinhouse

Waternotenteringsystem

JetPumpnotfunctioning

Pressureintankislessthan40PSI

Lowwaterflowatfaucets

Blowernotrunning

Blowerdoesnotstoprunning

Loudbangingwhensolenoidsshut

Pumpisshortcycling

Pumpwon'tshutoff

Solenoidschatterwhenclosing

Systemrunningdry

• Checkpower:Switchinonposition,circuitbreakeratpanelinonposition,fusesincontrolpanelintact.

• Checkpressureintank.Ifbelowthepropersettings,resetthepumpasdescribedinSystemStart-up(p.17).• BypassSystem.Ifthereisstillnowater,mainwellpumpmaynotbefunctioning.

• Checkon/offfloatforproperoperation.Replaceifnecessary.

•Checksolenoidsforproperoperation.Replaceifnecessary.•Checkfloatswitchesforproperoperation.Replaceifnecessary.•Checksedimentstrainerand/orfilter(ifapplicable)andcleanifnecessary.

•Checkfuseincontrolpanel.•Checkbreakeratelectricalpanel.•Replacejetpumpifnecessary.

•ResetjetpumpasdescribedinSystemStart-up(p.17).•Checkbladdertank.•Replacejetpumpand/orbladdertankasnecessary.

•Clearsedimentstrainersonfaucets.•Clearpumpinletscreen/waterinjector.•Replacepumpifnecessary.

•Checkfusesincontrolpanel.•Replacetimerifnecessary.•Replaceblowerifnecessary.

•CheckOn/Offfloatforproperoperation.•CheckTimerSettings.•ReplaceTimerRelayifnecessary.

•Installwaterhammersuppressororloopofflexiblehoseinpumpinletline.•Shortenthelengthofpipebetweenthewellpressuretankandthesystem.

•Bladdertankmayberuptured.Replaceifnecessary.•Checkpressureswitchonpumpforproperoperation.

•Callforsupport.

•CheckOn/Offfloatforproperoperation.Replaceifnecessary.

•Checksedimentstrainerand/orfilter(ifapplicable)andcleanifnecessary.•InstallaflowrestrictorormeterdowntheballvalveuntiltheAIRaiderTMoutflowis1GPMormorelessthanthewaterflowenteringthesystem.

TROUBLE SHOOTING1 2 3 4 5

Page 21: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

Page 21 of 22IN063 Rev. C 0713

LIMITED WARRANTY

Subject to applicable consumer protection legislation, RadonAway warrants that theAIRaider™willbefreefromdefectivematerialsandworkmanshipfortheperiodoftwo(2)yearsfromthedateofpurchase.

Warrantyiscontingentoninstallationinaccordancewiththeinstructionsprovided.Thiswarrantydoesnotapplywhererepairsoralterationshavebeenmadeorattemptedbyothers;or theunithasbeenabusedormisused.Warrantydoesnot includedamageinshipmentunlessthedamageisduetothenegligenceofRadonAway.Tomakeaclaimundertheselimitedwarranties,youmustreturnthedefectiveitemtoRadonAway.Allotherwarranties,expressedorwrittenarenotvalid.RadonAwayisnotresponsibleforinstallationorremovalcostassociatedwiththiswarranty.InnocaseisRadonAwayliablebeyondrepairorreplacementofthedefectiveproductFOBRadonAway.

RADONAWAY SPECIFICALLY DISCLAIMS ANY WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE.

THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THE DESCRIPTION ON THE FACE HEREOF. THERE IS NO WARRANTY OF MERCHANTABILITY. ALL OTHER WARRANTIES, EXPRESSED OR WRITTEN, ARE NOT VALID.

Inordertoobtainserviceunderthiswarranty,theconsumermustcontacttheinstallerordealerwheretheunitwaspurchased.TheinstallerordealermustthencontactRa-donAwaydirectlyforaReturnMerchandiseAuthorization(RMA)numberandship-ping information.No returns can be acceptedwithout an RMA. RadonAwaymayrequirethedefectivepart(s)tobereturnedtoplaceofmanufacture(freightpre-paid)toprocessthewarrantyclaim.Defectivepart(s)coveredunderthiswarrantywillbereplacedorrepairedattheplaceofmanufactureandreturnedtotheinstallerordeal-er(freightpre-paid).Inreplacingorrepairingpartsorproducts,RadonAwayreservestherighttomakesuchchangesinthedetailsofdesignconstruction,arrangementormakematerialsasshallinitsjudgmentconstituteanimprovementoverformerprac-tice.

Recordthefollowingforyourrecords:

SerialNo. DatePurchased:

3 Saber WayP.O. Box 8244Ward Hill, MA 01835

Phone: (800) 767-3703Fax: (978) 521-3964E-mail: [email protected]

Page 22: Installation & Instruction Manual - RadonAway · All wiring must be performed in accordance with the National Fire Protection Association’s (NFPA)”National Electrical Code, Standard

3SaberWayWardHill,MA01835

Phone:(800)767-3703 Fax:(978)521-3964

E-mail:[email protected]