installation instructions of invisible screen
TRANSCRIPT
![Page 1: Installation instructions of invisible screen](https://reader035.vdocument.in/reader035/viewer/2022080216/55c42abebb61eb2e038b46ab/html5/thumbnails/1.jpg)
ORIDOW INDUSTRIAL LIMITED
uPVC &Aluminium Windows & Doors Supplier from China
Add: No 59 Qiwei road, Cangshan distric, Fuzhou, Fujian, Chinawww.oridow.com, Tel: 86 591 88037851 Fax: 86 591 86449923
Installation Instructions of Invisible Screen
1. After receiving the finished product
user moves it to the right place as picture 2.
2. Screw holes can be seen after removing surrounding decorative covers (white parts inpicture 1)
3. Affix the screen on the installed position, adjust it up and down, left and right, andclamp the four edges with large plastic clips. (Small windows can be operated by oneperson, while large ones need two persons.) .
Picture 2
Picture 1
![Page 2: Installation instructions of invisible screen](https://reader035.vdocument.in/reader035/viewer/2022080216/55c42abebb61eb2e038b46ab/html5/thumbnails/2.jpg)
ORIDOW INDUSTRIAL LIMITED
uPVC &Aluminium Windows & Doors Supplier from China
Add: No 59 Qiwei road, Cangshan distric, Fuzhou, Fujian, Chinawww.oridow.com, Tel: 86 591 88037851 Fax: 86 591 86449923
4. After determining the accurate position, use the electric portable drillto drill holes. Diameter of the hole is 3.2 mm and 4.2 mm screws areused.
5. Distances between two screws should less than 800mm, otherwise,screw holes should be drilled between the two screws.
If it is difficult to punch in the head and tail locations, screws can befixed as shown in picture. .
6. Adjust the flatness of the screen slide-way while tightening the screws, making it as flatas possible.
7. Use the screwdriver to adjust the "+" or "-" holes to adjust the rewind speed. Clockwiseadjustment is tight and counterclockwise adjustment is loose.
8. After adjusting, install the decorative covers. Installation is over.
Plus: Installation Notes
1) Electric driller, screwdriver and other essential accessories are needed.2)If the screen is installed on second floor or above, installing workers above andsupporting people below must buckle seat belts.3) After installation, speed of the screen should be adjusted smoothly.4) Check whether there is residue on the product after installation, if so, clean the product.5) Shoe covers should be put on when entering renovated houses. After installation, cleanup the construction site and take out construction garbage.