installation of managed batteries with sp pro...
TRANSCRIPT
IN0051 Revision 02 (005293)– 1 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
Installation of Managed batteries with SP PRO Inverters
Introduction
This instruction will show how to install the Universal Battery Communications Kit (Order code 005295)
and the LG Chem Stand-Alone rack mount module Battery Communications Kit (Order code 005298).
Applicable Batteries Install
Kit
Suitable System
Application PV Type
Off Grid On Grid Generic AC
Coupling
SCERT AC
Coupling
DC
Coupling
BYD B-Plus 2.5 modules
(in B-Box RES or PRO) or
B-Plus 13.8, B-Plus 15.5
Universal
✘
Sonnenschein@home
Lithium 6.8 or 9.0
Universal ✘
LG Chem RESU 3.3, 6.5,
10 Universal ✘
LG Chem Stand-Alone
modules (LG Chem Rack
Mount)
LG Chem
Rack
mount ✘
These install kits are required where a battery requires management between the SP PRO and battery
via CAN bus communications. If your chosen battery requires CAN bus connection and is NOT on the list
above, it cannot be used.
Each application will have a minimum battery capacity and a maximum allowable PV, please refer to the battery manufacturers data sheet as well as the guidance given in the SP LINK Site Configuration Wizard.
Overview of Steps:
1. All batteries must be installed according to the manufactures installation manual
2. Update the SP PRO firmware while the green Communication Card (green comm card) is still installed
3. Install the blue Communication Card 2017
4. Update Firmware in the blue Communication Card 2017 (blue comm card)
5. Configure the SP PRO for the batteries
ADDITIONAL INFORMATION
Selectronic web site – http://www.selectronic.com.au or contact the Selectronic Sales Team.
IN0051 Revision 02 (005293)– 2 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
Preparation
If installing any of the following batteries, make sure the Universal Battery Communications Kit is
on site (Order code 005295):
BYD B-Plus 2.5 modules, B-Plus 13.8 or B-Plus 15.5, Sonnenschein@home Lithium, LG Chem
RESU
If installing LG Chem Rack Mount modules: Make sure the LG Chem Rack mount module Battery
Communications Kit is on site (Order code 005298).
If installing Sonnenschein@home batteries: Make sure there are 2x 200A NH fuses (ABB
OFAF1H200 or equivalent) for SPMC482 OR 2 x 160A NH fuses (ABB OFAF1H160 or equivalent)
for SPMC481 installed in each battery box.
NOTE: The battery fuse size for the SPMC482 when used with a Sonnenschein@home Lithium must be
200A. In this application ONLY, do not use 250A fuses as specified in the SP PRO installation manual as
this may damage the Sonnenschein@home lithium. A 200A fuse is suitable in this application as the
nominal battery voltage for the Sonnenschein@home lithium is 54V.
Summary of steps
The following is a summary of the steps needed to complete the installation.
Once the installation is completed, use the below points as a check list:
Make sure the appropriate Battery kit is onsite
For BYD B-Box, Sonnenschein@home, LG Chem RESU: Order Code 005295
For LG Chem Rack mount modules: Order Code 005298
Install the latest version of SP LINK (9.9 or higher) on your computer from
http://www.selectronic.com.au
Connect to the SP PRO via the original green comm card using SP LINK 9.9 or higher
Update the SP PRO with Firmware 9.81.6 (ABB and Fronius) or 9.81.1 (KACO) or higher
Install the blue comm card in the SP PRO
Connect Communication cable from battery to the blue comm card in the SP PRO
Update firmware in blue comm card to 1.02 or higher using SP LINK
Create the configuration for SP PRO using the Site Configuration Wizard in SP LINK
Connect to the SP PRO via SP LINK and save the configuration to the SP PRO
Turn power OFF and back ON again to the SP PRO
Test the system
IN0051 Revision 02 (005293)– 3 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
SP PRO Firmware Update
The SP PRO firmware must be 9.81 or higher. You must install SP LINK 9.9 or higher on a Windows
computer, connect to the SP PRO and update its firmware. This is done by following the steps below:
1. Leave the original green comm card in the SP PRO until the firmware update process is complete.
2. Download the SPLINK software from the Selectronic Web site and install it on a Windows PC. Windows XP, Vista, 7, 8.1 and 10 are supported.
http://www.selectronic.com.au/sppro/splink.htm
3. Connect the PC to the SP PRO via the supplied USB cable.
4. Connect the DC power to the SP PRO. This is done as follows:
For BYD B-Plus 2.5 modules, BYD B-Plus 13.8 BYD B-Plus 15.5, LG Chem Rack Mount –
Turn ON the system DC breaker of fuses to the SP PRO then turn ON the battery bank by
pressing the ON button.
For Sonnenschein@home – Leave the system DC circuit breaker or fuses OFF and turn
the battery ON by pressing the ON button (adjacent to the fuse holder). When the relay
inside the battery clicks indicating the batteries have come ON, turn ON the system DC
breaker or fuses.
For LG Chem RESU – Turn ON the system DC breaker of fuses to the SP PRO then turn
ON the battery bank circuit breaker(s).
Wait until the front panel LEDs are stable.
NOTE:
a. During the SP PRO power up, the front panel display cycles through three stages. First, all
LEDs turn green from bottom up, second, all LEDs turn red from bottom up and third, some
LED’s will be flashing while the battery LEDs are ON solid green. The third stage is what is
referred to as stable.
b. Perform the following tasks quickly as the batteries might shutdown in 5-10 minutes without
the CANBUS communications. If this happens, turn the batteries ON and restart the process.
5. Start Selectronic SP LINK.
IN0051 Revision 02 (005293)– 4 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
6. Select “Firmware Update…”
7. The Easy Start Guide will automatically detect when the SP PRO is ON.
Click “Connect” to start the SP PRO Firmware Update process.
IN0051 Revision 02 (005293)– 5 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
8. In the SP PRO Firmware update screen click on the Update firmware and restart SP PRO on
completion button.
Important:
a. Some batteries may turn themselves OFF during the firmware update. If this occurs, turn
the batteries ON, close the SP PRO Firmware Update window and reconnect to the SP
PRO. Continue Firmware update (step 7 and 8), repeat the process until the firmware is
updated.
b. In the case where the SP PRO firmware upload is complete and the batteries turn OFF
while the SP PRO is performing a firmware upgrade, turn the batteries ON and wait until
the front panel LEDs are stable. This may take a few minutes.
9. Once the SP PRO has restarted, wait another 20 seconds then click “Connect” on the Firmware
Update screen or restart SP LINK.
IN0051 Revision 02 (005293)– 6 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
10. The “Update firmware and restart SP PRO on completion” button should be disabled.
Make sure the “Current SP PRO Firmware Information Version” is 9.81 or higher.
11. Disconnect SP LINK and power down the SP PRO inverter. All Lights on the front panel will be
OFF. The three blue lights across the top will still be lit if there is AC source power (grid or
generator). This is OK.
Continue to section “Installing the Comms Card 2017 (blue)” page 7
IN0051 Revision 02 (005293)– 7 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
Installing the blue Comm Card
1. Make sure that the SP PRO inverter is powered down. All Lights on the front panel will be off.
The three blue lights across the top will still be lit if there is AC source power (grid or generator).
This is OK.
2. Remove the 4 Torx screws holding the original green comm card in the SP PRO.
Do not throw away the Torx screws, the screws will be used to remount the blue
Communication Card. (Mounting Screws)
3. Remove the 2 short grey RJ45 connectors from the Control Board in the SP PRO. (Internal
Communications Ports 1 and 2)
4. Remove the white, 2 pin plug on the top right corner of the green comm card (Power)
5. Remove the original green comm card.
6. Connect the white, 2 pin plug to the top, right corner of the blue comm card. (Power)
7. Connect the two, small grey RJ45 leads to the blue comm card and into the Control board in the
SP PRO. (Internal Communications Ports 1 and 2)
8. Screw down the blue comm card into the SP PRO using the 4 Torx screws.
NOTE: For Rev 02 boards, all labels are printed on to the board next to each connector.
Power
Internal Communications
Port 1 and 2
USB Port
SCERT Comms to Adaptor board (J5 RS485-2)
BYD B-Box Cable CANbus
RS232 Port 1 for Ethernet Adapt
Mounting Screws
Mounting Screws
IN0051 Revision 02 (005293)– 8 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
Communications Connection to SP PRO
The following communication connections must be completed for the appropriate battery type in order
for the system to operate with the SP PRO.
This section outlines the connection process of the communication line for the different battery options
compatible with the SP PRO inverter.
Section 1 for BYD B-Plus, B-Plus 13.8 and B-Plus 15.5 ONLY: Go to page 9
Communication connection for BYD B-Box
Section 2 for Sonnenschein@home Lithium ONLY: Go to page 10
Communication connection for Sonnenschein@home Lithium
Section 3 for LG Chem RESU (Single battery) ONLY: Go to page 11
Communication connection for LG Chem RESU
Section 4 for LG Chem RESU Plus (Dual battery) ONLY: Go to page 12
Communication connection for LG Chem RESU Plus
Section 5 for LG Rack mount modules ONLY: Go to page 13
Communication connection for LG Chem Rack Mount
IN0051 Revision 02 (005293)– 9 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
Section 1 for BYD B-Plus batteries in a BYD B-Box
1. Do not connect any wires to the pre-charge or battery sense terminals. The battery sense
voltage is read from the BYD B-Box BMS.
2. Follow the BYD B-Box instructions to install the BYD B-Box.
3. Using the Universal Battery Communications kit (Order code 005295), connect the RJ45
Connector cable from the SP PRO blue comm Card “SP PRO CANBUS” to the BYD B-Box “BMS
CANBUS”.
BYD B-Box connection is now complete,
Continue to section “Check Communications Card Firmware” page 14
SP PRO Inverter
Blue Comm Card (Comms Card 2017)
SP PRO CANBUS
BYD B-Box
IN0051 Revision 02 (005293)– 10 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
Section 2 for Sonnenschein@home Lithium
1. Do not connect any wires to the pre-charge or battery sense terminals. The battery sense
voltage is read from the Sonnenschein@home battery BMS.
2. Follow the Sonnenschein@home Lithium instructions to install the Sonnenschein@home Lithium.
3. Using the Universal Battery Communications kit (Order code 005295), connect the RJ45
Connector cable from the SP PRO blue comm card “SP PRO CANBUS” to the back of the
Sonnenschein@home Lithium “BMS CANBUS”.
4. Fit two 200A NH fuses (ABB OFAF1H200 or equivalent) for SPMC482 or two 160A NH fuses (ABB
OFAF1H200 or equivalent) for SPMC481 into the fuse housing inside the Sonnenschein@home.
NOTE: The battery fuse size for the SPMC482 when used with a Sonnenschein@home lithium must be
200A. In this application ONLY do not use 250A fuses as specified in the SP PRO installation manual as
this may damage the Sonnenschein@home lithium. A 200A fuse is suitable in this application as the
nominal battery voltage for the Sonnenschein@home lithium is 54V.
Sonnenschein@home Lithium connection is now complete,
Continue to section “Check Communications Card Firmware” page 14
Fuses inside
SP PRO Inverter
Blue Comm Card
(Comms
SP PRO CANBUS
Sonnenschein@home
IN0051 Revision 02 (005293)– 11 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
Section 3 for LG RESU (Single battery)
1. The SP PRO battery temperature sensor remains connected to the SP PRO. Roll it up and place it
inside the SP PRO.
2. Do not connect any wires to the pre-charge/battery sense terminals. The battery sense voltage is
read from the RESU BMS.
3. Configure the LG Chem RESU dip switch, set “SW Select”: 1&2 = OFF and 3&4 = ON.
4. Configure blue rotary switches, CAN H = 4, CAN L= 5 and GND = 2
5. Using the Universal Battery Communications kit (Order code 005295), connect the RJ45
Connector cable from the SP PRO blue comm card “SP PRO CANBUS” to the LG Chem RESU
“BMS CANBUS”.
LG Chem RESU connection is now complete,
Continue to section “Check Communications Card Firmware” page 14
SP PRO Inverter
Blue Comm Card (Comms Card
2017)
SP PRO CANBUS
LG Chem RESU
SW Select: 1&2 = OFF 3&4 = ON
IN0051 Revision 02 (005293)– 12 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
Section 4 for LG Chem RESU Plus (Dual battery)
1. The SP PRO battery temperature sensor remains connected to the SP PRO. Roll it up and place it
inside the SP PRO.
2. Do not connect any wires to the pre-charge/battery sense terminals. The battery sense voltage is
read from the RESU BMS.
3. Follow the RESU instructions to install the RESU plus and the RESU battery banks.
4. Configure the LG Chem RESU dip switch, set “SW Select”: 1,2&4 = OFF and 3 = ON.
6. Configure the LG Chem batteries and the LG Chem RESU Plus blue rotary switches:
CAN H = 4, CAN L= 5 and GND = 2.
5. Using the Universal Battery Communications kit (Order code 005295), connect the RJ45
Connector cable from the SP PRO blue comm card “SP PRO CANBUS” to the LG RESU “BMS
CANBUS”.
LG Chem RESU Plus connection is now complete,
Continue to section “Check Communications Card Firmware” page 14
SW Select: 1,2&4 = OFF 3 = ON
GND = 2 CAN L = 5 CAN H = 4
SP PRO Inverter
Blue Comm Card (Comms Card 2017)
SP PRO CANBUS
LG Chem RESU Plus
IN0051 Revision 02 (005293)– 13 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
Section 5 for LG Chem Rack Mount Modules
1. Do not connect any wires to the pre-charge or battery sense terminals. The battery sense
voltage is read from the LG Chem Rack Mount BMS.
2. Follow the LG Chem Rack Mount instructions to install the LG Rack Mount.
3. Using the LG Chem Rack mount module Battery Communications (Order code 005298), connect
the RJ45 end of the cable to the SP PRO blue comm card “SP PRO CANBUS” and connect the
DB9 end to the LG Chem Rack Mount battery DB9 cable “BMS CANBUS”.
LG Stand Alone rack mount module connection is now complete,
Continue to section “Check Communications Card Firmware” page 14
SP PRO Inverter
Blue Comm Card (Comms Card 2017)
SP PRO CANBUS
LG Chem Rack Mount
IN0051 Revision 02 (005293)– 14 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
Check Communications Card Firmware
The Communication Card firmware must be 1.02 or higher.
A Communication Card with firmware 0.05 or higher can be updated using SP LINK. To check and update the firmware if required, follow the steps below:
Note: Each battery type has a different power ON procedure. If the correct procedure for a given battery type is not followed, the battery may not turn ON and run.
1. Connect the DC power to the SP PRO. This is done as follows:
For Sonnenschein@home – Leave the system DC circuit breaker or fuses OFF and turn
the battery ON by pressing the ON button (adjacent to the fuse holder). When the relay
inside the battery clicks, indicating the batteries have come ON, turn ON the system DC
breaker or fuses.
For LG Chem RESU – Turn ON the system DC breaker or fuses to the SP PRO then turn
ON the battery bank circuit breaker(s).
For BYD B-Box, LG Rack Mount – Turn ON the system DC breaker or fuses to the SP PRO
then turn ON the battery bank by pressing the ON button.
Wait until the front panel LEDs are stable.
NOTE:
a. During the SP PRO power up, the front panel display cycles through three stages. First, all
LEDs turn green from bottom up, second, all LEDs turn red from bottom up and third, some
LED’s will be flashing while the battery LEDs are ON solid green. The third stage is what is
referred to as stable.
b. Perform the following tasks quickly as the batteries might shutdown in 5-10 minutes without
the CANBUS communications. If this happens, turn the batteries ON and restart the process.
2. After the SP PRO has powered up and the front panel LEDs are stable, check the green LEDs on
the blue comm card.
The right LED should be steadily ON.
The left LED should be ON or flash approximately once per second.
3. Start Selectronic SP LINK.
1 2
IN0051 Revision 02 (005293)– 15 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
4. Select “Firmware Update…”
5. The Easy Start Guide will automatically detect when the SP PRO is ON and USB cable is plugged
into SP PRO and Computer.
Click “Connect” to start the Firmware Update process.
IN0051 Revision 02 (005293)– 16 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
6. In the SP PRO Firmware update screen click on the Update firmware and restart SP PRO on
completion button.
Note: If firmware is already up to date then the “Update firmware and restart SP PRO
on completion” button will be disabled. Continue to “SP PRO Configuration” page 18
Important:
a. Batteries may turn OFF during the firmware update. If this occurs, turn the batteries ON,
close the SP PRO Firmware Update window.
Reconnect to the SP PRO and continue Firmware update (step 7 and 8). Repeat the
process until the firmware is updated.
b. In the case where the SP PRO firmware upload is complete and the batteries turn OFF
while the SP PRO is performing a firmware upgrade, turn the batteries ON and wait until
the front panel LEDs are stable. This may take a few minutes.
7. After the update is completed, the SP PRO will automatically restart. You will need to wait about
2.5 minutes for the blue comm card to restart. Communications with the SP PRO will be lost
during this time.
8. Once the SP PRO has restarted, wait another 20 seconds then click “Connect” on the Firmware
Update screen or restart SP LINK.
IN0051 Revision 02 (005293)– 17 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
9. Make sure the “Comms Card Version” is 1.02 or higher.
Note: If the blue comm card Firmware is up to date then the “Update firmware and restart SP
PRO on completion” button will be disabled.
Continue to section “SP PRO Configuration” page 18
Note: The blue comm card info
will be displayed on the screen.
IN0051 Revision 02 (005293)– 18 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
SP PRO Configuration
1. Make sure the USB lead is connected between the SP PRO and PC.
2. Make sure the DC power is present at the SP PRO.
If NOT then Connect the DC power to the SP PRO. This is done as follows:
For Sonnenschein@home – Leave the system DC circuit breaker or fuses OFF and turn
the battery ON by pressing the ON button (adjacent to the fuse holder). When the relay
inside the battery clicks indicating the batteries have come ON, turn ON the system DC
breaker or fuses.
For LG RESU – Turn ON the system DC breaker of fuses to the SP PRO then turn ON the
battery bank circuit breaker(s).
For BYD B-Box, LG Rack Mount – Turn ON the system DC breaker of fuses to the SP PRO
then turn ON the battery bank by pressing the ON button.
Wait until the front panel LEDs are stable.
NOTE:
a. During the SP PRO power up, the front panel display cycles through three stages. First, all
LEDs turn green from bottom up, second, all LEDs turn red from bottom up and third, some
LED’s will be flashing while the battery LEDs are ON solid green. The third stage is what is
referred to as stable.
b. Perform the following tasks quickly as the batteries might shutdown in 5-10 minutes without
the CANBUS communications. If this happens, turn the batteries ON and restart the process.
3. Start Selectronic SP LINK.
4. Select “Site Configuration Wizard”
IN0051 Revision 02 (005293)– 19 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
5. Enter the site name
6. Select “Select a detected USB Device”
7. Select NEXT
Note: The image is used as an example only, settings may differ.
8. Select “Standard Battery Configurations and myGrid Kits”
9. Select battery Model No, AND the Quantity (as required) then select NEXT
IN0051 Revision 02 (005293)– 20 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
10. Enter the appropriate system parameters for “Source of Renewables”
Note: The image is used as an example only, settings may differ.
11. Enter the appropriate system parameter for “Select Unit Application”
Note: The image is used as an example only, settings may differ.
IN0051 Revision 02 (005293)– 21 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
12. A summary of all the configured settings will appear as the final step of the wizard to review all
configurations. Select Finish
Note: The image is used as an example only, settings may differ.
13. From the menu bar, select File > Site Information > Save. This is to save the created site.
Note: The image is used as an example only, settings may differ.
IN0051 Revision 02 (005293)– 22 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
14. SP LINK will automatically detect when the SP PRO is ON and the USB cable is connected.
Click “Connect” to connect to the SP PRO.
Note: The image is used as an example only, settings may differ.
15. At the Configuration Settings tab, click the “Configure SP PRO” button.
The default settings passcode is 74.
Note: The image is used as an example only, settings may differ.
SP PRO Configuration is now complete,
Continue to section “Testing the Batteries” page 23
IN0051 Revision 02 (005293)– 23 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
Testing the Batteries
1. Turn OFF the main DC breaker, waiting 20 seconds and turn back ON.
2. After the SP PRO has powered up and the front panel LEDs are stable, check the green LEDs on
the blue comm card.
Note: During the SP PRO power up, the front panel display cycles through three stages. First, all
LEDs turn green from bottom up, second, all LEDs turn red from bottom up and third, some LED’s will be flashing while the battery LEDs are ON solid green. The third stage is what is referred to as stable.
The right LED should be steadily ON.
The left LED should flash approximately once per second.
NOTE: There may be a delay of up to 60 seconds after power on before the left LED
starts flashing.
3. Navigate to “Data view > Battery Management”. If the system is working correctly, the values on
this screen will be valid for the batteries.
4. The Module Status readings are greyed out as they are not used with the batteries.
5. The values displayed under Battery Management are those read from the batteries.
The SP PRO uses these values to adjust the charge current and to limit the discharge current in
the battery.
Note: The SP PRO will be beeping and
the batteries will turn off after 5-10
minutes if there is a problem with the
communications between the SP PRO and
the batteries.
Note: The image is used as an example
only, settings may differ.
1 2
IN0051 Revision 02 (005293)– 24 of 24
SP PRO Interactive Inverter Charger
Installation Note
POWER PERFORMANCE PASSION
Operation of the SP PRO
The SP PRO reads all the data out of the batteries and automatically adjusts the battery current to suit.
This means the operation is a little different than with other battery banks.
When connected to the grid, the operation of the SP PRO is as follows:
1. When the SP PRO is charging the charge current will be limited to the “Charge Current Limit” as
displayed in Battery Management (see diagram above) and the charge voltage limited to “Charge
Voltage Limit”.
2. When the SP PRO is supporting the load, the current taken from the battery bank will not exceed
the “Discharge Current Limit”. The SP PRO will adjust its maximum support power to ensure the
discharge current is not exceeded.
When the grid fails, the operation of the SP PRO in standalone mode is:
1. When the SP PRO is charging from the PV, the charge current will be limited to the “Charge
Current Limit” as displayed in Battery Management (see diagram above) and the charge voltage
limited to “Charge Voltage Limit”.
2. When the SP PRO is supporting the load, but the current drawn from the battery exceeds the
“Discharge Current Limit”, the SP PRO will go into current limit and reduce its output voltage. If
the load so high that the AC voltage drops below 200V for 10 seconds, the SP PRO will shut
down as the battery can no longer support the load. The customer then needs to reduce the load