Institute of Integrated Electrical Engineers of the Philippines, INC. 39th Annual National Convention and 3E XPO 2014
SMX Convention Center, MOA, Pasay City November 28, 2014
“The Philippine Power Crisis: Proposed Solutions from the Academe”
Eduardo Luis Barros Fernandez Department of Energy
Power Sector Situation LUZON Capacity by Grid
Installed Dependable Installed Dependable
Coal 4,671 4,391 36.10 38.14
Oil Based 2,020 1,494 15.61 12.98
Diesel 750 634 5.80 5.51
Oil Thermal 650 320 5.02 2.78
Gas Turbine 620 540 4.79 4.69
Natural Gas 2,861 2,759 22.11 23.97
Geothermal 844 692 6.52 6.01
Hydro 2,471 2,131 19.10 18.51
Wind 33 17 0.26 0.15
Biomass 38 29 0.30 0.25
TOTAL 12,939 11,514
FUEL TYPE
LUZON
Percent Share (%)Capacity (MW)
Source: List of Existing Power Plants, released October 2014
36.10
15.61
5.80
5.02 4.79
22.11
6.52
19.10
0.26 0.30
LUZON CAPACITY MIX (%)
Coal
Oil Based
Diesel
Oil Thermal
Gas Turbine
Natural Gas
Geothermal
Hydro
Wind
Biomass
Power Sector Situation VISAYAS Capacity by Grid
Source: List of Existing Power Plants, released October 2014
Installed Dependable Installed Dependable
Coal 806 777 31.97 35.97
Oil Based 670 505 26.60 23.40
Diesel 615 463 24.42 21.46
Gas Turbine 55 42 2.18 1.94
Geothermal 965 817 38.30 37.83
Hydro 11 11 0.45 0.50
Biomass 44 32 1.76 1.50
Natural Gas 1 1 0.04 0.05
Solar 22 17 0.87 0.76
TOTAL 2,520 2,160
FUEL TYPE
VISAYAS
Capacity (MW) Percent Share (%)
31.97
26.60
24.42 2.18
38.30
0.45
1.76 0.04
0.87
VISAYAS CAPACITY MIX (%)
Coal
Oil Based
Diesel
Gas Turbine
Geothermal
Hydro
Biomass
Natural Gas
Solar
Power Sector Situation MINDANAO Capacity by Grid
Source: List of Existing Power Plants, released October 2014
Installed Dependable Installed Dependable
Coal 232 210 10.79 11.59
Oil Based 713 654 33.15 36.08
Diesel 713 654 33.15 36.08
Geothermal 108 98 5.04 5.41
Hydro 1,061 840 49.31 46.35
Solar 1 0.3 0.05 0.02
Biomass 36 10 1.67 0.55
TOTAL 2,151 1,812
Capacity (MW)FUEL TYPE
MINDANAO
Percent Share (%)
10.79
33.15
33.15 5.04
49.31
0.05 1.67
MINDANAO CAPACITY MIX (%)
Coal
Oil Based
Diesel
Geothermal
Hydro
Solar
Biomass
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
10,000
11,000
12,000
W1
W
2
W3
W4
W5
W6
W7
W8
W9
W1
0
W1
1
W1
2
W1
3
W1
4
W1
5
W1
6
W1
7
W1
8
W1
9
W2
0
W2
1
W2
2
W2
3
W2
4
W2
5
W2
6
W2
7
W2
8
W2
9
W3
0
W3
1
W3
2
W3
3
W3
4
W3
5
W3
6
W3
7
W3
8
W3
9
W4
0
W4
1
W4
2
W4
3
W4
4
Total Available Capacity System Demand Regulating Reserve Contingency Reserve Dispatchable Reserve
LUZON POWER SUPPLY-DEMAND SITUATION 1 JANUARY to 31 OCTOBER 2014 (Daily)
Holy Week
January February
Actual Peak Demand = 8,717 MW (21 May)
17 Jun 2014: Malampaya Gas Restriction
Red Alert Manual Load Dropped: 105 MW
25 Jun 2014: Outages of Sual 1 (647 MW), Calaca 1 (300 MW), Masinloc
2 (315 MW), derated capability of GN power 1&2
12 -13 Jul 2014 PIGging, Ilijan Pipeline
Limited Capacity of Ilijan Gas plant
Typhoon “Glenda” 16 Jul 2014
March April May June July August
Source: NGCP Daily Operations Report
September
8-11 Sep 2014 Natural Gas restriction
Limited Capacity of Ilijan Gas plant
October
30 Aug - 28 Sep 2014 Sual Unit 2 (647 MW) Maintenance
26 Sep – 25 Oct 2014 Sual Unit 1 (647 MW) Maintenance
LUZON SUPPLY-DEMAND OUTLOOK 2014-2020
Notes a. Required Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve requirement b. 4.2 % peak demand growth rate resulted from observed 0.6 elasticity ratio of demand for electric power with national economic growth applied to 7
percent GDP growth rate (GR) target for 2014-2015. c. 4.8 % peak demand growth rate resulted from observed 0.6 elasticity ratio of demand for electric power with national economic growth applied to 8
percent GDP growth rate (GR) target for 2016-2020. d. Assumed average forced outage of the total available capacity
Actual
Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
(%) 5.3 6.2 6.3 4.9 7.7 7.0 6.3 4.7 5.5 8.2 5.89 5.6
MW 677 794 801 621 983 888 800 601 708 1041 738 716
2017 Nov: 420 MW Pagbilao 3
2018 Jun: 460 MW SBPL**
2014 Nov: 19 MW NWPDC Wind Ph3* 87 MW Burgos Wind Ph1* 81 Caparispisan Wind* Dec: 135 MW SLTEC Puting Bato U1* 10 MW Pampanga Solar 63 MW Burgos Wind Ph2* 24 MW SCJIpower Bio 7.5 MW Bataan Cogen
2016 Jan: 12 MW Green Innov Bio Mar: 450 MW San Gabriel NG May: 150 MW Limay Coal U1 Sep: 150 MW Limay Coal U2
2015 Mar : 150 MW SLPGC Coal U1 18 MW IBEC Bio Jun: 150 MW SLPGC Coal U2 13 MW Sabangan HEPP Jul: 67.5 MW Pililia Wind Oct: 82 MW Anda Coal Nov: 150 MW SLTEC Puting Bato Coal U2 Dec: 4 MW Bicol Biomass
** Upon Secretary’s consideration Note: 100 MW Avion and 40 MW Majestics considered as additional capacity (not in the committed power projects)
* On-going testing and commissioning
* Excluding Off-grid power projects ** New Entry from Indicative list
As of 30 September 2014
LUZON GRID COMMITTED POWER PROJECTS (2,682.1 MW) Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)
Target Testing &
Commissioning
Target Commercial
Operation
Bangui Bay Wind Power Project
(Phase 3)
NorthWind Power
Development Corporation
NorthWind Power
Development Corporation Bangui, Ilocos Norte 18.9 Sep-2014 Nov-2014
Burgos Wind Power Project
(Phase 1)
EDC Burgos Wind Power
Corporation
Energy Development
Corporation (EDC)
Nagsurot-Saoit,
Burgos, Ilocos Norte 87.0 Nov-2014 Nov-2014
Caparispisan Wind Energy Project Northern Luzon UPC Asia
Corporation UPC Asia Corporation
Brgy. Caparispisan,
Pagudpud, Ilocos
Norte
81.0 Nov-2014 Nov-2014
135 MW Puting Bato Coal Fired
Power Plant Phase I
South Luzon Thermal
Energy Corp. (SLTEC)
Trans Asia Oil and Energy
Development Corporation
(TAOil)
Brgy. Puting Bato
West, Calaca,
Batangas
135.0 Oct 2014 Dec-2014
Pampanga Solar Power Project Raslag Corporation Raslag Corporation Brgy. Suclaban,
Mexico, Pampanga 10.0 Dec 2014 Dec 2014
Burgos Wind Power Project
(Phase 2)
EDC Burgos Wind Power
Corporation
Energy Development
Corporation (EDC)
Nagsurot-Saoit,
Burgos, Ilocos Norte 63.0 Dec 2014 Dec 2014
12 MW SJCiPower Rice Husk-Fired
Biomass power Plant Project
Phase 1
San Jose City I Power
Corporation
San Jose City I Power
Corporation
Brgy. Tulat, San
Jose, Nueva Ecija 10.0 Dec 2014 Dec 2014
12 MW SJCiPower Rice Husk-Fired
Biomass power Plant Project
Phase 2
San Jose City I Power
Corporation
San Jose City I Power
Corporation
Brgy. Tulat, San
Jose, Nueva Ecija 10.0 Dec 2014 Dec 2014
12.5 MW Bataan 2020 Rice hull-
fired Cogen Plant Bataan 2020 Inc. Bataan 2020 Inc. Bataan 7.5 Oct 2014 Dec 2014
150 MW SLPGC Coal-Fired Power
Plant Phase I Unit 1
Southwest Luzon Power
Generation Corporation
(SLPGC)
DMCI Power Corporation Brgy. San Rafael,
Calaca, Batangas 150.0 Dec-2014 Mar-2015
20 MW IBEC Biomass Power Plant Isabela Biomass Energy
Corporation (IBEC)
Isabela Biomass Energy
Corporation (IBEC) Isabela 18.0 Mar 2015 Mar 2015
150 MW SLPGC Coal-Fired Power
Plant Phase I Unit 2
Southwest Luzon Power
Generation Corporation
(SLPGC)
DMCI Power Corporation Brgy. San Rafael,
Calaca, Batangas 150.0 Dec-2014 Jun-2015
Sabangan HEPP Hedcor Sabangan, Inc. Aboitiz Power Corporation Mt. Province 13.2 Jun 2015 Jun 2015
Pililla Wind Power Project
(Phase 1)
Alternergy Wind One
Corporation Alternergy
Brgy. Halayhayin,
Pililla, Rizal 67.5 Jul 2015 Jul 2015
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Testing &
Commissioning
Target Commercial
Operation
Anda Power Corporation's 82 MW
Ciculating Fluidized Bed Coal Fired
Power Plant
Anda Power Corporation Anda Power Corporation
Brgy. Bundagul,
Mabalacat,
Pampanga
82.0 Jun 2015 Oct-2015
135 MW Puting Bato Coal Fired
Power Plant Phase II
South Luzon Thermal
Energy Corp. (SLTEC)
Trans Asia Oil and Energy
Development Corporation
(TAOil)
Brgy. Puting Bato
West, Calaca,
Batangas
135.0 Oct 2014 Nov-2015
3.5 MW Bicol Biomass Energy
Corporation
Bicol Biomass Energy
Corporation
Bicol Biomass Energy
Corporation Camarines Sur 3.2 Dec 2015 Dec-2015
12 MW GITC Biomass Power Plant
Project
Green Innovations for
Tomorrow Corporation
(GITC)
Green Innovations for
Tomorrow Corporation
(GITC)
Nueva Ecija 10.8 Dec-2015 Jan-2016
San Gabriel Plant Phase II First Gas Power Corp. First Gen Power
Corporation
San Gabriel,
Batangas 450.0 Jan-2016 Mar 2016
Limay Power Plant Project Phase I
Unit 1
SMC Consolidated Power
Corporation
SMC Consolidated Power
Corporation
Brgy. Lamao, Limay,
Bataan 150.0 Mar 2016 May-2016
Limay Power Plant Project Phase I
Unit 2
SMC Consolidated Power
Corporation
SMC Consolidated Power
Corporation
Brgy. Lamao, Limay,
Bataan 150.0 Jul-2016 Sep-2016
Pagbilao Coal-Fired Thermal
Power Plant
Pagbilao Energy
Corporation
TeaM Energy / Aboitiz
Power
Pagbilao Power
Station, Nrgy.
Ibabang Polo,
Pagbilao, Quezon
420.0 May-2017 Nov-2017
San Buenaventura Power Ltd. Co.
(SBPL) Project
San Buenaventura Power
Ltd. Co. (SBPL) QPPL/EGCO Mauban, Quezon 460.0 Dec-2017 Jun-2018
TOTAL 2,682.1
LUZON GRID COMMITTED POWER PROJECTS (2,682.1 MW)
As of 30 September 2014
* Excluding Off-grid power projects ** New Entry from Indicative list *** by informal consideration from indicative to committed upon approval of Secretary
***
LUZON GRID INDICATIVE POWER PROJECTS (10,769.1 MW)
As of 30 September 2014
* Excluding Off-grid power projects
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
2 X 20 MW FDC
Camarines CFB Coal
Power Plant
FDC Utilities, Inc. FDC Utilities, Inc. Camarines Sur 40.0 Mar 2016
2 X 300 MW Coal-Fired
Power Plant
Redondo Peninsula
Energy, Inc.
MERALCO MGEN Power
Corporation/ Aboitiz Power
Corporation/ Taiwan
Cogeneration Corporation
Sitio Naglatore, Cawag,
Subic Bay Freeport Zone 600.0
Unit I - Oct 2016
Unit II - Dec 2016
2 X 150 MW SLPGC Coal-
Fired Power Plant Phase II
Southwest Luzon Power
Generation Corporation
(Project Company)
DMCI Power Corporation Brgy. San Rafael, Calaca,
Batangas 300.0
Unit I - Dec 2016
Unit II - Dec 2016
2 X 300 MW Masinloc
Expansion
AES Masinloc Power
Partners Co., Inc.
AES Philippines Power
Partners Co., LTD. Zambales 600.0
Unit 3 (300 MW) - Oct 2017
Unit 4 (300 MW) - Oct 2017
300 MW Limay Power Plant
Project Phase II SMC Consolidated Power
Corporation
SMC Consolidated Power
Corporation
Brgy. Lamao, Limay,
Bataan 300.0
Unit 1 - 150 MW - Jan 2017
(2x150MW) Unit 2 - 150 MW - Jul 2017
1x300 MW LEI Coal Power
Plant Lucidum Energy, Inc. (LEI) Lucidum Energy, Inc. (LEI) Silanguin Bay, Zambales 300.0 Jun 2017
Limay Power Plant Project
Phase III Unit 1
SMC Consolidated Power
Corporation
SMC Consolidated Power
Corporation
Brgy. Lamao, Limay,
Bataan 300.0 Oct-17
Limay Power Plant Project
Phase III Unit 2
SMC Consolidated Power
Corporation
SMC Consolidated Power
Corporation
Brgy. Lamao, Limay,
Bataan 300.0 Dec-17
JGS Coal Fired Thermal
Power Plant Unit 1 JG Summit Holdings, Inc. JG Summit Holdings, Inc.
Brgy. Pinamukan Ibaba,
Batangas City 150.0 Unit 1 - June 2018
JGS Coal Fired Thermal
Power Plant Unit 2 JG Summit Holdings, Inc.
Brgy. Pinamukan Ibaba,
Batangas City 150.0 Unit 2 - Dec 2018
2 X 600 MW Mariveles
Expansion Project
GNPower Mariveles Coal
Plant Ltd. Co. GNPower Ltd. Co. Mariveles, Bataan 1,200.0 Dec 2018
JGS Coal Fired Thermal
Power Plant Unit 3 JG Summit Holdings, Inc.
Brgy. Pinamukan Ibaba,
Batangas City 150.0 Unit 3 - June 2019
JGS Coal Fired Thermal
Power Plant Unit 4 JG Summit Holdings, Inc.
Brgy. Pinamukan Ibaba,
Batangas City 150.0 Unit 4 - Dec 2019
2 x 600 MW (net) Coal-
Fired Power Plant Atimonan One Energy
Meralco PowerGen
Corporation Atimonan, Quezon 1,200.0 Dec 2019
TOTAL COAL 5,740.0
LUZON GRID INDICATIVE POWER PROJECTS (10,769.1 MW)
As of 30 September 2014 * Excluding Off-grid power projects
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
Aero Derivative Combined
Cycle Power Plant
Calamba Aero Power
Corporation
MERALCO MGEN Power
Corporation Calamba, Laguna 150.0 TBD
TOTAL OIL-BASED 150.0
Pagbilao 600 MW
Combined Cycle Gas Fired
Power Plant*
Energy World Corporation
(EWC)
Energy World Corporation
(EWC)
Isla Grande, Pagbilao,
Quezon Province 600.0
U1 (200 MW)- Jan 2015
U2 (200 MW)- Dec 2015
U3 (200 MW)- Dec 2016
2 x 1,200 MW Combined
Cycle Gas Turbine Power
Plant Project
Atlantic, Gulf and Pacific
Company of Manila, Inc AG&P
Limay, Bataan
(PNOC-AFC Industrial
Estate)
2,400.0
Unit 1 - Mar 2017
Unit II - Mar 2018
415 MW San Isidro
Combined Cycle Gas
Turbine Plant Project
Trans Asia Oil and Energy
Development Corporation
(TAOil)
Trans Asia Oil and Energy
Development Corporation
(TAOil)
Pilipinas Shell Petroleum
Co.'s Tabangao Refinery,
Brgy. San Isidro and
Tabangao-Ambulong,
Batangas City
415.0 Sep 2017
2x450 San Gabriel Power
Plant
(Phase II)
First Gen Corproration First Gen Corproration San Gabriel, Batangas 900.0 U1 - 2017
U2 - 2019
TOTAL NATGAS 4,315.0
Bacman 3 (Tanawon)
Geothermal Project
Energy Development
Corporation (EDC)
Energy Development
Corporation (EDC) Guinlajon, Sorsogon 40.0 Dec 2016
Rangas Geothermal
Project
Energy Development
Corporation (EDC)
Energy Development
Corporation (EDC) Bacon District, Sorsogon 40.0 Jun 2017
Kayabon Geothermal
Project
Energy Development
Corporation (EDC)
Energy Development
Corporation (EDC) Manito, Albay 40.0 Dec 2019
TOTAL GEOTHERMAL 120.0
Ibulao Hydroelectric Power
Project Hydrocore, Inc. Hydrocore, Inc. Lagawe, Ifugao 4.5 May 2015
Dupinga Hydroelectric
Power Project
Constellation Energy
Corporation Exelon Corporation Gabaldon, Nueva Ecija 3.0 Oct 2015
Main Aklan Sunwest Water & Electric
Co., Inc. (SUWECO)
Sunwest Water & Electric
Co., Inc. (SUWECO) Libacao, Albay 15.0 Jul 2016
Tinoc 2 Philnew Hydro Power
Corporation
Philnew Hydro Power
Corporation Tinoc, Ifugao 11.0 Dec 2016
Tinoc 3 Philnew Hydro Power
Corporation
Philnew Hydro Power
Corporation Tinoc, Ifugao 5.0 Jun 2017
LUZON GRID INDICATIVE POWER PROJECTS (10,769.1 MW)
As of 30 September 2014 * Excluding Off-grid power projects
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
Pinacanauan Sunwest Water & Electric
Co., Inc.
Sunwest Water & Electric
Co., Inc. (SUWECO) Peñablanca, Cagayan 6.0 Jul 2017
Tinoc 1 Quadriver Energy Corp. Quadriver Energy Corp. Tinoc, Ifugao 4.1 Apr 2018
Tinoc 4 Philnew Hydro Power
Corporation
Philnew Hydro Power
Corporation Tinoc, Ifugao 5.0 Apr 2018
Colasi Colasi Mini Hydro Electric
Power Plant Corporation
Colasi Mini Hydro Electric
Power Plant Corporation Mercedes, Camarines Norte 1.0 Feb 2019
Majayjay Majayjay Hydro Power
Company, Inc.
Majayjay Hydro Power
Company, Inc.
Majayjay,
Laguna 2.2 Apr 2019
Biyao AV Garcia Power Systems
Corp
AV Garcia Power Systems
Corp Balbalan, Kalinga 0.8 TBD
Kapangan HEP
Cordillera Hydro Electric
Power Corporation
(COHECO)
Cordillera Hydro Electric
Power Corporation
(COHECO)
Kapangan & Kibungan,
Benguet 60.0 TBD
Abdao HEP AV Garcia Power Systems
Corp. Tabaan Sur, Tuba, Benguet 1.0 TBD
Barit (Irrigation Discharge)
Hydroelectric Power Project
NASCENT Technologies
Corporation Buhi, Camarines Sur 0.4 TBD
2.6 MW Maapon River Mini-
Hydro Power Project (MHP)
Renesons Energy
Corporation
Renesons Energy
Corporation Brgy. Piis, Lucban, Quezon 2.6 TBD
TOTAL HYDRO 121.6
Currimao Solar Photovoltaic
Power Project
Mirae Asia Energy
Corporation
Mirae Asia Energy
Corporation Currimao, Ilocos Norte 20.0 Mar 2015
SM North Edsa Solar Power
Project
Solar Philippines
Commercial Rooftop
Projects, Inc.
Solar Philippines
Commercial Rooftop
Projects, Inc.
SM North Edsa, Quezon
City 1.5 Mar 2015
Burgos Solar Power Project Energy Development
Corporation
Energy Development
Corporation Burgos, Ilocos Norte 4.0 Jul 2015
Macabud Solar Photovoltaic
Power Project
ATN Philippines Solar
Energy Group, Inc.
ATN Philippines Solar
Energy Group, Inc.
Brgy. Macabud, Rodriguez,
Rizal 30.0 Feb 2016
TOTAL SOLAR 55.5
LUZON GRID INDICATIVE POWER PROJECTS (10,769.1 MW)
As of 30 September 2014 * Excluding Off-grid power projects
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
Balaoi Wind Power Project Northern Luzon UPC Asia
Corporation UPC Asia Corporation
Brgy. Balaoi, Pagudpud,
Ilocos Norte 45.0 Sep 2015
Pasuquin East Wind Power
Project (Phase 1)
Energy Logics Philippines,
Inc.
Delgado Group of
Companies Pasuquin, Ilocos Norte 48.0 Oct 2015
Sembrano Wind Power
Project
(Formerly Mabitac Wind
Power Project Phase 2)
Alternergy Sembrano Wind
Corporation Alternergy
Mt. Sembrano, Mabitac,
Laguna 72.0 Apr 2017
Pagudpud Wind Power
Project
EDC Pagudpud Wind
Power Corporation
Energy Development
Corporation
Brgy. Balaoi and
Caunayan, Pagudpud,
Ilocos Norte
84.0 Dec 2018
TOTAL WIND 249.0
20 MW Waste-to-Energy
Project using Thermal
Gasifier Conversion
CJ Global Green Energy
Philippine Corp.
CJ Global Green Energy
Philippine Corp. Camarines Sur 18.0 Dec 2015
TOTAL BIOMASS 18.0
TOTAL 10,769.1
800
900
1,000
1,100
1,200
1,300
1,400
1,500
1,600
1,700
1,800
1,900
2,000
W1
W
2
W3
W4
W5
W6
W7
W8
W9
W1
0
W1
1
W1
2
W1
3
W1
4
W1
5
W1
6
W1
7
W1
8
W1
9
W2
0
W2
1
W2
2
W2
3
W2
4
W2
5
W2
6
W2
7
W2
8
W2
9
W3
0
W3
1
W3
2
W3
3
W3
4
W3
5
W3
6
W3
7
W3
8
W3
9
W4
0
W4
1
W4
2
W4
3
W4
4
Total Available Capacity System Demand Regulating Reserve Contingency Reserve Dispatchable Reserve
VISAYAS POWER SUPPLY-DEMAND SITUATION 1 JANUARY to 31 OCTOBER 2014 (Daily)
Source: NGCP Daily Operations Report
26 Jan 2014: Earthquake in Leyte
Affected Power Plants: Mahiao Geo (120 MW)
Actual Peak Demand = 1,636 MW (27 May)
PEDC 1 Forced Outage: 18-24 May 2014 PEDC 2 Forced Outage: 24-29 May 2014 CEDC 1 Forced Outage: 16-23 May 2014
CEDC U3 Forced Outage: 28 May-3 Jun 2014
CEDC 1 Planned Outage: 5 Jun-5 Jul 2014 KSPC 1 Coal Planned Outage: 5-24 Jul 2014
Holy Week
January February March April May June July August September October
Notes a. Reserve Margin (RM) i.e. 4% regulating reserve and largest online unit for contingency and dispatchable reserve requirement (100 MW
to increase by 135 MW in 2016) b. 7 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth
applied to 7 percent GDP growth rate (GR) target for 2014-2015. c. 8 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth
applied to 8 percent GDP growth rate (GR) target for 2016-2020. d. Assumed 4.35 percent average forced outage of the total available capacity
VISAYAS SUPPLY-DEMAND OUTLOOK 2014-2020 2014
Nov: 8 MW Villasiga HEP Dec: 82 MW TPC Expansion* 54 MW San Lorenzo Wind 46 MW URC Bio 12 MW Hpo Bagasse
2015 Jan: 34 MW Nabas Wind Ph1 Sep: 16 MW Nabas Wind Ph2 Dec: 20 MW SCBiopower
2016 Jun: 135 MW Concepcion Coal 1 Nov: 135 MW Concepcion Coal 2
2017 Jun: 8 MW Cantakoy HEPP 34 MW VMCI Bio (TBD**)
** TBD – To be determined (target commercial operation)
* On-going testing and commissioning
Actual
* Excluding Off-grid power projects ** New Entry from Indicative list As of 30 September 2014
VISAYAS GRID COMMITTED POWER PROJECTS (527.0 MW) Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)
Target Testing &
Commissioning
Target Commercial
Operation
Villasiga HEP
Sunwest Water &
Electric Co., Inc.
(SUWECO)
Sunwest Water &
Electric Co., Inc.
(SUWECO)
Brgy. Igsoro,
Bugasong, Antique 8.0 Sep 2014 Nov 2014
8.0 MW HPCo Bagasse
Cogeneration Plant
Hawaiian Philippines
Company
Hawaiian Philippines
Company Negros Occidental 3.0 Nov 2014 Nov 2014
46 MW Universal
Robina Corporation
Bagasse Cogeneration
Facility
Universal Robina
Corporation
JG Summit Holdings
Inc. Negros Occidental 31.0 Dec 2014 Dec 2014
54 MW San Lorenzo
Wind Power Project
Trans-Asia Renewable
Energy Corporation
Trans Asia Oil and
Energy Development
Corporation (TAOil)
San Lorenzo, Guimaras
Island 54.0 Dec 2014 Dec 2014
TPC Coal-Fired Power
Plant Expansion
Project*
Toledo Power
Company
Global Business Power
Corporation Toledo City, Cebu 82.0 Oct 2014 Dec 2014
Nabas Wind Power
Project Phase 1
Petrogreen Energy
Corporation
Petrogreen Energy
Corporation
Brgy. Pawa, Nabas,
Aklan 36.0 Jan 2015 Jan 2015
Nabas Wind Power
Project Phase 2
Petrogreen Energy
Corporation
Petrogreen Energy
Corporation
Brgy. Pawa, Nabas,
Aklan 14.0 Sep 2015 Sep 2015
20 MW SCBiopower
Bagasse-Fired Power
Generation Project
San Carlos Biopower
Inc. Bronzeoak Philippines Negros Occidental 18.0 Dec 2015 Dec 2015
2 X 135 MW
Concepcion Coal-fired
Power Plant
Palm Thermal
Consolidated Holdings
Corp.
AC Energy Holdings,
Inc./ Palm Thermal
Consolidated Holdings
Corporation/ Jin
Navitas Resource, Inc.
Brgy. Nipa,
Concepcion, Iloilo 270.0
U1 - Sep 2015
U2 – May 2016
U1 - Jun 2016
U2 - Nov 2016
Cantakoy HEP Quadriver Energy Corp. Quadriver Energy Corp. Danao, Bohol 8.0 Jun 2017 Jun 2017
34 MW VMCI Bagasse-
Fired Cogeneration
Plant
Victorias Milling
Company Inc.
Victorias Milling
Company Inc. Negros Occidental 3.0 TBD TBD
TOTAL 527.0
VISAYAS GRID INDICATIVE POWER PROJECTS (954.5 MW)
As of 30 September 2014
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
PEDC Expansion Project Panay Energy
Development Corporation
Global Business Power
Corporation
Brgy. Ingore, La Paz,
Iloilo 150.0 May 2016
Former report (1x150
MW Circulating Fluidized
Bed (CFB) Coal-Fired
Power Plant)
(Global Business Power
Corporation)
1 X 20 MW FDC Danao
CFB Coal Power Plant FDC Utilities, Inc. FDC Utilities, Inc. Danao City, Cebu 20.0 Dec 2016
300 MW Therma Visayas
Energy Project Therma Visayas Inc.
Aboitiz Power
Corporation
Brgy. Bato, Toledo City,
Cebu 300.0 Mar 2017
TOTAL COAL 470.0
18.9MW Calumangan
Diesel Power Plant
Energreen Power
Development &
Management, Inc.
Brgy. Calumangan, Bago
City, Negros Occidental 18.9 Dec 2014
TOTAL OIL-BASED 18.9
49 MW Biliran
Geothermal Plant Project
Biliran Geothermal
Incorporated
Orka Energy Philippines
(Iceland) Biliran, Biliran 49.0 Dec 2015
Dauin Geothermal
Project
Energy Development
Corporation (EDC)
Energy Development
Corporation (EDC) Dauin, Negros Oriental 40.0 Dec 2021
Southern Leyte
Geothermal Plant
Geothermal Project
(formerly known as Mt.
Cabalian Geothermal)
Energy Development
Corporation
Energy Development
Corporation (EDC) Cabalian, Southern Leyte TBA TBA
TOTAL GEOTHERMAL 89.0
Leyte Solar Photovoltaic
Power Project
Phil. Solar Farm-Leyte,
Inc.
Phil. Solar Farm-Leyte,
Inc. Ormoc City, Leyte 30.0 Jan 2015
San Carlos Solar Power
Project
Phase C-10
Phase D-13
San Carlos Solar Energy
Inc.
San Carlos City, Negros
Occidental 30.0 Feb 2015
Cadiz Solar Power
Project
Phil.Power Exploration &
Development Corporation
Brgy., Tinampa-an Cadiz
City, Negros Occidental 100.0 Jul 2015
TOTAL SOLAR 160.0
VISAYAS GRID INDICATIVE POWER PROJECTS (954.5 MW)
As of 30 September 2014
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
PEDC Expansion Project Panay Energy
Development Corporation
Global Business Power
Corporation
Brgy. Ingore, La Paz,
Iloilo 150.0 May 2016
Former report (1x150
MW Circulating Fluidized
Bed (CFB) Coal-Fired
Power Plant)
(Global Business Power
Corporation)
1 X 20 MW FDC Danao
CFB Coal Power Plant FDC Utilities, Inc. FDC Utilities, Inc. Danao City, Cebu 20.0 Dec 2016
300 MW Therma Visayas
Energy Project Therma Visayas Inc.
Aboitiz Power
Corporation
Brgy. Bato, Toledo City,
Cebu 300.0 Mar 2017
TOTAL COAL 470.0
18.9MW Calumangan
Diesel Power Plant
Energreen Power
Development &
Management, Inc.
Brgy. Calumangan, Bago
City, Negros Occidental 18.9 Dec 2014
TOTAL OIL-BASED 18.9
49 MW Biliran
Geothermal Plant Project
Biliran Geothermal
Incorporated
Orka Energy Philippines
(Iceland) Biliran, Biliran 49.0 Dec 2015
Dauin Geothermal
Project
Energy Development
Corporation (EDC)
Energy Development
Corporation (EDC) Dauin, Negros Oriental 40.0 Dec 2021
Southern Leyte
Geothermal Plant
Geothermal Project
(formerly known as Mt.
Cabalian Geothermal)
Energy Development
Corporation
Energy Development
Corporation (EDC) Cabalian, Southern Leyte TBA TBA
TOTAL GEOTHERMAL 89.0
Leyte Solar Photovoltaic
Power Project
Phil. Solar Farm-Leyte,
Inc.
Phil. Solar Farm-Leyte,
Inc. Ormoc City, Leyte 30.0 Jan 2015
San Carlos Solar Power
Project
Phase C-10
Phase D-13
San Carlos Solar Energy
Inc.
San Carlos City, Negros
Occidental 30.0 Feb 2015
Cadiz Solar Power
Project
Phil.Power Exploration &
Development Corporation
Brgy., Tinampa-an Cadiz
City, Negros Occidental 100.0 Jul 2015
TOTAL SOLAR 160.0
VISAYAS GRID INDICATIVE POWER PROJECTS (954.5 MW)
As of 30 September 2014
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
Pulupandan Wind Power
Project
First Maxpower International
Corporation
First Maxpower International
Corporation
Pulupandan, Negros
Occidental 50.0 Sep 2015
TOTAL WIND 50.0
Igbulo (Bais) Hydroelectric
Power Project
Century Peak Energy
Corporation
Century Peak Metals
Holdings Corp Igbaras, Iloilo 5.1 Jan 2015
Hilabangan (Upper Cascade) Century Peak Energy
Corporation
Century Peak Metals
Holdings Corp
Kabankalan, Negros
Occidental 4.8 Aug 2015
Hilabangan (Lower Cascade) Century Peak Energy
Corporation
Century Peak Metals
Holdings Corp
Kabankalan, Negros
Occidental 3.0 Aug 2015
Maninila (Lower Cascade) Century Peak Energy
Corporation
Century Peak Metals
Holdings Corp San Remigio, Antique 4.5 Oct 2016
Maninila (Upper Cascade) Century Peak Energy
Corporation
Century Peak Metals
Holdings Corp San Remigio, Antique 3.1 Oct 2016
Sibalom (Upper Cascade) Century Peak Energy
Corporation
Century Peak Metals
Holdings Corp San Remigio, Antique 4.2 Oct 2016
Sibalom (Middle Cascade) Century Peak Energy
Corporation
Century Peak Metals
Holdings Corp San Remigio, Antique 4.0 Oct 2016
Sibalom (Lower Cascade) Century Peak Energy
Corporation
Century Peak Metals
Holdings Corp San Remigio, Antique 3.3 Oct 2016
Basak II Meadowland Developers,
Inc. Badian, Cebu 0.5 Apr 2017
Timbaban Hydroelectric
Power Project
Oriental Energy and Power
Generation Corporation
Oriental Peninsula
Resources Group Inc (ORE) Madalag, Aklan 18.0 Aug 2017
Main Aklan River
Hydroelectric Power Project
Sunwest Water & Electric
Company, Inc. Libacao, Aklan 15.0 TBD
Amlan (Plant A) Natural Power Sources
Integration, Inc. Amlan, Negros Oriental 3.2 TBD
Amlan (Plant B) Natural Power Sources
Integration, Inc. Amlan, Negros Oriental 1.5 TBD
Amlan (Plant C) Natural Power Sources
Integration, Inc. Amlan, Negros Oriental 0.8 TBD
Loboc Hydro Power Project Sta Clara Power Corporation Sta Clara Int’l Corporation Loboc, Bohol 1.2 TBD
TOTAL HYDRO 72.2
South Negros 25 MW
Biomass Power Plant South Negros Biopower Inc.
Brgy. Cubay, La Carlota City,
Negros Occidental 22.4 Dec 2016
35.0 MW Mina Multi-Fuel
Biomass Power Generation
Facility
Green Power Panay Phils.,
Inc. Iloilo 32.0 TBD
TOTAL BIOMASS 54.4
40 MW Battery Storage
Project
AES Philippines Power
Partners Co., LTD.
AES Philippines Power
Partners Co., LTD.
Kabankalan, Negros
Occidental 40.0 Mar 2015
TOTAL BATTERY 40.0
TOTAL 954.5
600
700
800
900
1,000
1,100
1,200
1,300
1,400
1,500
1,600
1,700
1,800
1,900
2,000
W1
W
2
W3
W4
W5
W6
W7
W8
W9
W1
0
W1
1
W1
2
W1
3
W1
4
W1
5
W1
6
W1
7
W1
8
W1
9
W2
0
W2
1
W2
2
W2
3
W2
4
W2
5
W2
6
W2
7
W2
8
W2
9
W3
0
W3
1
W3
2
W3
3
W3
4
W3
5
W3
6
W3
7
W3
8
W3
9
W4
0
W4
1
W4
2
W4
3
W4
4
Total Available Capacity System Demand Regulating Reserve Contingency Reserve Dispatchable Reserve
MINDANAO POWER SUPPLY-DEMAND SITUATION 1 JANUARY to 31 OCTOBER 2014 (Daily)
Source: NGCP Daily Operations Report
2014 Actual Peak Demand = 1,444 MW (22 Oct)
Holy Week
27 Feb 2014 Mindanao Blackout
Affected Power Plant 200 MW Mindanao Coal-fired (MCF)
Restoration of 200 MW MCF Unit 2 : 8 May 2014 Unit 1 : 1 June 2014
January February March April May June July August September October
MINDANAO SUPPLY-DEMAND OUTLOOK 2014-2020
Notes a. Required Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve requirement b. 5.6 % peak demand growth rate resulted from observed 0.8 elasticity ratio of demand for electric power with national economic growth
applied to 7 percent GDP growth rate (GR) target for 2014-2015. c. 12.8 % peak demand growth rate resulted from observed 1.6 elasticity ratio of demand for electric power with national economic growth
applied to 8 percent GDP growth rate (GR) target for 2016 d. 8 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth
applied to 8 percent GDP growth rate (GR) target for 2017-2020 e. Assumed 3.3 percent average forced outage of the total dependable capacity ** TBD – To be determined (target commercial operation)
* On-going testing and commissioning
Actual
2015 Mar: 150 MW Therma South 1 Jun: 150 MW Therma South 2 Sep: 2 x 100 MW SEC Coal Dec: 15 MW LPC Bio
2014 Nov: 15 MW MEGC DPP* 21 MW Peak Power PSI 5.2 MW Peak Power PSFI
2016 Feb: 150 MW SMC Davao U1 Mar: 25 MW Lake Mainit Jun: 135 MW FDC Coal U1 Jul: 150 MW SMC Davao U2 Sep: 135 MW FDC Coal U2 Dec: 135 MW FDC Coal U3 10 MW Malaybalay Bio
2017 Jan: 9 MW Limbatangon HEPP Jul: 30 MW Puyo HEP Dec: 540 MW GNPower Kauswagan 5 MW Asiga HEPP (TBD**) 3 MW PTCI Bio (TBD**)
* Excluding Off-grid power projects ** New Entry from Indicative list
As of 30 September 2014
MINDANAO GRID COMMITTED POWER PROJECTS (1,870MW)
Name of the Project Project Proponent Mother/ JV
Company Location
Rated Capacity
(MW)
Target Testing &
Commissioning
Target Commercial
Operation
15 MW MEGC Diesel Power
Plant
Mapalad Energy
Generating
Corporation (MEGC)
Mapalad, Dalipuga, Iligan
City 15.0 Oct 2014 Nov 2014
3x6.97 PSI MW Bunker-Fired
Power Plant
Peak Power
Soccsargen, Inc.
(PSI)
Peak Power Energy
Inc. (subsidiary of A
Brown)
National Highway,
Brgy.Apopong, General
Santos City
20.9 Sep 2014 Nov 2014
1x5.2 MW PSFI Bunker-Fired
Power Plant
Peak Power San
Francisco (PSFI)
Peak Power Energy
Inc. (subsidiary of A
Brown)
ASELCO Compound,
Brgy. San Isidro,San
Francisco, Agusan del
Sur
5.2 Sep 2014 Nov 2014
2 X 150 MW Coal-Fired Therma
South Energy Project Therma South Inc.
Aboitiz Power
Corporation
Brgy. Binugao, Toril,
Davao City and Brgy.
Inawayan, Sta. Cruz,
Davao Del Sur
300.0 U1 – Nov 2014 U2 – Nov
2014
U1 – Mar 2015 U2 –
Jun 2015
Southern Mindanao Coal Fired
Power Station Unit 1
Sarangani Energy
Corporation
Alsons Power
Corporation
Brgy, Kamanga, Maasim,
Sarangani 100.0 Feb 2015
Unit 1 Sep 2015
SMC Davao Power Plant Project
Phase I Unit 1
San Miguel
Consolidated Power
Corporation
San Miguel
Consolidated Power
Corporation
Brgy. Culaman, Malita,
Davao del Sur 150.0 U1 - Jul 2015 U1 - Dec 2015
15 MW LPC Biomass Power
Plant Project
Lamsan Power
Corporation
Lamsan Power
Corporation Maguindanao 10.0 Dec 2015 Feb 2016
Lake Mainit Agusan Power
Corporation Tranzen Group Inc.
Jabonga, Agusan del
Norte 25.0 Mar 2016 May 2016
SMC Davao Power Plant Project
Phase I Unit 2
San Miguel
Consolidated Power
Corporation
San Miguel
Consolidated Power
Corporation
Brgy. Culaman, Malita,
Davao del Sur 150.0 U2 - May 2016 U2 - Jul 2016
3 X 135 MW FDC-Misamis
Circulating Fluidized Bed (CFB)
Coal-Fired Power Plant Project
FDC Utilities, Inc. FDC Utilities, Inc.
Phividec Industrial
Estate, Villanueva,
Misamis Oriental
405.0
U1 – Dec 2015
U2 – Mar 2016
U3 – Jun 2016
U1 – Jun 2016
U2 – Sep 2016
U3 – Dec 2016
Southern Mindanao Coal Fired
Power Station Unit 2
Sarangani Energy
Corporation
Alsons Power
Corporation
Brgy, Kamanga, Maasim,
Sarangani 100.0 Feb 2015 Nov-16
10 MW Malaybalay Bio-Energy
Corporation Multi Feedstock
Power Generating Facility
Malaybalay
Bioenergy
Corporation
Malaybalay
Bioenergy
Corporation
FIBECO, Anahawan,
maramag, Bukidnon 9.0 Dec 2016 Dec 2016
* Excluding Off-grid power projects ** New Entry from Indicative list
As of 30 September 2014
MINDANAO GRID COMMITTED POWER PROJECTS (1,870MW) MW Name of the Project Project Proponent
Mother/ JV
Company Location
Rated Capacity
(MW)
Target Testing &
Commissioning
Target Commercial
Operation
Limbatangon Hydroelectric
Power Project
Turbines Resource
& Development
Corp.
Turbines Resources
and Development
Corp. (TRDC)
Cagayan de Oro City,
Misamis Oriental 9.0 Jan 2017 Mar 2017
Puyo Hydroelectric Power
Project
First Gen Mindanao
Hydropower Corp.
First Gen Power
Corporation
Jabonga, Agusan del
Norte 30.0 Jul 2017 Jul 2017
GNPower Kauswagan Ltd.
540MW Clean Coal-Fired
Power Plant
GN Power
Kausawagan GN Power Ltd. Co.
Kauswagan, Lanao del
Norte 540.0 Feb 2017 Dec 2017
3 MW Biomass Cogeneration
Facility
Philippine Trade
Center, Inc.
Philippine Trade
Center, Inc. Maguindanao 1.6 TBD TBD
TOTAL 1,870.7
MINDANAO GRID INDICATIVE POWER PROJECTS (1,755.8MW)
As of 30 September 2014
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
Davao del Norte 20 MW
Circulating Fluidized Bed
Biomass-Coal Fired Thermal
Power Plant
FDC Utilities, Inc. FDC Utilities, Inc. Maco, Davao del Norte 20.0 Mar 2015
ZAM 100 MW Circulating
Fluidized Bed (CFB) Coal-
Fired Power Station
San Ramon Power Inc. Mapalad Power Corporation Sitio San Ramon, Bgry.
Talisayan, Zamboanga City 100.0 Dec 2015
600 MW SMC Davao Power
Plant Project Phase III
San Miguel Consolidated
Power Corporation
San Miguel Consolidated
Power Corporation
Brgy. Culaman, Malita, Davao
del Sur 600.0
150 MW - Jan 2016
150 MW - Jun 2016
300 MW - Dec 2018
Sibuguey Power Plant Project Philippine National Oil
Company (PNOC-EC)
Philippine National Oil
Company (PNOC) Sibugay, Zamboanga 100.0 Sep 2016
2x55 MW Balingasag
Thermal Power Plant
(Circulating Fluidized Bed
Combustion (CFBC) Coal-
Fired Power Plant Plant)
Minergy Coal Corporation Minergy Brgy. Mandangoa,
Balingasag, Misamis Oriental 110.0 Jan 2017
300 MW Coal Fired Power
Plant
Phase 1 - 2 x 100MW
Phase 2 - 1 x 100MW
Ozamiz Power Generation,
Inc.
Brgy. Pulot,Ozamiz
City,Misamis Occidental 300.0
Phase 1 - Mar 2018 Phase 2 - Dec
2018
300 MW SMC Davao Power
Plant Project Phase II
San Miguel Consolidated
Power Corporation
San Miguel Consolidated
Power Corporation
Brgy. Culaman, Malita, Davao
del Sur 300.0 Dec 2018
TOTAL COAL 1,530.0
Mindanao 3 Geothermal Energy Development
Corporation
Energy Development
Corporation Kidapawan, North Cotabato 50.0 Dec 2017
TOTAL GEO 50.0
Tagoloan Hydropower First Gen Mindanao
Hydropower Corp. First Gen Power Corporation
Impasugong & Sumilao,
Bukidnon 39.0 Oct 2015
Bubunawan Hydroelectric
Power Project
First Gen Mindanao
Hydropower Corp. First Gen Power Corporation
Baungon and Libona,
Bukidnon 23.0 Oct 2015
Tumalaong Hydroelectric
Power Project
First Gen Mindanao
Hydropower Corp. First Gen Power Corporation Baungon, Bukidnon 9.0 Oct 2015
MINDANAO GRID INDICATIVE POWER PROJECTS (1,755.8 MW)
As of 30 September 2014
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
Cabadbaran Hydroelectric
Power Project
First Gen Mindanao
Hydropower Corp.
First Gen Power
Corporation
Cabadbaran, Agusan del
Norte 9.8 Dec 2015
New Bataan Euro Hydro Power (Asia)
Holdings, Inc.
New Bataan, Compostela
Valley 2.4 Jan 2017
Pasonanca Philcarbon, Inc. Philcarbon, Inc. Zamboanga City 0.1 Mar 2017
Culaman Hydroelectric
Power Project
Oriental Energy and Power
Generation Corporation
Oriental Energy and Power
Generation Corporation Manolo Fortich, Bukidnon 10.0 Jun 2018
Mangima Hydroelectric
Power Project
Philnew Hydro Power
Corporation Manolo Fortich, Bukidnon 10.0 TBD
Clarin Philnew Hydro Power
Corporation Clarin, Misamis Occidental 5.0 TBD
Mat-i-I Philnew Hydro Power
Corporation Claveria, Cagayan de Oro 2.0 TBD
Mat-i-2 Philnew Hydro Power
Corporation
Cagayan de Oro, Misamis
Oriental 4.0 TBD
Mat-i-3 Philnew Hydro Power
Corporation
Cagayan de Oro, Misamis
Oriental 4.0 TBD
TOTAL HYDRO 118.3
Centralla Solar Power
Project
NV Vogt Philippines Solar
Energy One, Inc.
Brgy. Centralla, Surallah,
South Cotabato 6.3 Mar 2015
Kirahon Solar Power
Project Phase 1
Kirahon Solar Energy
Corporation
Brgy.
Kirahon,Villanueva,Misamis
Oriental
12.5 May 2015
Digos Solar Photovoltaic
Power Project
Enfinity Philippines
Renewable Resources, Inc. Enfinity Digos City, Davao del Sur 10.0 Oct 2015
TOTAL SOLAR 28.8
12 MW Biomass Power
Plant Project
Misamis Oriental Bio-
Energy Corporations
Misamis Oriental Bio-
Energy Corporations Misamis Oriental 10.8 Dec 2015
10MW Kalilangan Bio-
Energy Corporation Multi-
Feedstock Power
Generating Facility
Kalilangan Bio-Energy
Corporation Bukidnon 9.0 Dec 2016
10MW Don Carlos Bio-
Energy Corporation Multi-
Feedstock Power
Generating Facility
Don Carlos Bio-Energy
Corporations Bukidnon 9.0 Dec 2016
TOTAL BIOMASS 28.8
TOTAL 1,755.8
• Introduced Interruptible Load Program (ILP) • Implemented Modular Genset Program in Mindanao • Implemented Interim Mindanao Electricity Market (IMEM) • Managed Maintenance Program of Generation Facilities jointly with NGCP
(GOMP) • Increased Institutional/Technical Capacities of DUs in Formulating Distribution
Development Planning • Created Task Force on Electricity • Developed Policy on Demand Aggregation and Supply Auctioning • Institutional strengthening through more aggressive information Education and
Communication Campaign on developments in the power industry, energy programs and projects including energy efficiency
• More aggressive Energy Efficiency and Conservation Programs
Measures Undertaken to Address Power Supply Issues
Sending market signals to provide incentives for EE
Strengthening existing policy, advocacy, programs and institutional structures
Harnessing private sector / partner finance
Enabling innovation and new technologies
Residential Buildings
Industry
Energy Efficiency Roadmap for the Philippines, 2014-2030
Short Term (2014-15) Medium Term (2016-20) LongTerm (2021-30) Energy Savings over
baseline (by 2030)
• Link existing training projects with ESCO capacity building • Develop sectoral focus programs to facilitate EE in energy intensive industries (e.g. cement and construction, sugar)
• Develop standards for motors • Facilitate example models including ESCOs, finance • Implement demand response programs • Review of energy pricing
• Review inward investment rules for EE to remove distortions
• Enforceable minimum energy standards for appliances, with a focus on space cooling and refrigeration • Building envelope measures – cool roofs and insulation
• Develop role of utilities as key implementation partners and information providers • Specific EE programs for low-income households
• Towards energy efficient housing precincts • inclusion of residential measures in Building Code
Commercial Buildings
• Reformulate group to oversee EE measures in Building Code • Retro-commissioning program for existing buildings • Benchmarking and ratings for building information and reporting
• EE measures for inclusion in national building code • Government demonstration retrofits to showcase ESCOs and financing models • Promote green building ratings
• Incentive funds in place for EE, including private financiers • Mandatory disclosure of commercial building performance
Cross- Sectoral
• Support passage of Enercon Bill • Establish EE database, data collection regime, M&E framework • Establish enforcement regimes • Strengthen ESCO capacity • Continue awareness-raising
• National strategy for efficiency in power supply sector • Stronger coordination with other levels of government (LGUs) • Regular reporting and monitoring to commence
• Energy Efficiency and Conservation Center mandated and established
20
30
Ob
jecti
ve
s:
40%
reduct
ion in e
nerg
y inte
nsi
ty c
om
pare
d t
o 2
010 b
ase
line
Decr
ease
d e
nerg
y c
onsu
mption o
f 1.6
% p
er
year
again
st b
ase
line f
ore
cast
s Savin
gs
of appro
x. 10,6
65 K
TO
E p
.a. (o
ne-t
hird o
f cu
rrent
dem
and)
by 2
030
15 %
20 %
25 %