SEQUENCE
Types of ProcedureFactors Governing the Design of ProcedureCategories of AircraftInstrument Approach Procedure
– 5 Segments of Instrument Approach Procedure
2
![Page 3: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/3.jpg)
TYPES OF PROCEDURE
SIDSSTARSHOLDINGLED-DOWN CIRCLING APPROACHMISSED APPROACH
3
![Page 4: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/4.jpg)
FACTORS GOVERNING THE DESIGN OF PROCEDURE
Terrain Surrounding the Aerodrome– Min Sec Altitude – Transition Altitude / Level– Minimum Obstacle Clearance – Holding Pattern / Initial Approach Altitude
Area Available for Safe Operation – Danger / Prohibited / Restricted – Population – Adjacent Aerodrome Traffic – Mountains / Volcanic Eruption
4
![Page 5: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/5.jpg)
Types of Operation – Passenger/Cargo Operation – Military – General Aviation– Training
Type of Aircraft– Heavy / Medium / Light– Speed of Aircraft– Manoeuvrability (Turn / Bank)
5
![Page 6: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/6.jpg)
Pilot Ability– Experienced – Trainee
Available Nav Aids– Performance / Reliability / Accuracy
Procedural Utility (Aircraft Equipment)Flight Safety Concerns
– Type of Land – Bird Activity
6
![Page 7: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/7.jpg)
Weather Phenomena – Extreme Weather – Position of Sun & Moon– Wind Direction
• Tail Wing / Cross Wing Factor
Search & RescueSecurity Concerns
– Population – Terrorist Activities
7
![Page 8: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/8.jpg)
CATEGORIES OF AIRCRAFT8
CATEGORY SPEED
A less than 169 km/h (91 kt) indicated airspeed (IAS
B 169 km/h (91 kt) or more but less than 224 km/h (121 kt) IAS
C 224 km/h (121 kt) or more but less than 261 km/h (141 kt) IAS
D 261 km/h (141 kt) or more but less than 307 km/h (166 kt) IAS
E 307 km/h (166 kt) or more but less than 391 km/h (211 kt) IAS
H “Helicopters”
![Page 9: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/9.jpg)
INSTRUMENT APPROACH PROCEDURE
9
![Page 10: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/10.jpg)
SEGMENTS OF IAP10
An instrument approach procedure may have five separate segments– Arrival– Initial– Intermediate– Final– Missed approach segments
In addition, an area for circling the aerodrome under visual conditions is also considered
![Page 11: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/11.jpg)
ARRIVAL SEGMENT
11
![Page 12: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/12.jpg)
ARRIVAL SEGMENT
A standard instrument arrival (STAR) route permits transition from the en-route phase to the approach phase
When necessary or where an operational advantage is obtained, arrival routes from the en-route phase to a fix or facility used in the procedure are published
12
![Page 13: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/13.jpg)
MINIMUM SECTOR ALTITUDES (MSA)/TERMINAL ARRIVAL ALTITUDES (TAA)
Minimum sector altitudes or terminal arrival altitudes are established for each aerodrome and provide– at least 300 m (1 000 ft) obstacle clearance
within 46 km (25 NM) of the• Navigation aid• Initial approach fix or intermediate fix associated with
the approach procedure for that aerodrome
13
![Page 14: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/14.jpg)
14
![Page 15: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/15.jpg)
INITIAL APPROACH SEGMENT
15
![Page 16: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/16.jpg)
INITIAL APPROACH SEGMENT
The initial approach segment begins at the initial approach fix (IAF) and ends at the intermediate fix (IF)
In the initial approach, the aircraft has left the en-route structure and is manoeuvring to enter the intermediate approach segment
Aircraft speed and configuration will depend on the distance from the aerodrome, and the descent required
16
![Page 17: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/17.jpg)
MINIMUM OBSTACLE CLEARANCE
The initial approach segment provides at least 300 m (1 000 ft) of obstacle clearance in the primary area, reducing laterally to zero at the outer edge of the secondary area
17
![Page 18: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/18.jpg)
PRIMARY AND SECONDARY AREA18
![Page 19: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/19.jpg)
TYPES OF MANOEUVRES
Where no suitable IAF or IF is available to construct the instrument procedure, a reversal procedure, racetrack or holding pattern is required.
19
![Page 20: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/20.jpg)
REVERSAL PROCEDURE
The reversal procedure may be in the form of a procedure or base turn. Entry is restricted to a specific direction or sector.
In these cases, a specific pattern — normally a base turn or procedure turn — is prescribed
20
![Page 21: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/21.jpg)
21
![Page 22: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/22.jpg)
RACETRACK PROCEDURE
A racetrack procedure consists of:– A turn from the inbound track through 180° from
overhead the facility or fix on to the outbound track, for 1, 2 or 3 minutes; followed by a 180° turn in the same direction to return to the inbound track
22
![Page 23: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/23.jpg)
FLIGHT PROCEDURES FOR RACETRACK AND REVERSAL PROCEDURES
EntrySpeed restrictionsBank angleDescentWind effectDescent ratesShuttleDead reckoning (DR) segment
23
![Page 24: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/24.jpg)
SHUTTLE24
![Page 25: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/25.jpg)
DEAD RECKONING (DR) SEGMENT25
![Page 26: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/26.jpg)
SPEED RESTRICTIONS26
![Page 27: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/27.jpg)
27
![Page 28: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/28.jpg)
INTERMEDIATE APPROACH SEGMENT
28
![Page 29: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/29.jpg)
PURPOSE
This is the segment during which the aircraft speed and configuration should be adjusted to prepare the aircraft for final approach
For this reason, the descent gradient is kept as shallow as possible.
29
![Page 30: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/30.jpg)
MINIMUM OBSTACLE CLEARANCE
During the intermediate approach, the obstacle clearance requirement reduces from 300 m (984 ft) to 150 m (492 ft) in the primary area, reducing laterally to zero at the outer edge of the secondary area
30
![Page 31: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/31.jpg)
BEGINNING AND END OF THE SEGMENT
Where a final approach fix (FAF) is available, the intermediate approach segment begins when the aircraft is on the inbound track of the procedure turn, base turn or final inbound leg of the racetrack procedure.
It ends at the FAF or final approach point (FAP), as applicable.
Note: Where no FAF is specified, the inbound track is the final approach segment.
31
![Page 32: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/32.jpg)
32
![Page 33: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/33.jpg)
FINAL APPROACH SEGMENT
33
![Page 34: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/34.jpg)
PURPOSE
This is the segment in which alignment and descent for landing are made.
Final approach may be made to a runway for a straight-in landing, or to an aerodrome for a visual manoeuvre.
34
![Page 35: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/35.jpg)
TYPES OF FINAL APPROACH
The criteria for final approach vary according to the type– Non-precision approach (NPA) with final
approach fix (FAF)– NPA without FAF– Approach with vertical guidance (APV)– Precision approach (PA)
35
![Page 36: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/36.jpg)
36
![Page 37: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/37.jpg)
![Page 38: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/38.jpg)
![Page 39: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/39.jpg)
39
![Page 40: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/40.jpg)
MISSED APPROACH SEGMENT
40
![Page 41: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/41.jpg)
MISSED APPROACH SEGMENT
During the missed approach phase of the instrument approach procedure, the pilot is faced with the demanding task of changing the aircraft configuration, attitude and altitude
For this reason, the design of the missed approach has been kept as simple as possible and consists of three phases– Initial– Intermediate– Final
![Page 42: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/42.jpg)
PURPOSE
Only one missed approach procedure is established for each instrument approach procedure
It is designed to provide protection from obstacles throughout the missed approach manoeuvre
It specifies a point where the missed approach begins, and a point or an altitude/height where it ends
42
![Page 43: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/43.jpg)
The missed approach should be initiated not lower than the decision altitude/height (DA/H) in precision approach procedures, or at a specified point in non-precision approach procedures not lower than the minimum descent altitude/height (MDA/H)
43
![Page 44: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/44.jpg)
It is expected that the pilot will fly the missed approach procedure as published. If a missed approach is initiated before arriving at the missed approach point (MAPt), the pilot will normally proceed to the MAPt (or to the middle marker fix or specified DME distance for precision approach procedures) and then follow the missed approach procedure in order to remain within the protected airspace
44
![Page 45: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/45.jpg)
MISSED APPROACH PHASES45
![Page 46: INSTRUMENT APPROACH PROCEDURE DESIGN](https://reader036.vdocument.in/reader036/viewer/2022081502/551ee7d5497959cf398b4d32/html5/thumbnails/46.jpg)
Missed Approach ends at a point from where– Another approach can be initiated – Join the holding pattern– Join the en-route phase
46