integrated township- atali-dahej-phase-ii
TRANSCRIPT
presented by
Gujarat Industrial Infrastructure Project Development Company Limited
Gujarat Industrial
Development Corporation
Integrated Township at Atali-Dahej Phase II
Investor’s Conclave
6th March 2010
Integrated Township on the
banks of Narmada River
Background
• Gujarat Industrial Infrastructure Project Development Company
Limited (GIIPDCL)
o GIDC have incorporated a Joint Venture Company (JVC) named “Gujarat
Industrial Infrastructure Project Development Company Limited” (GIIPDCL) with
IL&FS Trust Company Limited & IL&FS Infrastructure Development Corporation
Ltd.
o The JVC has been mandated to develop industrial infrastructure projects in
Gujarat on Public Private Partnership Format.
• The Project
o Integrated, self-sufficient township with quality housing, healthy living and state
of art infrastructure is proposed to be developed in a planned manner
o The integrated township of around 1000 ha having following breakup:
· Township at Ekal, Keshrol & Manad – 714 ha
• Atali township Phase II – 294 ha (To be developed in Phase I)
Project Location & Connectivity
Regional Advantages
o 7 notified SEZs within the catchment area, including functional Dahej SEZ of 1,719
ha with processing area of 1698 ha without any provision for housing
o DMIC corridor is passing through Bharuch (Bharuch-Dahej Investment Region and
Vadodara-Ankleshwar Industrial Area are planned for development)
Dahej SEZ
PCPIR
To, Mumbai
Dahej SH - 6
ANKLESHWAR
PANOLI
Panoli SEZ
VilayatSEZs (3)
VAGRA
Jambusar SEZ
Dahej PCPIR
• 7 Notified SEZs
• Project Site
• Important Towns
Jhagadia SEZ
Atali TownshipPhase II (294 Ha)
Dahej SEZFunctional
BHARUCH
Township at Keshrol, Mannad& Eksal (714 ha)
To, Delhi
Atali TownshipPhase I (146 Ha)
DahejIndustrial
Estate
JHAGADIA
Notified SEZs within 25-30 km radius
of Project Sites (Bharuch District)
Location TypeLand
(Ha)
Jambusar Multi-product 3,380
Dahej Multi-product 1,719
Vilayat Hydrocarbon 450
Jhagadia Ceramic & Glass 197
Vilayat Chemicals 160
Panoli Pharmaceuticals 130
VilayatAgro based
(Chemical)118
6154
Dahej Economic Profile
Dahej PCPIR – One of the country’s largest Petrochemical Region
o Dahej Industrial Estate (spread across 4500 ha with large manufacturing units)
o Dahej SEZ (notified and functional multi product SEZ spread over 1719 ha).
Dahej SEZ, a multiproduct SEZ, is being developed by Dahej SEZ Ltd (DSL), a JV
company of GIDC and ONGC.
o Dahej Industrial Estate – Phase II (spread across 4200 ha is under development)
o Dahej Port (for transportation of solid, liquid and LNG facilities including first
LNG Terminal in the country)
Major Industrial Players
• Reliance (earlier IPCL)
• Gujarat Alkalies & Chemicals Limited (GACL)
• Birla Copper, Petronet LNG , Welspun
• Chemical Port Terminal Company Limited
• BASF
Mega industrial projects in pipeline:
(i) 7 SEZs in Bharuch District
within 25-30 km from Atali
village
(ii) Bharuch-Dahej Investment
Region and Vadodara-
Ankleshwar Industrial Area
under Delhi Mumbai Industrial
Corridor (DMIC)
Area
Site Area is 294 Ha
2
3
4
56
7
8
9
Dahej
1
SH - 6
To Bharuch
Atali Phase I
Township (under development)
Kaladar
a
Koliad
Atali Phase II Township
Site – 292 ha
Phase I
Keshrol, Manad & Eksal
Township Site – 714 ha
Phase II
Dahej Industrial Estate
Dahej II
Project Location
o Project site is strategically located in Vagra Taluka, Dahej
along 4 lane SH-6 in Dahej PCPIR , Bharuch district,
Gujarat
o Offsite trunk infrastructure already in place.
Legend1 PCPIR Area2 Vagra-Vilayat Industrial Estate3 Dahej II4 Dahej Housing (Atali Phase I)5 Eksal, Keshrol & Manad6 Dahej Housing (Atali Phase II)
7 Vagra-Vilayat (Bhersam, Argam, Ankot, Juner)8 Vagra-Vilayat (Bharsum)9 Dahej Extension (Amod Road)
10 Dahej Industrial Estate
Dahej
SEZ
Dahej SEZ 10
Project Location within PCPIR
Site Appreciation
11 KVA Power Transmission Line
Kaladara Village
Pond
Approach road to
Kaladara Village
Site for Atali Phase II
Towards Dahej
Towards Bharuch
Part of Kaladara Village
Narmada River
Scale
o Site Details
• Site Area is 292.93 Ha
• Area under canals – 5.3 Ha
• Developable Area -
o Land Status
• Land acquisition is under
progress
Site Appreciation… Cont’d
Site Features
• 11 KVA Transmission line along the SH-6
• Gas pipeline passing through the site
• ONGC pipeline passing through the site
• Water supply line along SH-6 (8 MGD-additional 17 MGD pipeline is along the other side of SH-6)
• Narmada Canal passing through the site(
TowardsDahej Industrial
Estate
Towards Bharuch
Narmada Canal
Atali
Kaladara
Narmada Canal
Not to Scale
Water supply Line
North
Electricity Line
Housing Need in the Region
Only Industrial township project within PCPIR to be developed on PPP format.
o Considering a catchment area of 20-25 km(4 notified SEZs, PCPIR region and Dahej
Industrial Estate including functional SEZ in Dahej), there is a dire need of housing in
Dahej due to following reasons
o Large no of Employees working in Industries within Dahej PCPIR commute from
nearby urban areas like Bharuch (42 km), Ankleshwar (56 km) and Vadodara (111
km)
The proposed Atali Township will substantially reduce their commuting time.
o Initially township of 293 ha has been earmarked at Atali and Kaladara villages for
residential and other supporting facilities to fulfill the housing requirement of the entire
PCPIR region of 453 sq km.
o As per PCPIR Master Plan, the total investments worth Rs. 50,000 crores are expected to
generate employment of around 8 lakh people and housing demand of 1 lakh Dwelling
Units.
This township is proposed to accommodate around 15000 Dwelling Units
Housing Demand & Typology - 2021
Source: Demand study conducted by Jones Lang LaSalle Meghraj
o Total housing demand of around 25000 Dwelling housing units in base case scenario and
39000 DU’s in optimistic scenario. This demand has been estimated based on primary
market survey, stakeholder consultations, and industry assessment, analysis of
employment pattern in existing and upcoming industries within PCPIR region. However
The proposed Township (293 ha) shall accommodate around 15000 Dwelling Units
This demand does not include the current demand of Atali Township Phase I (146 ha)
o This demand is spread across various housing typology : 4 BHK Bungalows, 3 BHK
Bungalows, 3 BHK Row Houses, 2 BHK Apartments, 1 BHK Apartments, Economic Housing
(hostel/dormitory / 1 RK apartment/ Studio Apartment)
Project Components
Integrated, self-sufficient township for more
than 15,000 households in a planned manner
Residential : Housing for all income category
o Bungalows to EWS housing (HIG, MIG,
LIG & EWS)
Commercial: Markets, offices, shopping
centres, hotel & restaurants
Social Infrastructure : Education & health
facilities and other public utilities
Recreation : leisure & entertainment
facilities, parks/gardens/open-spaces,
landscaped areas
Support Infrastructure : Efficient transport
system, road network, quality water supply,
sewerage & drainage facilities, security etc.
Integrated Township on the banks of Narmada River
Self-sufficient Township with quality housing, healthy living and world class infrastructure
• Energy efficient building – green architecture
• Encourage use of green architecture in building
design for important buildings.
• Eco-friendly transport System
• Central Green Space and continuous green belt
along major transport corridor (Cycle Track &
Jogging Track)
• Encourage Pedestrian Movement
• Eco friendly public transport
• Zero Waster Disposal
• Sustainable treatment of solid wastes
• Use of recycled water for gardening (non-potable
water)
• Community based Neighborhood Planning
• Social Amenities and public places within walking
distance
Project USP – Eco City
Central Green Park
Cycle Track / Jogging Track
Green City Model
Central
township
Open
Space
Public
utilities
Spine
Roads
Sector
Sector
Sector
Sector
Sector
Sector
Transport Hierarchy & Sector Planning
Sector
Sector
Sector Sector
Sector
Sector
Central
township
Open
Space
Central
Business
District
Public
utilities
Spine
Roads
Sector
Roads
Concept Development Eco City – Concept Development
Green Connectivity
Planning considerationsCONTOURS
WIND
Regional Connectivity
Kaladara
Village
Proposed Coastal Road to Dahej Port
Proposed link road
to Coastal Road to
Dahej Road
Narmada River
4 Lane SH – 6
Bharuch to
Dahej
T0 Dahej Port
GRID T0 Dahej
T0 Bharuch
Conceptual Master Plan - Layout
Legend
Conceptual Master Plan – Area Statement
S.No. Particulars Area (Ha) % of area
1 Total Land Area 293 100
2 Under Narmada Canal 5.4 2
3 Total Developable Area 287.6 98
S.No. Particulars Area (Ha)% of
area
1 Area Under Sectors 222 77
2 Central Business District 6.0 2
3Roads
(Arterial & Sub-arterial)19.5 7
4 Social Infrastructure 20.8 7
5
Physical Infrastructure
(STP, WTP, Crematorium, Solid
Waste Dumping Yard)
4.5 2
6 Open Space/Parks & Gardens 14.0 5
6.1 Public Green 4.0
6.2 Golf course ( Driving Range) 10.0
Total Area 287.6 100
SectorsArea
(Ha)
% of
area
Sector 1 40 18
Sector 2 40 18
Sector 3
(Reserved for
future
development
22 9
Sector 4 40 18
Sector 5 40 18
Sector 6 40 18
Total 222 100
Sector Level Standard Landuse Pattern
Landuse Category % of total area
Residential * 60
Commercial 2 – 3
Public and Semi-Public 6 – 8
Recreational 12 – 14
Roads 10 –12
Open areas/parks/gardens/Water bodies Balance
Total 100
* As per Regulation for Residential Township 2009 – Gujarat Government Notification (Department of Urban Development & Urban Housing, GoG)
Source – Urban Development Plans Formulation and Implementation Guidelines (UDPFI)
Draft Area Statement
S.No. Land Use Land area (Ha) % of total Area Non-Saleable (%)
1 Roads 41.59 14.20 14.20
2 Residential 178.33 60.89
3Commercial, hotel and
retail6.19 2.11
4 Utilities 4.65 1.59 1.59
5 Parks and open spaces 26.00 8.88 5.46
6
Social
Infrastructure/public
and semi public
36.10 12.33 1.81
Total 292.86 100 23.06
City Level Social Infrastructure & Utilities
Components Saleable Non-Saleable
Education
Integrated school without hostel facility 3.50
College 4.00
Technical education centre (ITI/polytechnic) 4.00
School for handicapped 0.50
Health
Intermediate Hospital 3.70
Nursing home, Child & maternity centre 0.60
Parks and Recreation
Major Recreational Club (Outdoor - swimming pool, lawn
tennis, jogging track & indoor sports facilities - table tennis,
badminton court etc including parking)
1.00
Socio-Cultural Centre
(Music, Dance & Drama Centre/Meditation & Spiritual
Centre/Arts & Craft Centre/Auditorium)
0.20
Mini Golf Course (Driving Range) 10.00
City Park 4.00
City Level Social Infrastructure & Utilities – Cont’d
Components Saleable Non-Saleable
Social Amenities
Community centre 1.00
Taxi stand including repair shop etc. 0.10
Police Station 1.50
Fire sub station 0.60
Post Office & telegraph office 0.10
Bus Terminal 0.20
Utilities and Services
Electric sub station (33/66 KV) 0.05
WTP with reservoir 1.50
STP 1.50
Solid waste dumping unit 1.00
Crematorium/burial ground/cemetery 0.50
Total 28.10 10.45
Total Area 38.55 ha
Sector Level Social Infrastructure & Utilities
FacilitiesProposed
(in no.)
Area in
ha (per
unit)
Total Area (Ha) per sector
Saleable Non-Saleable
Pre-primary, nursery school 5 0.40 0.40
Secondary/senior
secondary School1 0.60 1.60
Shopping cum Service
Centres (milk booth and
other venders etc.)
1 0.20 0.20
Dispensary 0 0.50 0.10
Community Hall and library 1 0.20 0.20
Parks, open space and tot-
lots4 0.60 2.00
Electric sub station 1 0.00 0.05
Over Head Tank 1 0.00 0.05
Religious place 1 0.10 0.10
Total 2.20 2.5
Total Area 4.7 ha per sector
Physical Infrastructure Assessment
Physical infrastructure
assessmentUnits
Water Demand
Potable Water supply (MLD) 13.1 MLD
Non- potable Water supply (MLD) 3.4 MLD
Total 16.5 MLD
Sewerage Generation
Sewage (MLD) 13.2 MLD
Power Demand (KVA) 7855
S.No. Assumptions for provision of Infrastructure
I Population to be Served
A Township Level 75,000
B Sector Level 15,000
II Density (Person Per Ha)*
A Township Level 255
B Sector Level 375
* Assuming Household size of 5
Bidding ProcessEvent Description Estimated Date
QUALIFICATION STAGE
Issue of RFQ document D
Last date for receiving queries D+15 days
Project Briefing Meeting(Developers’ Conclave)* D+15 days
Authority response to queries latest by D+20 days
Application Due Date D+30 days
Due date for opening of RFQs D+35 days
Announcement of short-listed Bidders D+45 days
BID STAGE
Sale of Bid Documents To be specified in RFP document
Last date for receiving queries
Pre-Bid meeting – 1
Authority response to queries latest by
Pre-Bid meeting – 2
Bid Due Date(s)
Opening of Bids
Letter of Award (LOA)
Validity of Bids
Signing of Lease Agreement
Sr.
No.
Project
Category
Minimum Development Obligations Minimum Technical
Experience
1. Residential
Sectors
Residential units and other incidental
facilities (commercial, social, recreational)
and supporting (internal) infrastructure
within each Residential Sector
Developed real estate projects
of at least 1 million sq.ft. in a
maximum of 5 projects during
last 5 years
OR
Completed development of at
least one Special Area Project
of at least 50 acres during last
5 years
2 Central
Business
District/ City
Centre
Markets, offices, shopping centers/Malls,
hotels & restaurants, Multiplexes,
Education, Health and other supporting
facilities and supporting (internal)
infrastructure within CBD/City Centre
3 Trunk
Infrastructure
Trunk water supply network & water
treatment plant, sewerage system
(including Sewerage Treatment Plant &
Pumping stations), road network, Storm
water drainage system, Solid waste
management & utilities
Implemented
Civil/infrastructure projects
worth at least Rs. 1500 million
during last 5 years
Project Categories & Qualifications
Role of Stakeholders
S.No. Stakeholder Role
I Gujarat
Industrial
Development
Corporation
• Provide Land free of all encumbrances on lease
• Facilitate provision of water supply, power supply upto the township
• Approve layout plans & monitor/ regulate enforcement of GDCR
• Facilitate government approvals
• Act as a nodal agency to resolve disputes among developers
II Developers • Payment of land premium, lease rental as per GIDC land allocation
policy
• Development (planning, detailed engineering & designing, financing,
construction, marketing & O&M) of the proposed project categories
• Development of internal infrastructure under each project categories for
respective sectors/ city centre(physical infrastructure, sector/internal
roads/public amenities, social infrastructure, parks & open spaces etc.)
• Comply to statutory /regulatory requirements
III GIIPDCL • Project Development & Transaction Advisory for the project
• Relevant project studies
• Project Structuring & financial Modeling
• Bid process management & Selection of developers
Thank You