integrating construction, demolition, and recycling by: brooke morgan at this time in northwest...

22
Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being dumped in the Tontitown landfill. These resources take up finite landfill space and are being kept out of the economic loop. The closed portion of the Tontitown landfill is over sixty acres in diameter and roughly eleven stories tall. The Tontitown landfill contains both class 1 and class 4 waste streams.

Upload: brett-brede

Post on 15-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

Integrating Construction, Demolition, and Recycling

By: Brooke Morgan

At this time in Northwest Arkansas, thousands of tons of valuable resources are being dumped in the Tontitown landfill. These resources take up finite landfill space and are being kept out of the

economic loop. The closed portion of the Tontitown landfill is over sixty acres in diameter and roughly eleven stories tall. The Tontitown landfill contains both class 1 and class 4 waste

streams.

Page 2: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

Defintion of Class 1 Landfill

● More commonly known as trash or household garbage, MSW (Municipal Solid Waste) consists of the non-hazardous waste we use every day. A Class 1 landfill is where the items we throw away is buried after being picked up by garbage trucks. Product packaging, plastic bottles, food scraps and newspaper from our homes, schools and businesses are dumped in Class 1 category landfills. *

Page 3: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

Definition of Class 4 Landfill

● A Class 4 landfill area will contain waste building materials, deredging materials, tree stumps, and rubble resulting from construction, remodeling, renovation, repair, and demolition of homes, businesses and other commercial buildings, structures and pavements. Some of these materials may contain lead, asbestos, or other hazardous materials.

Page 4: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

Class 4 Waste (Continued)●Even if people take into consideration that what we use in our houses goes to the landfill, we may

not necessarily think of how much waste is accumulated in the building of our homes.●C&D debris consists of materials such as

concrete, wood, asphalt, gypsum, metals, bricks, glass, and plastics; along with salvaged

components such as windows, doors, and plumbing fixtures.

●Most C&D waste ends up in a landfill. Only approximately 10% is recovered for other usage.

Page 5: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

MSW Generation**

Page 6: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

This is a closed portion of the Class 1 area in the Tontiown landfill.

Page 7: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

This is the Class 4 landfill area. This is separate from municipal solid waste (MSW); however, it is still a huge concern.

Page 8: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

This Is Our Class 4 Landfill

While visiting the Tontitown landfill, within thirty minutes five garbage trucks unloaded between six and fifteen tons of waste each. This process continues from sunup to sundown.

Page 9: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

C&D Pie Chart**

Few of these resources are recycled; 90% are sent to landfills.

Page 10: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

How Big a Piece of the Waste Stream Pie is Construction and Demolition?**

As is evident from the pie chart, construction and demolition trash accounts for approximately 17% of landfill waste.

Page 11: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

Waste Facts

● The Tontitown landfill is the only landfill in Northwest Arkansas.

● The Tontitown community receives $1.50 for every ton of garbage interred in the landfill.

● Up to 33 million tons of waste have been saved from landfills and incinerators across America from 1990 to 2000.

Page 12: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

Construction and Demolition and the Waste It Creates

● For my service learning project, I learned about the different stages of residential construction. The following slides present the different phases of construction and the waste produced by each stage.

Page 13: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

● Framing the house takes about two weeks, weather permitting. Debris and wood scraps of all shapes and sizes are discarded. Some wood scraps are

treated though most are not. Small wood scraps could be turned into pellets for wood-burning stoves.

First Phase of Construction

Page 14: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

Second Phase of Construction

● Mechanics take about 2-3 weeks. This is when the plumbing, heat and air get put in, as well as the electrical. At the same time, the brick, siding and roof are being installed. Debris from this phase include cardboard, PVC, copper, other types of metal , excess wiring, and plastic wrappings that packaged the fixtures.

Page 15: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

Third Phase of Construction

●Dry-in takes 4-5 days. During this phase, the roof gets tar-papered and shingled. Accumulated debris includes asphalt shingles and tar-paper.

Page 16: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

Fourth Phase of Construction

● Roughing-In – Involves the installation of sheet rock and insulation. This phase lasts 2-3 days.

● Leftover sheet rock and insulation scraps account for debris amassed during the Roughing-In stage.

Page 17: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

Final Phase of Construction

● “Finishing Out” - During this phase, enough debris is accumulated to fill a two-car garage.

● From this phase of construction, materials such as cardboard, shrink-wrap, and Styrofoam from all of the electrical fixtures and appliances account for the collected waste.

Page 18: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

Challenges of Removing Construction Debris from the Job Site

● The space on site;● The space in the street;● The weather;● The scheduling of different subcontractors;● Having a reliable mobile unit to remove the

debris in a timely manner.

Page 19: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

Solutions for Removing Construction Debris from a Job Site

● An independent firm with flexible laborers, able to remove construction waste at any given time.

● Senior citizens who are able to pick up, and subsequently utilize, lumber scraps, et cetera for projects.

● Have Eagle Scouts earning badges to participate in a construction site clean up project.

● An on-site mulcher owned by the primary contractor to mulch leftover wood debris.

Page 20: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

Conclusion●Many people think about Class 1 waste, the waste that results from daily living. However, few people outside builders and contractors think about all of the Class 4 waste, which is waste generated during the construction, renovation or demolition of a home or business.

●Class 4 waste has value that isn't being realized. By landfilling this waste we are keeping valuable resources out of the economic loop.

●There is an entrepreneurial opportunity for someone who is able to figure out how to remove items from the construction site and be able to place the assets in an appropriate market place.

Page 21: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

Special Thanks

● Louise Mann● Mikel Lolley● Gavin Edwards● John Frank

Page 22: Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being

Sources

● United States Environmental Protection Agency website for facts and defintions (epa.gov)

● Louise Mann● Gavin Edwards● **Google Images for charts