01-24-2012 EXHIBIT D TRANSPORTATION AND EXCHANGE INTERCONNECT PROJECT PROCEDURE for DESIGN, INSTALLATION, RECORDS AND GAS QUALITY REQUIREMENTS Revision 13

Upload: beatriz-adams-garcia

Post on 28-Apr-2015

183 views

Category:

Documents


12 download

DESCRIPTION

how to Interconnection design gas pipelines

TRANSCRIPT

Page 1: Interconnection design gas pipelines

01-24-2012

EXHIBIT D

TRANSPORTATION AND EXCHANGE

INTERCONNECT PROJECT

PROCEDURE

for

DESIGN, INSTALLATION, RECORDS

AND GAS QUALITY REQUIREMENTS

Revision 13

Page 2: Interconnection design gas pipelines

TABLE OF CONTENTS

Design, Installation, Records, and Gas Quality Requirements

CODE REQUIREMENT 1

1. METER TUBE REQUIREMENTS 1

2. OVERPRESSURE PROTECTION AND FLOW CONTROL REQUIREMENTS 3

3. ELECTRONIC GAS MEASUREMENT REQUIREMENTS 3

4. DATA COMMUNICATIONS EQUIPMENT 4

5. GAS SAMPLING 5

6. GAS QUALITY 5

7. MATERIALS FOR GAS PIPING 6

8. CATHODIC PROTECTION 9

9. CONTRACTORS/MANUFACTURERS 9

10. FABRICATION 9

11. DRAWINGS AND RECORDS 9

12. EXISTING EQUIPMENT & EXISTING METER STATION EXPANSION/ UPGRADE 10

13. INSTALLATION REQUIREMENTS 10

14. INSPECTION 12

15. HYDROSTATIC/PNEUMATIC TESTING 12

16. WELDING 12

17. RADIOGRAPHY 14

18. CLEANING AND PAINTING 15

19. FACILITIES COMMISSIONING GENERAL OVERVIEW 15

20. MAINTENANCE AND SECURITY 18

Page 3: Interconnection design gas pipelines

ATTACHMENTS

ATTACHMENT A - Company and US DOT Documentation Requirements 19

ATTACHMENT B - Typical Interconnect and Meter Standard Drawings 20

ATTACHMENT C - Approved Manufactures 24

ATTACHMENT D - Approved Meter Fabricators 43

Page 4: Interconnection design gas pipelines

- 1 -

DESIGN, INSTALLATION, RECORDS,

AND GAS QUALITY REQUIREMENTS

CODE REQUIREMENT

The Connecting Party’s meter station and associated piping will comply with all requirements

for materials, design, fabrication, welding, testing and installation, as stated in Part 192, Title

49 of the U. S. Department of Transportation (DOT) Code of Federal Regulations,

“Transportation of Natural and Other Gas by Pipelines: Minimum Federal Safety Standards”

and ANSI/ASME Code for Pressure Containing Piping, B31.8 (latest edition) Gas

Transmission and Distribution Piping Systems.

I. METER TUBE REQUIREMENTS

1.1 Meter Tube – The meter tube will meet or exceed Spectra Energy and/or its

subsidiaries (“Company”) specifications and will be designed in accordance

with the latest edition of AGA/ANSI B109 specifications per type of meter

station constructed. The meter station will additionally be designed per

Company specifications DS-MR1.6 and ES-PQ1.1. Company will determine the

type and design of the measurement facility required. Meter tubes will be

furnished by the meter fitting vendor or will be fabricated by a shop approved by

both the fitting vendor and Company. If fabricated by an approved shop, the

welding procedure and welder test report will be provided to Company for

Company’s approval prior to fabrication. The meter tube must be inspected by

a Company representative at the meter tube fabricator’s shop location.

1.2. Meter Fittings - Meter fittings will comply with AGA reports in conjunction

with the corresponding ANSI 2530-92 / API 14.3 / GPA 8185-92 reports.

A. Orifice Meter: AGA Report #3 (current edition) and Company Standard

Drawing SP-5000

B. Turbine Meter: AGA Report #7 (current edition)

C. Displacement Meter: ANSI B109 (current edition)

D. Ultrasonic Meter: AGA Report #9 (current edition) and Company Standard

Drawing SP-5011

1.3 Inspection – A Company representative must verify the meter tube

measurements prior to installation on meter skid. Connecting Party will notify

Company fifteen (15) business days prior to meter micing, ultrasonic meter

calibration, testing or inspection. Company must inspect the measurement

facilities, including witnessing the “micing” of the meter tube, at the vendor’s

fabrication yard, prior to shipment. If the inspection is performed after the

measurement facilities have been shipped to the meter site, the Connecting Party

will provide all necessary manpower and equipment to disassemble the tube for

Page 5: Interconnection design gas pipelines

- 2 -

inspection by Company. If meter tube(s) fail to meet the AGA or ANSI B109

requirements, Connecting Party is responsible for correcting the discrepancies

including shipment to repair facilities and return to the meter site.

1.4 Ultrasonic Meter Calibration – Prior to shipment for calibration, the meter tube

will inspected by a Company representative. Each ultrasonic meter will be

calibrated per Company standards, and such calibration will be witnessed by a

Company representative. The entire assembly, per Company Standard Drawing

SP-5011 including all spool pieces, inspection tees and any other piping that

constitutes the “meter tube,” will be calibrated together as one unit. The tube

will not be taken apart once the calibration has been completed. All thermo

wells and test wells will be installed prior to calibration.

1.5 Orifice Meter Runs - Single meter runs will be equipped with dual chamber

(senior type) orifice fittings. The orifice meter fitting will be a Daniel Senior or

a TMCO Sure Shot/Dual Chamber – three (3) piece assembly per Company

Standard Drawing SP-5000.

1.6 Flow Conditioner – A Daniel Profiler or CPA-50E 304 stainless steel flow

conditioner will be installed on all meter tubes as specified by Company.

1.7 Pipe Couplings - Couplings are not permitted.

1.8 Name Plate - Manufacturer’s nameplate will be securely attached to the meter

tube. Nameplate data will include design pressure, test pressure, purchaser’s

drawing number, manufacturer’s name, and date of purchase.

1.9 Pipe - Seamless steel pipe and ERW pipe are acceptable.

1.10 Taps - A total of six taps will be installed on the meter run – two taps upstream

and four taps downstream. Reference Company Standard Drawing SP-5000 for

orifice meters or SP-5011 for ultrasonic meters for size, location, placement and

orientation of the taps. Additional taps may be required for gas sampling, flow

control or pressure control based upon proposed gas volumes or operating

conditions as determined by Company and specified on Company’s Standard

drawings.

1.11 Closures - Yale head end closures will be installed to provide a means for open-

ended inspection of the meter tube without disassembly.

1.12 Transmitters - All electronic transmitters for gas measurement will be installed

as close to the meter as possible and at an elevation to avoid interference from

liquids per AGA-3 / ANSI – API 2530.

1.13 Bypass - No bypass is allowed around the meter run.

Page 6: Interconnection design gas pipelines

- 3 -

II. OVERPRESSURE PROTECTION & FLOW CONTROL REQUIREMENTS

2.1 Over pressure protection (OPP) and flow control requirements are based on

approved maximum gas flows at the meter station. Any increase in maximum

flow will require Company’s review and approval and may require upgraded or

additional equipment, as specified by Company.

2.2 All Meter Stations – An OPP device - relief valve, pressure monitor control

valve, etc. – is required at all meter stations. The type of OPP device will be

determined by Company.

2.3 Relief Valve Requirements - The manufacturer, type and size of the relief valve

to be installed will be approved by the Company. The relief valve will be

installed on the upstream side of the meter station. The capacity of the relief

valve will ensure the gas pressure will not exceed the meter station maximum

allowable operating pressure (MAOP) or Company’s pipeline MAOP or

Deferred Maximum Operating Pressure (DMOP), as applicable, plus four

percent (MAOP * 104% or DMOP * 104%). The diameter of the relief valve

riser piping will be a minimum of one inch larger than the size of the relief

valve. Reference Attachment C - Drawing HT-SC-1001.

2.4 Connecting Party Relief Valve – If approved by Company, Connecting Party’s

existing relief valve or monitor regulator may be used as overpressure protection

if the Connecting Party’s facilities have an MAOP that is less than or equal to

Company’s pipeline MAOP.

2.5 Positive Shut-in Valve – A solenoid operated On/Off Valve will be installed if

the approved maximum gas flow allowed is greater than or equal to 5.0 million

standard cubic feet per day (MMscf/d) and less than 25.0 MMscf/d.

2.6 Control Valve - A flow control (throttling) valve will be installed if the

maximum gas flow allowed is greater than or equal to 25 MMscf/d or as

otherwise determined by Company based upon gas quality or operating

conditions. Control valves will include a 3-valve manifold with bypass.

2.7 Multiple Control Valves (Worker & Pressure Monitor) – Two control valves

may be installed in series instead of an atmospheric relief valve dependent upon

gas flow parameters and Company approval. Standard drawings of the Meter

Station facilities are included in Attachment C of this Guideline for reference.

III ELECTRONIC GAS MEASUREMENT REQUIREMENTS

3.1 Electronic Gas Measurement (EGM) equipment and facilities are required for all

meter stations. Company will install EGM facilities at the meter station.

Page 7: Interconnection design gas pipelines

- 4 -

3.2 The EGM facilities at all new or upgraded meter stations will include a

Company approved remote terminal unit (RTU). Company will determine the

type of RTU based upon specific meter station requirements.

3.3 EGM Equipment - The following EGM Equipment will be ordered by Company:

A. EGM building(s), consisting of

i) RTU

ii) Battery charger or solar panels as determined by Company

iii) Battery box

iv) Communication equipment

v) Junction box, if required

vi) Gas sampling and quality monitoring equipment, as specified by

Company

B. All transmitter equipment for Company use will be specified by Company.

i) Transmitters used for custody transfer measurement will be multivariable

transmitters.

ii) Transmitters used for process control may be single variable transmitters.

3.4 EGM Equipment Placement - Company operations field representative or

Company’s on-site inspector will coordinate the placement of the EGM

equipment with Connecting Party.

3.5 Electronic Data Communications - Company will determine the type of EGM

communication media required for the meter station. Equipment type will be

based on the location, elevation and RTU required at the meter station site.

Radio communications are preferred and may require a radio tower at the meter

station. Alternate communication methods include satellite, cellular, TELCO

dial up telephone and leased circuit.

IV. DATA COMMUNICATIONS EQUIPMENT

4.1 Radio Communications - Approved radio communications equipment will be

installed by Company or Company-approved contractor including installation of

the foundation and any required radio towers.

4.2 Satellite Communications – Satellite equipment will be installed by Company or

Company-approved contractor.

Page 8: Interconnection design gas pipelines

- 5 -

4.3 TELCO Data Circuit (Lease Line) - Connecting Party will install utilities

required to provide telephone service to the meter station if required.

V. GAS SAMPLING

A gas analysis is required for all receipt connections to verify that the gas complies with

Company’s FERC gas tariff. Requirements for gas sampling equipment are determined

by Company and based on gas quality and approved maximum gas flows through the

meter station. Any change in gas flow may require additional or upgraded equipment,

as determined by Company. Gas sampling and equipment requirements are based upon

the following flow rates:

5.1 Initial Gas Sample -- Prior to first flow through the meter station, Connecting

Party must demonstrate the ability to comply with Company gas quality

standards.

5.2 Spot Sampler - Spot gas samples will be manually collected if the approved

maximum gas flow is less than or equal to 5 MMscf/d, unless otherwise

specified by Company.

5.3 Continuous Sampler - A continuous gas sampler is required if the approved

maximum gas flow is greater than or equal to 5 MMscf/d and less than 15

MMscf/d or if the gas source is from multiple wells, unless otherwise specified

by Company.

5.4 Gas Chromatograph - A gas chromatograph is required if the approved

maximum gas flow is greater than or equal to 15 MMscf/d. (Exception: All

receipt interconnects on the ETNG system will require chromatograph sampling

regardless of volumes).

VI. GAS QUALITY

6.1 Gas quality monitoring equipment requirements will be determined by Company

and are based upon actual gas quality and approved maximum gas flow through

the meter station. Any change in proposed gas flow or quality may require

additional or upgraded equipment, as specified by Company.

A. Moisture Analyzer – The need for a moisture analyzer is to be determined by

Company on a case by case basis. Additional water vapor content-

monitoring equipment may be required based on the results of the gas

quality sample and actual quality and quantity of gas received.

B. Additional Analyzers – Any additional requirements to maintain gas quality

will be determined on a case by case basis by Company.

6.2 Meter Station Shut-In - Company will shut in the meter station if the gas quality

fails to meet Company’s gas quality standards.

Page 9: Interconnection design gas pipelines

- 6 -

VII. MATERIALS FOR GAS PIPING

7.1 Valves

A. All valves will be of forged steel construction and meet API 6D

requirements. Malleable iron or cast iron valves are not acceptable.

B. Ball valves will be of ¼-turn valve design.

C. Meter tube isolation valves must be full-open ball or gate valves.

D. The minimum valve design rating is ANSI 600.

E. All valves will meet ANSI Specification ANSI B16.5 for steel pipe flanges,

flanged valves and fittings.

F. All ¼-inch, ½-inch, ¾-inch and 1-inch valves will be rated for a minimum

3,000 psig working pressure.

G. Screwed-body valves are not acceptable.

7.2 Control Valves (if applicable) - The capacity of control valves will be verified

and approved by Company prior to Connecting Party’s procurement of the

valve.

7.3 Instrumentation Gas Supply System (if applicable) - A Company approved

instrument gas supply (IGS) system is required for each flow-controlled or

pressure-controlled device. A Welker DA-1 IGS is acceptable and should

include the following features:

A. Parallel Fisher 1301F regulators with spring range of 50-150 psig

(Primary regulator set at 105 psig; secondary regulator set at 100 psig

B. Pressure gauge, 0-300 psig operating range

C. Relief valve set at 125 psig

D. Two (2) Welker-style F-5 filter dryers

7.4 Fittings

A. All fittings will be of forged steel construction. Malleable iron or cast iron

fittings are not acceptable.

B. All fittings will meet the following guidelines:

Page 10: Interconnection design gas pipelines

- 7 -

i) ANSI B16.9 – Manufacturing Standard for Grade B fittings. Factory-

made, wrought-steel, butt-welded fittings, design and dimensional

requirements for all fittings.

ii) MSS-SP-75 – Manufacturing Standard for High Yield fittings.

Dimensional requirements for fittings < 16” use ASME B16.9.

iii) ANSI B16.11 – Manufacturing Standard for forged-steel, socket-welded

and threaded fittings.

iv) ASTM A234 – Material Standard for Grade B fittings.

v) ASTM A694 – Material Standard for High Yield fittings.

C. The design pressure rating, wall thickness, and design factor for fittings will

be equal to or greater than that of the pipe.

D. All fittings 2-inch diameter or greater will be butt-welded; all fittings below

2-inch diameter will be socket-welded if installed underground or threaded if

installed aboveground.

7.5 Flanges

A. All flanges shall meet the following standards:

i) ASME B16.5 – Manufacturing Standard for Grade B flanges ≤ 24”

(except 22”).

ii) MSS-SP-44 – Manufacturing Standard for High Yield flanges and

flanges 22” and > 24”. MSS-SP-44 and ASME Section VIII, Appendix

II. Flanges may be proof tested to ASME Section VIII, UG-101 as an

alternate.

iii) ASTM A105 – Material Standard for Grade B flanges.

iv) ASTM A694 – Material Standard for High Yield flanges.

v) ANSI rating of flanges shall meet MAOP requirements.

B. The minimum flange design rating is ANSI 600.

C. All flanges will meet ANSI B16.5 for Pipe Flanges and Flanged fittings.

7.6 Piping

A. All gas piping less than 3-inch nominal pipe diameter will be Schedule 80;

all gas piping 3-inch and greater nominal pipe diameter must be Schedule 40

Page 11: Interconnection design gas pipelines

- 8 -

or better. All gas piping will be either API-5L or seamless, ASTM A106,

Grade B steel pipe.

B. All steel gas piping for meter stations; regulator stations; compressor

stations; or platforms located offshore or in in-land navigable waters,

including pipe riser, will meet a design factor of 0.50. All other pipe will be

designed in accordance with DOT Subpart C – Pipe Design.

C. The inner diameter of pipe utilized as meter tube spool pieces will be within

+/- 1% of the meter inner diameter for orifice and ultrasonic meters.

7.7 Nuts and Bolts

A. All flange bolts will be alloy steel, grade B7, meet ASTM A193 or ANSI

B16.5, IMF-3W coated.

B. All nuts will meet ASTM A194 or ANSI B16.5, grade 2-H, IMF-3W coated.

C. At least three threads will protrude beyond each nut after completion of the

assembly process.

D. All washers (1 per bolt) will be made of hardened steel, meet ASTM-A325,

and IMF-3W coated.

7.8 Gaskets

A. Gaskets will be spiral wound; ANSI 600; 1/8-inch thick; style CGI; inner

ring material: 304 SS; filler material: non-asbestos; outer ring material: CS.

Gaskets cannot protrude into the gas flow.

B. Connecting Party will electrically isolate the Connecting Party’s meter

station piping from the Company’s mainline system. Company will

determine the applicable electrical isolation equipment required.

C. An insulated flange kit will be provided by the Company for flange or

flanges at the change of ownership. Installation will be coordinated by

Company field operations representative or Company’s on-site inspector.

D. Solid-state polarization cell replacement (PCR) must be installed across the

insulating flange and will be 3.7 kA fault current; hazardous rating: Class-1,

Division-2; 304 SS weld tabs; and corrosion inhibitor: Dairyland Model No.

PCR-3.7 KA-WTM, purchased from Dairyland Electrical Industries (P.O.

Box, Stoughton, WI 53589).

Page 12: Interconnection design gas pipelines

- 9 -

VIII. CATHODIC PROTECTION

8.1 Company must approve the applicable cathodic protection measures to be

installed for corrosion control of the meter station underground piping.

8.2 Packaged Zinc Grounding Anode: 1.4-inch x 1.4-inch x 5-feet with 10-feet

minimum of #2 AWG stranded copper HMWPE wire silver soldered to anode,

C/W prepared backfill consisting of 50% Bentonite clay and 50% Gypsum in a

cloth sack. The packaged anode will be purchased from Corrpro Companies,

Inc. (7000B Hollister, Houston TX. 77040).

IX. CONTRACTORS/MANUFACTURERS

The Connecting Party is responsible for selecting the contractor and manufacturer for its

facilities, unless otherwise specified by the Company. Attachment D to this Guideline is

a listing of Company-approved manufacturers for Connecting Party’s use in ordering

materials.

X. FABRICATION

10.1 Piping

A. The gas piping will be fabricated in accordance with the ANSI/ASME Code

for Pressure Containing Piping: B31.8 (latest edition).

B. Piping 2-inch diameter and larger will be butt-welded or flanged.

C. Piping and headers will be constructed so no residual stresses are introduced

by jacking on piping or mechanically forcing piping into alignment for

bolting of flanges or welding. Heating of pipe while under restraint to

achieve alignment or reduce residual stresses is not permitted.

10.2 Weld-o-lets & Thread-o-lets

A. Couplings are not allowed. Only weld-o-lets and/or thread-o-lets will be

utilized.

B. Threads on thread-o-lets will be chased after installation, and threaded plugs

will be installed.

XI. DRAWINGS AND RECORDS

11.1 Reference Drawings- Connecting Party will use the isometric drawings provided

in Attachment C as an example to design and construct proposed meter station.

Page 13: Interconnection design gas pipelines

- 10 -

11.2 Review of Connecting Party Drawings - Prior to the start of fabrication or

construction of the meter station, the Connecting Party will submit all drawings

of the measurement facilities including plot plan, all bill-of-materials, and piping

and instrumentation diagrams (P&ID’s) to Company for approval. The

drawings will indicate the pressure ratings of the facilities and illustrate all

major piping, EGM, measurement equipment and instrumentation. The

approved drawings and bill-of-materials may not be changed without

Company’s prior written approval; Company may withhold such approval at its

sole discretion.

11.3 Equipment Layout - The Connecting Party’s measurement facility equipment

will be laid out according to the Company-approved drawings. Connecting

Party will “build to fit” its connecting piping from the meter station to

Company’s aboveground flanged connection after the Company facilities have

been installed.

11.4 As-Built Drawings - Within sixty (60) days of completion, the Connecting Party

will furnish to Company three (3) sets of all “as-built” drawings, including bill-

of-material, for the meter station. All drawings, including the bill-of-material

and mill test reports, must be sent to the Company Engineering Coordinator.

11.5 Records - DOT Maintenance Records will be provided as specified in the

Reimbursement, Construction, Ownership and Operation Agreement for the

meter station.

XII. EXISTING EQUIPMENT & EXISTING METER STATION EXPANSION/

UPGRADE

Should the Connecting Party utilize equipment or facilities already existing or

previously in gas service, the Connecting Party agrees that any such facilities not

conforming to the standards set forth in this guideline will be upgraded or replaced, as

necessary, and approved by Company prior to flow of gas through the subject facilities.

XIII. INSTALLATION REQUIREMENTS

13.1 Hot Tap Assembly – Company will fabricate and install the hot tap(s) and

associated piping terminating at a flange at the edge of Company ROW.

13.2 Meter Station Site Preparation – Connecting Party is responsible for obtaining

all property rights with ingress and egress assignment to Company for the meter

station site. Connecting Party must provide all-weather access as well as power

service and phone service if required. Connecting Party must prepare the meter

station site for the proposed facilities.

13.3 Meter Building - Connecting Party is responsible for installation of the meter

building or canopy, if required, as determined by Company. The building or

Page 14: Interconnection design gas pipelines

- 11 -

canopy type must be appropriate for the region’s weather conditions and

maintenance requirements, as determined by Company.

13.4 EGM

A. Building – Company will fabricate, outfit and install the EGM building. The

EGM building will house the RTU and electrical equipment of the Company

only. The Connecting Party will be responsible for providing a separate

EGM building for its RTU and associated equipment.

B. Site Preparation – Connecting Party will be responsible for site preparation

and installation of the EGM building foundation, unless specified otherwise

by Company.

C. Transportation – Company is responsible for the transportation of the EGM

building to the meter station site.

D. Conduit - Connecting Party will be responsible for the installation of all

conduits for power, communications and EGM equipment unless specified

otherwise by Company. All below ground conduits shall be PVC – coated

rigid metallic and a minimum of 1” diameter in size. Conduit and fitting

sizes of 1¼” diameter are not permitted. Installations will comply with NEC.

E. Electrical Wiring - Connecting Party will be responsible for the installation

of all wiring for power, communications, and EGM equipment and

grounding system unless specified otherwise by Company. The primary

power grounding system maximum resistance in the USA is three (3) ohms

to true earth ground when measured according to IEEE 81, unless specified

otherwise by Company. Instrument grounding system resistance will not

exceed one (1) ohm to the main ground system, unless specified otherwise

by Company. Installation will comply with NEC. Company operations field

representative will terminate all final connections to Company’s EGM

equipment.

13.5 Isolation Valve - A stand alone and separate isolation valve must be installed,

owned and operated by the Customer for the purpose of purging the Customers

gas system. The isolation valve must be located within 25’ feet of the meter

facility. The meter run isolation valves cannot be used for the purging of the

Customers gas system.

13.6 Separator - Company pipelines operating under an alternative design/waiver at

stress levels above 72% SMYS will require a filter separator to be installed at all

receipt M&R Stations to prevent liquids or contaminates from entering the

pipeline. A Company approved filter separator with a minimum removal

efficiency of 99.5% of liquid and solid particles 1 micron or larger is required.

Prior to specifying which type of separator is required, each location will be

evaluated as to gas quality and contaminates. The Company evaluation will

Page 15: Interconnection design gas pipelines

- 12 -

dictate if a filter/liquid separator is required along with a CO2 analyzer, Moisture

analyzer and or an H2S analyzer.

XIV. INSPECTION

14.1 Company reserves the right to inspect all facilities during installation,

fabrication and/or testing. Prior to start of construction, Company requires two

(2) weeks prior notice to arrange for inspection of the Connecting Party’s

facilities.

14.2 The inspection notifications will be directed to the Company Engineering

Coordinator unless specified otherwise by Company Project Manager.

XV. HYDROSTATIC/PNEUMATIC TESTING

15.1 Pipe Test Section - The gas piping, from the point of interconnection to the

Company facilities, including all piping 40-feet upstream (receipt) or

downstream (delivery) of the measurement facilities, shall be hydrostatically

tested to the lesser of 100% SMYS, 2 x MAOP or 1.5 x ACWP. If the MAOP is

less than 1110 psig, the 2 x MAOP will control. If the MAOP is greater than

1110 psig, the 1.5 x ACWP (for ANSI 600 valves and flanges) will control at

2220 psig. Pneumatic testing shall be 1.5 x MAOP. Pressure testing shall be in

accordance with Company Specification DP-CT1. The maximum design

pressure (-0, +50 psig) of the piping shall be held continuously for eight (8)

hours with no unaccounted for pressure loss for two (2) continuous hours during

the duration of the test. Quarter hour (15 minute) recordings will be made of the

test pressure and ambient and pipe temperatures for the first two hours of the test

and every 30 minutes for the remainder of the test. Dead weights will be used

and dead weight pressures recorded. Dead weights and pressure and

temperature recorders will be certified and calibrated by an AL2A certified

laboratory within six months prior to the date the test is performed.

15.2 Test Records - A copy of the test report log, including copies of the dead weight

and recorder’s calibration certificates, must be sent to the Company Engineering

Coordinator prior to first flow through the interconnect.

XVI. WELDING

16.1 Procedures - All welding of pipe will be performed in accordance with the

established written procedures for the materials being welded. The procedures

for welding of pipe will be qualified under API Std.1104, 20th Edition, October

2005, with Errata\Addendum, July 2007 or ASME BPVC Section IX, 2004

Edition, including addenda through July 1, 2005.

16.2 Welder Qualifications - All welding of pipe will be in accordance with API

Std.1104, 20th Edition, October 2005, with Errata\Addendum, July 2007 (“API

Page 16: Interconnection design gas pipelines

- 13 -

1104”) or ASME BPVC, Section IX, 2004 Edition, including addenda through

July 1, 2005 (“ASME BPVC”).

A. Welding will be performed by welders who were qualified according to a

Company-provided welding procedure or a Company-approved,

Contractor-provided procedure.

B. Welders working on compressor station, meter station or pipeline

components will be qualified by destructive testing. Welder qualification

destructive testing will be in accordance with API 1104.

B. Qualifications of welders for manual welding processes shall be in

accordance with Section 6 of API 1104 or in accordance with ASME

BPVC.

C. Mechanized welding processes shall be in accordance with Section 12 of

API 1104, or as directed by Company Engineer. ASME welder

qualifications shall be in accordance with the requirements of ASME

BPVC Section IX, or as directed by Company Engineer.

D. Qualified welders must maintain copies of the qualified welding

procedures, welder qualification reports, and Operator Qualification

Certifications in their possession for the duration of the project.

E. Qualification records for each welder who has welded on the pipe will be

current within one (1) year for the appropriate scope of work.

16.3 Repairs - All repair-welding will be performed in accordance with an

established written procedure per the latest DOT approved edition of API 1104.

16.4 Replacement - One attempt at repair is permitted on piping after which the

defective weld will be cut out as a cylinder.

16.5 Pipe Preheating - Preheating will be employed to 250°F minimum on all repairs

by welding.

16.6 Inspection - Welding will reflect a workmanlike appearance. It will be visually

inspected for such things as: undercutting; craters; high-low, inadequate or

excessive weld metal in cap; arc burns; cracks; and, when possible, incomplete

fusion or penetration. Arc burns will not be repaired and will be cut out as a

cylinder. Other defects will be repaired or cut out as needed to make the defect

area acceptable to Company’s on-site inspector. All cracked welds will be cut

out as a cylinder.

16.7 Clean Up - After welding of the orifice fitting, all welds inside of the meter tube

piping are to be ground smooth and flush with the wall of the pipe.

Page 17: Interconnection design gas pipelines

- 14 -

XVII. RADIOGRAPHY

17.1 Pipe Test Section - All gas piping welds from 40-feet upstream (receipt) or

downstream (delivery) of the measurement facilities to the connection with

Company will be 100% radiographically examined in the manner prescribed by

the API Std.1104, 20th Edition, October 2005, with Errata\Addendum, July

2007 (“API 1104”).

17.2 Radiographic Examination - Radiographic examination of piping will be

performed in accordance with a qualified written procedure. The procedure will

comply with the referenced standard and will be furnished upon request to the

Company Engineering Coordinator prior to first flow through the meter station.

All radiographs will be made available to the Company on-site inspector or

Company Engineering Coordinator, as determined by Company, for

examination prior to first flow through the meter station.

A. Any X-ray not meeting the referenced standard will be retaken at the

Connecting Party’s expense.

B. Any weld that is repaired or replaced will be re-examined by radiograph in

accordance with the same procedure used to examine the weld initially. Any

repair costs will be the sole responsibility of the Connecting Party.

C. For each rejected weld radiograph, the weld or x-ray number will be written

at the end of each radiograph in white paint stick/pen for easy referencing

and review.

D. All films will be clearly identified by the weld ID number, job number and

number of belts so that the proper weld and any discontinuities in it can be

quickly and accurately located. When radiographing a repaired weld, use

the original weld number and add the letter “R” at the end of the number.

E. When radiographing a cutout weld, add the letter “N” to the original weld

number. If the weld requires replacement again, add “NN” to the original

number. If a replacement weld requires repair, add “NR”.

F. The Connecting Party will provide a cross-reference number sketch showing

assigned numbers to specific welds on the assembly to Company’s

Engineering Coordinator prior to first flow through the interconnect.

G. All nondestructive test personnel examining pipe will be qualified in

accordance with the requirements of SNT-TC-1A for the procedure/method

being used.

Page 18: Interconnection design gas pipelines

- 15 -

H. A copy of the x-ray report, including the qualification records of the

nondestructive test personnel, must be sent to the Company Engineering

Coordinator prior to first flow through the interconnect.

XVIII. CLEANING AND PAINTING

18.1 Sandblasting - All sandblasting will be performed in accordance with NACE /

SPC-6. All surfaces must be sandblasted to a “commercial” finish to remove

corrosion products and loose mill scale. Any residue including oil, grease, wax

and soil, will be washed off, and the surface will be allowed to thoroughly dry.

18.2 Painting - All painting will be performed in accordance with NACE / SPC-6.

The prime coat of paint will be applied to a thickness of two to three (2-3) mils

immediately after sandblasting per the paint manufacturer’s specifications. Two

(2) coats of finish paint will be applied to a thickness of two to four (2-4) mils

per coat and in accordance with the paint manufacturer’s specifications.

XIX. FACILITIES COMMISSIONING GENERAL OVERVIEW

19.1 The Commissioning Procedure for each facility requires a complete repetition of

the Factory Acceptance Testing as well as additional procedures to verify the

proper operation of every device installed within the facility. This includes, but

is not limited to, physically verifying that the equipment is installed on-site

according to the design drawings and identified with proper tagging; physical

damage inspection of all structures and equipment; calibration checks and re-

calibration, if necessary, of all instrumentation; startup of analyzers and systems

required for operating and monitoring the facility; testing of AC and DC power

systems; startup and testing of local and wide-area communications; and

operational verification of all manual and automated valves.

19.2 General Building Inspection and Testing

A. Visually inspect building for any physical damage

B. Verify that all building penetrations are weather tight

C. Connect AC Power to EGM building electrical panel

D. Energize all AC circuit breakers

E. Test all electrical outlets using a multi-meter

F. Verify all building lighting is in working order

G. Verify operation of air conditioning unit

Page 19: Interconnection design gas pipelines

- 16 -

H. Verify operation of heating unit

I. Verify that all required components are installed within building according

to Company specifications and drawings

J. Verify that door locks, and keys operate as required

19.3 EGM Building I/O - All I/O physically located in the EGM building(s) and

connected to the RTU will be tested in conjunction with the RTU. The data will

be manipulated and verified within the RTU. This requires that all power

supplies, backup devices and local building I/O is properly installed and

operational.

19.4 Piping Skid I/O - All I/O relating to the piping skids will be tested back to the

RTU. This will include stroking valves using nitrogen for power gas, setting

pilot regulators, confirming limit switch operation, testing transmitter operation,

setting communications network addresses, testing communications to multi-

variable transmitters and ultrasonic meters, and testing meter data valid and

frequency signals.

19.5 Gas Chromatograph - When applicable, a factory-trained technician will be on-

site to provide initial startup, commissioning and initial calibration of the gas

chromatograph. Prior to energizing the device, the carrier gas and calibration

gas cylinders will be installed and connected to the gas chromatograph. A

thorough inspection will be conducted which will include leak checks of all

fittings and tubing connected to the gas chromatograph, verification that the

proper electrical and communications connections have been made, and

verification that the controller is configured properly for communication to both

the gas chromatograph and the RTU. The trained technician will then follow

standard startup and commissioning procedures as applicable to the gas

chromatograph installed at the site. Prior approval will be required before any

configuration changes and/or adjustments are made to the configuration of the

gas chromatograph. Upon completion of the commissioning of the gas

chromatograph, a copy of the configuration as it exists within the gas

chromatograph and controller will be turned over to the commissioning team.

19.6 Moisture, Hydrogen Sulfide & Total Sulfur Analyzer - When applicable, a

factory trained technician will be on-site to provide initial startup,

commissioning and initial calibration of the moisture and/or H2S analyzer and/or

total sulfer analyzer. Prior to energizing the device(s), a thorough inspection

will be conducted which will include leak checks of all fittings and tubing

connected to the analyzers, verification that the proper I/O connections have

been made, and verification that the analyzers are configured properly for the

application. The trained technician will then follow standard startup and

commissioning procedures as applicable to the analyzers installed at the site.

Page 20: Interconnection design gas pipelines

- 17 -

Prior approval will be required before any configuration changes and/or

adjustments are made to the configuration of the analyzer(s).

19.7 Valve Position Controllers & Operators - When applicable, a factory-trained

technician will be on-site to provide initial startup and commissioning of the

valve position controllers and operators. Prior to energizing the valve position

controllers and operators, a thorough inspection will be conducted which will

include leak checks of all fittings and tubing connected to the valve position

controllers and operators, verification that the proper I/O connections have been

made, and verification that the valve position controllers and operators are

configured properly for the application. The trained technician will then follow

standard startup and commissioning procedures as applicable for the valve

position controllers and operators installed at the site. Prior approval from

Company’s Project Manager will be required before any configuration changes

and/or adjustments are made to the configuration of the valve position

controllers and operators.

19.8 Manually Operated Valves - There may be a variety of types and sizes of

manually operated valves in use at the facility. Proper operation of each of these

valves must be verified prior to placing the facility in service.

19.9 Quarter-Turn Ball Valves - Using the P&ID and valve tagging, verify that all

required quarter-turn ball valves are installed in the proper location and are

configured properly. Each valve should be manually manipulated to the fully

open and fully closed position and verification made that the locking device is

installed and functional on each valve.

19.10 Instrumentation Plug Valves - Using the P&ID and valve tagging, verify that all

required instrumentation plug valves are installed in the proper location and are

configured properly. Each valve should be manually manipulated to the fully

open and fully closed.

19.11 Pipeline Isolation Valves - Using the P&ID and valve tagging, verify that all

required pipeline isolation valves are installed in the proper location and are

configured properly. Each valve should be manually manipulated to the fully

open and fully closed position.

19.12 Grounding Test - The grounding system will comply with the ohms

requirements in section 13.4, paragraph E of this guideline.

19.13 Communication System Checklist

A. Antenna dish is installed on the antenna mast, if applicable

B. Outdoor unit electronics are installed

C. Indoor unit electronics are installed

Page 21: Interconnection design gas pipelines

- 18 -

D. Antenna is positioned to optimize the signal, if applicable

E. Verify communications between the facility and host facility

F. For sites that have alternate means of communications, primary

communications will be disconnected and communications verified with the

backup.

XX. MAINTENANCE AND SECURITY

20.1 Tap Assembly - Company will be responsible for the maintenance and security

of the tap valves and check valves installed within Company pipeline right-of-

way. The tap assembly will be fenced and all gates locked.

20.2 Meter Station - Connecting Party will be responsible for the maintenance and

security at the meter station. The meter station site will be fenced and all gates

locked.

Page 22: Interconnection design gas pipelines

- 19 -

ATTACHMENT A

Company and US DOT Documentation Requirements

I. Documentation – At least five (5) days prior to commencement of gas flow,

Connecting Party will furnish to Company Engineering Coordinator: All

documentation required by Company to ensure compliance with the U.S. DOT

regarding the installation of the meter station equipment and everything within forty

(40) feet of the meter station. Such documentation will include but not limited to the

following:

1.1 Orifice meter tube micrometer reports, filled out by or witnessed by a Company

representative, or ultrasonic meter tube calibration reports, witnessed by a

Company representative

1.2 Hydrostatic/pneumatic testing equipment certification documents; inspection

reports, including test logs; temperature and pressure recorder charts;

deadweight and recorder certifications (current within 6 months); and leaks/

failures noted and their disposition

1.3 Radiographic inspection reports for 100% of the welds made including the

number of girth welds made, the number rejected and the disposition of the

rejects, with a sketch identifying the weld locations; radiographer qualification

records; and radiographic examination procedure qualifications

1.4 Each welding procedure used and results of specific welder qualifying tests

1.5 All drawings, including bill of material, mill test reports for the pipe material,

and P&IDs

1.6 Purchase orders for all materials

1.7 Relief valve sizing and capacity calculation as applicable

1.8 Cathodic protection measures installed

FIRST FLOW WILL NOT OCCUR UNTIL COMPANY HAS RECEIVED,

REVIEWED AND APPROVED, IN WRITING, THE ABOVE DOCUMENTATION.

II. As-Built Drawing - Connecting Party, within sixty (60) days after completion of all of

its activities as herein contemplated, will furnish to Company Engineering Coordinator

as-built information along with daily construction logs and completion reports,

including three (3) sets of all "As-Built" drawings for the M&R.

Page 23: Interconnection design gas pipelines

- 20 -

ATTACHMENT B

Typical Interconnect and Meter Standard Drawings

The attached drawings are provided for reference.

Page 24: Interconnection design gas pipelines
Page 25: Interconnection design gas pipelines
Page 26: Interconnection design gas pipelines

C

8" 8"

OR APPROVED EQUAL

DETAIL 2

ORIFICE

FITTING

DETAIL 1

SP-5000

6"

�" SPACER

FEMALE FLANGE

MALE FLANGE

�" RAISED FACE

�" RECESS

FLOW

THIS DRAWING

THIS DRAWING

SEE DETAIL 18"8"

FLOW

7 5

3

1

1

224

4

6 6

J

11

12

2

8

11

12

2

CONSTANTS

2

3

4

6

8

10

12 114"

38"

57"

76"

95"

9

36"

36"

CLOSURE

UL1 UL2

L

DANIEL DUAL CHAMBER FITTING

1

CLOSURE

A B C

K

WN+RF

3.125"

4.250"

6.375"

6.250"

4.875"

16"

19"

27"

36"

54"

45"

K K6"

A B C

18"

UL1 UL2

FULL SIZE TEE

SIZE

(INCH)

5.250"

9.125"

8.625"

13

SAMPLE

PROBE

PIPE SIZE

2",3",4"

6"

10"

12"

8"

THREADOLET

WELD

THERMOWELL

DIM "U"

2.5"

FULL SIZE

TEE

THERMOWELLS

DIM."U"

J (DANIEL) J (TMCO)L

316"

34" T.O.L.

3.500"

5.500"

L ORIFICE PLATE

CORIFICE PLATE L TO FLG.

34" T.O.L.

DETAIL 2

SEE

CONFIRM ORIENTATION FOR

FABRICATION OR FIELD INSTALL

GAS SAMPLE

PROBE W/FULL

PORTED VALVE

PAINTED YELLOW

AND TAGGED

DETAIL 3

THIS DRAWING

DETAIL 3

SEE

9.5 X D 8.0 x D 4.5 X D

6.938"

6.563"

7.938"

8.813"

5.250"

8.000"

8.625"

6.938"

6.563"

7.938"

8.813"

2

3

3

FLOW

TEMPERATURE TEST

WELL W/ CAP AND

CHAIN

(TEMPERATURE TRANSMITTER CONNECTION

HEAD/RTD/THERMOWELL)

MINIMUM REQUIRED SPOOL LENGTHS

SELECTED AGA VALUESFOR FABRICATION

16"

24"

32"

48"

64"

80"

96"

52"

52"

55"

76"

94"

113"

132"

22"

31"

39"

57"

90"

105"

73"

44"

45"

47"

55"

63"

74"

82"

119.8125"

129.8125"

142.8125"

231.8125"

321.8125"

279.8125"

189.8125"

**

**

**

* * *

316"1

58"(SIZES 2"-8")

258"(SIZES 10"-12")

TEMPERATURE WELL

(CUSTODY TRANSFER)

TEMPERATURE WELL

(CHECK MEASUREMENT)

1" T.O.L.6

1.5"

2.0"

3.0"

4.0"

SP

50

00.

DG

N

DESIGN NOTES:

5. ALL METER TUBES SHALL BE HYDROSTATICALLY TESTED TO 2220 PSIG

(-0,+25 PSIG) FOR 8 CONTINUOUS HOURS.

*

DL

PLAN VIEW

DL

CONFIRM ORIENTATION

FOR FABRICATION OR

FIELD INSTALL

1. METER TUBE SHALL CONFORM TO ALL PROVISIONS OF API 14.3/AGA 3,

AND SHALL BE IN ACCORDANCE WITH THIS STANDARD DRAWING.

2. METER TUBE SHALL BE PURCHASED AS ASSEMBLY, COMPLETE WITH A

HONED TUBE UPSTREAM AND DOWNSTREAM AND A FLOW-CONDITIONING

PLATE UPSTREAM OF THE ORIFICE.

3. METER TUBE SHALL BE FURNISHED WITH CPA50E OR DANIEL PROFILER

FLOW CONDITIONER AS REQUIRED UPSTREAM OF THE ORIFICE.

4. UNLESS OTHERWISE SPECIFIED IN DESIGN INFORMATION SHEET, TWO (2)

PAIRS OF 12" N.P.T. DIFFERENTIAL PRESSURE TAPS SHALL BE

REQUIRED ON THE SENIOR ORIFICE FITTING. ONE (1) PAIR EACH AT THE

3 O’CLOCK AND THE 9 O’CLOCK POSITIONS.

6. INTERNAL PIPE ROUGHNESS OF SPOOLS AND METER TO BE HONED TO 250

MICRO-INCHES OR LESS. THE FLANGE I.D. SHALL BE THE SAME I.D. AS

THAT OF THE PIPE. SPOOL AND METER ID MUST BE WITHIN 1%.

MATERIAL SPECIFICATIONS

5 FLOW CONDITIONER: PLATE-TYPE, 304 S.S., ANSI 600

2 FLANGES: ANSI 600, WNRF, BTM PIPE ID, ANSI B16.5, ASTM A-105

DESCRIPTIONMK#

3 GASKETS: ANSI 600, 18" SPIRAL WOUND, FLEXITALIC & NON-INTRUSIVE INTO

THE FLOW PATH.

4 BOLTS: STUD, ASTM A193, GR. B-7, EACH W/2 HEX. NUTS, ONE WASHER, ASTM

A194, GR.2H. BOLTS SHALL BE IMF-3W (XYLAN) COATED.

8 ORIFICE FITTING:DANIEL DUAL-CHAMBER, ORIFICE FITTING-SENIOR C-STYLE

ANSI 600, WExFE, OR APPROVED EQUAL.

11 TEE: FULL SIZE, ANSI B16.9. MINIMUM GRADE SHALL BE SPECIFIED IN

DESIGN INFORMATION SHEET.

12 CLOSURE: HORIZONTAL, ANSI 600, BTM PIPE ID, YALE FIG. 500 W/HINGE

OR APPROVED EQUAL.

13 SPACER PLATE 12" INCH ASTM A-516-70, CARBON STEEL, SERRATE BOTH FACES

TO MATCH ANSI 600 FLANGE FACINGS. O.D. OF SPACER TO FIT INSIDE FLANGE

BOLTS. I.D. OF SPACER = I.D. OF PIPE.

7 SPACER PLATE: 1" FOR SIZES 2"-8", 2" FOR SIZES 10" AND 12". ASTM A-516-70,

CARBON STEEL, SERRATE BOTH FACES TO MATCH ANSI 600 FLANGE FACINGS. O.D.

OF SPACER TO FIT INSIDE FLANGE BOLTS. I.D. OF SPACER = I.D. OF PIPE.

SPACER PLATE SHALL BE 118" if 2" CPA 50E FLOW CONDITIONER IS USED.

1 PIPE: UNLESS OTHERWISE SPECIFIED IN DESIGN INFORMATION SHEET, USE API-5L

OR ASTM A-106 GR.B. MINIMUM GRADE SHALL BE SPECIFIED IN DESIGN

INFORMATION SHEET.

9 ORIFICE PLATES: 304 S.S., PER API 14.3/AGA 3. PLATE SIZES FROM 0.2 TO 0.6

BETA IN 14" INCREMENTS FOR 2" THROUGH 6" RUNS AND

12" INCREMENTS FOR 8"

THROUGH 12" RUNS.

10 ORIFICE PLATE SEAL: 2" THROUGH 8", REMOVABLE DUAL SEAL; 10" & 12", DUAL

VULCANIZED SEAL.

14

15

16

17 GASKET: ANSI 600, 18" SPIRAL WOUND, NON-INTRUSIVE INTO FLOW PATH.

17

34" T.O.L.

6 14 15 16

6 THREDOLETS: 3000#, ASTM A-105.

18

18

PIPE NIPPLE 34", EH, GR. B, 3" LONG, TBE (SHIP LOOSE).

VALVE 34", BALL, 3000#, THREADED, BOLTED OR WELDED BODY (SHIP LOOSE).

PIPE PLUG 34", 3000#, FS, HEX HEAD, THREADED (SHIP LOOSE).

ID IS GREATER THAN NOMINAL DIA. FOR 6" NOM. STD W.T. PIPING

THEREFORE 1" HAS BEEN ADDED TO CALCULATED SPOOL LENGTH.

FLANGE: ANSI 600, WN FEMALE FACED, BTM PIPE ID, ANSI B16.5, ASTM A-105

ORIFICE METER TUBE

ASSEMBLY - ANSI 600

04-07-10AKL

IG.#

REV.DWG.

STANDARDS

INITIALS DATE

E:\

XM\

Workspace\standards\

Approved

Stds\

SP5000.d

gn

4/9/2010

Dra

wing:

Model:

Default

Ti

me:

twar

was

Userna

me:

DESIGN MANAGER

Page 27: Interconnection design gas pipelines
Page 28: Interconnection design gas pipelines

PRESSURE REGULATING SKID LIMITS

PSIGD

E

SET@150

PSIG

P

SET@125

P

SET@120

PSIG

PSIGA

B

SET@150

PSIG

P

SET@125

P

SET@120

PSIG

S1

INSTRUMENT GAS (S1)

INSTRUMENT GAS (S2)

HEATER

S2

HEATER

C

F

PI

0-1500 PSIG

1"

PI

0-1500 PSIG

1" 1"

V

1"

PI

0-1500 PSIG

34"

34"

34"

34"

PI

0-1500 PSIG

1"

PI

0-1500 PSIG

1" 1"

V

PI

0-1500 PSIG

34"

34"

34"

34"

RUN #1

PM

122BOPP

FCV

122B

PM

122AOPP

FCV

122A

DI

ZSC

122B

DI

ZSO

122B

AO

122B

AI

122B

DI

ZSC

122A

DI

ZSO

122A

AO

AI

1"

PIT

122

0-1500 PSIG

AI

PT

122

INSULATING

FLANGE

INSULATING

FLANGE

VENTVENTVENTVENT

VENTVENT VENTV

UH

34"

V

UH

34"

34"

34"

FR

OM

ME

TE

R

SKI

DS

ZT

122A

FY

122A

ZT FY

S1 S2

B

CE

F

INSULATING

FLANGE

INSULATING

FLANGE

FC

W/PO

W/PO

FC

2D PUP

2D PUP

SSD/PCR

SSD/PCR

SSD/PCR

SSD/PCR

FIL

TE

R

DR

YE

R

DR

YE

R

FIL

TE

R

FIL

TE

R

DR

YE

R

DR

YE

R

FIL

TE

R

PIPING & INSTRUMENTATION DIAGRAM

FOR REGULATOR RUNS

RUN #2

SWI

TC

HI

NG

SKI

D

TO

VA

LV

E

COMPANY/CUSTOMER

DEMARCATION

POINT*

OR

CU

ST

OM

ER

*ONLY IF STATION DOES NOT INCLUDE VALVE SWITCHING SKID.

V

V

IG.# REV.DWG.

INITIALS DATE

$$$$$$$$$$$$$$$$$$$$$$$$$$$

DG

NS

PE

C$$$$$$$$$$$$$$$$

$$$$$

SY

TI

ME$$$$$$

Dra

wing:

Model:

$M

OD

EL

NA

ME$

Ti

me:

$$$$$

US

ER

NA

ME$$$$

Userna

me:

DESIGN MANAGER

5400 Westheimer Ct. Houston, TX 77056-5310 713 / 627-5400

TYPICAL

Page 29: Interconnection design gas pipelines

VENT

VENT

VENT

TO REGULATOR RUNS

FROM FILTER/

SEPARATOR

RUN #3

2D PUP

2D PUP

SSD/PCR

SSD/PCR

SSD/PCRSSD/PCR

SSD/PCR

SSD/PCR

PSIGH

SET@150

PSIG

P

SET@125

P

SET@120

PSIG

S4

INSTRUMENT GAS (S4)

TW

MB

UT

MB

UT

120B

TE

FR

120B

120B 120B

A+ GENIE

PROBE

AW

12"SET @ XX PSIG

(0-60 PSIG)

1"

120B

UT

120C

MB

UT

120C

TE

120C

TW

A+ GENIE

PROBE

AW

12"

120C

1"

SET @ XX PSIG(0-60 PSIG)

E

T

ET

SPACER PLATE

SPACER PLATE

TW

TW

TW

TW

H

H

H 34"

V

UH

S4

UNCORRECTED

FLOW PULSE

DATA VALID

ALARM

DI

PI

FA

FT

120B

120B

A+ GENIE

PROBE

PD

3"

TW

TW

AW

12"

FT

120A

FE

120A

5-VALVE

UT

120A

SET @ XX PSIG(0-60 PSIG)1"

120A

14"

TW

TE

120A

PI

FT

120A

MB

UT

120B

S

STRAINER

PDS

120

PDI

120

5-VALVE

ST

120

DI

XY

120A

RS485 ULTRASONIC

METER FEED

MB

FR

120C

UNCORRECTED

FLOW PULSE

DATA VALID

ALARM

DI

PI

FA

FT

120C

120C

RS485 ULTRASONIC

METER FEED

FIL

TE

R

DR

YE

R

DR

YE

R

FIL

TE

R

FLOW

CONDITIONER

FLOW

CONDITIONER

RSV

120A

RSV

120C

RSV

120B

V

310

V

311

V

312

SPACER PLATE

INSPECTION

PORT

INSULATING

FLANGE

INSULATING

FLANGE

INSULATING

FLANGE

SPACER PLATE

INSPECTION

PORT

INSPECTION

PORT

INSPECTION

PORT

RUN #2

RUN #1

INSULATINGFLANGE

INSULATINGFLANGE

INSULATINGFLANGE

PIPING & INSTRUMENTATION DIAGRAM

FOR METER RUNS

1D PUP

(6" MINIMUM)

1D PUP

(6" MINIMUM)

HE

AT

TR

AC

ED

HE

AT

TR

AC

ED

V

301

2"

1"

2"

SI

PH

ON/

DR

AI

N

AS

SY

RESTRICTING ORIFICE PLATE /

FLOW LIMITING NOZZLE

DI

ZSO

120A

DI

ZSC

120A

DO

120A

DO

120A

EYOEYC

DI

ZSO

DI

ZSC

DO

DO

120B 120B 120B 120B

EYOEYC

DI

ZSO

DI

ZSC

DO

DO

120C 120C 120C 120C

EYOEYC

12"

12"

ETH

ET

120B

ETHERNET ULTRASONIC

METER FEED (TECH)

ETH

ET

120C

ETHERNET ULTRASONIC

METER FEED (TECH)

BYPASS

INDICATOR

E

T

HE

AT

TR

AC

ED

IG.# REV.DWG.

INITIALS DATE

$$$$$$$$$$$$$$$$$$$$$$$$$$$

DG

NS

PE

C$$$$$$$$$$$$$$$$

$$$$$

SY

TI

ME$$$$$$

Dra

wing:

Model:

$M

OD

EL

NA

ME$

Ti

me:

$$$$$

US

ER

NA

ME$$$$

Userna

me:

DESIGN MANAGER

5400 Westheimer Ct. Houston, TX 77056-5310 713 / 627-5400

TYPICAL

Page 30: Interconnection design gas pipelines

PSIGH

SET@150

PSIG

P

SET@125

P

SET@120

PSIG

S4

INSTRUMENT GAS (S4)

FIL

TE

R

DR

YE

R

DR

YE

R

FIL

TE

RDI

ZSO

DI

ZSC

DO

DO

VENT

DI

ZSO

DI

ZSC

DO

DO

VENT

120A 120A 120A 120A

120B 120B 120B 120B

FROM FILTER/

SEPARATOR

EYOEYC

EYOEYC

SSD/PCR

SSD/PCRSSD/PCR

SSD/PCR

TW

UT

MB

UT

120A

TE

120A 120A

A+ GENIE

PROBE

AW

12"SET @ XX PSIG

(0-60 PSIG)

1"

120A

E

T

SPACER PLATE

TW

TW

H

H

FLOW

CONDITIONER

ORIFICE METER

FE-120A

TW

UT

MB

UT

120B

TE

120B 120B

A+ GENIE

PROBE

AW

12"SET @ XX PSIG

(0-60 PSIG)

1"

120B

E

T

TW

TW

FLOW

CONDITIONER

ORIFICE METER

FE-120B

SPACER PLATE

34"

V

UH

S4TO REGULATOR RUNS

RSV

120A

RSV

120B

SPACER PLATE

SPACER PLATE

V

310

V

311

INSULATINGFLANGE

INSULATINGFLANGE

INSULATING

FLANGE

INSULATING

FLANGE

INSPECTION

PORT

INSPECTION

PORT

INSPECTION

PORT

INSPECTION

PORT

RUN #1

RUN #2

PIPING & INSTRUMENTATION DIAGRAM

FOR ORIFICE METER RUNS

IG.# REV.DWG.

INITIALS DATE

$$$$$$$$$$$$$$$$$$$$$$$$$$$

DG

NS

PE

C$$$$$$$$$$$$$$$$

$$$$$

SY

TI

ME$$$$$$

Dra

wing:

Model:

$M

OD

EL

NA

ME$

Ti

me:

$$$$$

US

ER

NA

ME$$$$

Userna

me:

DESIGN MANAGER

5400 Westheimer Ct. Houston, TX 77056-5310 713 / 627-5400

TYPICAL

Page 31: Interconnection design gas pipelines

V

205

V

202

2" 1"

2" 2"

V

201

INSPECTION

TAP

2"

12"

2"

2"

V

206

V

204

INSULATING

FLANGE

24"

12"

DIELECTRIC

FTG

2"x1"

12"

2"x 12

"

N5C

N3B

N2

N5D

N7BN7A

F/S

302

N4C

N4D

N14

N11B

2"x1"

N13A

LG

N5A

N3AN5B N11A

2"x1"

LCV

001A

N12

LCV

002A

2"x1"

2"x1"

INSULATING

FLANGE

DIELECTRIC

FTGV

304

N13BLG

RESTRICTING

ORIFICE

INSULATING

FLANGE

N1N8N10

SET @

1,248 PSIG

RV

N6D

N6C

N6B

N6A

12"

2"x1"

N4A

N4B

LC

001A

2"

12"

LC

001B

S

F

DO

FISHER-ROSEMOUNT

TYPE 1367

HP INSTRUMENT SUPPLY SYSTEM

SET @ 30 PSIG

N2

N7BN7A

F/S

301

N14

N12

S

INSULATING

FLANGE

DIELECTRIC

FTG

V

303

N1N8N10

SET @

1,248 PSIG

RV

12"

2"x1"

F

2"

12"

N5C

N3B N5D

N4C

N4DN11B

2"x1"

N13ALG

N5A

N3AN5B N11A

2"x1"

LCV

001A

LCV

002A

2"x1"

2"x1"

N13BLG

RESTRICTING

ORIFICE

INSULATING

FLANGE

N6D

N6C

N6B

N6A N4A

N4B

LC

001A

LC

001B

FISHER-ROSEMOUNT

TYPE 1367

HP INSTRUMENT SUPPLY SYSTEM

SET @ 30 PSIG

INSULATING

FLANGE

12"

DIELECTRIC

FTG

2"x1"

V

203

TO CONDENSTATE TANK

AI

PDT

302

PDT

302

LSH302A

DI

302A

LSH

LSH

302A

DI

302B

LSH

DO

AI

PDT

301

PDT

301

LSH301A

DI

301A

LSH

LSH301B

DI

301B

LSH

EV0

302

EV0

301

SIPHON/

DRAIN ASSY

FROM SWITCHING SKID TO METER RUNS

SSD/PCR

SSD/PCR

SSD/PCR

SSD/PCR

PIPING & INSTRUMENTATION DIAGRAM

FOR FILTER SEPARATORS

IG.# REV.DWG.

INITIALS DATE

$$$$$$$$$$$$$$$$$$$$$$$$$$$

DG

NS

PE

C$$$$$$$$$$$$$$$$

$$$$$

SY

TI

ME$$$$$$

Dra

wing:

Model:

$M

OD

EL

NA

ME$

Ti

me:

$$$$$

US

ER

NA

ME$$$$

Userna

me:

DESIGN MANAGER

5400 Westheimer Ct. Houston, TX 77056-5310 713 / 627-5400

TYPICAL

Page 32: Interconnection design gas pipelines

- 24 -

ATTACHMENT C

Approved Manufacturers

The attached listing is provided for reference.

Page 33: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:40 PMSpectra Commodities Lis

Table of ContentsACTUATORS........................................................... 2

BUILDINGS............................................................. 3

CATALYTIC CONVERTS........................................... 5

CHROMATOGRAPHS............................................. 6

CLOSURES.............................................................. 7

COATING APPLICATORS........................................ 8

COMPRESSORS...................................................... 12

CRANES.................................................................. 14

ENGINE GENERATOR SETS.................................... 15

FABRICATIONS....................................................... 16

FITTINGS................................................................ 21

FLANGES................................................................ 26

GASKETS................................................................ 28

GRAVITOMETERS.................................................. 29

HEAT EXCHANGERS............................................... 30

HEATERS................................................................ 31

INDUCTIONBEND.................................................. 32

INSTRUMENTATION.............................................. 33

INSULATING KITS................................................... 34

MAGNETIC PIG SIGS.............................................. 35

METERING............................................................. 36

MOTOR CONTROL CENTERS................................. 38

MOTORS................................................................ 39

PIPE........................................................................ 40

RTU........................................................................ 43

SWITCHGEAR......................................................... 44

TANKS.................................................................... 45

TRANSFORMERS.................................................... 46

TRANSFORMET...................................................... 47

TRANSMITTERS..................................................... 48

VALVES.................................................................. 49

VARIABLE SPEED DRIVES....................................... 57

Page 34: Interconnection design gas pipelines

VESSELS................................................................. 58

ACTUATORS........................................................... 3

BUILDINGS............................................................. 4

CATALYTIC CONVERTS........................................... 5

CHROMATOGRAPHS............................................. 6

CLOSURES.............................................................. 7

COATING APPLICATORS........................................ 8

COMPRESSORS...................................................... 12

CRANES.................................................................. 14

ENGINE GENERATOR SETS.................................... 15

FABRICATIONS....................................................... 16

FITTINGS................................................................ 21

FLANGES................................................................ 26

GASKETS................................................................ 28

GRAVITOMETERS.................................................. 29

HEAT EXCHANGERS............................................... 30

HEATERS................................................................ 31

INDUCTIONBEND.................................................. 32

INSTRUMENTATION.............................................. 33

INSULATING KITS................................................... 34

MAGNETIC PIG SIGS.............................................. 35

METERING............................................................. 36

MOTOR CONTROL CENTERS................................. 38

MOTORS................................................................ 39

PIPE........................................................................ 40

RTU........................................................................ 43

SWITCHGEAR......................................................... 44

TANKS.................................................................... 45

TRANSFORMERS.................................................... 46

TRANSFORMET...................................................... 47

TRANSMITTERS..................................................... 48

VALVES.................................................................. 49

VARIABLE SPEED DRIVES....................................... 57

VESSELS................................................................. 58

Page 35: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:43 PMSpectra Commodities Lis

ACTUATORSDirect Gas Actuators

Ph (419) 529‐4311 (419) 529‐3688

 Mansfield OH 44906

Limitations: ‐

Shafer Valve Operating Systems Fx:

DS:108‐2

Ph (847) 437‐5940 (847) 437‐2549

 Elk Grove Village IL 60007

Limitations: ‐

Dresser Flow Solutions ‐ Becker Operations Fx:

DS:011‐1

Ph 713‐983‐8880 713‐983‐8788

 Houston TX 77041

Limitations: ‐

Gevalco, Inc. Fx:

DS:285‐1

Ph (281) 499‐1561 (281) 499‐8445

 Missouri City TX 77489

Limitations: ‐

EIM Controls Fx:

DS:019‐1

Ph (281) 727‐5300 (281) 727‐5353

18703  G H Circle,  Waller TX 

Limitations: ‐

Bettis Corporation Fx:

DS:018‐1

Electric Motor Drive Actuators

Ph (434) 528‐4400 (434) 845‐9736

5114 Woodall Rd.,  Lynchburg VA 24502

Limitations: ‐

Limitorque Corporation Fx:

DS:058‐1

Ph (281) 499‐1561 (281) 499‐8445

 Missouri City TX 77489

Limitations: ‐

EIM Controls Fx:

DS:019‐1

Gas Hydraulic Actuators

Ph (419) 529‐4311 (419) 529‐3688

 Mansfield OH 44906

Limitations: ‐

Shafer Valve Operating Systems Fx:

DS:108‐1

Page 3 of 61

Page 36: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:43 PMSpectra Commodities Lis

BUILDINGSAuxillary Buildings

Ph 281‐219‐1877 832‐553‐7906

14350 Chrisman,  Houston Tx 77039

Limitations: ‐

Volta LLC Fx:

DS:290‐1

Ph (281) 496‐1300 (281) 496‐1314

 Houston TX 77079

Limitations: ‐

United Steel Structures Fx:

DS:076‐2

Compressor Buildings

Ph (281) 531‐2800 (281) 531‐2888

 Houston TX 77082

Limitations: ‐

Standard Industrial Structures Corporation Fx:

DS:075‐1

Ph (281) 496‐1300 (281) 496‐1314

 Houston TX 77079

Limitations: ‐

United Steel Structures Fx:

DS:076‐1

Fabricated Buildings

James Stone Ph 713‐723‐9950

PO Box 35636,  Houston TX 77235

Limitations: ‐

Parkline Texas, Inc. Fx:

DS:298.0001

Prefabricated Buildings

Ph (281) 445‐2600 (281) 445‐0598

 Houston TX 77037

Limitations: ‐

Cleveland Manufacturing, Inc. Fx:

DS:172‐1

Ph (409) 935‐5743 (409) 938‐4189

 Texas City TX 77568

Limitations: ‐

Bebco Industries, Inc. Fx:

DS:171‐1

James Stone Ph 713‐723‐9950

PO Box 35636,  Houston TX 77235

Limitations: ‐

Parkline Texas, Inc. Fx:

DS:298.0001

Ph (603) 216‐0607 (603) 4378668

15 Independence Dr.,  Londonderry NH 03053

Limitations: Precast Concrete

Concrete System, Inc. / Shelter Technologies Fx:

DS:279‐1

Ph (281) 444‐6022 (281) 444‐1290

 Houston TX 77066

Limitations: ‐

Tesla Power and Automation, Inc. Fx:

DS:191‐1

Ph (281) 590‐8185 (281) 590‐5947

 Houston TX 77039

Limitations: ‐

Russell Manufacturing and Fabricating, Inc. Fx:

DS:187‐1

Page 4 of 61

Page 37: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

CATALYTIC CONVERTSCatalytic Converter

Ph (281) 255‐6955 (281) 351‐8502

 Cypress TX 77429

Limitations: Not Approved by TETCO

McGuffy Industries Fx:

DS:093‐1

Page 5 of 61

Page 38: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

CHROMATOGRAPHSGas Chromatographs

Ph (281) 491‐5252 (281) 491‐8440

 Stafford TX 77477

Limitations: ‐

Instromet, Inc. Fx:

DS:249‐1

Ph (918) 338‐4888 (918) 338‐4605

 Bartlesville OK 74006

Limitations: ‐

ABB, Inc. ‐ Totalflow Products Fx:

DS:266‐1

Ph 631‐345‐3434 631‐924‐7337

 Yaphank NY 11980

Limitations: ‐

COSA Instrument Corp. Fx:

DS:276‐1

Ph (713) 467‐6000 (713) 827‐3880

111000 Brittmore Park,  Houston TX 77041

Limitations: 2"" and larger"

Daniel Measurement & Control, Division of Emerson Fx:

DS:045‐1

Ph (713) 849‐1600 (713) 849‐1645

 Houston TX 77040

Limitations: ‐

Cutler Hammer Div., Eaton Corp. Fx:

DS:173‐1

Page 6 of 61

Page 39: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

CLOSURESClosures

Ph 281‐807‐2818 281‐894‐1332

 Houston TX 77065

Limitations: ‐

GD Closure Systems Fx:

DS:221‐1

Ph (936) 539‐9222 (936) 539‐1450

1011 Beach Airport Rd.,  Conroe TX 77305

Limitations: ‐

Modco Industries, Inc. Fx:

DS:039‐1

Ph (940) 325‐2575 (940) 325‐4622

118 Washington Ave.,  Mineral Wells TX 76068

Limitations: ‐

PECO ‐ Perry Corp. Fx:

DS:099‐1

Ph (281) 351‐2222 (281) 351‐6557

 Tomball TX 77375‐8934

Limitations: ‐

R&M Energy Systems Fx:

DS:141‐1

Ph (918) 447‐5100 (918) 446‐6327

 Tulsa OK 74131

Limitations: ‐

TD Williamson, Inc. Fx:

DS:265‐1

Page 7 of 61

Page 40: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

COATING APPLICATORSAbrasion Coating Applicators

Ph (219) 322‐4564 (219) 322‐2761

925 Kennedy Ave.,  Schereville IN 46375

Limitations: ‐

Midwest Pipe Coating, Inc. Fx:

DS:065‐1

Bill Browman Ph 281‐204‐6020

 Bay St. Louis Mississippi 

Limitations: ‐

PSL North America, LLC Fx:

DS:299.0001

Nick Ehnot Ph 281‐457‐0200 281‐457‐5568

711 Shields St.,  Channelview TX 77520

Limitations: 6" thru 48" / 1.250"w

LaBarge Coating, LLC (Site 2) Fx:

DS:242‐2

Brian Roper Ph 713‐465‐1600

900 Paper Mill Rd.,  Mobile AL 36610

Limitations: ‐

Berg Spiral Pipe Corp Fx:

DS:300.000‐1

Ph (281) 425‐8321 (281) 485‐5638

4501 Knapp RD,  Pearland TX 77581

Limitations: ‐

ShawCor Pipe Protection LLC Fx:

DS:021.002‐2

Diane Burger Ph 281‐752‐7300

 Thisvi Greece 

Limitations: ‐

Corinth Pipe Works Fx:

DS:254.000‐1

Nick Ehnot Ph (281) 445‐6191 (281) 445‐8681

400 S. Sheldon Road,  Channelview TX 77530

Limitations: 2 3/8" thru 42" / .625"w

LaBarge Coating, LLC (Site 1) Fx:

DS:242‐1

Ph (306) 543‐2552 (306) 543‐6168

2501 Pasqua Street North,  Regina Saskatchewan, CAN  SPS3C2  (Canada)

Limitations: ‐

ShawCor Pipe Protection LLC Fx:

DS:230‐1

Ph (713) 676‐0085 (713) 676‐0085

 Houston TX 77013

Limitations: Approved for applying Powercrete abrasion coating.

Power Lone Star Fx:

DS:217‐1

Ph (281) 590‐8491 (281) 590‐9528

 Houston TX 77032

Limitations: ‐

Clock Spring Company, LP. Fx:

DS:248‐2

Concrete Coating Applicators

Ph (281) 886‐2350 (281) 886‐2351

 Houston TX 77032

Limitations: 4 1/2"" to 42"""

ShawCor Pipe Protection LLC Fx:

DS:034‐1

Ph (337) 369‐3761 (337) 365‐9747

 New Iberia LA 70560

Limitations: 12" to 48"

Bayou Pipe Coaters Fx:

DS:197.001‐1

Fusion Bond Epoxy Coating Applicators

Page 8 of 61

Page 41: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

Fusion Bond Epoxy Coating Applicators

Jason Norris Ph (724) 327‐0280 (724) 327‐0113

2658 Puckety Drive,  Export PA 15632

Limitations: ‐

Dura‐Bond Coating, Inc. Fx:

DS:144‐1

Jason Norris Ph (717) 986‐1100 (717) 986‐1104

 Steelton PA 17113

Limitations: ‐

Dura‐Bond Coating, Inc. Fx:

DS:144‐2

Jason Norris Ph 724‐327‐0782 724‐387‐2720

3200 Youghiogheny River Road,  McKeesport PA 15134

Limitations: ‐

Dura‐Bond Coating, Inc. Fx:

DS:144‐3

Ph (903) 656‐2581 (903) 639‐2421

 Lone Star TX 75668

Limitations: Pre‐Award/Prepro

A & A Coating, Inc. Fx:

DS:145‐1

Gary Foerster Ph (205) 252‐3490 (205) 252‐4185

3135‐B Daniel Payne Dr.,  Birmingham AL 35214

Limitations: 6 5/8"" to 36"""

L. B. Foster Company Fx:

DS:194‐1

Ph (713) 465‐1600 713‐827‐7423

 Panama City FL 32412

Limitations: ‐

EB Coaters ‐ Panama City, FL Fx:

DS:066‐1

Ph (225) 775‐3018 (225) 775‐6277

 Baton Rouge LA 70807

Limitations: 10 3/4 "" to 36"""

Bayou Pipe Coaters Fx:

DS:197‐1

Ph (337) 369‐3761 (337) 365‐9747

 New Iberia LA 70560

Limitations: 10" to 48"

Bayou Pipe Coaters Fx:

DS:197‐2

Nick Ehnot Ph (281) 445‐6191 (281) 445‐8681

400 S. Sheldon Road,  Channelview TX 77530

Limitations: 2 3/8" ‐ 42" / .625" W

LaBarge Coating, LLC (Site 1) Fx:

DS:242‐1

Ph (909) 357‐9002 (909) 357‐9021

14000 San Bernardina Ave., SW Gate 6,  Fontana CA 92335

Limitations: ‐

ShawCor Pipe Protection LLC Fx:

DS:021.001‐1

Ph (281) 425‐8321 (281) 485‐5638

4501 Knapp RD,  Pearland TX 77581

Limitations: ‐

ShawCor Pipe Protection LLC Fx:

DS:021.002‐2

Ph (801) 229‐2077 (801) 229‐2173

1750 N. Pioneer Lane,  Vineyard UT 84058

Limitations: ‐

ShawCor Pipe Protection LLC Fx:

DS:226‐1

Ph (281) 886‐2350 (281) 886‐2351

 Houston TX 77032

Limitations: 3/4"" to 4"", 3"" to 36"", 4"" to 30"", 6"" to 42

ShawCor Pipe Protection LLC Fx:

DS:034‐1

Page 9 of 61

Page 42: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

Fusion Bond Epoxy Coating Applicators

Ph (417) 865‐2844 (417) 865‐2467

522 Fremont,  Springfield MO 65802

Limitations: ‐

AFI International Fx:

DS:003‐1

Ph (306) 543‐2552 (306) 543‐6168

2501 Pasqua Street North,  Regina Saskatchewan, CAN  SPS3C2  (Canada)

Limitations: ‐

ShawCor Pipe Protection LLC Fx:

DS:230‐1

Ph (219) 322‐4564 (219) 322‐2761

925 Kennedy Ave.,  Schereville IN 46375

Limitations: 3/4"" to 48"" ‐ Schereville, IN"

Midwest Pipe Coating, Inc. Fx:

DS:065‐1

Bill Browman Ph 281‐204‐6020

 Bay St. Louis Mississippi 

Limitations: ‐

PSL North America, LLC Fx:

DS:299.0001

Kevin Trow Ph 713‐585‐3027

 Hickman AR 72310

Limitations: ‐

Tenaris/Hickman Fx:

DS:251‐3

Brian Roper Ph 713‐465‐1600

900 Paper Mill Rd.,  Mobile AL 36610

Limitations: ‐

Berg Spiral Pipe Corp Fx:

DS:300.000‐1

Diane Burger Ph 281‐752‐7300

 Thisvi Greece 

Limitations: Up to 48"

Corinth Pipe Works Fx:

DS:254.000‐1

Nick Ehnot Ph 281‐457‐0200 281‐457‐5568

711 Shields St.,  Channelview TX 77520

Limitations: 6" thru 48" / 1.250"w

LaBarge Coating, LLC (Site 2) Fx:

DS:242‐2

Internal Coating Applicators

Ph (225) 775‐3018 (225) 775‐6277

 Baton Rouge LA 70807

Limitations: ‐

Bayou Pipe Coaters Fx:

DS:197‐1

Nick Ehnot Ph 281‐457‐0200 281‐457‐5568

711 Shields St.,  Channelview TX 77520

Limitations: ‐

LaBarge Coating, LLC (Site 2) Fx:

DS:242‐2

Ph (713) 465‐1600 713‐827‐7423

 Panama City FL 32412

Limitations: ‐

EB Coaters ‐ Panama City, FL Fx:

DS:066‐1

Diane Burger Ph 281‐752‐7300

 Thisvi Greece 

Limitations: ‐

Corinth Pipe Works Fx:

DS:254.000‐1

Ph (306) 543‐2552 (306) 543‐6168

2501 Pasqua Street North,  Regina Saskatchewan, CAN  SPS3C2  (Canada)

Limitations: ‐

ShawCor Pipe Protection LLC Fx:

DS:230‐1

Page 10 of 61

Page 43: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

Internal Coating Applicators

Jason Norris Ph (717) 986‐1100 (717) 986‐1104

 Steelton PA 17113

Limitations: ‐

Dura‐Bond Coating, Inc. Fx:

DS:144‐2

Brian Roper Ph 713‐465‐1600

900 Paper Mill Rd.,  Mobile AL 36610

Limitations: ‐

Berg Spiral Pipe Corp Fx:

DS:300.000‐1

Ph (281) 886‐2350 (281) 886‐2351

 Houston TX 77032

Limitations: ‐

ShawCor Pipe Protection LLC Fx:

DS:034‐1

Somastic Coating Applicators

Ph (281) 886‐2350 (281) 886‐2351

 Houston TX 77032

Limitations: ‐

ShawCor Pipe Protection LLC Fx:

DS:034‐1

Page 11 of 61

Page 44: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

COMPRESSORSElectric Motor Driver Compressors

Ph (713) 672‐3500 (713) 672‐3644

 Houston TX 77029‐1398

Limitations: ‐

G.E. Oil & Gas Company Fx:

DS:043‐1

Briz Garcia Ph 713‐895‐4286 713‐895‐4270

2200 Pacific Highway,  San Diego CA 

Limitations: ‐

Solar Turbines, Inc. Fx:

DS:115‐1

Gas  Turbine Driver Compressors

Briz Garcia Ph 713‐895‐4286 713‐895‐4270

2200 Pacific Highway,  San Diego CA 

Limitations: ‐

Solar Turbines, Inc. Fx:

DS:115‐1

Ph (713) 672‐3500 (713) 672‐3644

 Houston TX 77029‐1398

Limitations: ‐

G.E. Oil & Gas Company Fx:

DS:043‐1

High Speed Unit Packager Compressors/Recip

Ph (713) 467‐2221 (713) 935‐3490

1200 W. Sam Houston Parkway North,  Houston TX 77043

Limitations: ‐

Dresser Rand Company Fx:

DS:028‐1

Ph (979) 732‐2327 (979)  732‐0056

 Alleyton TX 78935

Limitations: ‐

Exterran (Hanover Smith) Fx:

DS:208‐1

Centrifugal Assembly Natural Gas Compressors

Briz Garcia Ph 713‐895‐4286 713‐895‐4270

2200 Pacific Highway,  San Diego CA 

Limitations: ‐

Solar Turbines, Inc. Fx:

DS:115‐1

Ph (713) 672‐3500 (713) 672‐3644

 Houston TX 77029‐1398

Limitations: ‐

G.E. Oil & Gas Company Fx:

DS:043‐1

Ph (609) 890‐5000 (609) 895‐9180

 Trenton NJ 08650

Limitations: ‐

Siemens Demag Delaval Turbomachinery Corp. Fx:

DS:054‐1

Ph (713) 467‐2221 (713) 935‐3490

1200 W. Sam Houston Parkway North,  Houston TX 77043

Limitations: ‐

Dresser Rand Company Fx:

DS:028‐1

Ph (713) 354‐1900 (713) 354‐1923

 Houston TX 77092

Limitations: ‐

Cameron Compression Fx:

DS:023‐1

Low Speed Integral Compressor Natural Gas/Recip

Page 12 of 61

Page 45: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

Low Speed Integral Compressor Natural Gas/Recip

Ph (713) 467‐2221 (713) 935‐3490

1200 W. Sam Houston Parkway North,  Houston TX 77043

Limitations: ‐

Dresser Rand Company Fx:

DS:028‐1

Ph (713) 354‐1900 (713) 354‐1923

 Houston TX 77092

Limitations: ‐

Cameron Compression Fx:

DS:023‐1

Reconditioned Recip Integral Natural Gas Comp

Ph (713) 467‐2221 (713) 935‐3490

1200 W. Sam Houston Parkway North,  Houston TX 77043

Limitations: ‐

Dresser Rand Company Fx:

DS:028‐1

Ph (713) 354‐1900 (713) 354‐1923

 Houston TX 77092

Limitations: ‐

Cameron Compression Fx:

DS:023‐1

Ph (281) 579‐7850 (281) 579‐4545

 Houston TX 77084

Limitations: ‐

Baker/MO Services, Inc. (Baker Energy Services) Fx:

DS:007‐1

Recip Valve Pocket Natural Gas Compressors

Ph (713) 354‐1900 (713) 354‐1923

 Houston TX 77092

Limitations: ‐

Cameron Compression Fx:

DS:023‐1

Ph (918) 583‐5711 (918) 388‐3202

 Tulsa OK 74110

Limitations: ‐

Arrow Engine (Dressor Rand) Fx:

DS:008‐1

Ph (713) 467‐2221 (713) 935‐3490

1200 W. Sam Houston Parkway North,  Houston TX 77043

Limitations: ‐

Dresser Rand Company Fx:

DS:028‐1

Ph (713) 664‐7333 (713) 663‐1858

 Houston TX 77081

Limitations: ‐

Compressor Engineering Corp. ‐ CECO Fx:

DS:111‐1

Page 13 of 61

Page 46: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

CRANESBridge Cranes

Ph (918) 836‐6827 (918) 835‐1008

 Claremore OK 74019

Limitations: ‐

Gaffey, Inc. of Tulsa Fx:

DS:163‐1

Jib Cranes

Ph (918) 836‐6827 (918) 835‐1008

 Claremore OK 74019

Limitations: ‐

Gaffey, Inc. of Tulsa Fx:

DS:163‐1

Page 14 of 61

Page 47: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

ENGINE GENERATOR SETSEngine Generator Sets

Ph (713) 723‐1050 (713) 551‐0799

 Houston TX 77035

Limitations: ‐

Waukesha Pearce Industries Fx:

DS:192‐1

Ph (504) 367‐2401 (504) 367‐4044

2550 Belle Chasse Highway,  Gretna LA 70054

Limitations: ‐

Reagan Equipment Company, Inc. Fx:

DS:203‐1

Ph (281) 452‐3610 (281) 452‐7550

 Houston TX 77015

Limitations: ‐

S & S Energy, a Division of GE, Gas Turbine Produ Fx:

DS:118‐1

Ph (713) 460‐2000 (713) 460‐3582

12800 Northwest Freeway,  Houston TX 77251

Limitations: ‐

Mustang CAT Power Systems Fx:

DS:078‐1

Page 15 of 61

Page 48: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

FABRICATIONSAir Compressor Skid Fabrications

Ph (713) 335‐7000 (713) 335‐7771

 Houston TX 77041

Limitations: ‐

Universal Compression Fx:

DS:219‐1

Anchoring System Fabrications

Ph (713) 354‐1900 (713) 354‐1923

 Houston TX 77092

Limitations: ‐

Cameron Compression Fx:

DS:023‐1

Dehydration Unit Fabrications

Ph (281) 371‐7500 (281) 371‐0132

35610 Clay Road,  Houston TX 77492

Limitations: ‐

Optimized Process Designs, Inc. Fx:

DS:205‐1

Ph (405) 258‐2314 (405) 258‐2110

1510 East 15th Street,  Chandler OK 74834

Limitations: ‐

Barnhart's Technical Service, Inc. Fx:

DS:198‐1

Jim Wall Ph 918‐492‐0508 918‐488‐9042

5555 E. 71st ST,  Tulsa Oklahoma 74136

Limitations: ‐

E.T.I. Fx:

DS:308.01

Lilac Khosrowyar Ph 918‐663‐8383 918‐663‐8460

1007 E.Admiral Blvd.,  Tulsa Ok. 74120

Limitations: ‐

Gas Tech Eng. Fx:

DS:309.01

Gas Process Skid Fabrications

Ph (281) 452‐7202 (281) 860‐6713

 Channelview TX 77530

Limitations: ‐

Turbofab ‐ Solar Fx:

DS:164‐1

Ph 281‐351‐6315 281‐351‐2382

18115 Telge Road,  Cypress TX 77429

Limitations: ‐

Professional Projects, Inc. Fx:

DS:289‐1

Ph (740) 685‐2542 (740) 685‐5516

 Derwent OH 43733

Limitations: ‐

Bicon Services, Inc. Fx:

DS:112‐2

Ph (409) 938‐ 6602 (409)  935‐9361

 La Marque TX 77568

Limitations: ‐

Paragon Fabricators, Inc. Fx:

DS:204‐1

Ph (432) 337‐3571 (432) 337‐2624

 Odessa TX 77429

Limitations: ‐

Sivalls, Inc. Fx:

DS:094‐1

Lilac Khosrowyar Ph 918‐663‐8383 918‐663‐8460

1007 E.Admiral Blvd.,  Tulsa Ok. 74120

Limitations: ‐

Gas Tech Eng. Fx:

DS:309.01

Page 16 of 61

Page 49: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

Gas Process Skid Fabrications

Jim Wall Ph 918‐492‐0508 918‐488‐9042

5555 E. 71st ST,  Tulsa Oklahoma 74136

Limitations: ‐

E.T.I. Fx:

DS:308.01

Ph (281) 371‐7500 (281) 371‐0132

35610 Clay Road,  Houston TX 77492

Limitations: ‐

Optimized Process Designs, Inc. Fx:

DS:205‐1

Ph (713) 225‐4913 (713) 224‐7937

3905 Jensen Drive,  Houston TX 77026

Limitations: ‐

EN‐FAB, Inc. Fx:

DS:038‐1

Ph (918) 437‐2272 (918) 438‐6418

 Tulsa OK 74116

Limitations: ‐

Red Man Measurement Fx:

DS:229‐2

Launcher & Receiver Fabrications

Ph (918) 227‐4600 (918) 224‐8452

 Sapulpa OK 74066

Limitations: ‐

Sagebrush Pipeline Equipment Company Fx:

DS:235‐1

John Kennedy Ph (913) 294‐5331 (913) 294‐5337

 Paola KS 66071

Limitations: ‐

Taylor Forge Engineered Systems Fx:

DS:127‐2

Ph 918‐224‐4144 918‐224‐4455

 Tulsa OK 74131

Limitations: ‐

Pipeline Equipment, Inc. Fx:

DS:283‐1

Ph (740) 685‐2542 (740) 685‐5516

 Derwent OH 43733

Limitations: ‐

Bicon Services, Inc. Fx:

DS:112‐1

Machining Fabrications

Ph (432) 563‐5010 (432) 563‐4013

4307 South County Rd. 1300,  Odessa TX 79765

Limitations: ‐

Texas Welding & Crankshaft Repair Fx:

DS:114‐1

Ronnie Maybre Ph (713) 691‐3781 (713) 691‐6938

8923 Manus,  Houston TX 77093

Limitations: ‐

Natco Machine & Welding Co., Inc. Fx:

DS:105‐1

Ph (785) 825‐4683 (785) 826‐4425

 Salina KS 67402‐1487

Limitations: ‐

Exline, Inc. Fx:

DS:104‐1

Ph (903) 892‐8145 (903) 892‐6395

 Sherman TX 75090

Limitations: Able to do crankshaft machining.

Washington Iron Works Fx:

DS:103‐1

Page 17 of 61

Page 50: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

Machining Fabrications

Ph (717) 653‐8111 (717) 653‐2013

 Mount Joy PA 17752

Limitations: ‐

Griener Industries, Inc. Fx:

DS:132‐1

Mole Sieve Unit Fabrications

Ph (281) 371‐7500 (281) 371‐0132

35610 Clay Road,  Houston TX 77492

Limitations: ‐

Optimized Process Designs, Inc. Fx:

DS:205‐1

Pipe Support, Clamp & Strap Fabrications

Ronnie Maybre Ph (713) 691‐3781 (713) 691‐6938

8923 Manus,  Houston TX 77093

Limitations: ‐

Natco Machine & Welding Co., Inc. Fx:

DS:105‐1

Ph (713) 731‐0030 (713) 731‐8640

3701 Holmes Road,  Houston TX 77051

Limitations: ‐

Sweco‐Fab Fx:

DS:153‐1

Repair Sleeve Fabrications

Ph (918) 447‐5100 (918) 446‐6327

 Tulsa OK 74131

Limitations: ‐

TD Williamson, Inc. Fx:

DS:265‐1

Ronnie Maybre Ph (713) 691‐3781 (713) 691‐6938

8923 Manus,  Houston TX 77093

Limitations: ‐

Natco Machine & Welding Co., Inc. Fx:

DS:105‐1

Tracey Provenzano Ph (814) 362‐9200 (814) 362‐9353

 Bradford PA 16701

Limitations: ‐

Dresser Piping Specialties Fx:

DS:267‐1

Structural Fabrications

Ronnie Maybre Ph (713) 691‐3781 (713) 691‐6938

8923 Manus,  Houston TX 77093

Limitations: ‐

Natco Machine & Welding Co., Inc. Fx:

DS:105‐1

Ph (281) 371‐7500 (281) 371‐0132

35610 Clay Road,  Houston TX 77492

Limitations: ‐

Optimized Process Designs, Inc. Fx:

DS:205‐1

Ph (918) 583‐7184 (918) 583‐8423

2505 South 33rd West Avenue,  Tulsa OK 74107

Limitations: ‐

Allen Edwards, Inc. Fx:

DS:002‐1

Eric Verzwyvelt Ph 985‐868‐7854

250 N0. American Ct,  Houma LA 70363

Limitations: ‐

Performance Energy Fx:

DS:303‐1

Ph (281) 496‐1300 (281) 496‐1314

 Houston TX 77079

Limitations: ‐

United Steel Structures Fx:

DS:076‐1

Page 18 of 61

Page 51: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

Structural Fabrications

Ph (217) 253‐3371 (217) 253‐2834

980  North CR 610 E,  Tuscola IL 61953

Limitations: ‐

J. L. Allen Company Fx:

DS:071‐1

General Non‐Asme Vessel Fabrications

Ph 519‐451‐5480 519‐451‐9922

 London ON N5V 2C1 

Limitations: ‐

Sleegers Engineering, Inc. Fx:

DS:286‐1

Ph 918‐224‐4144 918‐224‐4455

 Tulsa OK 74131

Limitations: ‐

Pipeline Equipment, Inc. Fx:

DS:283‐1

Ph (281) 371‐7500 (281) 371‐0132

35610 Clay Road,  Houston TX 77492

Limitations: ‐

Optimized Process Designs, Inc. Fx:

DS:205‐1

Ph (225) 381‐9422 (225) 381‐9746

1700 West Port Drive,  Port Allen LA 70767

Limitations: ‐

Turner Industries Group, LLC Fx:

DS:055‐1

Ph (918) 227‐4600 (918) 224‐8452

 Sapulpa OK 74066

Limitations: Including Meter Skids

Sagebrush Pipeline Equipment Company Fx:

DS:235‐1

Ph (740) 685‐2542 (740) 685‐5516

 Derwent OH 43733

Limitations: ‐

Bicon Services, Inc. Fx:

DS:112‐1

Tracey Provenzano Ph (814) 362‐9200 (814) 362‐9353

 Bradford PA 16701

Limitations: ‐

Dresser Piping Specialties Fx:

DS:267‐1

Ph (409) 938‐ 6602 (409)  935‐9361

 La Marque TX 77568

Limitations: ‐

Paragon Fabricators, Inc. Fx:

DS:204‐1

Ph (361) 289‐5892 (361) 289‐0124

 Corpus Christi TX 78409

Limitations: ‐

Pickett Measurement Fx:

DS:238‐1

Ph 713‐466‐6252 713‐466‐6217

6417 Cunningham Rd.,  Houston TX 77041

Limitations: ‐

R & N Manufacturing Fx:

DS:297.000‐1

John Kennedy Ph (913) 294‐5331 (913) 294‐5337

 Paola KS 66071

Limitations: ‐

Taylor Forge Engineered Systems Fx:

DS:127‐2

Ph (432) 337‐3571 (432) 337‐2624

 Odessa TX 77429

Limitations: ‐

Sivalls, Inc. Fx:

DS:094‐1

Page 19 of 61

Page 52: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

General Non‐Asme Vessel Fabrications

Ph (918) 342‐3222 (918) 341‐9430

2405 South Hwy 66,  Claremore OK 74017

Limitations: ‐

Process Pipe Fabricators, Inc. Fx:

DS:161‐1

Ph 281‐351‐6315 281‐351‐2382

18115 Telge Road,  Cypress TX 77429

Limitations: ‐

Professional Projects, Inc. Fx:

DS:289‐1

Ph

   

Limitations: ‐

Valtronics Fx:

DS:301.000‐1

Ph (713) 683‐9292 (713) 683‐6768

 Houston TX 77092

Limitations: ‐

NATCO Fx:

DS:096‐1

Ronnie Maybre Ph (713) 691‐3781 (713) 691‐6938

8923 Manus,  Houston TX 77093

Limitations: ‐

Natco Machine & Welding Co., Inc. Fx:

DS:105‐1

Ph (217) 253‐3371 (217) 253‐2834

980  North CR 610 E,  Tuscola IL 61953

Limitations: ‐

J. L. Allen Company Fx:

DS:071‐1

Ph (903) 757‐7341 (903) 759‐6986

 White Oak TX 75693

Limitations: ‐

Winston F2S Corporation Fx:

DS:239‐1

Page 20 of 61

Page 53: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

FITTINGSAnchor Forging Fittings

Ph (713) 868‐4200 (713) 868‐4160

 Houston TX 77015

Limitations: 2"" to 48"""

Coffer Corporation, An Ameri‐Forge Group Company Fx:

DS:020‐1

Ph (713) 688‐2515 (713) 688‐0205

 Houston TX 77091

Limitations: 2"" to 48"""

National Flange & Fitting Company Inc Fx:

DS:073‐1

Ph (214) 589‐8177 (214) 589‐8892

 Dallas TX 75356

Limitations: 1/2"" to 48"""

Ladish Fittings ‐ Trinity Fx:

DS:057‐1

Extrusion Fittings

Ph (713) 460‐3700 (713) 939‐1808

 Houston TX 77092‐4495

Limitations: 2"" through 36"" ‐ Due to shop size, orders shoul

Weldfit Corporation Fx:

DS:223‐1

John Kennedy Ph (913) 294‐5331 (913) 294‐5337

 Paola KS 66071

Limitations: ‐

Taylor Forge Engineered Systems Fx:

DS:127‐1

Ph (318) 222‐3295 (318) 222‐6185

1810 Barton Drive,  Shreveport LA 71107

Limitations: 12"" to 48"""

Steel Forgings, Inc. Fx:

DS:116‐1

Ph 918‐224‐4144 918‐224‐4455

 Tulsa OK 74131

Limitations: ‐

Pipeline Equipment, Inc.(Extrusion) Fx:

DS:284‐1

Flexiforge End Connector Fittings

Al Cooper Ph 713‐326‐4500 713‐329‐4951

11911 FM 529,  Houston TX 77041

Limitations: ‐

Oceaneering Fx:

DS:302‐1

Ph (713) 510‐2200 (713)  668‐9166

 Houston TX 77040

Limitations: ‐

Oil States Industries, Inc. Fx:

DS:236‐1

Forged Steel Fittings ‐ 2in and less

Ph (214) 589‐8177 (214)  589‐8892

708 S. Elmira,  Russellville AR 72801

Limitations: 2"" and less ‐ Caps 1/2"" to 2"""

Hackney Fittings, Div of Trinity Fitting Group In Fx:

DS:048‐1

Ph (214) 589‐8177 (214) 589‐8892

 Dallas TX 75356

Limitations: 1/2"" to 2"""

Ladish Fittings ‐ Trinity Fx:

DS:057‐1

Ph 610‐266‐0530

 Catasauqua PA 18032

Limitations: ‐

Phoenix Forging Company Fx:

DS:263‐1

Page 21 of 61

Page 54: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

Forged Steel Fittings ‐ 2in and less

Ph (603) 422‐8000 (603) 422‐8033

110 Corporate Dr., Suite 10,  Portsmouth NH 03802‐3180

Limitations: 2"" and less ‐ Longview, TX"

Anvil International Inc Fx:

DS:044‐1

Ph (918) 241‐3595

 Tulsa OK 74101

Limitations: 1 1/2"" to 2"""

Flo‐Bend ‐ Trinity Fx:

DS:042‐1

Ph (817) 542‐9977

US Route 522 South,  Mount Union PA 17066‐0330

Limitations: 2"" and less"

Bonney Forge Fx:

DS:015‐1

Ph (323) 321‐6520 (310)  32‐0476

 Gardena CA 90248

Limitations: ‐

Mills Iron Works Fx:

DS:067‐1

Grade B Fittings

Ph (214)  589‐8177 (214)  589‐8892

400 E. Willow,  Enid OK 73701

Limitations: Caps 2"" to 28"""

Hackney Fittings ‐ Trinity Fx:

DS:048.001‐1

Ph (918) 241‐3595

 Tulsa OK 74101

Limitations: 2"" to 24""; Elbows ‐ thru 30""; Caps ‐ thru 36""

Flo‐Bend ‐ Trinity Fx:

DS:042‐1

John Kennedy Ph (913) 294‐5331 (913) 294‐5337

 Paola KS 66071

Limitations: caps 10"" to 42""; reducers 12"" X 8"" to 48"" X4

Taylor Forge Engineered Systems Fx:

DS:127‐1

Ph (318) 222‐3295 (318) 222‐6185

1810 Barton Drive,  Shreveport LA 71107

Limitations: caps 10"" t0 48""; reducers 2"" to 28""; tees 10"

Steel Forgings, Inc. Fx:

DS:116‐1

Ph (503) 241‐0716 (503) 274‐7196

 Portland OR 97210

Limitations: Tees 2""‐ 30""_Ells 2""‐30""_Reducers 2""‐ 24""_C

Tube Forgings of America, Inc. Fx:

DS:234‐1

Ph (214) 589‐8177 (214) 589‐8892

 Dallas TX 75356

Limitations: 2"" to 48"""

Ladish Fittings ‐ Trinity Fx:

DS:057‐1

Ph (323) 321‐6520 (310)  32‐0476

 Gardena CA 90248

Limitations: 2"" to 24"""

Mills Iron Works Fx:

DS:067‐2

Ph (214) 589‐8177 (214)  589‐8892

708 S. Elmira,  Russellville AR 72801

Limitations: Caps 2"" to 28"""

Hackney Fittings, Div of Trinity Fitting Group In Fx:

DS:048‐1

Ph (450) 375‐3575 (450) 375‐3772

 Granby Quebec, CAN  J2J 1J6 

Limitations: 4"" and Larger"

EZEFlow, Inc. Fx:

DS:233‐1

Page 22 of 61

Page 55: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

Grade B Fittings

Ph (713) 460‐3700 (713) 939‐1808

 Houston TX 77092‐4495

Limitations: 2"" through 36"""

Weldfit Corporation Fx:

DS:223‐1

Ph (908) 638‐6200 (908) 638‐0015

 High Bridge NJ 08829

Limitations: 2"" thru 42"""

Custom Alloy Corporation Fx:

DS:228‐1

High Yield Fittings

Ph (450) 375‐3575 (450) 375‐3772

 Granby Quebec, CAN  J2J 1J6 

Limitations: ‐

EZEFlow, Inc. Fx:

DS:233‐1

Ph (214) 589‐8177 (214) 589‐8892

 Dallas TX 75356

Limitations: 2"" to 48"""

Ladish Fittings ‐ Trinity Fx:

DS:057‐2

Harald Irowez Ph 281‐363‐2686 281‐367‐2488

 Houston TX  (Austria)

Limitations: ‐

ERNE Fittings Fx:

DS:307.01

Ph (318) 222‐3295 (318) 222‐6185

1810 Barton Drive,  Shreveport LA 71107

Limitations: caps 10"" t0 48""; reducers 2"" to 28""; tees 10"

Steel Forgings, Inc. Fx:

DS:116‐1

Massimo Maimi Ph 390523889811

 Castelsangiovanni Piacenza Italy  29027 

Limitations: No Flanges

Tecnoforge Fx:

DS:292‐1

John Kennedy Ph (913) 294‐5331 (913) 294‐5337

 Paola KS 66071

Limitations: caps 10"" to 42""; reducers 12"" X 8"" to 48"" X4

Taylor Forge Engineered Systems Fx:

DS:127‐1

Ph (713) 460‐3700 (713) 939‐1808

 Houston TX 77092‐4495

Limitations: 2"" through 36"""

Weldfit Corporation Fx:

DS:223‐1

Ph (908) 638‐6200 (908) 638‐0015

 High Bridge NJ 08829

Limitations: 2"" thru 42"", Through Y‐70"

Custom Alloy Corporation Fx:

DS:228‐1

Ph (503) 241‐0716 (503) 274‐7196

 Portland OR 97210

Limitations: Tees 2""‐30"", Y‐70_Ells 2""‐30"", Y‐70_Reducers

Tube Forgings of America, Inc. Fx:

DS:234‐2

Ph 39 0523 555311 39 0523 559621

via Roma 150,  Podenzano Piacenza Italy  29027 

Limitations: Up to NPS 48""_Supplies ""non‐field"" segmentable

TecTubi Raccordi S.p.A Fx:

DS:291‐1

Ph 39 0523 555311 39 0523 559621

Via Ancona, 27,  Calendasco (Piacenza) Italy 29027

Limitations: Up to NPS 48""_Supplies ""non‐field"" segmentable

TecTubi Raccordi S.p.A. Fx:

DS:291.02‐1

Page 23 of 61

Page 56: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

High Yield Fittings

Ph (918) 241‐3595

 Tulsa OK 74101

Limitations: 2"" to 24""; Elbows ‐ thru 30""; Caps ‐ thru 36""

Flo‐Bend ‐ Trinity Fx:

DS:042‐1

Mechanical End Connectors

Ph (713) 510‐2200 (713)  668‐9166

 Houston TX 77040

Limitations: ‐

Oil States Industries, Inc. Fx:

DS:236‐1

Al Cooper Ph 713‐326‐4500 713‐329‐4951

11911 FM 529,  Houston TX 77041

Limitations: ‐

Oceaneering Fx:

DS:302‐1

Ph 713‐526‐7274 713‐529‐3773

 Houston TX 77040

Limitations: ‐

Quality Connector Systems, LLC Fx:

DS:288‐1

Mechanical Hot Taps

Ph (713) 510‐2200 (713)  668‐9166

 Houston TX 77040

Limitations: ‐

Oil States Industries, Inc. Fx:

DS:236‐1

Al Cooper Ph 713‐326‐4500 713‐329‐4951

11911 FM 529,  Houston TX 77041

Limitations: ‐

Oceaneering Fx:

DS:302‐1

Ph 713‐526‐7274 713‐529‐3773

 Houston TX 77040

Limitations: ‐

Quality Connector Systems, LLC Fx:

DS:288‐1

Piggable Y Fitting

Ph 713‐526‐7274 713‐529‐3773

 Houston TX 77040

Limitations: ‐

Quality Connector Systems, LLC Fx:

DS:288‐1

Pipe Insulating Joints

Al Cooper Ph 713‐326‐4500 713‐329‐4951

11911 FM 529,  Houston TX 77041

Limitations: ‐

Oceaneering Fx:

DS:302‐1

Ph 39‐059‐578611 39‐059‐570633

 Formigine Italy 41043

Limitations: ‐

Nuova Giungas SRL Fx:

DS:262‐1

Ph (713) 510‐2200 (713)  668‐9166

 Houston TX 77040

Limitations: ‐

Oil States Industries, Inc. Fx:

DS:236‐1

Repair Clamps

Page 24 of 61

Page 57: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

Repair Clamps

Al Cooper Ph 713‐326‐4500 713‐329‐4951

11911 FM 529,  Houston TX 77041

Limitations: ‐

Oceaneering Fx:

DS:302‐1

Ph (713) 510‐2200 (713)  668‐9166

 Houston TX 77040

Limitations: ‐

Oil States Industries, Inc. Fx:

DS:236‐2

Ph 713‐526‐7274 713‐529‐3773

 Houston TX 77040

Limitations: ‐

Quality Connector Systems, LLC Fx:

DS:288‐1

Ph (440) 871‐5700 (440) 871‐9577

 Cleveland OH 44145

Limitations: ‐

Plidco International, Inc. Fx:

DS:250‐1

Split Tees / Weld Saddles

Ph 918‐224‐4144 918‐224‐4455

 Tulsa OK 74131

Limitations: ‐

Pipeline Equipment, Inc. Fx:

DS:283‐1

Tracey Provenzano Ph (814) 362‐9200 (814) 362‐9353

 Bradford PA 16701

Limitations: ‐

Dresser Piping Specialties Fx:

DS:267‐1

Ph (318) 222‐3295 (318) 222‐6185

1810 Barton Drive,  Shreveport LA 71107

Limitations: ‐

Steel Forgings, Inc. Fx:

DS:116‐1

Stopples

Tracey Provenzano Ph (814) 362‐9200 (814) 362‐9353

 Bradford PA 16701

Limitations: ‐

Dresser Piping Specialties Fx:

DS:267‐1

Ph (918) 447‐5100 (918) 446‐6327

 Tulsa OK 74131

Limitations: ‐

TD Williamson, Inc. Fx:

DS:265‐1

Tubing Fittings

Ph (440) 656‐3700

 Hudson OH 44236

Limitations: ‐

Swagelok Quick‐Connect Company Fx:

DS:190‐1

Ph (614) 279‐7070 (614) 279‐7685

 Columbus OH 43228

Limitations: ‐

Parker Hannifin Corporation, Tube Fittings Divisi Fx:

DS:200‐2

Page 25 of 61

Page 58: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

FLANGESFuturetap Flanges

Ph 713‐526‐7274 713‐529‐3773

 Houston TX 77040

Limitations: ‐

Quality Connector Systems, LLC Fx:

DS:288‐1

Al Cooper Ph 713‐326‐4500 713‐329‐4951

11911 FM 529,  Houston TX 77041

Limitations: ‐

Oceaneering Fx:

DS:302‐1

Ph (713) 510‐2200 (713)  668‐9166

 Houston TX 77040

Limitations: ‐

Oil States Industries, Inc. Fx:

DS:236‐1

Misalignment Flanges

Ph (713) 510‐2200 (713)  668‐9166

 Houston TX 77040

Limitations: ‐

Oil States Industries, Inc. Fx:

DS:236‐1

Al Cooper Ph 713‐326‐4500 713‐329‐4951

11911 FM 529,  Houston TX 77041

Limitations: ‐

Oceaneering Fx:

DS:302‐1

Ph 713‐526‐7274 713‐529‐3773

 Houston TX 77040

Limitations: ‐

Quality Connector Systems, LLC Fx:

DS:288‐1

Swivel Ring Flanges

Al Cooper Ph 713‐326‐4500 713‐329‐4951

11911 FM 529,  Houston TX 77041

Limitations: ‐

Oceaneering Fx:

DS:302‐1

Ph 713‐526‐7274 713‐529‐3773

 Houston TX 77040

Limitations: ‐

Quality Connector Systems, LLC Fx:

DS:288‐1

Ph (713) 510‐2200 (713)  668‐9166

 Houston TX 77040

Limitations: ‐

Oil States Industries, Inc. Fx:

DS:236‐1

Weld Neck Flanges

Ph (214) 589‐8177 (214)  589‐8892

708 S. Elmira,  Russellville AR 72801

Limitations: 1/2"" to 24"""

Hackney Fittings, Div of Trinity Fitting Group In Fx:

DS:048‐1

Ph (713) 675‐9433 (713) 258‐2110

 Houston TX 77013

Limitations: ‐

Boltex, Inc. Fx:

DS:202‐1

Ph (713) 868‐4200 (713) 868‐4160

 Houston TX 77015

Limitations: 1/2"" to 60"""

Coffer Corporation, An Ameri‐Forge Group Company Fx:

DS:020‐1

Page 26 of 61

Page 59: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

Weld Neck Flanges

Ph (713) 433‐0700 (713) 433‐5580

 Houston TX 77047

Limitations: 2"" ‐ 42"" ‐ ANSI 150 ‐ 1500, ASME B16.5 & MSS SP

Galperti, Inc. Fx:

DS:232‐1

Karan Guzman Ph 832‐397‐4290 713‐635‐4784

7785 East Little York,  Houston Texas 77016 (USA)

Limitations: ‐

DL Flange Fx:

DS:311.01

Ph (713) 688‐2515 (713) 688‐0205

 Houston TX 77091

Limitations: 1/2""  to 48"""

National Flange & Fitting Company Inc Fx:

DS:073‐1

Ph (214) 589‐8177 (214) 589‐8892

 Dallas TX 75356

Limitations: 1/2"" to 60"""

Ladish Fittings ‐ Trinity Fx:

DS:057‐1

Page 27 of 61

Page 60: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

GASKETSSpiral Wound Gaskets

Ph (281) 459‐7202 (281) 459‐7243

 Houston TX 77049

Limitations: ‐

Garlock Sealing Technologies Fx:

DS:155‐1

Ph (281) 604‐2400 (281) 604‐2415

 Deer Park TX 77563

Limitations: ‐

Flexitallic LP Fx:

DS:156‐1

Page 28 of 61

Page 61: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

GRAVITOMETERSGravitometers

Ph (814) 371‐8000 (814) 375‐8460

 Dubois PA 15801

Limitations: Not approved by TETCO

Sensus Metering Systems, Inc. Fx:

DS:245‐1

Ph (918) 250‐7200 (918) 459‐0165

 Broken Arrow OK 74012

Limitations: ‐

Amatek Fx:

DS:176‐1

Page 29 of 61

Page 62: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

HEAT EXCHANGERSGas Cooler Heat Exchangers

Ph (918) 251‐2571 (918) 251‐2574

12585 East 61st Street,  Broken Arrow OK 74012

Limitations: Need to required AWS D1.1 structural welders for o

R & R Engineering Company, Inc. Fx:

DS:207‐1

Ph (918) 251‐7477 (918) 251‐7482

 Broken Arrow OK 74012

Limitations: Need to order without slits in the tube fins ‐ spe

Air Cooled Exchangers, Inc. Fx:

DS:206‐1

Ph (918) 747‐7447 (918) 749‐5080

1219 East 33rd,  Tulsa OK 74105

Limitations: Tek‐ Fins fabricates tube fins and assembles aeria

Tek‐Fins, Inc. Fx:

DS:220‐1

Ph (918) 619‐8000 (918) 384‐5000

5215 Arkansas Rd,  Catoosa OK 74015

Limitations: ‐

Air X‐Changers, A Harsco Company Fx:

DS:001‐1

Ph (918) 446‐4406 (918) 445‐2857

6312 S. 39th W. Ave.,  Tulsa Ok 74132

Limitations: ‐

Smithco Engineering Fx:

DS:095‐1

Regenerator Heat Exchangers

Ph (303) 987‐0123

 Lakewood CO 80228

Limitations: ‐

GEA Power Cooling, Inc. Fx:

DS:159‐1

Shell and Tube Heat Exchangers

Ph 716‐684‐6700 716‐684‐2129

 Buffalo NY 14225

Limitations: ‐

API Basco Fx:

DS:278‐1

Ph (716) 897‐2800 (716) 897‐1777

 Buffalo NY 14227

Limitations: ‐

ITT Standard Fx:

DS:069‐1

Ph (281) 471‐4140 (281) 471‐5612

12415 LaPorte Road ‐ Hwy. 225,  LaPorte TX 77571

Limitations: ‐

Ohmstede, LTD Fx:

DS:195‐1

Turbocharger Aftercooler Heat Exchangers

Ph (713) 467‐2221 (713) 935‐3490

1200 W. Sam Houston Parkway North,  Houston TX 77043

Limitations: ‐

Dresser Rand Company Fx:

DS:028‐1

Ph (713) 354‐1900 (713) 354‐1923

 Houston TX 77092

Limitations: ‐

Cameron Compression Fx:

DS:023‐1

Page 30 of 61

Page 63: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

HEATERSDirect Fired Heaters

Ph (713) 683‐9292 (713) 683‐6768

 Houston TX 77092

Limitations: ‐

NATCO Fx:

DS:096‐1

Ph (432) 337‐3571 (432) 337‐2624

 Odessa TX 77429

Limitations: ‐

Sivalls, Inc. Fx:

DS:094‐1

Indirect Fired Heaters

Ph (979) 732‐2327 (979)  732‐0056

 Alleyton TX 78935

Limitations: Inspect critical points indentified on the ITP.

Exterran (Hanover Smith) Fx:

DS:208‐1

Ph (713) 683‐9292 (713) 683‐6768

 Houston TX 77092

Limitations: ‐

NATCO Fx:

DS:096‐1

Ph (432) 337‐3571 (432) 337‐2624

 Odessa TX 77429

Limitations: ‐

Sivalls, Inc. Fx:

DS:094‐1

Lilac Khosrowyar Ph 918‐663‐8383 918‐663‐8460

1007 E.Admiral Blvd.,  Tulsa Ok. 74120

Limitations: ‐

Gas Tech Eng. Fx:

DS:309.01

Ph 519‐451‐5480 519‐451‐9922

 London ON N5V 2C1 

Limitations: ‐

Sleegers Engineering, Inc. Fx:

DS:286‐1

Page 31 of 61

Page 64: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

INDUCTIONBENDInduction Bends

Ph (225) 667‐1000 (225) 667‐1019

 Walker LA 70785

Limitations: Pre‐Pro

Sunland Fabricators, Inc. Fx:

DS:216‐1

Ph (403) 279‐2222 (403) 236‐1522

 S.E. Calgary Alberta, CAN  T2C2V8 

Limitations: 2"" to 36"""

Indutech Canada Fx:

DS:146‐1

Ph (801) 773‐2575 (801) 773‐2950

210 E 700 South,  Clearfield UT 84015

Limitations: 2"" to 66"""

Shaw Naptech, Inc. Fx:

DS:147‐1

Ph (218) 722‐0205 (218) 722‐6598

366 Garfield Ave,  Duluth MN 55802

Limitations: ‐

Bendtec, Inc. Fx:

DS:157‐1

Ph 918‐749‐2463 918‐834‐5910

3207 Dawson Road,  Tulsa OK 74110

Limitations: 2" thru 42"

American Pipe Bending Co. Fx:

DS:304‐1

Ph (281) 449‐8241 (281) 449‐3707

14500 E. Hardy,  Houston TX 77039

Limitations: 2"" to 36"""

Houston Pipe Benders Fx:

DS:051‐1

Ph (225) 381‐9422 (225) 381‐9746

1700 West Port Drive,  Port Allen LA 70767

Limitations: 2"" TO 32"""

Turner Industries Group, LLC Fx:

DS:055‐1

Page 32 of 61

Page 65: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

INSTRUMENTATIONPneumatic Interface Panels

Ph (713) 937‐8111 (713) 937‐0486

 Houston TX 77040‐3191

Limitations: ‐

Tex‐A‐Draulics, Inc. Fx:

DS:210‐1

Page 33 of 61

Page 66: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

INSULATING KITSInsulating Kits

Ph (281) 556‐1661 (281) 556‐1683

 Houston TX 77082

Limitations: ‐

Pipeline Seal & Insulator, Inc. Fx:

DS:237‐1

Page 34 of 61

Page 67: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

MAGNETIC PIG SIGSMagnetic Pig Sigs

Ph (918) 447‐5100 (918) 446‐6327

 Tulsa OK 74131

Limitations: ‐

TD Williamson, Inc. Fx:

DS:265‐1

Page 35 of 61

Page 68: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

METERINGAnnubars

Ph (952) 906‐8811

8200 Market Blvd.,  Chanhassen MN 55317

Limitations: ‐

Dieterich Standard, Subsidiary of Rosemount Fx:

DS:030‐1

Flow Conditioner

Mike Sanders Ph 281‐235‐0052

10653 46 St. S.E.,  Calgary Alberta T2C 5C2 (Canada)

Limitations: ‐

MPS Systems LLC Fx:

DS:300.01

Ph (713) 467‐6000 (713) 827‐3880

111000 Brittmore Park,  Houston TX 77041

Limitations: ‐

Daniel Measurement & Control, Division of Emerson Fx:

DS:045‐1

Orifice Fittings

Clyde Shugart Ph 432‐381‐5153 432‐381‐3537

725 N. Ave.,  Odessa TX 79763

Limitations: Includes:Orifice Plates, Seal Rings, Replace Parts

Precision Flow Inc. Fx:

DS:305‐2

Orifice Meters

Ph 713‐465‐3255 713‐465‐3237

 Houston TX 77043

Limitations: ‐

TMCO ‐ The Measurement Company, Inc. Fx:

DS:275‐2

Clyde Shugart Ph 432‐381‐5153 432‐381‐3537

725 N. Ave.,  Odessa TX 79763

Limitations: ‐

Precision Flow Inc. Fx:

DS:305‐1

Ph (713) 467‐6000 (713) 827‐3880

111000 Brittmore Park,  Houston TX 77041

Limitations: ‐

Daniel Measurement & Control, Division of Emerson Fx:

DS:045‐1

Rotary Meters

Charlene Bragg Ph 832‐590‐2542

16240 Port N.W. Dr. ST.100,  Houston TX 

Limitations: ‐

Dresser Roots Meters Fx:

DS:294‐1

Ph (281) 491‐5252 (281) 491‐8440

 Stafford TX 77477

Limitations: ‐

Instromet, Inc. Fx:

DS:249‐1

Meter Tube Pipe

Ph 281‐391‐4340

1501 FM 1489 So.,  Brookshire TX 

Limitations: ‐

Scot Industries Fx:

DS:313.01

Meter Tubes

Page 36 of 61

Page 69: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

Meter Tubes

Ph (713) 467‐6000 (713) 827‐3880

111000 Brittmore Park,  Houston TX 77041

Limitations: ‐

Daniel Measurement & Control, Division of Emerson Fx:

DS:045‐1

Clyde Shugart Ph 432‐381‐5153 432‐381‐3537

725 N. Ave.,  Odessa TX 79763

Limitations: ‐

Precision Flow Inc. Fx:

DS:305‐1

Turbine Meters

Ph (814) 371‐8000 (814) 375‐8460

 Dubois PA 15801

Limitations: ‐

Sensus Metering Systems, Inc. Fx:

DS:245‐1

Ultrasonic Meters

Ph (713) 467‐6000 (713) 827‐3880

111000 Brittmore Park,  Houston TX 77041

Limitations: ‐

Daniel Measurement & Control, Division of Emerson Fx:

DS:045‐1

Ph 631‐231‐3600 631‐231‐3334

 Hauppauge NY 11788

Limitations: Portable Clamp‐on Ultrasonic Flowmeters for check 

Controlotron Fx:

DS:243‐2

 

Darryl Kahanek Ph 281‐436‐5100

15415 International Plaza Dr. St 100,  Houston Texas 77032

Limitations: ‐

SICK MEASUREMENT Fx:

DS:296.000‐1

Ph 814‐898‐5000 814‐899‐8927

 Erie PA 16510

Limitations: ‐

FMC Measurement Solutions Fx:

DS:268‐1

Page 37 of 61

Page 70: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

MOTOR CONTROL CENTERSMotor Control Centers

Ph (713) 672‐3500 (713) 672‐3644

 Houston TX 77029‐1398

Limitations: ‐

G.E. Oil & Gas Company Fx:

DS:043‐2

Ph (847) 397‐2600

 Palatine IL 60067

Limitations: ‐

Square D / Schneider Electric Fx:

DS:189‐1

Ph (770) 740‐3000

 Alpharetta GA 30005

Limitations: ‐

Siemens Energy & Automation, Inc. ‐ Corp. Headqua Fx:

DS:188‐1

Page 38 of 61

Page 71: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

MOTORSElectric Motors

Ph (864) 297‐4800 (864) 281‐2433

 Greenville SC 29615

Limitations: ‐

Reliance Electric Fx:

DS:184‐1

Ph (770) 740‐3000

 Alpharetta GA 30005

Limitations: ‐

Siemens Energy & Automation, Inc. ‐ Corp. Headqua Fx:

DS:188‐2

Page 39 of 61

Page 72: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

PIPEDouble Submerged Arc Weld Pipe

Ph 55‐12‐3644‐9122 55‐12‐3644‐9027

Av. Gastao Vidigal Neto, 475, Cidade Nova,  Pindamonhangaba Sao Paula Brazil 

Limitations:  24" to 60"

Tenaris / Confab Fx:

DS:251‐1

Ph 44(0)1536‐402121 44(0)1536‐404004

Brenda Rd,  Hartlepool Clevland UK TS252EF 

Limitations: 16" to 42"

Corus Tubes Fx:

DS:252‐1

Ph (713) 653‐8400 (713) 658‐9246

 Houston TX 77024

Limitations: ‐

Sumitomo Corporation of America Fx:

DS:256.001‐1

Ph (713) 465‐1600 (713) 827‐7423

5315 W 19th Street,  Panama City FL 32401

Limitations: 30"" to 72"""

Berg Steel Pipe Corp. Fx:

DS:012‐1

Ph (713) 532‐0052 (713) 532‐0062

 Houston TX 77042

Limitations: 20" to 64"

JFE / Kawasaki Fx:

DS:257.001‐1

Ph (713) 465‐1600 (713) 827‐7423

 Houston TX 77042

Limitations: ‐

Europipe Fx:

DS:255‐1

Ph (713) 532‐0052 (713) 532‐0062

 Houston TX 77042

Limitations: ‐

JFE / Nippon Fx:

DS:258.001‐1

April Schatte Ph (713) 961‐5858 (713) 961‐4433

 Taranto Italy 

Limitations: 18" to 56"

Ilva America, Inc. Fx:

DS:253‐1

Ph

   

Limitations: ‐

Evraz Camrose Fx:

DS:306‐2

Electric Resistance Weld Pipe

Diane Burger Ph (281) 752‐7300 (281) 752‐7303

.,  Thisvi Greece 

Limitations: 8" to 26"

Corinth Pipeworks Fx:

DS:254‐000‐2

Ph (972) 386‐3981 (972) 770‐6409

6866 Hwy 259 South,  Lone Star TX 75668‐1000

Limitations: Diameters 8 5/8"" through 16"" for grades X‐60 an

U.S. Steel (Lone Star Steel) Fx:

DS:224‐1

Ph 909‐350‐5978 (909) 350‐6210

 Fontana CA 92335

Limitations: Diameters 4 1/2"" through 16"" for all grades"

California Steel Industries Fx:

DS:225‐1

Page 40 of 61

Page 73: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

Electric Resistance Weld Pipe

April Schatte Ph (713) 961‐5858 (713) 961‐4433

 Taranto Italy 

Limitations: 6" to 20"

Ilva America, Inc. Fx:

DS:253‐1

Mark Tinne Ph 281‐671‐3800281‐671‐3800

10343 Sam Houston Park Drive,  McKeesport PA 

Limitations: 8 5/8" thru 16"  x‐52

U.S. Steel Fx:

DS:131.000‐2

Ph (225) 775‐8800 (225) 775‐7610

12555 Ronaldson Road,  Baton Rouge LA 70807

Limitations: 10 3/4"" to 24"""

Stupp Corporation Fx:

DS:119‐1

Kevis Trow Ph 713‐585‐3027

 Hickman Arkansas 72310

Limitations: Up thru 16"  (X‐60)

Tenaris/Hickman Fx:

DS:251‐2

Ph 55‐12‐3644‐9122 55‐12‐3644‐9027

Av. Gastao Vidigal Neto, 475, Cidade Nova,  Pindamonhangaba Sao Paula Brazil 

Limitations: ‐

Tenaris / Confab Fx:

DS:251.000‐1

Ph (306) 924‐7700 (306) 924‐7500

 Reginia Canada 

Limitations: 14"" thr 24"" diameter with yield strength  up

Evraz IPSCO Regina. Fx:

DS:212‐1

Ph

   

Limitations: ‐

Evraz Camrose Fx:

DS:306‐1

Ph (713) 532‐0052 (713) 532‐0062

 Houston TX 77042

Limitations: 8" to 24"

JFE / Nippon Fx:

DS:258.001‐1

Ph (713) 532‐0052 (713) 532‐0062

 Houston TX 77042

Limitations: ‐

JFE / Kawasaki Fx:

DS:257‐2

Ph (713) 465‐1600 (713) 827‐7423

 Houston TX 77042

Limitations: ‐

Europipe Fx:

DS:255‐1

Ph (713) 653‐8400 (713) 658‐9246

 Houston TX 77024

Limitations: ‐

Sumitomo Corporation of America Fx:

DS:256.000‐2

Ph 44(0)1536‐402121 44(0)1536‐404004

Brenda Rd,  Hartlepool Clevland UK TS252EF 

Limitations: ‐

Corus Tubes Fx:

DS:252‐1

Ph (713) 686‐4351 (713) 685‐2222

 Houston TX 77055

Limitations: ‐

TEX Tube, Inc Fx:

DS:128.000‐1

Page 41 of 61

Page 74: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

Electric Resistance Weld Pipe

Ph (205) 325‐7742 (205) 325‐8194

1501 31st Ave North,  Birmingham AL 35201

Limitations: 10 3/4"" to 24"""

American Steel Pipe, Division, American Cast Iron Fx:

DS:004‐1

Seamless Pipe

Ph (705) 946‐8130 (705) 946‐8154

 Sault Ste Marie ON P6C 1L9 

Limitations: ‐

Tenaris / Algoma Tubes Fx:

DS:251.001‐1

Ph (713) 532‐0052 (713) 532‐0062

 Houston TX 77042

Limitations: 2" to 16"

JFE / Nippon Fx:

DS:258.000‐1

Ph (81) 44‐328‐3400 (81) 44‐328‐3456

 Kawasaki City Japan 210‐0855 

Limitations: ‐

Tenaris / NKK Tubes Fx:

DS:251.002‐1

Mark Tinne Ph

 Fairfield AL 

Limitations: Seamless

U.S. Steel Fx:

DS:131.000‐3

Karen Leone Ph 281‐456‐6018 281‐456‐7247

 Youngstown Ohio 44510

Limitations: Seamless Pipe sizes 6"" to 10"""

V&M Star Steel, Inc.(North Star) Fx:

DS:199.000‐1

Mark Tinne Ph 281‐671‐3800

 Lorain Ohio 

Limitations: Seamless

U.S. Steel Fx:

DS:131.000‐1

Spiral Pipe

Bill Browman Ph 281‐204‐6020

 Bay St. Louis Mississippi 

Limitations: ‐

PSL North America, LLC Fx:

DS:299.0001

Ph (225) 775‐8800 (225) 775‐7610

12555 Ronaldson Road,  Baton Rouge LA 70807

Limitations: ‐

Stupp Corporation Fx:

DS:119‐1

Ph

 Reginia Canada  (Canada)

Limitations: ‐

Evraz IPSCO Regina Fx:

DS:212‐2

Diane Burger Ph 281‐752‐7300

 Thisvi Greece 

Limitations: 24" to 48"

Corinth Pipe Works Fx:

DS:254.000‐1

Brian Roper Ph 713‐465‐1600

900 Paper Mill Rd.,  Mobile AL 36610

Limitations: ‐

Berg Spiral Pipe Corp Fx:

DS:300.000‐1

Page 42 of 61

Page 75: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

RTURemote Terminal Units (RTU)

Ph (713) 272‐2294 (713) 272‐5338

 Houston TX 77099

Limitations: ‐

Thermo Electron Corporation Fx:

DS:244.000‐1

Page 43 of 61

Page 76: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

SWITCHGEARSwitchgear

Ph (770) 740‐3000

 Alpharetta GA 30005

Limitations: ‐

Siemens Energy & Automation, Inc. ‐ Corp. Headqua Fx:

DS:188.000‐1

Ph (713) 672‐3500 (713) 672‐3644

 Houston TX 77029‐1398

Limitations: ‐

G.E. Oil & Gas Company Fx:

DS:043.000‐2

Page 44 of 61

Page 77: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

TANKSAtmospheric Storage Tanks

Ronnie Maybre Ph (713) 691‐3781 (713) 691‐6938

8923 Manus,  Houston TX 77093

Limitations: ‐

Natco Machine & Welding Co., Inc. Fx:

DS:105.000‐1

Ph (903) 859‐2111 (903) 859‐4191

100 Hwy 64 West,  Arp TX 75750

Limitations: ‐

Baker Tank Company Fx:

DS:083.000‐1

Ph (580) 338‐5496 (580) 338‐0885

 Guymon OK 73942

Limitations: ‐

Cimarron, Inc. Fx:

DS:084.000‐1

Page 45 of 61

Page 78: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

TRANSFORMERSTransformers

Ph (713) 672‐3500 (713) 672‐3644

 Houston TX 77029‐1398

Limitations: ‐

G.E. Oil & Gas Company Fx:

DS:043.000‐1

Ph (434) 846‐3553

 Lynchburg VA 24501

Limitations: ‐

Delta Star, Inc. Fx:

DS:175.000‐1

Ph (414) 209‐1620 (414) 209‐1621

 Franklin WI 53132‐8847

Limitations: ‐

Jefferson Electric Fx:

DS:214.000‐1

Ph (606) 813‐2236

 Versailles KY 40383

Limitations: ‐

Kuhlman Electric Fx:

DS:180.000‐1

Page 46 of 61

Page 79: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

TRANSFORMETTransformet

Ph (919) 734‐8900 (919) 580‐3244

 Goldsboro NC 27530

Limitations: ‐

Waukeshau Electric Fx:

DS:178.000‐1

Page 47 of 61

Page 80: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

TRANSMITTERSTransmitters

Ph (952) 906‐8811

 Chanhassen MN 55317‐9687

Limitations: ‐

Rosemount Division Emerson Process Management Fx:

DS:185.000‐1

Ph (713) 780‐6500 (713) 780‐6676

 Houston TX 77063

Limitations: ‐

Honeywell, Inc. Fx:

DS:179.000‐1

Page 48 of 61

Page 81: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

VALVESBall Valve ‐ 2inch and larger

Bill Richardson Ph 281‐261‐3698 (281) 261‐3589

 Weifang City China 

Limitations: 2" thru 24" All valves must be tested in US

Cameron Valves Fx:

DS:016.000‐2

Ph (780) 463‐4888

3707 97th Street,  Edmonton Alberta T6E 6J2 

Limitations: ‐

Grove Valve, Valgro Fx:

DS:046.001‐1

Bill Richardson Ph 281‐261‐3698 (281) 261‐3589

 Ville Platte LA 70586

Limitations: 2"" to 16"", Removed Small Valves with threaded d

Cameron Valves WKM Fx:

DS:016.001‐1

Franco Perfetti Ph 8651285160128

 Wujiang China 

Limitations: All valves must be tested in U.S.

Valvitalia (Delta)(China) Fx:

DS:277.000‐2

Ph 281‐261‐3698 (281) 261‐3589

 Houston TX 77042

Limitations: As of 02/27/2002, Cameron's Type 40, bolted‐body

Cameron Valves/Ville Platte Fx:

DS:016.000‐1

Ph (405) 631‐1533 (405) 631‐5034

 Oklahoma City OK 73143

Limitations: 2"" to 4"""

KF Industries, Inc. Fx:

DS:151.000‐1

Max Ruggeri Ph 39.0382.94.59.11 39.0383.916.31

 Rivanazzano (PV) Italy 27055

Limitations: Valves to be tested in U.S.

Delta Valve / Valvitalia Fx:

DS:277.000‐1

Ph 800‐643‐9390 501‐570‐5700

 Little Rock AR 72209

Limitations: ‐

Orbit Valve ‐ Cooper Cameron Fx:

DS:086.000‐1

Bill Richardson Ph 281‐261‐3698 281‐261‐3589

 Houston TX 77041

Limitations: 2"" & larger ‐ 2"" to 48"""

Grove Valve, (Cameron Ville Platte) Fx:

DS:046.000‐1

Ph (281) 340‐5400 (281) 340‐5499

 Stafford TX 77477

Limitations: 2"" thru 24"", ANSI 150 thru 1500, 2"" thru 12"",

PBV‐USA, Inc. Fx:

DS:222.000‐2

Ph (905) 791‐5777 (905)  791‐5756

 Brampton ON, CAN  L6T 4L3

Limitations: Approved for 20"" ‐ 60"""

GVS, Ltd. ‐ Guide Valve (Nuovo Pignone Design) Fx:

DS:240.000‐1

Josh Smith Ph 281‐482‐4728 281‐482‐9728

3521 FM 646 Rd. North,  Santa Fe Texas 77510

Limitations: Up thru 24"

Southern California Valve Fx:

DS:312.02

Ball Valve ‐ less than 2in

Page 49 of 61

Page 82: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

Ball Valve ‐ less than 2in

Ph (704) 841‐6000 (704) 841‐6020

 Matthews NC 28106

Limitations: Now make up 12" FExFE ‐ Bronze, Carbon, Stainles

Apollo Ball Valve Division, Conbraco Fx:

DS:005.000‐1

Josh Smith Ph 281‐482‐4728 281‐482‐9728

3521 FM 646 Rd. North,  Santa Fe Texas 77510

Limitations: ‐

Southern California Valve Fx:

DS:312.02

Ph 603‐895‐4761 603‐865‐6785

 Raymond NH 03077

Limitations: ‐

Gemini Valve Fx:

DS:272.000‐1

Ph (508) 481‐4800 (508) 481‐4454

 Marlborough MA 01752

Limitations: Less than 2"" ‐ 1/8"" to 2"" bolt‐thru body desig

Worcester Controls Corp. Fx:

DS:138.000‐1

Ph 508‐852‐0200 508‐852‐8172

44 Bowditch Dr.,  Shrewsbury MA 01545

Limitations: Bolt‐thru body design only

Neles‐Jamesbury Valve, Div of Metso Automation Fx:

DS:074.000‐1

Ph (440) 473‐1050 (440) 473‐0402

 Highland Heights OH 44143

Limitations: 1/8"" to 2"" bolt‐thru body design only ‐ AGT doe

Swagelok ‐ Whitey Fx:

DS:137.000‐1

Ph (931) 432‐4021 (931) 432‐5518

 Cookeville TN 38501

Limitations: Less than 2"" ‐ 1/4"" to 1"" ‐ Screwed Body Const

McCanna / Marpac Valves   Div of Flowserve Fx:

DS:062.000‐1

Butterfly Valves (Non Gas Service)

Ph (931) 432‐4021 (931) 432‐5518

 Cookeville TN 38501

Limitations: 3"" to 36"""

McCanna / Marpac Valves   Div of Flowserve Fx:

DS:062.000‐1

Ph 641‐754‐3011 641‐754‐2830

 Marshalltown IA 50158

Limitations: ‐

Posi‐Seal, Division of Fisher Controls Fx:

DS:152.000‐1

Check Valves ‐ 2in and larger

John Brown Ph 832‐912‐1022 832‐912‐1151

 Edmonton Canada 

Limitations: 1" thru 42"

Stream‐Flo Industries Fx:

DS:295.1

Daniele Balzarotti Ph 3904447491168 390444401498

 Vicenza Italy 

Limitations: Valves must be tested in U.S.

Valvitalia (Vitas) Fx:

DS:293.01

Ph (281) 599‐3777 (281) 599‐3888

Nijverheidsstraat 67,  Gouda The Netherlands 

Limitations: 2"" & larger ‐ 2"" to 48"" ‐ Disapproved by AGT"

Mokveld Valves, Inc. Fx:

DS:068.000‐1

Page 50 of 61

Page 83: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

Check Valves ‐ 2in and larger

Ph (281) 469‐0550 (281) 894‐1332

19191 Hempstead Hwy.,  Houston TX 77065

Limitations: 2"" thru 16"""

M & J Valve, An SPX Process Equipment Operation Fx:

DS:027.000‐2

Ph (832) 590‐2300 (832) 590‐2529

 Houston TX 77041

Limitations: 2"" & larger ‐ 2"" to 48"""(US Only)

Tom Wheatley Valve Fx:

DS:130.000‐1

Ph (918) 446‐4551 (918) 582‐5013

6750 S. 57th West Ave.,  Tulsa OK 74131‐2233

Limitations: 2 & larger ‐ 2"" to 48"

National Oilwell Varco Fx:

DS:136.000‐1

Josh Smith Ph 281‐482‐4728 281‐482‐9728

3521 FM 646 Rd. North,  Santa Fe Texas 77510

Limitations: Up thru 24"

Southern California Valve Fx:

DS:312.01

Check Valves ‐ less than 2"

Ph (814) 542‐9977

 Mount Union PA 77040

Limitations: Less than 2"" ‐ 1/4"" to 2"""

RP & C, Division of Bonney Forge Fx:

DS:102.000‐1

Ph (903) 885‐3151 (903) 439‐3411

1511 Jefferson St.,  Sulphur Springs TX 75482

Limitations: Less than 2"" ‐ 1/4"" to 2"" ‐ Not Approved by AG

Vogt Valve, Div. of Flowserve Fx:

DS:135.000‐1

Josh Smith Ph 281‐482‐4728 281‐482‐9728

3521 FM 646 Rd. North,  Santa Fe Texas 77510

Limitations: ‐

Southern California Valve Fx:

DS:312.02

Ph (918) 446‐4551 (918) 582‐5013

6750 S. 57th West Ave.,  Tulsa OK 74131‐2233

Limitations: Less than 2"" ‐ 1/2"" to 2"""

National Oilwell Varco Fx:

DS:136.000‐1

Ph (203) 363‐7300

 Stamford CT 06902

Limitations: 1/4"" to 2""  ‐ Disapproved by AGT"

Crane Company Fx:

DS:025.000‐1

Ph (832) 590‐2300 (832) 590‐2529

 Houston TX 77041

Limitations: Less than 2"" ‐ 1/2"" to 2"""(US Only)

Tom Wheatley Valve Fx:

DS:130.000‐1

Ph (713) 590‐1312 (713) 590‐1319

 Houston TX 77040

Limitations: Less than 2"" ‐ 1/4"" to 2"" ‐ Disapproved by AGT

Smith Valve, Division of Newdell Industries Fx:

DS:109.000‐1

John Brown Ph 832‐912‐1022 832‐912‐1151

 Edmonton Canada 

Limitations: ‐

Stream‐Flo Industries Fx:

DS:295.1

Control Valves

Page 51 of 61

Page 84: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:44 PMSpectra Commodities Lis

Control Valves

Ph (832) 590‐2300 (832) 590‐2529

 Houston TX 77041

Limitations: ‐

Masoneilan Valve Division, Dresser Flow Solutions Fx:

DS:061.000‐1

Ph (952) 906‐8811

 Chanhassen MN 55317

Limitations: Ball 4"" to 24"", Globe 1"" to 12"""

Fisher, Division of Emerson Process Management Fx:

DS:041.000‐1

Ph (801) 489‐8611 (801) 489‐3719

 Springville UT 84663‐0903

Limitations: Ball 2"" ‐ 12""; Globe 1/2"" to 42"""

Flow Serv Fx:

DS:134.000‐1

Ph (985) 851‐3160 (985) 851‐7062

 Houma LA 70360

Limitations: ‐

CorVal, L. P. Fx:

DS:241.000‐1

Ph 508‐852‐0200 508‐852‐8172

44 Bowditch Dr.,  Shrewsbury MA 01545

Limitations: Ball 4"" ‐ 36"", Globe 1/2"" ‐ 16"""

Neles‐Jamesbury Valve, Div of Metso Automation Fx:

DS:074.000‐1

Gate Valves ‐ 2in and larger

Ph (780) 463‐4888

3707 97th Street,  Edmonton Alberta T6E 6J2 

Limitations: ‐

Grove Valve, Valgro Fx:

DS:046.001‐1

Bill Richardson Ph 281‐261‐3698 (281) 261‐3589

 Ville Platte LA 70586

Limitations: 2"" to 36"""

Cameron Valves WKM Fx:

DS:016.001‐1

Bill Richardson Ph 281‐261‐3698 281‐261‐3589

 Houston TX 77041

Limitations: 2"" & larger ‐ 2"" to 48"""

Grove Valve, (Cameron Ville Platte) Fx:

DS:046.000‐1

Ph (281) 469‐0550 (281) 894‐1332

19191 Hempstead Hwy.,  Houston TX 77065

Limitations: 2"" to 87"""

M & J Valve, An SPX Process Equipment Operation Fx:

DS:027.000‐2

Josh Smith Ph 281‐482‐4728 281‐482‐9728

3521 FM 646 Rd. North,  Santa Fe Texas 77510

Limitations: Up thru 24"

Southern California Valve Fx:

DS:312.01

Ph (203) 363‐7300

 Stamford CT 06902

Limitations: ‐

Crane Company Fx:

DS:025.000‐1

Ph 281‐261‐3698 (281) 261‐3589

 Houston TX 77042

Limitations: ‐

Cameron Valves/Ville Platte Fx:

DS:016.000‐1

Gate Valves ‐ less than 2in

Page 52 of 61

Page 85: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:45 PMSpectra Commodities Lis

Gate Valves ‐ less than 2in

Ph (814) 542‐9977

 Mount Union PA 77040

Limitations: Less than 2"" ‐ 1/2"" to 2"" ‐ Disapproved by AGT

RP & C, Division of Bonney Forge Fx:

DS:102.000‐1

Ph (713) 590‐1312 (713) 590‐1319

 Houston TX 77040

Limitations: Less than 2"" ‐ 1/4"" to 2"" ‐ Disapproved by AGT

Smith Valve, Division of Newdell Industries Fx:

DS:109.000‐1

Ph (203) 363‐7300

 Stamford CT 06902

Limitations: 1/2"" to 2"""

Crane Company Fx:

DS:025.000‐1

Josh Smith Ph 281‐482‐4728 281‐482‐9728

3521 FM 646 Rd. North,  Santa Fe Texas 77510

Limitations: ‐

Southern California Valve Fx:

DS:312.02

Ph (903) 885‐3151 (903) 439‐3411

1511 Jefferson St.,  Sulphur Springs TX 75482

Limitations: Less than 2"" ‐ 1/2"" to 2"""

Vogt Valve, Div. of Flowserve Fx:

DS:135.000‐1

Globe Valves ‐ less than 2in

Ph (713) 590‐1312 (713) 590‐1319

 Houston TX 77040

Limitations: Less than 2"" ‐ 1/4"" to 2"""

Smith Valve, Division of Newdell Industries Fx:

DS:109.000‐1

Ph (814) 542‐9977

 Mount Union PA 77040

Limitations: Less than 2"" ‐ 1/4"" to 2"" ‐ Disapproved by AGT

RP & C, Division of Bonney Forge Fx:

DS:102.000‐1

Ph (903) 885‐3151 (903) 439‐3411

1511 Jefferson St.,  Sulphur Springs TX 75482

Limitations: Less than 2"" ‐ 1/2"" to 2"""

Vogt Valve, Div. of Flowserve Fx:

DS:135.000‐1

Ph (203) 363‐7300

 Stamford CT 06902

Limitations: 1/4"" to 2"""

Crane Company Fx:

DS:025.000‐1

Manifold Valves

Ph (832) 261‐2400 (281) 291‐8801

 Pasadena TX 77507

Limitations: ‐

Anderson Greenwood, Div of TYCO Valves & Controls Fx:

DS:106.000‐1

Ph (713) 466‐0056 (800) 568‐9228

 Houston TX 77041

Limitations: ‐

PGI International Fx:

DS:100.000‐1

Ph (440) 473‐1050 (440) 473‐0402

 Highland Heights OH 44143

Limitations: ‐

Swagelok ‐ Whitey Fx:

DS:137.000‐1

Needle Valves

Page 53 of 61

Page 86: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:45 PMSpectra Commodities Lis

Needle Valves

Ph (864) 574‐7966 (864)  587‐5608

405 Centura Court,  Spartanburg SC 29303

Limitations: ‐

Hoke, Inc. Fx:

DS:120.000‐1

Ph (440) 951‐7100 (440) 951‐4872

 Willouby OH 44084

Limitations: ‐

Swagelok ‐ Nupro Fx:

DS:082.000‐1

Ph (440) 473‐1050 (440) 473‐0402

 Highland Heights OH 44143

Limitations: ‐

Swagelok ‐ Whitey Fx:

DS:137.000‐1

Ph 304‐387‐1200 304‐387‐1212

 Newell WV 26050

Limitations: ‐

Marsh ‐ Bellofram Fx:

DS:060.000‐1

Ph (832) 261‐2400 (281) 291‐8801

 Pasadena TX 77507

Limitations: ‐

Anderson Greenwood, Div of TYCO Valves & Controls Fx:

DS:106.000‐1

Ph (713) 466‐0056 (800) 568‐9228

 Houston TX 77041

Limitations: ‐

PGI International Fx:

DS:100.000‐1

Piston Check Valves ‐ 2in and larger

Ph (281) 599‐3777 (281) 599‐3888

Nijverheidsstraat 67,  Gouda The Netherlands 

Limitations: 2"" & larger"

Mokveld Valves, Inc. Fx:

DS:068.000‐1

Ph (832) 590‐2300 (832) 590‐2529

 Houston TX 77041

Limitations: Waiver Req.  2"" to 20""_VERTICAL PISTON"

Tom Wheatley Valve Fx:

DS:130.000‐1

Ph (713) 590‐1312 (713) 590‐1319

 Houston TX 77040

Limitations: 2"" and larger"

Smith Valve, Division of Newdell Industries Fx:

DS:109.000‐1

John Brown Ph 832‐912‐1022 832‐912‐1151

 Edmonton Canada 

Limitations: 2" thru 42"(Valves to be tested in No. Am.)

StreamFlo (Europa Va) Fx:

DS:295‐2

Plug Valves ‐ 2in and larger

Veron Jones Ph 281‐890‐2739 281‐469‐2827

1511 Jefferson Street,  Sulphur Springs TX 75482

Limitations: 2"" and larger ‐ 8"" to 42"""

Nordstrom Valves Division of Flowserve Fx:

DS:079.000‐1

Franco Perfetti Ph 8651285160128

 Wujiang China 

Limitations: ‐

Valvitalia (Delta)(China) Fx:

DS:277.000‐2

Page 54 of 61

Page 87: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:45 PMSpectra Commodities Lis

Plug Valves ‐ 2in and larger

Josh Smith Ph 281‐482‐4728 281‐482‐9728

3521 FM 646 Rd. North,  Santa Fe Texas 77510

Limitations: Up thru 24"

Southern California Valve Fx:

DS:312.02

Ph (713) 692‐9921 (713) 692‐1802

 Houston TX 77022

Limitations: 2"" and larger‐ 2"" to 24"""

Serck Audco Valves, Division of Flowserve Fx:

DS:107.000‐2

Max Ruggeri Ph 39.0382.94.59.11 39.0383.916.31

 Rivanazzano (PV) Italy 27055

Limitations: ‐

Delta Valve / Valvitalia Fx:

DS:277.000‐1

Ph 39.02.96.799.632 39.02.96.799.699

 Milano Italy 20020

Limitations: ‐

Galli‐Cassina Fx:

DS:280.000‐1

Plug Valves ‐ less than 2in

Ph (440) 951‐7100 (440) 951‐4872

 Willouby OH 44084

Limitations: 2"" ‐ 1/8"" to 1/2"""

Swagelok ‐ Nupro Fx:

DS:082.000‐1

Ph (713) 692‐9921 (713) 692‐1802

 Houston TX 77022

Limitations: Less than 2"" ‐ 1/2"" to 2"""

Serck Audco Valves, Division of Flowserve Fx:

DS:107.000‐1

Veron Jones Ph 281‐890‐2739 281‐469‐2827

1511 Jefferson Street,  Sulphur Springs TX 75482

Limitations: less than 2"" ‐ 1/4"" to 2"""

Nordstrom Valves Division of Flowserve Fx:

DS:079.000‐1

Regulators

Ph (780) 463‐4888

3707 97th Street,  Edmonton Alberta T6E 6J2 

Limitations: ‐

Grove Valve, Valgro Fx:

DS:046.001‐1

Ph (801) 487‐2225 (801) 487‐2587

 Salt Lake City UT 84115

Limitations: ‐

Mooney Controls ‐ Division of Dresser Fx:

DS:070.000‐1

Ph (952) 906‐8811

 Chanhassen MN 55317

Limitations: ‐

Fisher, Division of Emerson Process Management Fx:

DS:041.000‐1

Bill Richardson Ph 281‐261‐3698 281‐261‐3589

 Houston TX 77041

Limitations: ‐

Grove Valve, (Cameron Ville Platte) Fx:

DS:046.000‐1

Ph (281) 491‐2331 (281) 491‐8344

13839 West Bellfort,  Sugarland TX 77478

Limitations: ‐

Welker Engineering Fx:

DS:053.000‐1

Relief Valves

Page 55 of 61

Page 88: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:45 PMSpectra Commodities Lis

Relief Valves

Ph (281) 491‐2331 (281) 491‐8344

13839 West Bellfort,  Sugarland TX 77478

Limitations: ‐

Welker Engineering Fx:

DS:053.000‐1

Ph (801) 487‐2225 (801) 487‐2587

 Salt Lake City UT 84115

Limitations: ‐

Mooney Controls ‐ Division of Dresser Fx:

DS:070.000‐1

Ph (832) 261‐2400 (281) 291‐8801

 Pasadena TX 77507

Limitations: ‐

Anderson Greenwood, Div of TYCO Valves & Controls Fx:

DS:106.000‐1

Ph (780) 463‐4888

3707 97th Street,  Edmonton Alberta T6E 6J2 

Limitations: ‐

Grove Valve, Valgro Fx:

DS:046.001‐1

Perry Blythe (The Blythe Co)

Ph 704‐843‐1960 704‐843‐1990

6012 Waxhaw Highway,  Mineral Springs North Carolina 28108 (USA)

Limitations: 1/2" inlet to 8" inlet

Mercer Valve Co. Fx:

DS:310.01

Bill Richardson Ph 281‐261‐3698 281‐261‐3589

 Houston TX 77041

Limitations: ‐

Grove Valve, (Cameron Ville Platte) Fx:

DS:046.000‐1

Ph 716‐662‐2585 716‐662‐2580

 Orchard Park NY 14127

Limitations: ‐

Flow Safe Supply Fx:

DS:282.000‐1

Page 56 of 61

Page 89: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:45 PMSpectra Commodities Lis

VARIABLE SPEED DRIVESElectric Variable Speed Drives

Ph (713) 467‐9888 (713) 827‐8460

 Houston TX 77043

Limitations: ‐

National Oil Well Fx:

DS:186.000‐1

Ph (770) 740‐3000

 Alpharetta GA 30005

Limitations: ‐

Siemens Energy & Automation, Inc. ‐ Corp. Headqua Fx:

DS:188.000‐1

Ph (713) 672‐3500 (713) 672‐3644

 Houston TX 77029‐1398

Limitations: ‐

G.E. Oil & Gas Company Fx:

DS:043.000‐1

Page 57 of 61

Page 90: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:45 PMSpectra Commodities Lis

VESSELSBlowdown Tanks/Silencers

Ph (716) 662‐6540 (716) 662‐6548

401 US Hwy 281,  Wichita Falls TX 76310

Limitations: ‐

Burgess‐Manning, Inc. Fx:

DS:092.000‐1

Ph (713) 465‐0995 (713) 465‐0997

7607 Wright Road,  Houston TX 77041

Limitations: ‐

Mueller Environmental Designs, Inc. Fx:

DS:201.000‐1

Ph (716) 662‐6540 (716) 662‐6548

105 E. 10th Street,  Sisco TX 76437

Limitations: ‐

Burgess‐Manning, Inc. Fx:

DS:092.001‐1

Ph (318) 671‐5400 (318) 671‐5583

 Shreveport LA 71106‐7198

Limitations: ‐

Beaird Company, LTD Fx:

DS:010.000‐1

Ph (281) 255‐6955 (281) 351‐8502

 Cypress TX 77429

Limitations: ‐

McGuffy Industries Fx:

DS:093.000‐1

Engine Air Intake Filters

Ph (952) 887‐3131 (952) 887‐3155

9250 West Bloomington,  Minneapolis MN 55431

Limitations: ‐

Donaldson Company, Torit Products Fx:

DS:113.000‐1

Ph (281) 255‐6955 (281) 351‐8502

 Cypress TX 77429

Limitations: ‐

McGuffy Industries Fx:

DS:093.000‐1

Engine Air Intake Silencers

Ph (608) 873‐4242 (608) 873‐4298

1925 Hwy 51 W,  Stoughton WI 53589

Limitations: ‐

Universal Silencers Fx:

DS:085.000‐1

Ph (716) 662‐6540 (716) 662‐6548

105 E. 10th Street,  Sisco TX 76437

Limitations: ‐

Burgess‐Manning, Inc. Fx:

DS:092.000‐2

Ph (318) 671‐5400 (318) 671‐5583

 Shreveport LA 71106‐7198

Limitations: ‐

Beaird Company, LTD Fx:

DS:010.000‐1

Ph (713) 465‐0995 (713) 465‐0997

7607 Wright Road,  Houston TX 77041

Limitations: ‐

Mueller Environmental Designs, Inc. Fx:

DS:201.000‐1

Ph (716) 662‐6540 (716) 662‐6548

401 US Hwy 281,  Wichita Falls TX 76310

Limitations: ‐

Burgess‐Manning, Inc. Fx:

DS:092.000‐1

Engine Lube Oil Filters

Page 58 of 61

Page 91: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:45 PMSpectra Commodities Lis

Engine Lube Oil Filters

Ph (940) 325‐2575 (940) 325‐4622

118 Washington Ave.,  Mineral Wells TX 76068

Limitations: ‐

PECO ‐ Perry Corp. Fx:

DS:099.000‐1

Ph (847) 674‐7782 (847) 674‐0379

3440 Cleveland Ave.,  Skokie IL 60076

Limitations: ‐

William W. Nugent & Co., Inc. Fx:

DS:081.000‐1

Ph (607) 733‐7121 (617)  737‐1108

 Elmira NY 14902‐7121

Limitations: ‐

Hilco Div. / Hilliard Corp. Fx:

DS:050.000‐2

Exhaust Silencers

Ph (716) 662‐6540 (716) 662‐6548

105 E. 10th Street,  Sisco TX 76437

Limitations: ‐

Burgess‐Manning, Inc. Fx:

DS:092.001‐1

Ph (318) 671‐5400 (318) 671‐5583

 Shreveport LA 71106‐7198

Limitations: ‐

Beaird Company, LTD Fx:

DS:010.000‐1

Ph (713) 465‐0995 (713) 465‐0997

7607 Wright Road,  Houston TX 77041

Limitations: ‐

Mueller Environmental Designs, Inc. Fx:

DS:201.000‐1

Ph (716) 662‐6540 (716) 662‐6548

401 US Hwy 281,  Wichita Falls TX 76310

Limitations: ‐

Burgess‐Manning, Inc. Fx:

DS:092.000‐1

Ph (281) 255‐6955 (281) 351‐8502

 Cypress TX 77429

Limitations: ‐

McGuffy Industries Fx:

DS:093.000‐1

Gas Separators

Ph (713) 225‐4913 (713) 224‐7937

3905 Jensen Drive,  Houston TX 77026

Limitations: ‐

EN‐FAB, Inc. Fx:

DS:038.000‐1

Ph 905‐696‐9292 905‐696‐8046

 Mississauga Ontario L4W 2V6 

Limitations: ‐

ESS Corp. Fx:

DS:270.000‐1

John Kennedy Ph (913) 294‐5331 (913) 294‐5337

 Paola KS 66071

Limitations: ‐

Taylor Forge Engineered Systems Fx:

DS:127.000‐1

Lilac Khosrowyar Ph 918‐663‐8383 918‐663‐8460

1007 E.Admiral Blvd.,  Tulsa Ok. 74120

Limitations: ‐

Gas Tech Eng. Fx:

DS:309.01

Page 59 of 61

Page 92: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:45 PMSpectra Commodities Lis

Gas Separators

Ph 713‐466‐6252 713‐466‐6217

6417 Cunningham Rd.,  Houston TX 77041

Limitations: ‐

R & N Manufacturing Fx:

DS:297.000‐1

Ph (903) 757‐7341 (903) 759‐6986

 White Oak TX 75693

Limitations: ‐

Winston F2S Corporation Fx:

DS:239‐1

Ph (940) 325‐2575 (940) 325‐4622

118 Washington Ave.,  Mineral Wells TX 76068

Limitations: ‐

PECO ‐ Perry Corp. Fx:

DS:099.000‐1

Ph (214) 357‐6181 (214) 351‐0194

 ABILINE TX 75229

Limitations: ‐

Peerless Manufacturing Fx:

DS:098.000‐1

Ph (716) 662‐6540 (716) 662‐6548

401 US Hwy 281,  Wichita Falls TX 76310

Limitations: ‐

Burgess‐Manning, Inc. Fx:

DS:092.000‐1

Ph (903) 759‐4478 (903) 759‐6781

208 South Ave. A,  Longview TX 75604

Limitations: ‐

King Tool Company Fx:

DS:091.000‐1

Inline Silencers

Ph (608) 873‐4242 (608) 873‐4298

1925 Hwy 51 W,  Stoughton WI 53589

Limitations: ‐

Universal Silencers Fx:

DS:085.000‐1

Pulsation Bottles

Ph (740) 685‐2542 (740) 685‐5516

 Derwent OH 43733

Limitations: ‐

Bicon Services, Inc. Fx:

DS:112.000‐1

Ph (716) 662‐6540 (716) 662‐6548

401 US Hwy 281,  Wichita Falls TX 76310

Limitations: ‐

Burgess‐Manning, Inc. Fx:

DS:092.000‐1

Ph (214) 357‐6181 (214) 351‐0194

 ABILINE TX 75229

Limitations: ‐

Peerless Manufacturing Fx:

DS:098.000‐1

John Kennedy Ph (913) 294‐5331 (913) 294‐5337

 Paola KS 66071

Limitations: ‐

Taylor Forge Engineered Systems Fx:

DS:127.000‐1

Strainers, 6" and Larger"

Ph (940) 325‐2575 (940) 325‐4622

118 Washington Ave.,  Mineral Wells TX 76068

Limitations: Larger than 6"""

PECO ‐ Perry Corp. Fx:

DS:099.000‐1

Page 60 of 61

Page 93: Interconnection design gas pipelines

Thursday, July 28, 2011

1:57:45 PMSpectra Commodities Lis

Strainers, 6" and Larger"

Ph (214) 357‐6181 (214) 351‐0194

 ABILINE TX 75229

Limitations: Larger than 6"""

Peerless Manufacturing Fx:

DS:098.000‐1

Ph (716) 662‐6540 (716) 662‐6548

401 US Hwy 281,  Wichita Falls TX 76310

Limitations: larger than 6"""

Burgess‐Manning, Inc. Fx:

DS:092.000‐1

John Kennedy Ph (913) 294‐5331 (913) 294‐5337

 Paola KS 66071

Limitations: ‐

Taylor Forge Engineered Systems Fx:

DS:127.000‐1

Strainers, Less than 6""

Ph (704) 841‐6000 (704) 841‐6020

 Matthews NC 28106

Limitations: ‐

Apollo Ball Valve Division, Conbraco Fx:

DS:005.001‐1

Ph (903) 885‐3151 (903) 439‐3411

1511 Jefferson St.,  Sulphur Springs TX 75482

Limitations: Less than 6"""

Vogt Valve, Div. of Flowserve Fx:

DS:135.000‐1

Ph (610) 825‐2100 (610) 825‐1235

480 Norristown Rd.,  Blue Bell PA 19422

Limitations: Less than 6"""

Yarway Corp Fx:

DS:139.000‐1

Ph (713) 6692‐3340 (713) 699‐5186

4920 Airline Drive,  Houston TX 77022

Limitations: Less than 6"""

Aitken, Inc. Fx:

DS:149.000‐1

Ph (903) 757‐7341 (903) 759‐6986

 White Oak TX 75693

Limitations: less than 6"""

Winston F2S Corporation Fx:

DS:239.000‐2

Ph (910) 865‐8241 (910) 865‐3179

 St. Pauls NC 28384

Limitations: less than 6"""

Mueller Steam Specialties Fx:

DS:089.000‐1

Ph (908) 351‐5400 (908)  351‐7893

900 Fairmont Ave.,  Elizabeth NJ 07207

Limitations: less than 6"""

Hayward Industrial Products Fx:

DS:049.000‐1

Ph (918) 445‐1140 (918) 445‐4617

 Sapulpa OK 74066

Limitations: less than 6"""

Weamco, Inc. Fx:

DS:088.000‐1

Page 61 of 61

Page 94: Interconnection design gas pipelines

- 43 -

ATTACHMENT D

Approved Meter Fabricators

The attached listing is provided for reference.

Page 95: Interconnection design gas pipelines

Spectra» Energy

Manufacturer

Daniel Measurement

Northstar Industries

Pickett Measurement

Pipeline Equipment, Inc.

Sagebrush

SICK Maihak, Inc.

* Valtronics, Inc.

*Dresser

*Gas Tech

Page 10f2

Revision: 3 Date: 03-09-2011

Approved Manufacturers Commodity: Fabrication - Meter and Regulator Skids / Meter Tubes

Contact / E-Mail

Bill Buckley [email protected]

Tom Quine [email protected]

Mike Quick [email protected]

Tom Gates [email protected]

Richard Gray [email protected]

Darryl Kahanek [email protected]

Ken Thompson [email protected]

Patty German [email protected]

Paul Hall [email protected]

Phone

713.827.5150

978.975.5500

281.825.0512 877 .602.6868 (Toll)

832.698.1690 877.914.4144 (Toll)

281. 723.8585

281.436.5100 877.356.9742 (Toll)

304.273.5356

814.362.9230

281.825.1845 800.685.6579 (Toll)

Approved Location (ONLY specified Shop below)

Houston,

Methuen, MA

Corpus Christi, TX

Tulsa, OK

Tulsa, OK

Houston, TX

Ravenswood, W. VA

Bradford, PA

Tulsa, Ok

RLWallace
Typewritten Text
RLWallace
Typewritten Text
RLWallace
Typewritten Text
RLWallace
Typewritten Text
TX
RLWallace
Typewritten Text
RLWallace
Typewritten Text
RLWallace
Typewritten Text
RLWallace
Typewritten Text
RLWallace
Typewritten Text
RLWallace
Typewritten Text
Page 96: Interconnection design gas pipelines

Spect~ Energy

Manufacturer

Bi-Con

*Accurate Measurement

*Star Measurement

Approved Manufacturers Commodity: Fabrication - Meter and Regulator Skids / Meter Tubes

Contact / E-Mail

Steve Warner [email protected]

Mike Arceneaux ma [email protected]

Danny Guilliot [email protected]

Phone

740.68S.2S42-Ext. 262

337-369-9222

337.233.1211

Approved Location (ONLY specified Shop below)

Derwent,OH

Broussard, LA

Lafayette, LA

*Tentatively approved pending final review.

Page 2 of 2