Natural Gas Transmission Pipelines. Brisbane City Council Meeting June 6, 2011. Natural Gas Transmission Pipelines. PG&E provides 4.3 million customer accounts with natural gas service PG&E’s top priority is safety Comprehensive pipeline inspection and monitoring programs - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Natural Gas Transmission Pipelines

1

Natural Gas Transmission Pipelines

Brisbane City Council Meeting

June 6, 2011

Page 2: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

2

Natural Gas Transmission Pipelines PG&E provides 4.3 million customer accounts

with natural gas service

PG&E’s top priority is safety

Comprehensive pipeline inspection and monitoring programs

- Monitor pipelines on a 24-hour basis

- Conduct regular pipeline assessments

- Any issues identified as a threat to public safety are immediately addressed

Page 3: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

3

Enhancing the Safety of the System

Reduction in Gas PressureAccelerated Leak SurveyRoutine Pipeline PatrolsCathodic Protection SurveysIntegrity Assessments

Page 4: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

4

Natural Gas Transmission Pipelines

Page 5: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

5

Natural Gas Transmission Pipelines PG&E uses data it collects during routine

surveys to help plan and prioritize future work

Evaluation takes into consideration the following criteria:

- Potential for third party damage

- Potential for corrosion

- Potential for ground movement

- Physical design and characteristics

Page 6: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

6

Natural Gas Transmission Pipelines PG&E determines which segments warrant

further evaluation, monitoring or future action- Top 100 list

- Document used to inform future work plans

- As conditions change and work is completed year to year, PG&E reevaluates the segments included on the list

- No Brisbane segments appear on the Top 100 list

- Pipelines in Brisbane- Line 101 runs along Bayshore Boulevard

- Line 132 runs through San Bruno Mountain State Park, crosses West Hill Place and north to Guadalupe Canyon Parkway

Page 7: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

77Lines 101 and 132

Page 8: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

8

Natural Gas Transmission Pipelines

Pipeline 2020 Program Modernize Critical Pipeline Infrastructure

Expand the Use of Automatic and Remotely Operated Shut-Off Valves

Spur Development of Next-Generation Inspection Technologies

Develop Industry-Leading Best Practices

Enhance Public Safety Partnerships

Page 9: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

9

What is hydrostatic testing?• PG&E will be performing a hydrostatic pressure test

on a segment of natural gas pipeline.

• This involves pressurizing a section of pipe with water to a much higher level than the pipe will ever operate at with natural gas.

• This verifies the capability of a pipeline to safely operate and can also reveal weaknesses that could lead to defects and leaks.

Page 10: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

10

Customer outreach efforts:PG&E has a comprehensive plan for customer and community outreach regarding our tests and field work:• Letters sent to all residents and businesses near the area

where testing will take place, with the following information:

• Project fact sheets will be included with the letters that will describe the work, what customers can expect, and when the work will be completed

• Open Houses where customers can have their questions answered by PG&E representatives and subject matter experts

• Door hangers placed on residences nearest to construction activity to remind them of work just prior to it taking place

• Recorded reminder messages delivered by telephone

• Post-test letter informing residents and businesses of the test results

Page 11: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

1111Work area:

Page 12: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

12

Where to go for more information:• Customer Care gas specialist representatives are

available to answer questions about natural gas pipelines or the work being done in the area at 1-888-743-7431, between 7 a.m. and 6 p.m., Monday through Friday.

• Online information about the project, PG&E’s Natural Gas Transmission System and our Pipeline Safety Programs at: www.pge.com/gassystem.

Page 13: Natural Gas Transmission Pipelines

Brisbane City Council MeetingJune 6, 2011

13

ResourcesWebsite: www.pge.com

Pipeline Information Line: 1-888-743-7431

Customer Call Center: 1-800-743-5000

Contractors “Call Before You Dig”: 811