Page 1 of 52 SAUDI BINLADEN GROUP - ABCD PAYMENT CERTIFICATE DEPARTMENT Project : CORRECTIONAL FACILITIES P-1182, Dammam SubCon : Dar Anan Contracting Engineers, Contract No. 526 Subject : Payment Certificate No. 3 - CONCRETE WORKS Period : As of February 2016 Item No. Description Unit Ap Previous CONCRETE WORKS Plain Concrete 1 Plain Concrete 20Mpa-SRC Thick = 50mm m3 26.51 2 Plain Concrete 20Mpa-SRC Thick = 100mm m3 40.90 3 5% Micro Silica m3 - 4 Mass concrete > 100mm m3 50.60 Sub-structure Concrete works 30 Mpa-SRC (w/o S.O.G) 1 Isolated Footing m3 96.52 2 Strip Footing m3 76.72 3 Tie Beams / Grade Beams m3 126.01 4 Column Neck m3 8.51 5 Wall Neck m3 6 Slab On Grade m3 168.67 7 Vapour Barrier 300 micron Polyethylene under slab m2 804.09 8 Damp Proofing m2 2,403.46 9 5% Micro Silica m3 Super Structure Concrete Works - 30Mpa OPC 1 Column / Beams / Walls m3 223.07 2 Column / Beams / Walls (with corbel) m3 17.57 3 Suspended Slab (Vary Thick) m3 118.66 4 Concrete Ramps, Step & Landing m3 - 5 Fairface Finish or Concrete ramps, steps & landing m2 - 6 Concrete Screed m3 6.73 7 Concrete Parapet m3 - 8 Concrete Coping Lm 1,399.22 9 Mechanical Pad m3 Steel Reinforcement (3% allowable wastage) - Straight Reinforcem 1 Supply, Cut, Bend & Installation ton 132.33 2 Cut, Bend & Installation ton - 3 Installation only ton - 4 Supply, Cut & Bend only ton -

Upload: archie728

Post on 13-Jul-2016

15 views

Category:

Documents


4 download

DESCRIPTION

Reference only

TRANSCRIPT

Page 1: Interim Payment for Concrete Works

Page 1 of 52

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

Item No. Description UnitApproved Quantity

Previous

CONCRETE WORKSPlain Concrete

1 Plain Concrete 20Mpa-SRC Thick = 50mm m3 26.51 2 Plain Concrete 20Mpa-SRC Thick = 100mm m3 40.90 3 5% Micro Silica m3 - 4 Mass concrete > 100mm m3 50.60

Sub-structure Concrete works 30 Mpa-SRC (w/o S.O.G)1 Isolated Footing m3 96.52 2 Strip Footing m3 76.72 3 Tie Beams / Grade Beams m3 126.01 4 Column Neck m3 8.51 5 Wall Neck m3

6 Slab On Grade m3 168.67 7 Vapour Barrier 300 micron Polyethylene under slab m2 804.09 8 Damp Proofing m2 2,403.46 9 5% Micro Silica m3

Super Structure Concrete Works - 30Mpa OPC1 Column / Beams / Walls m3 223.07 2 Column / Beams / Walls (with corbel) m3 17.57 3 Suspended Slab (Vary Thick) m3 118.66 4 Concrete Ramps, Step & Landing m3 - 5 Fairface Finish or Concrete ramps, steps & landing m2 - 6 Concrete Screed m3 6.73 7 Concrete Parapet m3 - 8 Concrete Coping Lm 1,399.22 9 Mechanical Pad m3

Steel Reinforcement (3% allowable wastage) - Straight Reinforcement bars 8 & 10, 12, 14, 16mm1 Supply, Cut, Bend & Installation ton 132.33 2 Cut, Bend & Installation ton - 3 Installation only ton - 4 Supply, Cut & Bend only ton -

Page 2: Interim Payment for Concrete Works

Page 2 of 52

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

Item No. Description UnitApproved Quantity

Previous

Block Works1 200mm thick (CMU) non fire rated m2 - 2 150mm thick (CMU) non fire rated m2 - 3 100mm thick (CMU) non fire rated m2 391.27 4 Additional rate for fire rated solid block m2 - 5 Supply & Apply backing rod Lm -

Plaster Works1 Supply & Install of cement plaster (Internal) m2 - 2 Supply & Install of cement plaster (External) m2 - 3 Galvanized Steel Grooves in Plaster Lm -

Page 3: Interim Payment for Concrete Works

Page 3 of 52

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

Item No. Description UnitApproved Quantity

Previous

1 Perimeter Fence Type-2 Lm 169.33

1 B2602 - 4, 5 nos 2.00

FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs

WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs

Page 4: Interim Payment for Concrete Works

Page 4 of 52

Approved Quantity Remarks

Current To Date

- 26.51 - 40.90 - - - 50.60

- 96.52 - 76.72 - 126.01 - 8.51 - - - 168.67 - 804.09 - 2,403.46 - -

41.35 264.42 - 17.57 14.25 132.91 - - - - - 6.73 - - 44.20 1,443.42 - -

Steel Reinforcement (3% allowable wastage) - Straight Reinforcement bars 8 & 10, 12, 14, 16mm 7.69 140.02 - - - - - -

Page 5: Interim Payment for Concrete Works

Page 5 of 52

Approved Quantity Remarks

Current To Date

- - - - - 391.27 - - - -

- - - - - -

Page 6: Interim Payment for Concrete Works

Page 6 of 52

Approved Quantity Remarks

Current To Date

- 169.33

- 2.00

(RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs

Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs

Page 7: Interim Payment for Concrete Works

Page 7 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit 903-1 1601-4 2006 2007-1 2007-2

CONCRETE WORKS

1 Plain Concrete 20MPa Thk=50mm m3 3.18

2 Plain Concrete 20MPa Thk=100mm & > 100mm m3 15.86

3 5% Micro silica m3

4 Mass concrete > 100mm m3

SUB-STRUCTURE CONCRETE 30MPa

1 Isolated Footing m3 54.43

2 Strip Footing m3

3 Tie Beam/Grade Beam m3 66.57

4 Column Neck m3 5.36

5 Wall Neck m3

6 m3 107.00

7 Vapor barrier 300microns Polyehtylene sheet m2 279.03

8 Damp proofing m2 960.65

9 5% Micro silica m3

Slab on Grade 30MPa

Page 8: Interim Payment for Concrete Works

Page 8 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit 903-1 1601-4 2006 2007-1 2007-2

SUPER-STRUCTURE CONCRETE 30MPa

1 Columns/Beams/Walls without corbel m3 36.69 2.01 8.19 8.19

2 Columns/Beams/Walls with corbel m3 17.57

3 Suspended slab m3 56.71

4 Concrete ramps, steps, landing m3

5 Fair face concrete (ramp, steps, landing) m2

6 Concrete Screed m3 6.73

7 Concrete Parapet m3

8 Concrete Coping (incl galv acce) Lm 116.12 480.00 158.10 97.60 97.60

9 Mechanical pad m3

STEEL REINFORCEMENT

1 Supply, Cut, Bend & Install (dia 8,10,12,14,16) ton 42.76 3.65 1.87 2.91 2.91

2 Install, Cut, Bend (dia 8,10,12,14,16) ton

3 Install ton

Page 9: Interim Payment for Concrete Works

Page 9 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit 903-1 1601-4 2006 2007-1 2007-2

Page 10: Interim Payment for Concrete Works

Page 10 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit 903-1 1601-4 2006 2007-1 2007-2

BLOCKWORKS

1 Thk=200mm, non-fire rated m2

2 Thk=150mm, non-fire rated m2

3 Thk=100mm, non-fire rated m2

4 Add'l rate for fire rated solid block m2

5 Backing rod (3cm thick) & fire rated sealant above Lm

PLASTERWORKS

1 Internal m2

2 External m2

3 Galvanized steel grooves in plaster Lm

1 Perimeter Fence Type-2 Lm

FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs

WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs

Page 11: Interim Payment for Concrete Works

Page 11 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit 903-1 1601-4 2006 2007-1 2007-2

1 B2602 - 4, 5 nos

Page 12: Interim Payment for Concrete Works

Page 12 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

CONCRETE WORKS

1 Plain Concrete 20MPa Thk=50mm m3

2 Plain Concrete 20MPa Thk=100mm & > 100mm m3

3 5% Micro silica m3

4 Mass concrete > 100mm m3

SUB-STRUCTURE CONCRETE 30MPa

1 Isolated Footing m3

2 Strip Footing m3

3 Tie Beam/Grade Beam m3

4 Column Neck m3

5 Wall Neck m3

6 m3

7 Vapor barrier 300microns Polyehtylene sheet m2

8 Damp proofing m2

9 5% Micro silica m3

Slab on Grade 30MPa

2007-3 2007-4 2008-1 2008-2 2100

1.67

11.47

38.69

44.03

3.15

41.03

241.69

691.45

Page 13: Interim Payment for Concrete Works

Page 13 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

SUPER-STRUCTURE CONCRETE 30MPa

1 Columns/Beams/Walls without corbel m3

2 Columns/Beams/Walls with corbel m3

3 Suspended slab m3

4 Concrete ramps, steps, landing m3

5 Fair face concrete (ramp, steps, landing) m2

6 Concrete Screed m3

7 Concrete Parapet m3

8 Concrete Coping (incl galv acce) Lm

9 Mechanical pad m3

STEEL REINFORCEMENT

1 Supply, Cut, Bend & Install (dia 8,10,12,14,16) ton

2 Install, Cut, Bend (dia 8,10,12,14,16) ton

3 Install ton

2007-3 2007-4 2008-1 2008-2 2100

8.19 8.19 7.35 7.35 12.02

47.51

97.60 97.60 97.60 97.60

2.91 2.91 2.76 2.76 29.80

Page 14: Interim Payment for Concrete Works

Page 14 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit 2007-3 2007-4 2008-1 2008-2 2100

Page 15: Interim Payment for Concrete Works

Page 15 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

BLOCKWORKS

1 Thk=200mm, non-fire rated m2

2 Thk=150mm, non-fire rated m2

3 Thk=100mm, non-fire rated m2

4 Add'l rate for fire rated solid block m2

5 Backing rod (3cm thick) & fire rated sealant above Lm

PLASTERWORKS

1 Internal m2

2 External m2

3 Galvanized steel grooves in plaster Lm

1 Perimeter Fence Type-2 Lm

FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs

WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs

2007-3 2007-4 2008-1 2008-2 2100

Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs

Page 16: Interim Payment for Concrete Works

Page 16 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

1 B2602 - 4, 5 nos

2007-3 2007-4 2008-1 2008-2 2100

Page 17: Interim Payment for Concrete Works

Page 17 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

CONCRETE WORKS

1 Plain Concrete 20MPa Thk=50mm m3

2 Plain Concrete 20MPa Thk=100mm & > 100mm m3

3 5% Micro silica m3

4 Mass concrete > 100mm m3

SUB-STRUCTURE CONCRETE 30MPa

1 Isolated Footing m3

2 Strip Footing m3

3 Tie Beam/Grade Beam m3

4 Column Neck m3

5 Wall Neck m3

6 m3

7 Vapor barrier 300microns Polyehtylene sheet m2

8 Damp proofing m2

9 5% Micro silica m3

Slab on Grade 30MPa

2602-4 2602-5 3202A-3 3202A-6 3202A-13

21.66

1.06

29.00

3.40

32.83

15.41

20.64

174.13

439.30

Page 18: Interim Payment for Concrete Works

Page 18 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

SUPER-STRUCTURE CONCRETE 30MPa

1 Columns/Beams/Walls without corbel m3

2 Columns/Beams/Walls with corbel m3

3 Suspended slab m3

4 Concrete ramps, steps, landing m3

5 Fair face concrete (ramp, steps, landing) m2

6 Concrete Screed m3

7 Concrete Parapet m3

8 Concrete Coping (incl galv acce) Lm

9 Mechanical pad m3

STEEL REINFORCEMENT

1 Supply, Cut, Bend & Install (dia 8,10,12,14,16) ton

2 Install, Cut, Bend (dia 8,10,12,14,16) ton

3 Install ton

2602-4 2602-5 3202A-3 3202A-6 3202A-13

0.40 0.40 26.09

19.73

(Monshri) 51.80 51.80

0.23 0.23 20.10

Page 19: Interim Payment for Concrete Works

Page 19 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit 2602-4 2602-5 3202A-3 3202A-6 3202A-13

Page 20: Interim Payment for Concrete Works

Page 20 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

BLOCKWORKS

1 Thk=200mm, non-fire rated m2

2 Thk=150mm, non-fire rated m2

3 Thk=100mm, non-fire rated m2

4 Add'l rate for fire rated solid block m2

5 Backing rod (3cm thick) & fire rated sealant above Lm

PLASTERWORKS

1 Internal m2

2 External m2

3 Galvanized steel grooves in plaster Lm

1 Perimeter Fence Type-2 Lm

FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs

WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs

2602-4 2602-5 3202A-3 3202A-6 3202A-13

Page 21: Interim Payment for Concrete Works

Page 21 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

1 B2602 - 4, 5 nos

2602-4 2602-5 3202A-3 3202A-6 3202A-13

1.00 1.00

Page 22: Interim Payment for Concrete Works

Page 22 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

CONCRETE WORKS

1 Plain Concrete 20MPa Thk=50mm m3

2 Plain Concrete 20MPa Thk=100mm & > 100mm m3

3 5% Micro silica m3

4 Mass concrete > 100mm m3

SUB-STRUCTURE CONCRETE 30MPa

1 Isolated Footing m3

2 Strip Footing m3

3 Tie Beam/Grade Beam m3

4 Column Neck m3

5 Wall Neck m3

6 m3

7 Vapor barrier 300microns Polyehtylene sheet m2

8 Damp proofing m2

9 5% Micro silica m3

Slab on Grade 30MPa

Lift Sta 3 Lift Sta 7

4.71 7.80

21.60

14.66 29.23

54.62 54.62

156.03 156.03

Fence Type-2

Page 23: Interim Payment for Concrete Works

Page 23 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

SUPER-STRUCTURE CONCRETE 30MPa

1 Columns/Beams/Walls without corbel m3

2 Columns/Beams/Walls with corbel m3

3 Suspended slab m3

4 Concrete ramps, steps, landing m3

5 Fair face concrete (ramp, steps, landing) m2

6 Concrete Screed m3

7 Concrete Parapet m3

8 Concrete Coping (incl galv acce) Lm

9 Mechanical pad m3

STEEL REINFORCEMENT

1 Supply, Cut, Bend & Install (dia 8,10,12,14,16) ton

2 Install, Cut, Bend (dia 8,10,12,14,16) ton

3 Install ton

Lift Sta 3 Lift Sta 7Fence Type-2

54.37 84.98

8.96

8.01 16.21

Page 24: Interim Payment for Concrete Works

Page 24 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit Lift Sta 3 Lift Sta 7Fence Type-2

Page 25: Interim Payment for Concrete Works

Page 25 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

BLOCKWORKS

1 Thk=200mm, non-fire rated m2

2 Thk=150mm, non-fire rated m2

3 Thk=100mm, non-fire rated m2

4 Add'l rate for fire rated solid block m2

5 Backing rod (3cm thick) & fire rated sealant above Lm

PLASTERWORKS

1 Internal m2

2 External m2

3 Galvanized steel grooves in plaster Lm

1 Perimeter Fence Type-2 Lm

FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs

WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs

Lift Sta 3 Lift Sta 7Fence Type-2

160.75 230.52

169.33

Page 26: Interim Payment for Concrete Works

Page 26 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

1 B2602 - 4, 5 nos

Lift Sta 3 Lift Sta 7Fence Type-2

Page 27: Interim Payment for Concrete Works

Page 27 of 52

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

Item No. Description UnitApproved Quantity

Previous

CONCRETE WORKSPlain Concrete

1 Plain Concrete 20Mpa-SRC Thick = 50mm m3 26.51 2 Plain Concrete 20Mpa-SRC Thick = 100mm m3 40.90 3 5% Micro Silica m3 - 4 Mass concrete > 100mm m3 50.60

Sub-structure Concrete works 30 Mpa-SRC (w/o S.O.G)1 Isolated Footing m3 96.52 2 Strip Footing m3 76.72 3 Tie Beams / Grade Beams m3 126.01 4 Column Neck m3 8.51 5 Wall Neck m3

6 Slab On Grade m3 168.67 7 Vapour Barrier 300 micron Polyethylene under slab m2 804.09 8 Damp Proofing m2 2,403.46 9 5% Micro Silica m3

Super Structure Concrete Works - 30Mpa OPC1 Column / Beams / Walls m3 223.07 2 Column / Beams / Walls (with corbel) m3 17.57 3 Suspended Slab (Vary Thick) m3 118.66 4 Concrete Ramps, Step & Landing m3 - 5 Fairface Finish or Concrete ramps, steps & landing m2 - 6 Concrete Screed m3 6.73 7 Concrete Parapet m3 - 8 Concrete Coping Lm 1,399.22 9 Mechanical Pad m3

Steel Reinforcement (3% allowable wastage) - Straight Reinforcement bars 8 & 10, 12, 14, 16mm1 Supply, Cut, Bend & Installation ton 132.33 2 Cut, Bend & Installation ton - 3 Installation only ton - 4 Supply, Cut & Bend only ton -

Page 28: Interim Payment for Concrete Works

Page 28 of 52

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

Item No. Description UnitApproved Quantity

Previous

Block Works1 200mm thick (CMU) non fire rated m2 - 2 150mm thick (CMU) non fire rated m2 - 3 100mm thick (CMU) non fire rated m2 391.27 4 Additional rate for fire rated solid block m2 - 5 Supply & Apply backing rod Lm -

Plaster Works1 Supply & Install of cement plaster (Internal) m2 - 2 Supply & Install of cement plaster (External) m2 - 3 Galvanized Steel Grooves in Plaster Lm -

Page 29: Interim Payment for Concrete Works

Page 29 of 52

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

Item No. Description UnitApproved Quantity

Previous

1 Perimeter Fence Type-2 Lm 169.33

1 B2602 - 4, 5 nos 2.00

FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs

WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs

Page 30: Interim Payment for Concrete Works

Page 30 of 52

Approved Quantity Remarks

Current To Date

- 26.51 - 40.90 - - - 50.60

- 96.52 - 76.72 - 126.01 - 8.51 - - - 168.67 - 804.09 - 2,403.46 - -

41.35 264.42 - 17.57 14.25 132.91 - - - - - 6.73 - - 44.20 1,443.42 - -

Steel Reinforcement (3% allowable wastage) - Straight Reinforcement bars 8 & 10, 12, 14, 16mm 7.69 140.02 - - - - - -

Page 31: Interim Payment for Concrete Works

Page 31 of 52

Approved Quantity Remarks

Current To Date

- - - - - 391.27 - - - -

- - - - - -

Page 32: Interim Payment for Concrete Works

Page 32 of 52

Approved Quantity Remarks

Current To Date

- 169.33

- 2.00

(RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs

Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs

Page 33: Interim Payment for Concrete Works

Page 33 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit 903-1 1601-4 2006 2007-1 2007-2

CONCRETE WORKS

1 Plain Concrete 20MPa Thk=50mm m3 3.18

2 Plain Concrete 20MPa Thk=100mm & > 100mm m3 15.86

3 5% Micro silica m3

4 Mass concrete > 100mm m3

SUB-STRUCTURE CONCRETE 30MPa

1 Isolated Footing m3 54.43

2 Strip Footing m3

3 Tie Beam/Grade Beam m3 66.57

4 Column Neck m3 5.36

5 Wall Neck m3

6 m3 107.00

7 Vapor barrier 300microns Polyehtylene sheet m2 279.03

8 Damp proofing m2 960.65

9 5% Micro silica m3

Slab on Grade 30MPa

Page 34: Interim Payment for Concrete Works

Page 34 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit 903-1 1601-4 2006 2007-1 2007-2

SUPER-STRUCTURE CONCRETE 30MPa

1 Columns/Beams/Walls without corbel m3 36.69 2.01 8.19 8.19

2 Columns/Beams/Walls with corbel m3 17.57

3 Suspended slab m3 56.71

4 Concrete ramps, steps, landing m3

5 Fair face concrete (ramp, steps, landing) m2

6 Concrete Screed m3 6.73

7 Concrete Parapet m3

8 Concrete Coping (incl galv acce) Lm 116.12 480.00 158.10 97.60 97.60

9 Mechanical pad m3

STEEL REINFORCEMENT

1 Supply, Cut, Bend & Install (dia 8,10,12,14,16) ton 42.76 3.65 1.87 2.91 2.91

2 Install, Cut, Bend (dia 8,10,12,14,16) ton

3 Install ton

Page 35: Interim Payment for Concrete Works

Page 35 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit 903-1 1601-4 2006 2007-1 2007-2

Page 36: Interim Payment for Concrete Works

Page 36 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit 903-1 1601-4 2006 2007-1 2007-2

BLOCKWORKS

1 Thk=200mm, non-fire rated m2

2 Thk=150mm, non-fire rated m2

3 Thk=100mm, non-fire rated m2

4 Add'l rate for fire rated solid block m2

5 Backing rod (3cm thick) & fire rated sealant above Lm

PLASTERWORKS

1 Internal m2

2 External m2

3 Galvanized steel grooves in plaster Lm

1 Perimeter Fence Type-2 Lm

FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs

WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs

Page 37: Interim Payment for Concrete Works

Page 37 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit 903-1 1601-4 2006 2007-1 2007-2

1 B2602 - 4, 5 nos

Page 38: Interim Payment for Concrete Works

Page 38 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

CONCRETE WORKS

1 Plain Concrete 20MPa Thk=50mm m3

2 Plain Concrete 20MPa Thk=100mm & > 100mm m3

3 5% Micro silica m3

4 Mass concrete > 100mm m3

SUB-STRUCTURE CONCRETE 30MPa

1 Isolated Footing m3

2 Strip Footing m3

3 Tie Beam/Grade Beam m3

4 Column Neck m3

5 Wall Neck m3

6 m3

7 Vapor barrier 300microns Polyehtylene sheet m2

8 Damp proofing m2

9 5% Micro silica m3

Slab on Grade 30MPa

2007-3 2007-4 2008-1 2008-2 2100

1.67

11.47

38.69

44.03

3.15

41.03

241.69

691.45

Page 39: Interim Payment for Concrete Works

Page 39 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

SUPER-STRUCTURE CONCRETE 30MPa

1 Columns/Beams/Walls without corbel m3

2 Columns/Beams/Walls with corbel m3

3 Suspended slab m3

4 Concrete ramps, steps, landing m3

5 Fair face concrete (ramp, steps, landing) m2

6 Concrete Screed m3

7 Concrete Parapet m3

8 Concrete Coping (incl galv acce) Lm

9 Mechanical pad m3

STEEL REINFORCEMENT

1 Supply, Cut, Bend & Install (dia 8,10,12,14,16) ton

2 Install, Cut, Bend (dia 8,10,12,14,16) ton

3 Install ton

2007-3 2007-4 2008-1 2008-2 2100

8.19 8.19 7.35 7.35 12.02

47.51

97.60 97.60 97.60 97.60

2.91 2.91 2.76 2.76 29.80

Page 40: Interim Payment for Concrete Works

Page 40 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit 2007-3 2007-4 2008-1 2008-2 2100

Page 41: Interim Payment for Concrete Works

Page 41 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

BLOCKWORKS

1 Thk=200mm, non-fire rated m2

2 Thk=150mm, non-fire rated m2

3 Thk=100mm, non-fire rated m2

4 Add'l rate for fire rated solid block m2

5 Backing rod (3cm thick) & fire rated sealant above Lm

PLASTERWORKS

1 Internal m2

2 External m2

3 Galvanized steel grooves in plaster Lm

1 Perimeter Fence Type-2 Lm

FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs

WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs

2007-3 2007-4 2008-1 2008-2 2100

Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs

Page 42: Interim Payment for Concrete Works

Page 42 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

1 B2602 - 4, 5 nos

2007-3 2007-4 2008-1 2008-2 2100

Page 43: Interim Payment for Concrete Works

Page 43 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

CONCRETE WORKS

1 Plain Concrete 20MPa Thk=50mm m3

2 Plain Concrete 20MPa Thk=100mm & > 100mm m3

3 5% Micro silica m3

4 Mass concrete > 100mm m3

SUB-STRUCTURE CONCRETE 30MPa

1 Isolated Footing m3

2 Strip Footing m3

3 Tie Beam/Grade Beam m3

4 Column Neck m3

5 Wall Neck m3

6 m3

7 Vapor barrier 300microns Polyehtylene sheet m2

8 Damp proofing m2

9 5% Micro silica m3

Slab on Grade 30MPa

2602-4 2602-5 3202A-3 3202A-6 3202A-13

21.66

1.06

29.00

3.40

32.83

15.41

20.64

174.13

439.30

Page 44: Interim Payment for Concrete Works

Page 44 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

SUPER-STRUCTURE CONCRETE 30MPa

1 Columns/Beams/Walls without corbel m3

2 Columns/Beams/Walls with corbel m3

3 Suspended slab m3

4 Concrete ramps, steps, landing m3

5 Fair face concrete (ramp, steps, landing) m2

6 Concrete Screed m3

7 Concrete Parapet m3

8 Concrete Coping (incl galv acce) Lm

9 Mechanical pad m3

STEEL REINFORCEMENT

1 Supply, Cut, Bend & Install (dia 8,10,12,14,16) ton

2 Install, Cut, Bend (dia 8,10,12,14,16) ton

3 Install ton

2602-4 2602-5 3202A-3 3202A-6 3202A-13

0.40 0.40 26.09

19.73

(Nahdet) 51.80 51.80

0.23 0.23 20.10

Page 45: Interim Payment for Concrete Works

Page 45 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit 2602-4 2602-5 3202A-3 3202A-6 3202A-13

Page 46: Interim Payment for Concrete Works

Page 46 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

BLOCKWORKS

1 Thk=200mm, non-fire rated m2

2 Thk=150mm, non-fire rated m2

3 Thk=100mm, non-fire rated m2

4 Add'l rate for fire rated solid block m2

5 Backing rod (3cm thick) & fire rated sealant above Lm

PLASTERWORKS

1 Internal m2

2 External m2

3 Galvanized steel grooves in plaster Lm

1 Perimeter Fence Type-2 Lm

FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs

WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs

2602-4 2602-5 3202A-3 3202A-6 3202A-13

Page 47: Interim Payment for Concrete Works

Page 47 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

1 B2602 - 4, 5 nos

2602-4 2602-5 3202A-3 3202A-6 3202A-13

1.00 1.00

Page 48: Interim Payment for Concrete Works

Page 48 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

CONCRETE WORKS

1 Plain Concrete 20MPa Thk=50mm m3

2 Plain Concrete 20MPa Thk=100mm & > 100mm m3

3 5% Micro silica m3

4 Mass concrete > 100mm m3

SUB-STRUCTURE CONCRETE 30MPa

1 Isolated Footing m3

2 Strip Footing m3

3 Tie Beam/Grade Beam m3

4 Column Neck m3

5 Wall Neck m3

6 m3

7 Vapor barrier 300microns Polyehtylene sheet m2

8 Damp proofing m2

9 5% Micro silica m3

Slab on Grade 30MPa

Lift Sta 3 Lift Sta 7

4.71 7.80

21.60

14.66 29.23

54.62 54.62

156.03 156.03

Fence Type-2

Page 49: Interim Payment for Concrete Works

Page 49 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

SUPER-STRUCTURE CONCRETE 30MPa

1 Columns/Beams/Walls without corbel m3

2 Columns/Beams/Walls with corbel m3

3 Suspended slab m3

4 Concrete ramps, steps, landing m3

5 Fair face concrete (ramp, steps, landing) m2

6 Concrete Screed m3

7 Concrete Parapet m3

8 Concrete Coping (incl galv acce) Lm

9 Mechanical pad m3

STEEL REINFORCEMENT

1 Supply, Cut, Bend & Install (dia 8,10,12,14,16) ton

2 Install, Cut, Bend (dia 8,10,12,14,16) ton

3 Install ton

Lift Sta 3 Lift Sta 7Fence Type-2

54.37 84.98

8.96

8.01 16.21

Page 50: Interim Payment for Concrete Works

Page 50 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit Lift Sta 3 Lift Sta 7Fence Type-2

Page 51: Interim Payment for Concrete Works

Page 51 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

BLOCKWORKS

1 Thk=200mm, non-fire rated m2

2 Thk=150mm, non-fire rated m2

3 Thk=100mm, non-fire rated m2

4 Add'l rate for fire rated solid block m2

5 Backing rod (3cm thick) & fire rated sealant above Lm

PLASTERWORKS

1 Internal m2

2 External m2

3 Galvanized steel grooves in plaster Lm

1 Perimeter Fence Type-2 Lm

FENCE: (RC + Steel Reinf Misc) As per Final Approved Drwg & Project Specs

WATCH TOWER: Concrete 30Mpa (RC+Steel Reinf+Masonry+Plaster+Misc) As per Final Approved Drwgs & Project Specs

Lift Sta 3 Lift Sta 7Fence Type-2

160.75 230.52

169.33

Page 52: Interim Payment for Concrete Works

Page 52 of 52SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project : CORRECTIONAL FACILITIES P-1182, DammamSubCon : Dar Anan Contracting Engineers, Contract No. 526Subject : Payment Certificate No. 3 - CONCRETE WORKSPeriod : As of February 2016

SN Description Unit

1 B2602 - 4, 5 nos

Lift Sta 3 Lift Sta 7Fence Type-2