interim report - tram depot
TRANSCRIPT
-
8/18/2019 Interim Report - Tram Depot
1/13
1
Flowchart Aktifitas Depo Tram Surabaya
Trem MasukDepo
Cleaning Inspeksi
Daily check
(Setiap 7 hari)
3 bulan/setiap
15000 km
8 bulan/setiap
500.000 km
Repair/
Unschedule
QualityControl
SiapOperasi
AIR Check
alat
-
8/18/2019 Interim Report - Tram Depot
2/13
2
Cleaning (Cuci)
• Cleaning (cuci) tram adalah kegiatan pembersihan
setiap armada tram yang selesai operasional
• Cleaning / pencucian tram dilakukan di washing
area
-
8/18/2019 Interim Report - Tram Depot
3/13
3
Schedule Perawatan
No Uraian Kegiatan Waktu
1 Daily 7 hari atau sama dengan 2500 km
2 Maintenance Interval 3 bulan atau sama dengan 15.000 km
3 Overhaul Interval 1 tahun atau sama dengan 60.000 km
-
8/18/2019 Interim Report - Tram Depot
4/13
4
Harian
• Pemeriksaan keausan flen roda
-
8/18/2019 Interim Report - Tram Depot
5/13
5
Harian
• Pemeriksaan kekencangan baut kasut roda
-
8/18/2019 Interim Report - Tram Depot
6/13
6
Harian
• Pemeriksaan understel rangka bawah
-
8/18/2019 Interim Report - Tram Depot
7/13
7
Harian
• Pemeriksaan battery & Super capasitor
-
8/18/2019 Interim Report - Tram Depot
8/13
8
Maintenance Interval
• Maintenance Interval dilakukan setiap 3 bulan atau sama dengan 15.000 km
Pemeriksaan kebocoran air spring Bubut Roda
-
8/18/2019 Interim Report - Tram Depot
9/13
9
Overhaul Interval
• Overhaul interval dilakukan setelah
uperasional tram mencapai 1 tahun atau sama
dengan 60.000 km
Working Pit Lifting Jack
-
8/18/2019 Interim Report - Tram Depot
10/13
10
LAYOUT DEPO TREM JOYOBOYO ( Alternatif I )
WORKING PITCH
KOLONG
MESINBUBUT UNDERFLOOR
SPOOR BADUG
TEMBOK
BANGKUKERJA GDLISTRIK GUDANG MEK
LOGISTIKKR
LUARKDT KR LOS ADM
Instruc
tureToilet
Kompresor
200 m
144 m G a n t r y C r a n e
Jembatankerja
Jembatankerja
Jembatankerja
Jembatankerja
Daily
Monthly
Night stay TREM
Yearly
cleaning
cleaning
1
2
3
4
5
6
7
8
9
10
Unschedule
( Alternatif I )
Night stay TREM
inspection
inspection
Stabling
Stabling
144 m
-
8/18/2019 Interim Report - Tram Depot
11/13
11
LAYOUT DEPO TREM JOYOBOYO ( Alternatif II )
WORKING PITCH
KOLONG
MESIN BUBUT UNDER
FLOOR
TEMBOK
BANGKUKERJA GDLISTRIK GUDANG MEK
LOGISTIKKR
LUARKDT KR LOS ADM
Instruc
tureToilet
Kompresor
200 m
144 m G a n t r y C r a n e
Jembatankerja
Jembatankerja
Jembatankerja
Jembatankerja
Daily
Monthly
Night stay TREM
Yearly
cleaning
cleaning
1
2
3
4
5
6
7Unschedule
Night stay TREM
inspection
inspection
Night stay TREM
144 m
Night stay TREM
( Alternatif II )
-
8/18/2019 Interim Report - Tram Depot
12/13
12
LAYOUT DEPO TREM JOYOBOYO (Alternatif III)
WORKING PITCH
KOLONG
MESIN BUBUT UNDER
FLOOR
TEMBOK
BANGKUKERJA GD LISTRIK GUDANG MEK
LOGISTIKKR
LUARKDT KR LOS ADM
Instruc
tureToilet
Kompresor
200 m
144 m G a n t r y C r a n e
Jembatan kerja
Jembatan kerja
Jembatan kerja
Jembatan kerja
Daily
Monthly
Night stay TREM
Yearly
cleaning
cleaning
1
2
3
4
5
6Unschedule
inspection
inspection
Night stay TREM
144 m
Night stay TREM inspection
inspection
( Alternatif III )
-
8/18/2019 Interim Report - Tram Depot
13/13
13
Tabel Keterangan Layout DEPO
Jumlah
Track
Spoor
KolongSpoor Cuci
Spoor
Inspeksi
Spoor Night
Stay
ALT I 10 3 2 4 5
ALT II 7 3 2 4 3
ALT III 6 3 2 4 3