intern management system

10
Intern Management System Principals

Upload: sadie

Post on 04-Jan-2016

72 views

Category:

Documents


2 download

DESCRIPTION

Intern Management System. Principals. Modules. Record of Teacher Internship Year (RTIY) Create committee meeting reports Sign-off on committee meeting reports Resource Teacher Timesheet View and approve or deny timesheet. Principal Main Page. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Intern Management System

Intern Management System

Principals

Page 2: Intern Management System

Modules

• Record of Teacher Internship Year (RTIY)– Create committee meeting reports– Sign-off on committee meeting reports

• Resource Teacher Timesheet– View and approve or deny timesheet

Page 3: Intern Management System

Principal Main Page• If you have more than one intern, a list of interns

will be displayed– Select an intern

• Once an intern is selected, you will see a status report for that internship– View the status of the Resource Teacher’s timesheet.

If the status is “Awaiting Principal Acceptance,” click on the link to review the timesheet and either sign-off or send the timesheet back to the resource teacher.

– View the status of the RTIY Reports.• Determine if any reports are awaiting a sign-off• Create cycle reports

Page 4: Intern Management System
Page 5: Intern Management System

RTIY – Cycle Reports

• Dates– Each cycle report asks for the date of the committee meeting

and most ask for the observation dates for that cycle• Enter dates in the MM/DD/YYYY format

• Observation Scores– Where requested, enter the scores from each observer for each

standard– The scores entered on the Cycle III report will determine if the

final report indicates a successful or unsuccessful internship• Strengths and Priority Areas

– Cycles I, II and III have text boxes where you can enter text to identify this information

• Generate Report– Once all data has been entered for a report, click the “Generate

Report” button to create the report

Page 6: Intern Management System
Page 7: Intern Management System
Page 8: Intern Management System
Page 9: Intern Management System

RTIY – View & Sign-off

• Once a report is generated, you will be able to view it by clicking on the view link. This will open the report in a new window which will require you to have Adobe Reader installed on your machine.

• To sign-off, enter your full name, username and password; click the “Accept” checkbox and then the “Sign-off” button. This will store your sign-off and load the page for the remaining signatures.

• If you are not ready to sign-off, simply return to the main page or logout and you can view and sign-off on the report at a later time.

• Each intern, resource teacher and teacher educator should complete the sign-off process individually by selecting his or her role and repeating the sign-off steps.

Page 10: Intern Management System

RTT – Review & Sign-off

• Review timesheet– This link will open the timesheet in a new window for

your review. It will require you to have Adobe Reader installed on your machine.

– Acceptance• To sign-off on the timesheet and send it to the district

coordinator, enter your full name, username and password in the boxes provided; check the accept checkbox; and hit the sign-off button.

• To send the timesheet back to the resource teacher for edits, click the “Send Back to Resource Teacher” button.