international civil aviation organization creating operational improvements through aviation system...

35
International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation Bureau ATCA Annual Conference 02-05 October 2011

Upload: reginald-burlison

Post on 31-Mar-2015

217 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

International Civil Aviation Organization

Creating Operational Improvements Through Aviation System

Block Upgrades

Nancy GrahamDirector, Air Navigation Bureau

ATCA Annual Conference02-05 October 2011

Page 2: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

2ATCA Annual Conference

Our Collective Challenge

Page 3: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

3ATCA Annual Conference

Developing Tomorrow’s Aviation System

• Global framework is needed to ensure:– Safety is maintained and enhanced – ATM improvement programmes are harmonized– Barriers to future efficiency and environmental gains are

removed, at reasonable cost

Page 4: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

4ATCA Annual Conference

Developing Tomorrow’s Aviation System

• Investment certainty is required for:– Operators– Infrastructure providers– Equipment manufacturers

• Regulatory approval process must be outlined – Support States in introduction of significant changes

Page 5: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

5ATCA Annual Conference

Developing Tomorrow’s Aviation System

• ICAO developed 4-step plan

• Setting the stage for global interoperability

Page 6: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

6ATCA Annual Conference

Step 1Get Harmonization on the Global Agenda

• Initial NextGen/SESAR Symposium (2008)

• Convened Standards Organization Roundtable (2009)

• Established working agreements with Standards Organizations on shared work programmes

Page 7: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

7ATCA Annual Conference

Step 2Global Aviation System Block Upgrades

• Define global aviation system block upgrades

• For interoperability purposes

• Independent of when and where specific ATM improvement programmes are introduced

Why is this approach proposed?

Page 8: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 8

The Reality of Our System Today…

Page 9: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

9ATCA Annual Conference

A Team Effort

Page 10: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 10

Air & GroundEquipment / Systems

+ Approvals

Measurable Operational

Improvement Air & GroundStandards & Procedures

Positive Business Case

What is a Block Upgrade?

Page 11: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 11

Canada

We Can Benefit From What Is Already Out There…

Australia

India

China

Russia

Page 12: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 12

4 Blocks Upgrades are Proposed

0B 1B

2B 3B

Block 0Available now

Block 22023

Block 12018

Block 32028>

Page 13: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 13

A Block is Made Up of Modules…

Page 14: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 14

…So a Block is Scalableto Meet Regional or Local Needs

Page 15: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 15

Modules are Grouped in 4 Performance Improvement Areas

Page 16: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 16

Greener Airports

Page 17: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 17

Global Interoperable Systems & Data

Page 18: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 18

Optimum Capacity & Flexible Flights

Page 19: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 19

Efficient Flight Path

Page 20: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

20ATCA Annual Conference

Block 0:Capabilities within our Grasp Today

• Block 0 initiatives must leverage on existing on-board avionics• 3 Priorities have been agreed to:– Performance Based Navigation (PBN)– Continuous Descent Operations (CDO)– Continuous Climb Operations (CCO)

Page 21: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

21ATCA Annual Conference

Block 0 - Contents

21

Block 0Today and Beyond; Based on Operational Need

2 Modules depending on; Ground-Ground Integration based on AIDC; Digital AIM using AIXM and other developments.

5 Modules depending on; GNSS-based Approaches; Better Wake Vortex Minima; A-SMGCS; Airport CDM, Improved Metering

3 Modules based on: PBN, FUA and CDM in combination; Improved Flow Planning and Air Traffic Situational Awareness

3 Modules based on: Existing Datalink Operations which support CDOs, CCOs and En-Route Operations

Optimum Capacity and

Flexible Flights

Globally Interoperable

Systems and Data

Efficient Flight Path

Greener Airports

Performance Improvement

Areas

Full 4D – TBO

And More

Traffic Complexity

Management

Full FF-ICEAnd More

Integrated AMAN/DMAN

/SMAN

Page 22: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 22

Let’s Focus on Block 1…

1B

Page 23: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 23

Block 1 Modules for:Greener Airports

NAV Equip.

A-SMGCS

WakeVortex

A-CDM

RemoteTower

A/DMAN

Page 24: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 24

Block 1 Modules for:Global Interoperable Systems & Data

FF-ICE 1

Digital ATM Info

SWIM

Page 25: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 25

Block 1 Modules for:Optimum Capacity & Flexible Flights

IntervalMgmt

In Trail ADS

CDM + FLT

Planning

WX Info

Dynamic ATS

Routing

Page 26: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 26

Block 1 Modules for:Efficient Flight Path

OPDs

Synch/ 4D

TRAD

RPAs

Page 27: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 27

Threads Between Modules…and Across Blocks

Greener Airports

Available Now 2018 2023 2028>

Improved Approach & Departure

Management through

Integration

Block 1

Improved Traffic Flow

through Runway

Metering

Block 0 Block 2

Linked AMAN/DMAN

Block 3

Integrated AMAN/ DMAN/ SMAN

Page 28: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 28

Global Interoperable Systems & DataThrough Global SWIM

Available Now 2018 2023 2028>

Increased Interoperability,

Efficiency & Capacity through

Ground-Ground Integration

Block 0 Block 2

Improved Coordination

through multi-centre Ground-

Ground integration:

(FF-ICE/1 &

Flight Object, SWIM)

Block 3

Improved Operational Performance through the

introduction of Full FF-ICE

Block 1

Increased Interoperability,

Efficiency & Capacity

through FF-ICE/1

application before

Departure

Threads Between Modules…and Across Blocks

Page 29: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 29

Optimum Capacity & Flexible FlightsThrough Global Collaborative ATM

Available Now 2018 2023 2028>

Improved Flow

Performance through Planning

Based on a Network-

Wide View

Block 0 Block 2

Increased User Involvement in

the Dynamic Utilisation of the Network

Block 3

Traffic Complexity

Management

Block 1

Enhanced Flow

Performance through Network

Operational Planning

Threads Between Modules…and Across Blocks

Page 30: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

ATCA Annual Conference 30

Efficient Flight PlanThrough Trajectory-based Operations

Available Now 2018 2023 2028>

Improved Flexibility & Efficiency in

Descent Profiles (CDOs)

Block 0 Block 2

Optimised Arrivals in

Dense Airspace

Block 3

Full 4D Trajectory

based Operations

Block 1

Improved Flexibility & Efficiency in

Descent Profiles (OPDs)

Threads Between Modules…and Across Blocks

Page 31: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

31ATCA Annual Conference

Step 3 Global Rollout & Feedback at GANIS

• Held Global Air Navigation Industry Symposium– September 2011– Over 500 participants from Industry, States and

international organizations

• Platform to enable feedback• Industry voice is critical in our planning• Essential preparation for AN-Conf/12• GANIS Working Document posted on website

http://www2.icao.int/en/GANIS/Pages/Documentation.aspx

Page 32: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

32ATCA Annual Conference

Your Feedback is Important

• Electronic form: http://www2.icao.int/en/GANIS/Lists/EFeedback/NewForm.aspx

• Word version: http://www2.icao.int/en/GANIS/Pages/Documentation.aspx

• Email: [email protected]

Page 33: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

33ATCA Annual Conference

Step 3 What Happens Post-GANIS?

• Collect feedback on GANIS Working Document– Until 17 October 2011

• Technical Team will generate version 2 of GANIS Working Document– Week of 24th October 2011

• Version 2 will be released for further feedback– November 2011

• Proposed revision of Global Air Navigation Plan (GANP)– Include technical roadmaps for CNS/AIM, based on ASBUs concept – Internal review – March 2012– Public consultation – 30 June 2012

• In all 6 official ICAO languages

• Proposed GANP content will be discussed at AN-Conf/12– 19-30 November 2012

Page 34: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

34ATCA Annual Conference

Step 4International Agreement at AN-Conf/12

• Montréal, 19-30 November 2012• Opportunity to formalize future of infrastructure & equipage • Strategies for longer-term requirements• Agreement of first series of block upgrades

– Level of certainty for all stakeholders – Encourage more efficient implementation

• Revised GANP– Operational capabilities to manage ATM system requirements

Page 35: International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation

35ATCA Annual Conference

• Electronic form: http://www2.icao.int/en/GANIS/Lists/EFeedback/NewForm.aspx

• Word version: http://www2.icao.int/en/GANIS/Pages/Documentation.aspx

• Email: [email protected]