International Conference onHealthcare Infrastructure &
Medical Technology 2011New Delhi; Feb. 3, 2011
Renewable Energy Options for Hospitals and Healthcare Sector
Ministry of New & Renewable Energy Government of India
Website: www.mnre.gov.in
MNRE
© RFHHA. All rights reserved
Renewable Energy for Green Hospitals
Solar passive design for green buildings
• Energy savings• Day light integration• Ventilation
Solar Thermal applications
• Hot water for cleaning, washing, bathing etc. • Steam generation for cooking, laundry, sterilization & air
conditioningSolar Photovoltaic applications
• Lighting• Electricity generation
Kitchen waste processing • Cooking gas, manure • Electricity generation
Wastewater & Solid Waste treatment and reuse
MNRE
© RFHHA. All rights reserved
Why Green Buildings? MNRE
• Concept of Green Building Design becoming popular all over the world. 40% of energy consumption and 42% GHG emissions in building sector
• Green Buildings have the advantages of :
- Reduced energy consumption and AC requirements
- Reduced water use
• 30 – 40% lower operation cost with negligible impact on project cost
© RFHHA. All rights reserved
Green Building Design
• Sustainable site planning (orientation, landscaping etc.)
• Building envelope design (sun shades, window design, double glazing, wall & roof insulation, roof painting etc)
• Building system design (heating ventilation & air conditioning, electrical & day lighting etc)
• Integration of RE devices/ systems
• Water and waste management
• Use of ecologically sustainable materials
• Indoor environmental quality
A National Rating System for Green Buildings- GRIHAdeveloped & incentivized. GRIHA rating made mandatory in all new Govt/PSU buildings
MNRE
© RFHHA. All rights reserved
Fortis Hospital Shalimar Bagh, Delhi
• First hospital in thecountry to receive GrihaRating (3star)
• 32% savings in energy
• 58% savings in water
MNRE
© RFHHA. All rights reserved
Pradhan Mantri Swasthya Suraksha Yojana
Government leading the way
AIIMS type institutes in Phase – 1 at
• Bhopal• Bhubaneshwar• Jodhpur• Patna• Raipur• Rishikesh
Registered with GRIHA. Aim at minimum
4 Star Green Rating.
MNRE
© RFHHA. All rights reserved
THE MAKING OF AN A.I.I.M.S
INNOVATION AND FUNCTION
Innovation as reflected in Plan & function as in efficient Process flow
ARCHITECTURE FOR ENVIRONMENT
• Sustainability
• Simplicity
• Functionality
• CostEffectiveness
MNRE
© RFHHA. All rights reserved
Large Area DevelopmentsGreen Campuses
MNRE
• Large Area Developments include educational and institutionalcampuses, medical colleges, hospitals, engineering collegecomplexes, SEZs, new townships etc.
• Large Area Developments need to address environmental,economic, social sustainability and land use parameters within amacro planning framework
• In addition to micro building benchmarks covered underGRIHA, new macro benchmarks for energy consumption, waterconsumption, waste handling, energy generation anddistribution, water pumping, street lighting, landscaping, access,mobility, walkablity etc. will be addressed in Guidelines beingdeveloped for Green Campuses/ Large Area Developments
© RFHHA. All rights reserved
Solar Water Heating Systems
• 1.0 million hospital beds estimated in India projected to grow to1.58 million by 2022
• Hot water required for bathrooms, kitchen and laundry
• 30 lpd per bed hot water requirement; 190 lpd per bed in multi-specialty private hospitals
• Total hot water requirement expected to grow from 45 million lpdat present to 75 million lpd by 2022
• Solar water heating demand to grow from 5 million lpd/year to 21million lpd/year by 2022
MNRE
© RFHHA. All rights reserved
• Commercially viable technology
• Can replace/ bypass electric geysers &save precious fuel oil
• Helps in peak load shaving besidesreducing energy bills & CO2 emissions
• Good manufacturing base and dealer'snetwork in most cities
• Over 500 hospitals and nursing homeshave already deployed solar waterheating systems
MNRE
FPC based system
ETC based system
Solar Water Heating Systems
© RFHHA. All rights reserved
42,000 lpd Batra Hospital, New Delhi
32,000 lpd Apollo Hospital, Bangalore (ESCO)
15,000 lpd Holy Family Hospital, Delhi (ESCO)
15,000 lpd Apollo Hospital, Ludhiana
15,000 lpd Mahavir Jain Hospital, Bangalore
12,000 lpd St. Johns Hospital, Bangalore
10,000 lpd Escort Heart Institute, Jaipur
10,000 lpd K G Hospital, Coimbatore
10,000 lpd Vedanta Medicity, Gurgaon
10,000 lpd PGI, Chandigarh
8,000 lpd Indian Spinal Injury Center, Delhi
8,000 lpd M. K.Hospital,Bhiwani
MNRE
Some SWH Installations at Hospitals
© RFHHA. All rights reserved
Some SWH Installations at Hospitals
7,000 lpd Bangalore Cancer Hospital, Bangalore
6,650 lpd Tirath Ram Shah Hospital, New Delhi
6,000 lpd DHAS Hospital, New Delhi
6,000 lpd Metro Hospital & Heart Institute, New Delhi
6,000 lpd St. Martha’s Hospital, Bangalore
6,000 lpd NIMHANS, Bangalore
5,000 lpd Silver Oak Hospital, Mohali
5,000 lpd Chintpurni Medical College, Pathankot
5,000 lpd Sacred Heart Hospital, Jalandhar
5,000 lpd K.C. General Hospital, Bangalore
4,500 lpd National Brain Research Centre, Manesar
MNRE
© RFHHA. All rights reserved
Economics of SWH SystemCase Study – Vedanta Medicity,
GurgaonCapacity 10,000 lpd (2010)
Cost Rs. 26 lakhs
Diesel Saving Per Annum 26,240 litres
Saving /annum @ Rs. 37/lit Rs. 9.7 lakhs
O&M cost /annum Rs.0.50 lakhs
Net saving /annum Rs. 9.2 lakhs
80 % Depreciation in 1st year Rs. 6 lakhs
Capital subsidy Rs. 2.8 lakhs
Investment recovered in 1st year Rs. 18 lakhs
Total cost – Saving 1st year Rs. 8 lakhs
Payback period 1.86 years
MNRE
© RFHHA. All rights reserved
• 75% of hot waterrequirement met bySolar Water HeatingSystem
• 66% of Energyrequired for heatingsaved
Solar Water Heating System at Fortis Hospital MNRE
© RFHHA. All rights reserved
Solar Steam Generating Systems
Can supplement conventional steam systems for• Community cooking• Process heat• Sterilization • Laundry• Cooling through VAR
MNRE
Savings • System of 100 sq. m. dish area can generate 40 to 50 kg steam per hour and save 5,000 liters of diesel per year
Pay back • 4 -5 years with MNRE support & depreciation benefit
© RFHHA. All rights reserved
Solar Steam System at Global Hospital, Mount Abu
• Installed in 2004-05
• 20 dishes system with a cost of Rs. 20 lakhs
• Generates 1200 kg of steam per day at around 180oC
• 60% steam being used for sterilization and in laundry, rest for cooking
MNRE
© RFHHA. All rights reserved
Solar Cooling
• Suitable for places where fuel oil/DG sets being used for cooling due to power cuts
• 215.5 TR system being built at Civil Hospital, Thane
• 184 Solar dishes, hybrid with biomass boiler.
• Dehumidification of fresh air entering OPD of hospital, excess steam for laundry & sterilization
• Cost- Rs. 4.00 crore MNRE subsidy- Rs. 1.25 crore
• Expected savings- Rs. 60 lakh/yr Payback - 4 years
MNRE
© RFHHA. All rights reserved
Roof Top SPV Systems
• Suitable for diesel
abatement at places where
power cuts are high during
day time
• Systems designed to have
minimal storage batteries
with first use of solar
power
• A 100 kW system could
save up to 50,000 liters of
diesel per year.
• Pays back the cost in 5-6
years with MNRE support
MNRE
© RFHHA. All rights reserved
Campus Lighting
• LED based lights are cost effective due to lower requirement of SPV modules
• Suitable for areas having frequent power cuts in evenings
• Avoid use of DG sets therebyreducing diesel consumption & air/noise pollution
• At Fortis Hospital in Delhi, 30% of LED based external lighting fixtures powered by SPV thus saving 22% of electrical load for external lighting
MNRE
© RFHHA. All rights reserved
• A lot of kitchen, food and other wastes get generated in hospitals, nursing homes and campuses of medical institutions
• Problems are faced in its safe and timely disposal, apart from problems of odour, rodents, stray dogs etc.
• Technologies are now available which can process these wastes,generate useful energy and produce organic manure
• One tonne of mixed waste can generate about 75 cum of biogas perday equivalent to 135 units of electricity or 35 kg of LPG which ismore than two cylinders of cooking gas
• This can result in savings of Rs 2,000 per day in terms of cooking gas or Rs 700 per day in terms of electricity
• Compact , portable and aesthetically good looking units have now been developed and are being commercially deployed with pay back periods of 3-4 years
Biogas Plants based on Kitchen & Food Wastes
MNRE
© RFHHA. All rights reserved
1. Capacity 100 kg/day
2. Area 3.5m x 3.5m
3. Year 2004-05
4. Project Cost Rs. 4 Lac
5. End Use Cooking in Canteen
• In operation since 2005.
• Compact portable unit withaesthetic looks.
Biogas Unit at Sahyadri Hospital, Pune
MNRE
© RFHHA. All rights reserved
Financial Support from MNRE
• 30% of project cost as subsidy, 20% equity & rest soft loan at 5%.
• Accelerated depreciation for profit making bodies
• Credit linked projects to get loan upto 80% with capital subsidy to be adjusted on completion
• Implementation through various channel partners
• Consolidated proposals possible if tied up with channel partners including approved manufactures/ integrators & banks
MNRE