Interpreting the project details: Control and Project Numbers - Project identifiers assigned by NDOT. The first digit in the control number is the field district in which the project is located. Jurisdiction – entity responsible for carrying out the project. Work Phases- PE – preliminary engineering ROW – right-of-way acquisition Const / CE – utilities, construction and construction engineering Fund type and amount expected to be obligated in each fiscal year - Estimates are in year-of-expenditure dollars. For this STIP period, estimates are inflated at a rate of 5% for FY-20 and FY-21 and 3% per year thereafter.

Upload: buidieu

Post on 16-Nov-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Interpreting the project details:

Control and Project Numbers - Project identifiers assigned by NDOT. The first digit in the control number is the field district in which the project is located.

Jurisdiction – entity responsible for carrying out the project.

Work Phases- PE – preliminary engineering ROW – right-of-way acquisition Const / CE – utilities, construction and construction engineering

Fund type and amount expected to be obligated in each fiscal year - Estimates are in year-of-expenditure dollars. For this STIP period, estimates are inflated at a rate of 5% for FY-20 and FY-21 and 3% per year thereafter.

STIP AdjustmentsControl No

Project No Location Revision OriginalA-1

AmountDiff NHPP STP SFTY Comments

FY-19 Original 141,493 118,174 27,95342764 NH-281-2(128) In St Paul & South Remove, was obligated in FY-18 1,360 0 (1,360) (1,360)32125A STP-98-5(108) Pierce East Levee Bridge Remove, was obligated in FY-18 700 0 (700) (700)42089 STP-11-3(116) North Loup - Ord Reduce estimate 7,010 1,956 (5,054) (5,054)70872 STP-46-1(103) Oxford South Remove, was obligated in FY-18 3,796 0 (3,796) (3,796)71185 STP-283-1(118) Platte River South Advance year of AC conversion to FY-19 0 7,235 7,235 7,23580644 STP-70-4(105) N Jct US-281 East Remove, was obligated in FY-18 1,825 0 (1,825) (1,825)80866 STP-96-3(101) US-183 Southeast Correct STIP entry 5,600 0 (5,600) (5,600)80883 STP-137-4(106) Keya Paha River - South Dakota Line Remove, was obligated in FY-18 3,359 0 (3,359) (3,359)42728 HSIP-30-4(159) 12th Ave - 7th Ave, Kearney Remove, was obligated in FY-18 1,926 0 (1,926) (1,926)

A-1 Changes (1,360) (13,099) (1,926)Original plus A-1 Amount 140,133 105,075 26,027Amount Shown in A-1 Summary 140,133 105,075 26,027Difference 0 0 0

Control No

Project No Location Revision OriginalA-1

AmountDiff NHPP STP SFTY Comments

FY-20 Original 155,153 128,84632137 NH-20-6(110) North of Dixon - South of Martinsburg Update estimate 6,198 6,925 727 72761565 NH-STP-80-3(152) Brule - Ogallala Update estimate 47,852 34,395 (13,457) (13,457)32257 STP-75-3(122) Tekamah North Update estimate 4,187 5,600 1,413 1,41371185 STP-283-1(118) Platte River South Advance year of AC conversion to FY-19 6,080 0 (6,080) (6,080)

A-1 Changes (12,730) (4,667)Original plus A-1 Amount 142,423 124,179Amount Shown in A-1 Summary 142,423 124,179Difference 0 0

Control No

Project No Location Revision OriginalA-1

AmountDiff NHPP STP Comments

FY-22 Original 90,448 18,99051443 S-385-3(1021) L-62A North Move const to FY-23, update estimate 18,000 0 (18,000) (18,000)

A-1 Changes 0 (18,000)Original plus A-1 Amount 90,448 990Amount Shown in A-1 Summary 90,448 990Difference 0 0

Fund NHPP STP BRO SFTYSTP

LINCOLNSTP

MAPANHFP TAP RTP EM State

Total Fed Funds

Beginning Bal 18,786 33,725 1,216 22,953 1,097 32,687 0 10,341 3,226 68,839 110,000 192,870

FY Alloc/ Apport 180,065 68,741 3,777 19,717 6,200 15,733 9,892 5,801 1,217 0 337,000 311,143

New Balance 198,851 102,466 4,993 42,670 7,297 48,420 9,892 16,142 4,443 68,839 447,000 504,013

Adjustments* 40,000 (40,000) 0 0 0 0 0 0 0 0 0 0

Adjusted Balance 158,851 142,466 4,993 42,670 7,297 48,420 9,892 16,142 4,443 68,839 447,000 504,013

FY Planned 140,133 105,075 2,755 31,346 6,000 20,908 9,881 9,337 31,863 369,432 357,298

FY End Balance 18,718 37,391 2,238 11,324 1,297 27,512 11 6,805 4,443 36,976 77,568 146,715

FY Alloc/ Apport 185,467 70,803 3,777 20,309 6,386 16,205 11,007 5,975 1,254 0 337,000 321,182

New Balance 154,185 158,194 6,015 31,633 7,683 43,717 11,018 12,780 5,697 36,976 414,568 467,897

FY Planned 142,423 124,179 5,141 12,393 6,000 37,853 11,007 227 0 25,000 103,046 364,223

FY End Balance 11,762 34,015 874 19,240 1,683 5,864 11 12,553 5,697 11,976 311,522 103,674

FY Alloc/ Apport 191,031 72,927 3,777 20,918 6,578 16,691 9,139 6,154 1,291 0 337,000 328,507

New Balance 152,793 156,942 4,651 40,157 8,261 22,555 9,150 18,708 6,988 11,976 648,522 432,181

FY Planned 139,707 115,148 3,687 17,149 6,000 15,130 0 4,178 0 0 186,758 300,999

FY End Balance 13,086 41,794 964 23,008 2,261 7,425 9,150 14,529 6,988 11,976 461,764 131,182

FY Alloc/ Apport 196,762 75,115 3,777 21,545 6,775 17,192 9,414 6,339 1,330 0 337,000 338,248

New Balance 159,848 166,910 4,741 44,554 9,035 24,617 18,564 20,868 8,317 11,976 798,764 469,430

FY Planned 131,488 90,448 2,693 16,160 6,000 17,188 0 1,762 0 990 135,823 266,729

FY End Balance 28,360 76,462 2,048 28,394 3,035 7,430 18,564 19,106 8,317 10,986 662,941 202,702

$50,000 transferred from NHPP to STP in FY-20, 21, 22

NHPP - National Highway Performance Program Grouped Project Categories:STP - Surface Transportation Program - includes all funds allocated under this program except TAP - Transportation Alternatives

those allocated to Lincoln and MAPA. Also includes miscellaneous funds apportioned Minor SFTY - Safety projects that are not regionally significantfor use on any elibigle Title 23 project; Congestion Mitigation, Equity Bonus, RTP - Rec Trails ProgramRedistributed funds, Extension of Allocated Programs, etc.

BRO - Surface Transportation Program Funds set aside for off system bridgesSTP Lincoln - STP funds allocated for use in the Lincoln Metroplitan Planning AreaSTP MAPA - STP funds allocated for use in the Omaha Metroplitan Planning AreaEM - Earmarks - Discretionary, Demonstration, Federal Lands and other funds not distributed by federal formulaSFTY - Highway Safety Improvement Program (includes Rail Safety)

FY - 2022

Fund Descriptions:

Summary by Fund Type

FY

FY - 2019FY - 2020

FY - 2021

Fund NHPP STP BRO SFTY LIN MAPA FP TAP RTP EMAdjustments 40,000 (40,000) 0 0 0 0 0 0 0 0

*Adjustments made to projects that are not on the current STIP, such as letting adjustments, modified agreements and final vouchers. Transfers between apportionments.

Date C.N Proj. No. Reason FundAmount ($1,000)

Transfer NH funds to STP NHPP 40,000 FV Final Voucher - closing project adjustmentTransfer NH funds to STP STP (40,000) MA Mod. Agmt. - adjustments for C.O.'s, overruns, etc.

Let Adj Post-letting adjust to low bid amountCE Adj CE Adjustment - Adjust CE to contract amountPE Adj PE Adjustment - Adjust PE to contract amount

Adjustments *

Projects in these categories are not listed in the STIP individually unless

Grouped Project Categories 2019 2020 2021 2022

Minor Safety Projects 5,319 0 0 0

Transportation Alternatives 9,337 227 4,178 1,762

Recreational Trails 0 0 0 0

Grouped Project Estimates by Fiscal Year

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202200959 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

WashingtonProject No HSIP-STWD(142) NDOT Improvement Lighting

Statewide Lighting 0.00 0.0At several intersections statewide

$453Estimate ($1,000)FY22

PEState 00 0 01 0Const / CESFTY 00 407 00 0State 00 45 00 0

00994Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KnoxProject No STP-NBIS(115) NDOT Improvement Biannual NBIS routine inspection with possible load rating by consultant N-14 Bridge Over Mo. River, Niobrara N-14 203.30 0.0

N-14 bridge over Missouri River near Niobrara $75Estimate ($1,000)

FY22PESTP 060 0 00 0Local 015 0 00 0

00995Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CedarProject No STP-NBIS(116) NDOT Improvement Biannual NBIS routine inspection with possible load rating by consultant US-81 Bridge Over MO. River, Yankton US-81 214.89 0.0

US-81 bridge over Missouri River near Yankton $75Estimate ($1,000)

FY22PESTP 060 0 00 0Local 015 0 00 0

11599 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

JeffersonProject No STP-8-6(104) NDOT Improvement Replace bridge on new shifted alignment and associated approach work Blue River South of Fairbury N-8 51.55 0.9

Realigned N-8 over the Blue River south of Fairbury $8,655Estimate ($1,000)

FY22PEState 0250 0 00 0ROWState 00 35 00 0Const / CESTP-AC 00 0 00 6670State 00 0 00 1700State 00 0 -6,6700AC Conv 0STP 00 0 6,6700AC Conv 0

1

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202211718 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

JeffersonProject No STP-15-1(110) NDOT Improvement Mill, resurf 24' rdwy, br repair, br replace

Fairbury North N-15 10.11 11.0N-15 from US-136 in Fairbury north to N-4

$7,678Estimate ($1,000)FY22

PEState 00 0 0380 0ROWState 00 0 075 0Const / CESTP-AC 05,661 0 00 0State 01,562 0 00 0STP 00 5,661 00AC Conv 0State 00 -5,661 00AC Conv 0

11781 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SewardProject No BRO-7080(27) County Improvement Br replacement and associated approach work Seward South 0.00 0.0

Co Rd over the Big Blue River 0.1 mi south of Seward $1,944Estimate ($1,000)

FY22PEBRO 00 0 027 0State 00 0 02 0Local 00 0 09 0ROWBRO 08 0 00 0Local 02 0 00 0Const / CEBRO 00 1,517 00 0Local 00 3 00 0State 00 376 00 0

2

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202211895 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PawneeProject No STP-50-1(109) NDOT Improvement Mill, resurf 24' rdwy w/4'-6' earth shld, replace 3 br's, conc repair in Du BoisPawnee City Southeast N-50 0.00 12.4

N-8 from Pawnee City to N-50, then south on N-50 to NE/KS state line $10,441Estimate ($1,000)

FY22PEState 00 0 0365 0ROWState 07 0 00 0Const / CEState 02,227 0 00 0STP-AC 07,842 0 00 0STP 00 7,842 00AC Conv 0State 00 -7,842 00AC Conv 0

12080 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SewardProject No STP-15-2(117) NDOT Improvement Urban reconstruction

US-34 North & South, Seward N-15 66.24 1.4N-15 from BNSF DOT#083457X north 1.4 mi to Seward

$6,014Estimate ($1,000)FY22

PEState 0257 0 00 0ROWState 00 280 00 0Const / CEState 1,2100 0 00 0STP-AC 4,2670 0 00 0State 00 0 00AC Conv -4267STP 00 0 00AC Conv 4267

12704 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CassProject No STP-S13K(103) NDOT Improvement Conc repair, mill, asph widen/resurf 22' rdwy to 28', br replacement Weeping Water Spur S-13K 0.00 1.9

Weeping Water Spur (S-13K) from N-50 to Weeping Water $2,910Estimate ($1,000)

FY22PEState 00 97 00 0ROWState 200 0 00 0Const / CEState 00 0 5800 0STP 00 0 2,2130 0

3

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202213028 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

GageProject No STP-4-6(114) NDOT Improvement Mill, asph resurf 24' rdwy w/6' earth shld

E Jct US-136 - Lewiston Spur N-4 167.47 12.3N-4 from the East jct US-136 to 3.5 mi east of the Lewiston Spur (S-67A)

$5,633Estimate ($1,000)FY22

PEState 00 181 00 0Const / CEState 00 0 1,1980 0STP 00 0 4,2540 0

13100 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CassProject No STP-66-7(116) NDOT Improvement Mill, resurf 24' rdwy w/6' shld, 5' surf, br repair, conc repair South Bend - N-50 N-66 105.16 4.8

N-66 from just east of Nebraska St in South Bend to just west of N-50 $0Estimate ($1,000) Remove, was obligated in FY-18FY22

Const / CEState 00 0 00 0STP-AC 00 0 00 0

13103 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

NemahaProject No STP-67-1(121) NDOT Improvement Cold-in-place recycle, widen/resurf 24' rdwy to 28', br repair N Jct US-75 - Brock N-67 34.36 6.5

N-67 from N Jct US-75 west to approx 0.2 mi east of Brock $5,274Estimate ($1,000)

FY22PEState 0600 0 00 0ROWState 00 2 00 0Const / CEState 00 0 00 1033STP-AC 00 0 00 3639State 00 0 -3,6390AC Conv 0STP 00 0 3,6390AC Conv 0

4

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202213104 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

OtoeProject No STP-67-1(122) NDOT Improvement Mill, resurf 24' rdwy w/6' earth shld, br repair

N-105 North N-67 43.57 8.6N-67 from N-105 north to E Jct N-128. Includes segment on Talmage Spur (S-66D)

$5,514Estimate ($1,000)FY22

PEState 00 240 00 0ROWState 300 0 00 0Const / CEState 00 0 1,3480 0STP 00 0 3,8960 0

13161Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Project No URB-6763(1) City Improvement New roadway Karol Kay Blvd, Bader-Hillcrest, Seward

Extension of Karol Kay Blvd, from Bader Ave to Hillcrest Dr in Seward $1,008Estimate ($1,000)

FY22PELocal 00 0 049 0STP 00 0 0196 0ROWLocal 01 0 00 0STP 05 0 00 0Const / CESTP 0573 0 00 0Local 0184 0 00 0

13186 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

GageProject No STP-HSIP-41-6(115) NDOT Improvement Mill, widen/resurf to 28' rdwy, conc repair, br deck overlay, intersection Adams West N-41 74.46 11.3

N-41 from US-77 east to just east of N-43, including S-24C $6,900Estimate ($1,000)

FY22PEState 00 0 0215 0ROWState 00 0 050 0Const / CESFTY 0428 0 00 0State 01,419 0 00 0STP-AC 04,788 0 00 0State 00 -4,788 00AC Conv 0STP 00 4,788 00AC Conv 0

5

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202213236 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

JohnsonProject No STP-50-1(113) NDOT Improvement Conc repair, seal cracks & joints, mill & resurf rdwy, culv extentions, gdrl Tecumseh North N-50 32.06 5.9

N-50 from Tecumseh north to approx 2.0 mi north of N-41 $4,846Estimate ($1,000)

FY22PEState 00 0 0295 0ROWState 010 0 00 0Const / CEState 1,0040 0 00 0STP 3,5370 0 00 0

13238 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

JeffersonProject No STP-8-6(115) NDOT Improvement Br replacement and associated approach work Rose Creek Bridge West of Reynolds N-8 38.52 0.2

N-8 over Rose Creek 1.0 mi west of Reynolds $2,080Estimate ($1,000)

FY22PEState 065 0 00 0ROWState 00 10 00 0Const / CEState 00 0 00 401STP 00 0 00 1604

13245 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

JeffersonProject No STP-103-1(111) NDOT Improvement Conc repair, mill, resurf, br repair/overlay

Diller South N-103 0.00 4.4N-103 from N-8 north to Diller

$2,104Estimate ($1,000)FY22

PEState 00 0 082 0ROWState 010 0 00 0Const / CEState 4630 0 00 0STP 1,5490 0 00 0

6

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202213246 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

JeffersonProject No NH-136-6(124) NDOT Improvement Conc repair, resurf 24' rdwy w/10' shld, 8' surf

Jansen East US-136 156.24 9.8US-136 from Jansen east to 0.2 mi east of the Jefferson/Gage Co line

$6,611Estimate ($1,000)FY22

PEState 00 23 00 0ROWState 10 0 00 0Const / CENHPP 00 0 5,2690 0State 00 0 1,3180 0

13250 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ButlerProject No STP-15-2(124) NDOT Improvement Mill, resurf 24 rdwy w/10' shld, 8' surf

David City North N-15 92.68 5.6N-15 from David City north to N-64 including 0.3 mi on N-64

$2,012Estimate ($1,000)FY22

PEState 030 0 00 0ROWState 00 1 00 0Const / CEState 3960 0 00 0STP 1,5850 0 00 0

13264 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CassProject No NH-34-7(130) NDOT Improvement Mill, asph resurf 24' rdwy w/10' shld, 8' surf

N-50 East US-34 352.65 7.7US-34 from approx 0.2 mi east of N-50 east to approx 1.1 mi west of N-67

$6,276Estimate ($1,000)FY22

PEState 00 0 0220 0ROWState 0136 0 00 0Const / CENHPP 04,628 0 00 0State 01,292 0 00 0

7

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202213266 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

GageProject No STP-8-6(116) NDOT Improvement Mill, asph resurf 24' rdway, br repair/overlay

Barneston East N-8 86.64 12.1N-8 from just west 1st St in Barneston, east to Jct N-99

$4,942Estimate ($1,000)FY22

PEState 00 0 0101 0Const / CEState 9680 0 00 0STP-AC 3,8730 0 00 0STP 00 0 00AC Conv 3873State 00 0 00AC Conv -3873

13268 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

OtoeProject No STP-43-2(107) NDOT Improvement Mill, widen/resurf 24' rdwy to 28', br repair/overlay, scour mitigation at CBC Eagle South N-43 22.30 8.0

N-43 from E Jct N-2 north to US-34 $5,129Estimate ($1,000)

FY22PEState 00 0 0525 0ROWState 010 0 00 0Const / CEState 0919 0 00 0STP-AC 03,675 0 00 0State 00 -3,675 00AC Conv 0STP 00 3,675 00AC Conv 0

13270 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

GageProject No STP-41-6(118) NDOT Improvement Mill, widen/resurf 24' rdwy to 28', 1 br repair, 2 br replacements Adams - Sterling N-41 85.48 6.7

N-41 from just east of N-43 to just east of the east limits of Sterling $6,096Estimate ($1,000)

FY22PEState 00 0 0202 0ROWState 050 0 00 0Const / CESTP-AC 04,675 0 00 0State 01,169 0 00 0State 00 -4,675 00AC Conv 0STP 00 4,675 00AC Conv 0

8

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202213272 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SewardProject No STP-15-2(126) NDOT Improvement Mill and asph resurf existing rdwy and s-shld

E Jct US-6 - I-80 N-15 57.03 3.4N-15 from E Jct US-6 north to just south of I-80

$1,635Estimate ($1,000)FY22

PEState 00 0 0132 0Const / CEState 0301 0 00 0STP 01,202 0 00 0

13273 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SewardProject No STP-6-6(162) NDOT Improvement Mill, resurf rdwy & shld, br repair, curb & gutter repair, curb/flume In Milford and North US-6 292.03 3.6

US-6 from 0.1 mi west of Milford to and including L-80H, excl 0.7 mi in Milford $2,652Estimate ($1,000)

FY22PEState 00 0 0160 0Const / CEState 0498 0 00 0STP 01,994 0 00 0

13275 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PawneeProject No STP-50-1(114) NDOT Improvement Resurf, br repair

W Jct N-4 - Tecumseh N-50 20.03 12.0N-50 from just east of west jct N-50, east to Tecumseh

$5,748Estimate ($1,000)FY22

PEState 00 25 00 0Const / CEState 00 0 1,1450 0STP 00 0 4,5780 0

9

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202213276 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

OtoeProject No STP-50-1(115) NDOT Improvement Conc repair, resurf, repair 5-br's, replace 1-br sized CBC w/br sized CBC Syracuse South N-50 37.93 14.0

N-50 from 2.0 mi north of N-41 north to Syracuse $7,114Estimate ($1,000)

FY22PEState 0245 0 00 0ROWState 00 15 00 0Const / CEState 00 0 00 1371STP-AC 00 0 00 5483State 00 0 -5,4830AC Conv 0STP 00 0 5,4830AC Conv 0

13277 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

NemahaProject No STP-67-1(124) NDOT Improvement Mill, patch asph rdwy and shld, br repair

Nemaha South N-67 12.13 1.5N-67 from Co Rd 724 to approx 0.2 mi south of the north limits of Nemaha

$1,585Estimate ($1,000)FY22

PEState 00 0 050 0ROWState 02 0 00 0Const / CEState 0337 0 00 0STP 01,196 0 00 0

13278 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ButlerProject No STP-15-2(127) NDOT Improvement Mill, asph resurf 24' rdwy w/10' shld, 8' surf, br repair

N-92 South N-15 76.12 11.0N-15 from Seward/Butler Co line north to the E Jct N-92

$5,376Estimate ($1,000)FY22

PEState 00 0 0211 0Const / CEState 1,0330 0 00 0STP-AC 4,1320 0 00 0State 00 0 00AC Conv -4132STP 00 0 00AC Conv 4132

10

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202213295 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PawneeProject No STP-4-7(108) NDOT Improvement Mill, resurf, culv, curb ramp, sidewalk

Table Rock West N-4 191.97 5.1N-4 from W Jct N-50 to Table Rock, including a segment on N-50

$3,276Estimate ($1,000)FY22

PEState 00 0 013 0ROWState 075 0 00 0Const / CESTP 2,4830 0 00 0State 7050 0 00 0

13297 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

OtoeProject No HSIP-2-7(117) NDOT Improvement Intersection improvements, right turn lane, median island N-2/"I" St, Palmyra N-2 476.04 0.1

N-2 from approx 0.4 mi east of E Jct N-43 to "I" St in Palmyra $518Estimate ($1,000)

FY22PEState 00 0 017 0ROWState 015 0 00 0Const / CESFTY 0427 0 00 0State 059 0 00 0

13302 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SalineProject No STP-33-6(109) NDOT Improvement Mill, resurf

US-6/N-15 - Crete N-33 0.00 10.9N-33 from Jct US-6 & N-15, southeast to Crete

$2,285Estimate ($1,000)FY22

PEState 00 15 00 0Const / CEState 00 0 4540 0STP 00 0 1,8160 0

11

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202213307 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

RichardsonProject No NH-73-1(119) NDOT Improvement Conc repair, mill & resurf existing rdwy & s-shld, br repair, modify turn lanes Verdon East & West US-73 8.14 13.9

US-73 from 5.4 mi southeast of N-67 to 0.2 mi east of Jct US-75 $8,792Estimate ($1,000)

FY22PEState 099 0 00 0Const / CEState 00 0 00 1739NHPP 00 0 00 6954

13325 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

NemahaProject No STP-105-1(108) NDOT Improvement Replace br, add approaches

N-62 South Bridge N-105 17.71 0.0N-105 over Long Branch Creek just north of Pawnee/Richarson/Nemaha Co line

$2,030Estimate ($1,000)FY22

PEState 00 0 0166 0ROWState 015 0 00 0Const / CEState 0406 0 00 0STP 01,443 0 00 0

13326 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SaundersProject No NH-77-2(165) NDOT Improvement Bridge repair/overlay, seal conc bridge rail, replace guardrail Wahoo Viaduct US-77 92.05 0.0

US-77 br locations approx 0.3 mi south and 1.4 mi north W Jct N-92 west of Wahoo$1,722Estimate ($1,000)

FY22PEState 00 0 0149 0Const / CENHPP 01,258 0 00 0State 0315 0 00 0

13329 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

OtoeProject No NH-2-7(118) NDOT Improvement Conc repair, diamond grind

Syracuse East N-2 492.00 11.5N-2 from approx 3.1 mi east Syracuse, east to 0.5 mi west (SB) US-75 gr sep

$2,800Estimate ($1,000)FY22

PEState 00 0 032 0Const / CEState 0554 0 00 0NHPP 02,214 0 00 0

12

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202213330 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

OtoeProject No STP-S66E(104) NDOT Improvement Mill and overlay, CBC repair/replace

Burr Spur S-66E 0.00 6.2S66E (Burr Spur)

$964Estimate ($1,000)FY22

PEState 010 0 00 0Const / CEState 00 0 00 191STP 00 0 00 763

13338 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

GageProject No NH-77-1(135) NDOT Improvement Conc repair, mill, resurf, br repair/overlay, reconstruct median Pickrell North US-77 31.06 7.3

US-77 from 1.0 mi north of Pickrell Spur to 1.8 mi south of Cortland $10,083Estimate ($1,000)

FY22PEState 00 0 0352 0Const / CENHPP 7,7850 0 00 0State 1,9460 0 00 0

13344 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

JeffersonProject No STP-S48A(101) NDOT Improvement Replace existing bridge with triple 10'x12' CBC

Steele City Spur Bridge S-48A 0.15 0.0S-48A approx 0.3 mi north of Steel City

$493Estimate ($1,000)FY22

PEState 00 15 00 0ROWState 100 0 00 0Const / CESTP 00 0 3740 0State 00 0 940 0

13356 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SewardProject No NH-80-8(159) NDOT Improvement Mill, inlay, br repair

York/Seward County Line - Goehner I-80 365.14 7.5I-80 from York/Seward county line, east to approx 0.5 mi west of Goehner

$6,217Estimate ($1,000)FY22

PEState 00 1 00 0Const / CEState 00 0 6220 0NHPP 00 0 5,5940 0

13

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202213358 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SewardProject No NH-80-8(160) NDOT Improvement Mill, resurf existing 4-ane divided interstate & s-shld, conc repair, br repair Goehner - Milford I-80 372.68 9.4

I-80 from approx 0.4 mi west Goehner Intch to 0.4 mi west Milford Intch $13,118Estimate ($1,000)

FY22PEState 00 0 098 0Const / CENHPP-AC 00 11,718 00 0State 00 1,302 00 0NHPP 11,7180 0 00AC Conv 0State -11,7180 0 00AC Conv 0

13359 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SewardProject No NH-80-8(161) NDOT Improvement Conc repair, mill, resurf rdwy and shld, br repair

Milford - Lincoln I-80 381.71 13.2I-80 from 0.4 mi west of Milford to 1.0 mi west of NW 48th St

$10,886Estimate ($1,000)FY22

PEState 00 0 082 0Const / CENHPP-AC 00 9,723 00 0State 00 1,081 00 0NHPP 9,7230 0 00AC Conv 0State -9,7230 0 00AC Conv 0

13361 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SalineProject No BRM-7076(24) County Improvement Bridge replacement and associated approach work Crete Tuxedo Park Rd 0.00 0.0

Tuxedo Park Rd bridge U062044305 in Crete $1,365Estimate ($1,000)

FY22PEBRO 00 192 00 0Local 00 48 00 0ROWBRO 80 0 00 0Local 20 0 00 0Const / CEBRO 00 0 00 892Local 00 0 00 223

14

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202213362 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SewardProject No BRO-7080(54) County Improvement Bridge replacement and associated approach work Seward Northwest 0.00 0.0

Bluff Rd bridge #C008002010 just northeast of Seward $1,357Estimate ($1,000)

FY22PEBRO 00 0 0234 0ROWBRO 08 0 00 0Local 02 0 00 0Const / CEBRO 8910 0 00 0Local 2220 0 00 0

13363 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SewardProject No BRO-7748(1) County Improvement Bridge replacement and associated approach work Beaver Crossing South 0.00 0.0

Pioneers Rd bridge #C008004010 just south of Beaver Crossing $1,044Estimate ($1,000)

FY22PEBRO 00 0 0216 0ROWBRO 08 0 00 0Local 02 0 00 0Const / CEBRO 00 654 00 0Local 00 164 00 0

13371 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

OtoeProject No NH-2-7(119) NDOT Improvement Bridge repair and epoxy polymer overlay

Nebraska City Missouri River Bridge N-2 508.16 0.0N-2 bridge over the Missouri River east of Nebraska City

$1,704Estimate ($1,000)FY22

Const / CENHPP 00 416 00 0State 00 104 00 0Other 00 1,184 00 0

15

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202213381 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SaundersProject No STP-66-6(109) NDOT Improvement Br repair/overlay, replace/remodel abutments, replace expansion joints Ashland Viaduct N-66 97.43 0.0

N-66 over BNSF $955Estimate ($1,000)

FY22PEState 00 0 032 0Const / CEState 00 184 00 0STP 00 739 00 0

13394 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SaundersProject No NH-77-2(167) NDOT Improvement Mill and overlay

Wahoo East US-77 95.41 16.0US-77 approx 0.4 mi west S Jct US77/N-92 with N-109 to just east of E Jct N-92

$7,232Estimate ($1,000)FY22

PEState 01 0 00 0Const / CENHPP 5,7850 0 00 0State 1,4460 0 00 0

13396 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SaundersProject No STP-64-6(106) NDOT Improvement Mill and resurf

US-77 - Platte River N-64 47.22 5.5N-64 from Jct US-77 east to just west Platte River

$2,205Estimate ($1,000)FY22

PEState 00 0 01 0Const / CEState 00 441 00 0STP 00 1,763 00 0

13397 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

OtoeProject No STP-128-7(110) NDOT Improvement Mill, widen/ovly rdwy, br repair

Lorton West N-128 0.00 7.9N-128 from N-50 to W Jct N-67

$3,150Estimate ($1,000)FY22

PEState 00 0 01 0Const / CEState 00 630 00 0STP 00 2,519 00 0

16

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202220626 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DodgeProject No S-30-6(1044) NDOT Improvement ROW, grading conc pvmt for 4-lane divided expressway, Str, lighting and util North Bend - Fremont US-30 414.94 10.7

US-30 (new alignment) from west of North Bend to the Fremont Bypass $82,718Estimate ($1,000)

FY22PEState 00 0 03,215 0ROWState 05,573 0 00 0Const / CEState 025,000 0 00 0State 00 35,000 00 0State 13,9300 0 00 0

21209 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CassProject No S-75-2(1072) NDOT Improvement 4-lane divided expressway

Murray - Plattsmouth US-34 373.33 6.8US-34 from N-1 north 6.3 mi and on US-75 from US-34 north 1.2 mi

$45,526Estimate ($1,000)FY22

PELocal 00 0 037 0State 00 0 01,802 0ROWLocal 00 0 077 0State 00 0 01,276 0Const / CELocal 00 1,570 00 0State 00 40,764 00 0

21704 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

WashingtonProject No STP-75-3(107) NDOT Improvement Mill, resurf existing rdwy & s-shld w/asphalt, br repairs, br replacements, gdrlBlair - Herman US-75 116.35 9.8

US-75 from north limits of Blair to 0.2 mi north of the Burt Co line $9,249Estimate ($1,000)

FY22PEState 00 0 01,040 0ROWState 0550 0 00 0Const / CEState 1,6270 0 00 0STP-AC 6,0320 0 00 0State 00 0 00AC Conv -6032STP 00 0 00AC Conv 6032

17

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202222177 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DodgeProject No STPN-TMT-5616(1) NDOT Improvement New viaduct

23rd St Viaduct, Fremont 0.00 0.523rd St from Colorado Ave to Nye Ave in Fremont

$26,390Estimate ($1,000)FY22

PELocal 00 1,562 00 0ROWLocal 1,2360 0 00 0Const / CELocal 00 0 00 10102EM 00 0 00 990SFTY 00 0 00 10000State 00 0 00 2500

22339 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DodgeProject No S-30-6(1048) NDOT Improvement Mill, asph resurf 24' rdwy w/10' shld, 8' surf

North Bend - Fremont US-30 407.50 16.0US-30 from 3.1 mi east of N-79 east to Fremont

$4,851Estimate ($1,000)FY22

PEState 00 0 030 0Const / CEState 00 4,821 00 0

22455 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DodgeProject No STP-91-6(113) NDOT Improvement Conc repair, mill, asph resurf, br repair

In Snyder & East N-91 188.91 4.4N-91 from approx 0.1 mi east of Snyder east to US-275

$5,701Estimate ($1,000)FY22

PEState 00 0 0286 0ROWState 083 0 00 0Const / CEState 1,1790 0 00 0STP 4,1530 0 00 0

18

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202222467A Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CassProject No STP-1-7(107) NDOT Improvement Conc pvmt reconstruction, viaduct replacement, curb inlets, storm sewer Murray - US-34/75 N-1 25.85 1.0

N-1 in Murray and east to Jct US-34/75 $11,428Estimate ($1,000)

FY22PEState 00 0 0770 0ROWState 00 0 0339 0Const / CEEM 03,404 0 00 0NHPP-AC 04,659 0 00 0State 02,256 0 00 0State 00 -4,659 00AC Conv 0NHPP 00 4,659 00AC Conv 0

22508 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

WashingtonProject No STP-DPS-3854(1) NDOT Improvement 2-lane conc pvmt, storm sewer, bike trail

Blair South Bypass 0.00 1.0Bypass road from US-30 at Hollow Rd east to US-75 at Co Rd P35

$12,383Estimate ($1,000)FY22

PEEM 00 0 0974 0ROWLocal 0250 0 00 0STP 01,000 0 00 0EM 0422 0 00 0Const / CELocal 00 9,737 00 0

22568 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

WashingtonProject No NH-75-3(119) NDOT Improvement Mill, resurf

Fort Calhoun South US-75 101.35 4.7US-75 from 0.2 mi north of Douglas/Washington Co line north to Fort Calhoun

$2,840Estimate ($1,000)FY22

PEState 00 0 0295 0ROWState 010 0 00 0Const / CENHPP 01,970 0 00 0State 0565 0 00 0

19

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202222569 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DodgeProject No NH-77-3(132) NDOT Improvement Mill, conc repair, asph resurf, br repair/overlay

Inglewood - Fremont (Relinquishment) US-77 112.48 1.5US-77 from 0.4 mi south Fremont to just south 5th St in Fremont except 0.2 mi

$2,932Estimate ($1,000)FY22

PEState 00 0 0220 0ROWState 00 0 03 0Const / CENHPP 02,167 0 00 0State 0542 0 00 0

22582 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DodgeProject No NH-275-6(139) NDOT Improvement Mill, resurf existing rdwy & s-shld, resurf ramps, conc repair, br repair/ovly Douglas County Line North US-275 152.44 4.5

US-275 from E Jct US-30 to Dodge/Douglas Co line, includes US-30 br repair/ovly $4,248Estimate ($1,000)

FY22PEState 01 0 00 0Const / CENHPP 00 0 00 3397State 00 0 00 850

22590 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

WashingtonProject No NH-91-7(111) NDOT Improvement Mill, conc repair, urban resurf, ADA curb ramps

In Blair N-91 229.97 0.5N-91 from US-30/75 in Blair southwest 0.5 mi

$891Estimate ($1,000)FY22

PEState 00 0 030 0ROWState 015 0 00 0Const / CEState 0186 0 00 0NHPP 0660 0 00 0

20

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202222639 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DodgeProject No NH-77-3(136) NDOT Improvement Add left turn lanes at all four legs of intersection, tr signals, asph resurf US-77/Cloverly Rd, Inglewood US-77 112.80 0.2

US-77 at Cloverly Rd south of Fremont $1,240Estimate ($1,000)

FY22PEState 00 0 063 0ROWState 00 0 0137 0Const / CENHPP 0810 0 00 0State 0230 0 00 0

22686 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DodgeProject No NH-77-3(140) NDOT Improvement Construct US-77 (SB) turn-lane, paved median and US-77 (NB) acceleration lane US-77/US-275 East of Hooper US-77 124.30 0.3

US-77/US-275 Interchange east of Hooper $607Estimate ($1,000)

FY22PEState 00 0 021 0ROWState 020 0 00 0Const / CENHPP 0453 0 00 0State 0113 0 00 0

22688 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DodgeProject No NH-30-6(138) NDOT Improvement Mill, resurf EB lanes & shld, rumble strips, br repair/overlay Fremont Northeast Bypass US-30 426.09 3.3

EB US-30 from US-77 to just north of US-275 east of Fremont $2,908Estimate ($1,000)

FY22PEState 00 0 0103 0Const / CENHPP 02,244 0 00 0State 0561 0 00 0

21

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202222691 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DodgeProject No NH-77-3(137) NDOT Improvement Conc repair, crack/joint seal, roadway sealer

Fremont - US-30 (Relinquishment) US-77 115.15 1.4US-77 from 23rd St in Fremont to 0.3 mi south of US-30

$1,218Estimate ($1,000)FY22

PEState 00 5 00 0Const / CELocal 00 0 1080 0NHPP 00 0 8840 0State 00 0 2210 0

22720 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DodgeProject No NH-30-6(139) NDOT Improvement Gr, conc pvmt & s-shld reconstruction, culv, br repairs, gdrl US-275 East of Fremont - Arlington US-30 429.28 3.9

US-30 from approx 0.6 mi east US-275 gr separation east to west lmts Arlington $12,038Estimate ($1,000)

FY22PEState 0300 0 00 0Const / CENHPP 00 0 9,3900 0State 00 0 2,3480 0

22722 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DodgeProject No S-77-3(1036) NDOT Improvement Gr, new bridges, conc pvmt for new 4-lane divided expressway Fremont Southeast Beltway 112.43 3.2

US-77 from Platte River on new alignment to new US-275 interchange SE of Fremont$43,069Estimate ($1,000)

FY22PETIB 00 0 01,254 0Const / CETIB 00 41,815 00 0

22731Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CassProject No NH-34-7(132) NDOT Improvement Bridge repair/overlay, remodel butress, replace expansion joints, gdrl Plattsmouth - Bellevue Bridges US-77 382.10 1.2

US-34 bridges from approx 1.4 mi north Plattsmouth to 0.6 mi north Jct US-75 $3,945Estimate ($1,000)

FY22PEState 0145 0 00 0Const / CEState 7000 0 00 0NHPP 3,1000 0 00 0

22

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202222752 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DodgeProject No STP-79-3(108) NDOT Improvement Resurf

North Bend - US-30 N-79 42.44 2.1N-79 from 0.5 mi south North Bend to new US-30 Rogers - North Bend alignment

$667Estimate ($1,000)FY22

PEState 00 0 01 0Const / CEState 00 133 00 0STP 00 533 00 0

31208 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

StantonProject No BRO-7084(7) County Improvement Bridge replacement and associated approach work Stanton North 0.00 0.2

Co Road #839 over Indian Creek 2.2 mi north of Stanton $774Estimate ($1,000)

FY22PEBRO 00 0 051 0Local 00 0 06 0State 00 0 06 0ROWBRO 08 0 00 0State 02 0 00 0Const / CEBRO 0500 0 00 0Local 0101 0 00 0State 0100 0 00 0

31490 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

MadisonProject No STP-45-3(106) NDOT Improvement Mill, asph widen/resurf existing 24'-rdwy to 28', br repair, gdrl Newman Grove North & South N-45 0.00 9.2

N-45 from Jct N-91 to Jct N-32 except for a small segment; Includes L-58B $4,886Estimate ($1,000)

FY22PEState 00 0 0225 0ROWState 010 0 00 0Const / CEState 0930 0 00 0STP 03,721 0 00 0

23

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202231510 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KnoxProject No STP-14-4(109) NDOT Improvement Bridge replacement, add approaches & GB on pile, gdrl Niobrara South Bridge N-14 198.59 0.0

N-14 1.0 mi south of Niobrara over Burgess Creek $2,858Estimate ($1,000)

FY22PEState 00 0 0256 0ROWState 00 0 06 0Const / CEState 0571 0 00 0STP 02,025 0 00 0

31515 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

WayneProject No STP-98-5(106) NDOT Improvement Mill, widen/resurf existing 24' rdwy to 28', conc repair, culv, gdrl North Jct US-81 - N-35 N-98 7.46 13.0

N-98 from N Jct US-81, east to Jct N-35 $7,868Estimate ($1,000)

FY22PEState 030 0 00 0ROWState 00 50 00 0Const / CEState 00 0 00 1558STP-AC 00 0 00 6230State 00 0 -6,2300AC Conv 0STP 00 0 6,2300AC Conv 0

31674 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KnoxProject No S-12-5(1011) NDOT Improvement Gr, str, surf 24' rdwy w/8' shld, 2' surf

Niobrara East & West N-12 151.48 10.6N-12 east and west of Niobrara on shifted alignment

$224,863Estimate ($1,000)FY22

PEOther 00 0 012,720 0State 00 0 05,383 0ROWOther 00 8,730 00 0Const / CEOther 00 0 198,0300 0

24

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202231677 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CedarProject No NH-20-5(112) NDOT Improvement Mill, resurf rdwy, replace urban section in Randolph, br repair/replace US-81 - Belden US-20 373.95 10.5

US-20 from US-81 east to approx 1.0 mi west of N-57 west of Belden $15,415Estimate ($1,000)

FY22PEState 00 0 0388 0ROWState 054 0 00 0Const / CENHPP-AC 11,9770 0 00 0State 2,9960 0 00 0NHPP 00 0 00AC Conv 11977State 00 0 00AC Conv -11977

31817A Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DakotaProject No NH-20-7(116) NDOT Improvement Gr, conc pvmt reconstruction, storm sewer

In Jackson US-20 421.86 0.7US-20 from approx 0.2 mi west of Jackson to near the east limits of Jackson

$3,452Estimate ($1,000)FY22

PEState 00 0 0247 0ROWState 00 0 096 0Const / CEEM 02,346 0 00 0State 0669 0 00 0Local 089 0 00 0NHPP 05 0 00 0

31821 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KnoxProject No BRO-7054(19) County Improvement Br replacement and associated approach work Verdigre North 0.00 0.2

Co Rd 3.5 mi north of Verdigre crossing Verdigris Creek $2,256Estimate ($1,000)

FY22PEBRO 00 0 0258 0State 00 0 069 0ROWBRO 08 0 00 0State 02 0 00 0Const / CEBRO 01,535 0 00 0State 0384 0 00 0

25

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202231832 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KnoxProject No STP-84-5(108) NDOT Improvement Asph widen/resurf 24' rdwy to 28' w/6' earth shld Bloomfield - US-81 N-84 22.39 11.6

N-84 from the east limits of Bloomfield east to US-81 $8,869Estimate ($1,000)

FY22PEState 00 195 00 0Const / CESTP 00 0 6,7600 0State 00 0 1,9140 0

31845A Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ColfaxProject No STP-91-6(114) NDOT Improvement Mill, widen/resurf 24' rdwy to 28', br repair, extend culv Clarkson East N-91 174.60 8.5

N-91 from 0.3 mi west of N-15 to the Colfax/Dodge Co line, also part on S19C $4,662Estimate ($1,000)

FY22Const / CEState 0-3,321 0 00AC Conv 0STP 03,321 0 00AC Conv 0

31883 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PlatteProject No BRO-7071(9) County Improvement Bridge replacement and associated approach work Monroe Southwest 0.00 0.0

Co Rd 0.7 mi south and 1.8 mi west of Monroe crossing Columbus Genoa Canal $855Estimate ($1,000)

FY22PEBRO 00 0 074 0Local 00 0 026 0ROWBRO 04 0 00 0Local 01 0 00 0Const / CEState 00 0 1500 0BRO 00 0 6000 0

31915 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BooneProject No STP-56-5(107) NDOT Improvement Mill, resurf 24' rdwy w/6' earth shld and repair 2 bridges Cedar Rapids - St. Edward N-56 22.27 13.0

N-56 from E Jct N-52 1.0 mi east of Cedar Rapids east to 0.6 mi west of N-39 $6,063Estimate ($1,000)

FY22Const / CEState 0-4,495 0 00AC Conv 0STP 04,495 0 00AC Conv 0

26

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202231916 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CedarProject No STP-57-4(116) NDOT Improvement Mill, resurf 24' rdwy to 28' w/6' earth shld, br repair, curb/flume Coleridge - Hartington N-57 57.88 8.7

N-57 from 875 Rd north of Coleridge north to N-84 near Hartington $5,855Estimate ($1,000)

FY22PEState 0209 0 00 0ROWState 00 10 00 0Const / CEState 00 0 00 1127STP-AC 00 0 00 4509State 00 0 -4,5090AC Conv 0STP 00 0 4,5090AC Conv 0

31925 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PlatteProject No RRZ-TMT-6061(8) NDOT Improvement Viaduct

UPRR/12th Ave, Columbus 0.00 0.512th Ave over UPRR 10th St - 13th Ave in Columbus

$21,777Estimate ($1,000)FY22

PESFTY-AC 00 0 0730 0Other 00 0 091 0Local 00 0 091 0Local 00 -730 00 0SFTY 00 730 00AC Conv 0ROWLocal 00 0 0505 0Other 00 0 0505 0SFTY 00 0 0109 0SFTY-AC 00 0 03,934 0Local 0500 0 00 0Other 0500 0 00 0SFTY 04,000 0 00 0Local 00 -3,934 00 0SFTY 00 3,934 00AC Conv 0Const / CEOther 01,081 0 00 0SFTY 04,325 0 00 0Local 01,081 0 00 0State 04,325 0 00 0

27

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202231949 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CumingProject No STP-32-6(113) NDOT Improvement Conc repair, mill, widen/resurf 24' rdwy to 28', br repair, extend culv, gdrl West Point West N-32 62.41 10.9

N-32 from near Wisner Rd to approx 0.2 mi east of west lmts West Point $7,163Estimate ($1,000)

FY22PEState 00 0 0253 0ROWState 05 0 00 0Const / CESTP-AC 05,524 0 00 0State 01,381 0 00 0STP 00 5,524 00AC Conv 0State 00 -5,524 00AC Conv 0

31983 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PlatteProject No NH-30-5(131) NDOT Improvement Replace (SB) & repair (NB) br's over Loup River, CBC to replace br at S030 37787Columbus South Bridges US-30 377.73 0.0

US-30 br's over Loup River & US-30 br approx 0.2 mi north of south lmts Columbus$9,291Estimate ($1,000)

FY22PEState 00 316 00 0ROWState 200 0 00 0Const / CENHPP 00 0 6,9760 0State 00 0 1,9790 0

31987 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BooneProject No STP-56-5(108) NDOT Improvement Asph resurf 24' rdwy w/6' shld, 1.5' surf

Cedar Rapids West N-56 12.93 8.1N-56 from Greeley/Boone Co line to the W Jct N-52 near Cedar Rapids

$3,843Estimate ($1,000)FY22

PEState 00 15 00 0Const / CEState 00 0 7650 0STP 00 0 3,0630 0

28

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202231990Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Project No URB-6065(6) City Improvement 41' b-b urban reconstruction 3rd Ave, 8th St - S 5th St, Columbus

3rd Ave from 8th St south to 0.1 mi north of S 5th St in Columbus $1,965Estimate ($1,000)

FY22PESTP 00 0 0186 0Local 00 0 046 0ROWLocal 018 0 00 0STP 072 0 00 0Const / CESTP 01,071 0 00 0Local 0572 0 00 0

32124 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CumingProject No STP-L20A(102) NDOT Improvement Mill, resurf rdwy and shld, br repair/overlay

Beemer North L-20A 0.00 5.3L-20A from N-51 south to US-275 in Beemer

$3,122Estimate ($1,000)FY22

PEState 00 0 020 0Const / CEState 0621 0 00 0STP 02,481 0 00 0

32125AControl NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PierceProject No STP-98-5(108) NDOT Improvement Bridge widen/rehab

Pierce East - Levee Bridge N-98 0.61 0.0N-98 over the north Fork of the Elkhorn River

$0Estimate ($1,000) Remove, was obligated in FY-18FY22Const / CESTP 00 0 00 0

32127 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KnoxProject No STP-59-5(108) NDOT Improvement Mill, asph resurf

N-121 West N-59 16.00 9.0N-59 from approx 9.0 mi east of Creighton east to N-121

$4,777Estimate ($1,000)FY22

PEState 00 0 020 0Const / CESTP 3,8060 0 00 0State 9510 0 00 0

29

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202232128 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KnoxProject No STP-59-5(109) NDOT Improvement Conc repair, mill & resurf existing rdwy, trench widen/resurf, br repair Creighton East N-59 6.42 9.6

N-59 from approx 0.7 mi east of Creighton east to 540th Ave $4,589Estimate ($1,000)

FY22PEState 00 0 0163 0ROWState 064 0 00 0Const / CEState 0894 0 00 0STP-AC 03,468 0 00 0State 00 -3,468 00AC Conv 0STP 00 3,468 00AC Conv 0

32137 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DixonProject No NH-20-6(110) NDOT Improvement Mill, resurf 24' rdwy, w/8' s shld, bridges repair/replace/rehab, guardrail North of Dixon - South of Martinsburg US-20 399.15 9.6

US-20 from 0.2 mi west of N-116 east to 0.8 mi east of E Jct N-9 $8,865Estimate ($1,000) Update estimateFY22

PEState 00 0 0200 0Const / CENHPP-AC 06,925 0 00 0State 01,740 0 00 0NHPP 00 6,925 00AC Conv 0State 00 -6,925 00AC Conv 0

32139 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BurtProject No STP-75-3(118) NDOT Improvement Asph widen/resurf 24' rdwy to 28', br repair

Decatur - Macy US-75 149.19 7.8US-75 from 0.1 mi north of N-51 in Decatur, north to 1.0 mi south of Macy

$2,651Estimate ($1,000)FY22

PEState 015 0 00 0Const / CEState 5270 0 00 0STP 2,1090 0 00 0

30

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202232150 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DakotaProject No NH-35-4(125) NDOT Improvement Conc repair, resurf 24' rdwy w/10' shld, 8' surf, br repair, replace 1-br Hubbard Southwest N-35 48.92 10.1

N-35 from approx 0.3 mi east of E jct N-9 to 0.3 mi west of Hubbard $8,480Estimate ($1,000)

FY22PEState 00 0 0300 0ROWState 00 0 060 0Const / CENHPP-AC 06,300 0 00 0State 01,820 0 00 0State 00 -6,300 00AC Conv 0NHPP 00 6,300 00AC Conv 0

32155 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ThurstonProject No NH-75-4(112) NDOT Improvement 43' b-b urban reconstruction, add roundabout

In Winnebago US-75 169.05 0.7US-75 in Winnebago from US-75/77 north to just north of Osborn St

$5,476Estimate ($1,000)FY22

PEState 00 0 0270 0ROWState 00 0 0160 0Const / CENHPP 03,930 0 00 0State 01,116 0 00 0

32181Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

MadisonProject No ER-2915(3) County Improvement Rdwy repair and river bank restoration

Battle Creek North 0.00 0.0Co Rd 7.0 mi east of Meadow Grove 0.1 mi south of Str# C005912530

$1,010Estimate ($1,000)FY22

Const / CELocal 0200 0 00 0ER 010 0 00 0STP 0800 0 00 0

31

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202232190 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PlatteProject No RRZ-71(33) NDOT Improvement New viaduct

Columbus East Viaduct 0.00 0.0E 29th Ave, from E 8th St north to US-301.0 mi east of Columbus

$12,787Estimate ($1,000)FY22

PEState 020 0 00 0SFTY 0237 0 00 0Local 0634 0 00 0Other 028 0 00 0ROWLocal 05 0 00 0Other 05 0 00 0SFTY 020 0 00 0State 05 0 00 0Const / CESFTY 8,0000 0 00 0State 2,0000 0 00 0Local 6110 0 00 0Other 1,2220 0 00 0

32213 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

AntelopeProject No NH-275-5(145) NDOT Improvement Bridge replacement

Clearwater East Bridge US-275 35.96 0.0US-275 over a stream 4.7 mi east of Clearwater

$412Estimate ($1,000)FY22

PEState 00 0 025 0ROWState 00 0 01 0Const / CENHPP 0309 0 00 0State 077 0 00 0

32

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202232220 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CumingProject No NH-275-6(143) NDOT Improvement Gr, replace br's w/CBC, reconstruct adjacent rdwy & shlds, rumble strips,gdrl Wisner Southeast Bridges US-275 104.68 0.0

US-275 over a stream approx 2.6 mi southeast of Wisner $1,661Estimate ($1,000)

FY22PEState 00 0 0186 0ROWState 00 0 010 0Const / CEState 00 322 00 0NHPP 00 1,143 00 0

32223 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CumingProject No STP-9-3(105) NDOT Improvement Bridge replacements

Pender South Bridges N-9 13.97 0.0N-9 at three bridge locations approx 3.1, 1.9 and 0.2 mi south of Pender

$2,646Estimate ($1,000)FY22

PEState 00 1 00 0Const / CESTP 00 0 2,1160 0State 00 0 5290 0

32228 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ColfaxProject No STP-15-3(116) NDOT Improvement Br repair/overlay, painting

In Schuyler N-15 108.33 0.0N-15 viaduct approx 0.2 mi south of 16th St in Schuyler

$645Estimate ($1,000)FY22

PEState 00 0 024 0ROWState 00 0 01 0Const / CENHPP 0496 0 00 0State 0124 0 00 0

33

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202232229 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

AntelopeProject No STP-14-4(114) NDOT Improvement Viaduct redeck, replace approaches

Brunswick West Viaduct N-14 170.44 0.0N-14 over BNSF approx 0.6 mi south of N-20, 3.0 mi west of Brunswick

$1,577Estimate ($1,000)FY22

PEState 00 0 0118 0ROWState 00 0 013 0Const / CEState 0400 0 00 0STP-AC 01,046 0 00 0State -1,0460 0 00AC Conv 0STP 1,0460 0 00AC Conv 0

32234 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PlatteProject No NH-30-5(134) NDOT Improvement Urban reconstruction

23rd St, Columbus US-30 379.44 2.7US-30 from just east of N Jct US-81 east to 11th Ave in Columbus

$18,549Estimate ($1,000)FY22

PELocal 0135 0 00 0Local 0135 0 00 0State 0701 0 00 0ROWLocal 00 40 00 0Local 00 40 00 0State 00 160 00 0Const / CELocal 00 0 00 3468STP-AC 00 0 00 13411State 00 0 00 459STP 00 0 13,4110AC Conv 0State 00 0 -13,4110AC Conv 0

34

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202232236 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KnoxProject No STP-14-4(115) NDOT Improvement Mill, widen/resurf 24' rdwy to 28', replace 1 br, repair 1 br, culv, flumes Verdigre - Niobrara N-14 187.98 11.5

N-14 from Jct N-84 & S-54A (Verdigre Spur) north to W Jct N-12 in Niobrara $6,640Estimate ($1,000)

FY22PEState 00 0 0360 0ROWState 00 0 016 0Const / CEState 01,384 0 00 0STP-AC 04,880 0 00 0State 00 -4,880 00AC Conv 0STP 00 4,880 00AC Conv 0

32237 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KnoxProject No STP-14-4(116) NDOT Improvement Mill, resurf, br repair/overlay

N-59 - Verdigre N-14 179.19 9.0N-14 from N-59 north to jct N-84/S54A; includes approx 0.2 mi on S54A

$5,261Estimate ($1,000)FY22

PEState 00 0 0333 0Const / CESTP-AC 03,942 0 00 0State 0986 0 00 0State 00 -3,942 00AC Conv 0STP 00 3,942 00AC Conv 0

32238 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DixonProject No STP-9-4(118) NDOT Improvement Mill and resurf existing rdwy, replace 2 bridges, gdrl

E Jct US-20 - N-12 N-9 50.98 10.0N-9 from E Jct US-20, northeast to jct N-12 approx 0.5 mi south Ponca

$6,507Estimate ($1,000)FY22

PEState 00 0 0369 0ROWState 00 0 010 0Const / CEState 01,355 0 00 0STP-AC 04,773 0 00 0STP 00 4,773 00AC Conv 0State 00 -4,773 00AC Conv 0

35

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202232239 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PlatteProject No STP-91-5(125) NDOT Improvement Mill, conc repair, widen/resurf existing rdwy to 28', br repair, jt & crack sealUS-81 West N-91 144.50 8.9

N-91 from approx 2.5 mi east of Lindsay, east to approx 0.1 mi west jct US-81 $5,111Estimate ($1,000)

FY22PEState 00 0 0331 0ROWState 00 0 0100 0Const / CEState 0936 0 00 0STP-AC 03,744 0 00 0State 00 -3,744 00AC Conv 0STP 00 3,744 00AC Conv 0

32240 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KnoxProject No STP-12-5(120) NDOT Improvement Mill, resurf 24' rdwy with 5' earth shld

Crofton West N-12 177.16 12.0N-12 from Hoboe Creek east to E Jct N-121

$5,272Estimate ($1,000)FY22

PEState 00 20 00 0Const / CEState 00 0 1,0510 0STP 00 0 4,2010 0

32241 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CedarProject No STP-121-4(112) NDOT Improvement Mill, widen/resurf existing 24'-rdwy to 28', conc repair, br, resurf rec parkingGavins Point Dam East N-121 76.41 3.5

N-121 from Gavin's Point Dam Rd (Rd 898), east to jct US-81 $4,232Estimate ($1,000)

FY22PEState 00 0 0259 0ROWState 00 0 05 0Const / CEState 0877 0 00 0STP 03,091 0 00 0

36

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202232249 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BurtProject No ITS-NH-STP-77-3(134) NDOT Improvement Deploy closed circuit TV cameras

District 3 CCTV Cameras US-77 141.31 0.0At 8 locations on N-9, US-77, N-32, US-20 and US-81 in District 3

$397Estimate ($1,000)FY22

PEState 00 0 013 0Const / CENHPP 0230 0 00 0State 077 0 00 0STP 077 0 00 0

32252 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KnoxProject No STP-14-4(118) NDOT Improvement Br repair/overlay

Standing Bear Bridge NE of Niobrara N-14 203.30 0.0N-14 Standing Bear Bridge over Missouri River northeast of Niobrara

$976Estimate ($1,000)FY22

PEOther 00 0 013 0State 00 0 028 0Const / CEOther 0299 0 00 0State 0127 0 00 0STP 0509 0 00 0

32256 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CedarProject No STP-57-4(118) NDOT Improvement Mill, resurf 28' rdwy, br repair/overlay, extend culv, seal br rail, culv, gdrl Hartington North N-57 67.33 6.7

N-57 from Norwegian Bow Cr bridge approx 0.2 mi north Hartington to Jct N-12 $5,297Estimate ($1,000)

FY22PEState 00 0 0176 0ROWState 010 0 00 0Const / CEState 1,0230 0 00 0STP-AC 4,0880 0 00 0State 00 0 00AC Conv -4088STP 00 0 00AC Conv 4088

37

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202232257 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BurtProject No STP-75-3(122) NDOT Improvement Conc repair, mill, resurf, br replacement

Tekamah North US-75 133.44 6.1US-75 from just north of Tekamah north to 8.8 mi south of Decatur

$7,210Estimate ($1,000) Update estimateFY22PEState 00 0 0200 0ROWState 00 0 010 0Const / CESTP-AC 05,600 0 00 0State 01,400 0 00 0State 00 -5,600 00AC Conv 0STP 00 5,600 00AC Conv 0

32262 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BooneProject No STP-14-3(119) NDOT Improvement Conc repair, mill, inlay, curb and gutter, sidewalk ramps, br In Albion, Petersburg & Elgin N-14 121.43 3.8

Three segements of N-14 in the areas of Albion, Petersburg and Elgin $3,539Estimate ($1,000)

FY22PEState 00 0 0329 0ROWState 00 0 010 0Const / CEState 0708 0 00 0STP-AC 02,492 0 00 0STP 00 2,492 00AC Conv 0State 00 -2,492 00AC Conv 0

32263 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CedarProject No STP-15-4(121) NDOT Improvement Mill, asph resurf rdwy, br repait, earth shld rehab

N-59 - N-84 N-15 182.94 9.8N-15 from N-59 north to approx 0.2 mi south of N-84

$4,406Estimate ($1,000)FY22

PEState 00 0 025 0Const / CESTP-AC 3,5050 0 00 0State 8760 0 00 0State 00 0 00AC Conv -3505STP 00 0 00AC Conv 3505

38

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202232280 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KnoxProject No STP-121-4(113) NDOT Improvement Mill, resurf existing rdwy, brrepair, w iden turn lanes & shld,curb & flume,gdrlCrofton North N-121 66.73 9.7

N-121 from N-12 north to approx 1.4 mi east of the Knox/Cedar Co line $7,805Estimate ($1,000)

FY22PEState 015 0 00 0Const / CEState 1,5580 0 00 0STP-AC 6,2320 0 00 0STP 00 0 00AC Conv 6232State 00 0 00AC Conv -6232

32281 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CumingProject No NH-275-6(146) NDOT Improvement Mill, resurf existing rdwy & s-shld with asphalt, br repairs Wisner - Beemer US-275 102.81 6.0

US-275 from just east of SE lmts Wisner to just east of NW lmts Beemer $2,619Estimate ($1,000)

FY22PEState 00 0 012 0Const / CENHPP 2,0850 0 00 0State 5220 0 00 0

32283 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PierceProject No STP-13-4(112) NDOT Improvement Mill, resurf existing rdwy, add s-shld, culv extentions, repair light poles Pierce Northwest N-13 9.24 4.7

N-13 from approx 0.4 mi SE of NW lmts of Pierce, NW to just NW of Jct N-121 $2,474Estimate ($1,000)

FY22PEState 00 0 09 0ROWState 05 0 00 0Const / CEState 00 492 00 0STP 00 1,968 00 0

39

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202232285 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BurtProject No STP-75-3(123) NDOT Improvement Mill, resurf, br repair, replace approaches

Tekamah South US-75 126.19 5.8US-75 from Washington/Burt Co line to 0.4 mi north of south limits of Tekamah

$4,318Estimate ($1,000)FY22

PEState 00 0 0142 0ROWState 020 0 00 0Const / CEState 8200 0 00 0STP 3,3360 0 00 0

32286 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ColfaxProject No STP-15-3(119) NDOT Improvement Resurf

N-91 South N-15 111.32 15.2N-15 from north side of Shell Creek bridge north Schuyler, north to Jct N-91

$6,843Estimate ($1,000)FY22

PEState 00 10 00 0Const / CEState 00 0 1,3670 0STP 00 0 5,4660 0

32287 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PlatteProject No NH-30-5(135) NDOT Improvement Conc repair, mill, resurf existing rdwy and s-shld, br repair, culv, gdrl Columbus East & North US-30 382.10 7.7

US-30 from Columbus east approx 2.3 mi; includes rwo segments on US-81 $5,050Estimate ($1,000)

FY22PEState 00 0 050 0Const / CENHPP 4,0000 0 00 0State 1,0000 0 00 0

32292 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PlatteProject No STP-22-5(119) NDOT Improvement Resurf, replace two bridges

Monroe East & West N-22 75.95 13.2N-22 from Nance/Platte Co line east to approx 0.3 mi west of US-81

$10,766Estimate ($1,000)FY22

Const / CEState 00 0 2,1530 0STP 00 0 8,6130 0

40

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202232293 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PierceProject No NH-81-4(126) NDOT Improvement Resurf

S. Jct. N-98 - US-20 US-81 168.94 11.1US-81 from S Jct N-98, north to just north of Jct US-20

$6,425Estimate ($1,000)FY22

PEState 00 1 00 0Const / CEState 00 0 1,2850 0NHPP 00 0 5,1390 0

32296 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BurtProject No STP-51-7(106) NDOT Improvement Mill, resurf existing rdwy & s-shld, culv, br repair and gdrl US-77 - US-75 N-51 24.49 11.0

N-51 from just west of Jct US-77, east to just west of S jct US-75 $5,582Estimate ($1,000)

FY22PEState 01 0 00 0Const / CEState 00 0 00 1116STP-AC 00 0 00 4465State 00 0 -4,4650AC Conv 0STP 00 0 4,4650AC Conv 0

32297 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CedarProject No STP-57-4(120) NDOT Improvement Concrete pavement patching, joint repair, replace CBC In Hartington N-57 66.06 2.0

N-57 from S Jct N-84 to just north Norwegian Bow Creek Bridge in Hartington $1,030Estimate ($1,000)

FY22PEState 00 1 00 0Const / CESTP 00 0 00 823State 00 0 00 206

41

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202232301 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ThurstonProject No BRO-7087(4) County Improvement Bridge replacement and associated approach work Winnebago North 0.00 0.0

Co Rd 897 (B Ave) C008710425 0.2 mi west of US-75/77, 2.7 mi north of Winnebago$1,274Estimate ($1,000)

FY22PEBRO 00 0 0189 0ROWBRO 010 0 00 0Const / CEBRO 1,0750 0 00 0

32302 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CumingProject No S-275-6(1050) NDOT Improvement 4-lane gr, str, surf

Scribner - West Point US-275 114.00 19.7US-275 from Scribner to West Point

$110,000Estimate ($1,000)FY22

PETIB 00 0 010,000 0ROWTIB 00 0 05,000 0Const / CETIB 025,000 0 00 0TIB 00 45,000 00 0TIB 25,0000 0 00 0

32309 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DakotaProject No NH-75-4(114) NDOT Improvement Mill, resurf existing rdwy, fog seal s-shld, conc & jt repair, br repair/ovly, Winnebago - Homer US-75 171.08 4.9

US-75 from approx 1.6 mi north Winnebago to 0.6 mi northeast Homer $1,635Estimate ($1,000)

FY22PEState 00 0 013 0Const / CENHPP 01,297 0 00 0State 0325 0 00 0

42

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202232310 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PierceProject No NH-81-4(127) NDOT Improvement Mill, conc repair, asph conc patching, resurf existing rdwy and s-shld N-13 - S. Jct N-98 US-81 162.39 6.6

US-81 from approx 0.4 mi north Madison/Pierce county line to S. Jct N-98 $1,015Estimate ($1,000)

FY22PEState 00 0 01 0Const / CENHPP 0811 0 00 0State 0203 0 00 0

41086 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

AdamsProject No S-6-4(1022) NDOT Improvement Gr, culv, 1.9 mi conc pvmt - 5 lane urban section, 3.2 mi 4-lane divided sectionHastings Southeast US-6 212.70 2.4

US-6 from just west 'J' St to just west BNSF RR xing approx 1.3 mi east Hastings$34,328Estimate ($1,000)

FY22PELocal 00 0 0382 0State 00 0 01,746 0ROWLocal 00 0 01,200 0State 00 0 04,800 0Const / CEState 00 20,960 00 0Local 00 5,240 00 0

42013 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

MerrickProject No RRZ-TMT-14-2(123) NDOT Improvement New viaduct, 24' conc pvmt w/8' shld, 44' b-b urban section Central City Viaduct N-14 79.76 2.4

N-14 (new alignment) from the Platte River to N 10th St in Central City $22,285Estimate ($1,000)

FY22PEState 01,038 0 00 0ROWState 00 1,791 00 0Const / CELocal 00 0 00 168Other 00 0 00 776SFTY 00 0 00 6130State 00 0 00 2712STP-AC 00 0 00 6191State 00 0 -2,7120AC Conv 0STP 00 0 6,1910AC Conv 0

43

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202242089 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ValleyProject No STP-11-3(116) NDOT Improvement Widen/resurf 24' rdwy to 28' with a portion on new alignment North Loup - Ord N-11 63.35 11.7

N-11 from North Loup north to 11th St in Ord, 2.5 mi on new alignment $10,805Estimate ($1,000) Reduce estimateFY22

Const / CEState 0-1,956 0 00AC Conv 0STP 01,956 0 00AC Conv 0

42322 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HallProject No BRO-7040(25) County Improvement Br replacement and associated approach work Grand Island Northwest 0.00 0.1

Monitor Rd over Prairie Cr 0.1 mi south of White Cloud Rd NW of Grand Island $899Estimate ($1,000)

FY22PEBRO 00 0 0126 0Local 00 0 04 0State 00 0 017 0ROWBRO 03 0 00 0State 01 0 00 0Const / CEBRO 0599 0 00 0State 0149 0 00 0

42335 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

MerrickProject No BRO-7061(27) County Improvement Br replacement and associated approach work Palmer Northwest 0.00 0.1

Merrick Rd over Rock Creek 5.7 mi north and 1.8 mi west of Palmer $1,099Estimate ($1,000)

FY22PELocal 00 0 05 0State 00 0 07 0BRO 00 0 040 0ROWState 01 0 00 0BRO 04 0 00 0Const / CEBRO 00 834 00 0State 00 208 00 0

44

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202242404 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

YorkProject No STP-S93A(107) NDOT Improvement Asph resurf 24' rdwy w/6'-10' shld, 2' - 8' surf, br repair

Henderson Spur S-93A 0.00 6.7Henderson Spur (S-93A) except for approx 0.3 mi section

$4,582Estimate ($1,000)FY22

PEState 00 151 00 0Const / CEState 00 0 8860 0STP 00 0 3,5450 0

42474 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ThayerProject No STP-53-1(103) NDOT Improvement Bridge replacements and associated app roach work, culv Alexandria South Bridges N-53 0.29 0.0

N-53 at 3 sites from 2.8 mi north of U S-136 to 0.5 mi south of Alexandria $9,711Estimate ($1,000)

FY22Const / CESTP 06,985 0 00AC Conv 0State 0-6,985 0 00AC Conv 0

42533 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ThayerProject No STP-53-1(104) NDOT Improvement Mill, asph resurf 24' rdwy w/2.5' earth shld, (mill, inlay in Alexandria) Alexandria South N-53 0.00 7.1

N-53 from US-136, north 7.1 mi through Alexandria $2,777Estimate ($1,000)

FY22PEState 00 0 0539 0ROWState 00 0 04 0Const / CEState 0448 0 00 0STP 01,786 0 00 0

42543 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ThayerProject No RD-136-5(1014) NDOT Improvement Asph resurf 24' rdwy, widen earth shld to 3', br

Nuckolls Co Line - L85F US-136 116.28 12.1US-136 from Nuckolls Co line to 1.2 mi west of US-81

$10,046Estimate ($1,000)FY22

PEState 00 235 00 0ROWState 700 0 00 0Const / CEState 00 0 00 9741

45

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202242564A Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

YorkProject No STP-34-5(117) NDOT Improvement Mill, conc resurf 24' rdwy, asph resurf 8' shld, intersection median islands York West US-34 262.04 9.8

US-34 from 0.2 mi east of the Henderson Spur east to the south jct with US-81 $7,565Estimate ($1,000)

FY22PEState 0105 0 00 0ROWState 00 1 00 0Const / CEState 00 0 00 1492STP-AC 00 0 00 5967STP 00 0 5,9670AC Conv 0State 00 0 -5,9670AC Conv 0

42572 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ValleyProject No STP-70-4(108) NDOT Improvement Mill, resurf existing rdwy, remove 3RR X-ing, br sized culvs, curb & flume, gdrlOrd Northeast N-70 123.74 15.7

N-70 from 0.2 mi northeast of Ord northeast to 0.1 mi south of Jct N-91 $6,217Estimate ($1,000)

FY22PEState 00 0 0485 0ROWState 00 0 020 0Const / CEState 01,263 0 00 0STP-AC 04,449 0 00 0State 00 -4,449 00AC Conv 0STP 00 4,449 00AC Conv 0

42573 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ShermanProject No STP-58-2(109) NDOT Improvement Mill, resurf 24' rdwy w/4' earth shld, conc repair, br's, gdrl North Jct N-92 - N-70 N-58 41.82 10.4

N-58 from N Jct N-92 north to N-58 $5,695Estimate ($1,000)

FY22PEState 00 0 070 0ROWState 00 0 010 0Const / CEState 01,123 0 00 0STP-AC 04,492 0 00 0State 00 -4,492 00AC Conv 0STP 00 4,492 00AC Conv 0

46

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202242576 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ShermanProject No STP-68-2(103) NDOT Improvement Conc repair, asph resurf, drainage, br repair

Ravenna North N-68 2.16 12.2N-68 from 0.1 mi north Buffalo/Sherman Co line north to L82A & east to N-58

$6,222Estimate ($1,000)FY22

PEState 00 0 0115 0Const / CEState 01,222 0 00 0STP-AC 04,885 0 00 0STP 00 4,885 00AC Conv 0State 00 -4,885 00AC Conv 0

42599 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HamiltonProject No STP-34-5(116) NDOT Improvement Conc repair, mill, resurf, replace shld, br repair/overlay Aurora East US-34 251.85 10.2

US-34 from Aurora to approx 0.2 mi east of S-93A includes via 0.9 west of Aurora$5,453Estimate ($1,000)

FY22Const / CEState 0-4,363 0 00AC Conv 0STP 04,363 0 00AC Conv 0

42608 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ClayProject No STP-74-5(110) NDOT Improvement Conc repair, mill, resurf

S Jct N-14 - Ong Spur N-74 52.03 12.5N-74 from S jct N-14 east to just east of Ong Spur; includes Ong Spur

$5,328Estimate ($1,000)FY22

PEState 00 0 0175 0Const / CEState 00 1,030 00 0STP-AC 00 4,123 00 0State -4,1230 0 00AC Conv 0STP 4,1230 0 00AC Conv 0

47

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202242610 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ClayProject No STP-6-5(114) NDOT Improvement Mill, conc repair, resurf rdwy & s-shld, br repair, culv, replace median, lgtingHarvard - Sutton US-6 227.98 16.2

US-6 from 0.3 mi east of the Harvard Spur to Sutton including S-18A $8,183Estimate ($1,000)

FY22PEState 00 0 055 0Const / CESTP-AC 06,502 0 00 0State 01,626 0 00 0STP 00 6,502 00AC Conv 0State 00 -6,502 00AC Conv 0

42611 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ThayerProject No STP-8-5(108) NDOT Improvement Mill, asph resurf existing rdwy & s-shld, curb & flume, br repair, gdrl Hardy - Chester N-8 7.28 17.5

N-8 from just west Main St in Hardy to just west of east lmts Chester & S-85A $9,055Estimate ($1,000)

FY22PEState 00 0 0316 0ROWState 010 0 00 0Const / CEState 1,7450 0 00 0STP-AC 6,9840 0 00 0State 00 0 00AC Conv -6984STP 00 0 00AC Conv 6984

42612 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BuffaloProject No STP-10-2(122) NDOT Improvement Widen/resurf 24' rdwy to 28', br repair, rumble strips, urban section, gdrl Pleasanton South N-10 65.46 10.4

N-10 from approx 4.9 mi north Jct N-40 to approx 0.4 mi north of S Loup River $9,299Estimate ($1,000)

FY22PEState 00 0 0430 0ROWState 00 0 0280 0Const / CEState 01,904 0 00 0STP-AC 06,685 0 00 0State -6,6850 0 00AC Conv 0STP 6,6850 0 00AC Conv 0

48

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202242613 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HowardProject No STP-58-2(110) NDOT Improvement Conc repair, mill & resurf existing rdwy& s-shld, br repair, gdrl US-281 - Dannebrog N-58 0.00 10.1

N-58 from US-281 west to the north Jct N-11 near Dannebrog $5,037Estimate ($1,000)

FY22PEState 00 0 0230 0ROWState 00 0 046 0Const / CEState 0952 0 00 0STP 03,809 0 00 0

42617 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

WebsterProject No STP-136-4(115) NDOT Improvement Mill, resurf 24' rdwy w/3' earth shld, br replacement Red Cloud West US-136 64.35 10.9

US-136 from Franklin/Webster Co line east to US-281 in Red Cloud $11,554Estimate ($1,000)

FY22PEState 00 0 0805 0ROWState 00 0 0150 0Const / CESTP-AC 08,355 0 00 0State 02,244 0 00 0State 00 -8,355 00AC Conv 0STP 00 8,355 00AC Conv 0

42694 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

MerrickProject No STP-92-5(109) NDOT Improvement Conc repair, mill, resurf rdwy & shld, br repair

W Jct N-14 East N-92 372.18 8.6N-92 from 2.2 mi west of W Jct N-14 east to 0.5 mi east of US-30

$3,629Estimate ($1,000)FY22

PEState 00 0 0270 0Const / CEState 0672 0 00 0STP 02,687 0 00 0

49

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202242726 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HowardProject No STP-92-4(113) NDOT Improvement Br replacement and associated approach work, gdrl Farwell West Bridge N-92 337.75 0.0

N-92 over Turkey Creek approx 3.7 mi east of the Sherman/Howard Co line $1,489Estimate ($1,000)

FY22PEState 00 0 070 0ROWState 00 0 03 0Const / CEState 0283 0 00 0STP 01,133 0 00 0

42728 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BuffaloProject No HSIP-30-4(159) NDOT Improvement Variable width b-b urban, intersection, curb ramps, traffic signals, storm sewer12th Ave - 7th Ave, Kearney US-30 272.17 0.5

US-30 from 12th Ave to near 6th Ave in Kearney $0Estimate ($1,000) Remove, was obligated in FY-18FY22

Const / CESFTY 00 0 00 0

42732 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HamiltonProject No NH-80-7(161) NDOT Improvement Mill, resurf existing rdwy & s-shld with asphalt, conc repair, br repair, gdrl Aurora East & West (Resurf) I-80 329.06 8.9

I-80 from approx 2.9 mi west of Aurora east to 5.4 mi east of Aurora $10,556Estimate ($1,000)

FY22PEState 00 0 052 0Const / CENHPP 00 9,454 00 0State 00 1,050 00 0

42756 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BuffaloProject No NH-80-5(76) NDOT Improvement Replace dual 4-lane conc rdwy & s-shld, br widen/redeck, ramp, culv, asph resurfDawson Co Line - Odessa I-80 255.09 9.9

I-80 from Dawson/Buffalo Co line east to 0.4 mi west of Odessa $41,185Estimate ($1,000)

FY22PEState 00 2,544 00 0ROWState 10 0 00 0Const / CENHPP 00 0 30,9130 0State 00 0 7,7270 0

50

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202242756A Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BuffaloProject No NH-80-5(77) NDOT Improvement Crossovers

Dawson Co Line - Odessa Crossovers I-80 254.87 0.0Along I-80 between the Dawson Co line and the Odessa Interchange

$2,280Estimate ($1,000)FY22

PEState 00 141 00 0Const / CEState 00 0 2140 0NHPP 00 0 1,9250 0

42763 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BuffaloProject No STP-183-2(110) NDOT Improvement Mill, asph resurf existing rdwy and s-shld, curb & flume, br repair, gdrl I-80 - Elm Creek US-183 48.13 2.5

US-183 from just north of I-80 north to just north of Elm Creek; includes L10E $2,403Estimate ($1,000)

FY22PEState 00 0 0140 0Const / CEState 0453 0 00 0STP 01,810 0 00 0

42764 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HowardProject No NH-281-2(128) NDOT Improvement Conc repair, dowel bar retrofit, diamond grind, resurf shld In St Paul & South US-281 90.91 3.3

US-281 from 0.5 mi south of S Jct N-92 to 0.5 mi north of St Paul $0Estimate ($1,000) Remove, was obligated in FY-18FY22

Const / CENHPP 00 0 00 0

42765 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BuffaloProject No STP-L10D(104) NDOT Improvement Widen/resurf 24' rdwy to 28', earth shld widen, culvs, asph patching Shelton Link L-10D 0.00 4.0

Shelton Link (L-10D) from I-80 north to US-30 $2,111Estimate ($1,000)

FY22PEState 00 0 0149 0Const / CEState 0392 0 00 0STP 01,570 0 00 0

51

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202242774 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

FillmoreProject No STP-6-5(115) NDOT Improvement Widen/resurf existing rdwy & shld, modify loop & ramp terminals, conc repair Fairmont West Interchange US-6 256.00 0.5

US-6 from approx 0.2 mi east of west lmts Fairmont, east to 0.3 mi west 6th Ave $822Estimate ($1,000)

FY22PEState 00 0 029 0ROWState 00 0 020 0Const / CESTP 0618 0 00 0State 0155 0 00 0

42779 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

FillmoreProject No STP-6-5(116) NDOT Improvement Mill, resurf rdwy and shld

Sutton - Grafton US-6 242.43 7.4US-6 from near NE limits Sutton to approx 0.2 mi east of west limits of Grafton

$3,361Estimate ($1,000)FY22

PEState 00 0 013 0ROWState 015 0 00 0Const / CEState 7370 0 00 0STP 2,5960 0 00 0

42780 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

NuckollsProject No STP-8-5(111) NDOT Improvement Gr, mill, resurf rdwy and shld, br repair/overlay

Superior - Hardy N-8 0.52 6.8N-8 from Superior east to just west of Main St in Hardy

$3,021Estimate ($1,000)FY22

PEState 00 0 0300 0Const / CESTP 02,177 0 00 0State 0544 0 00 0

52

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202242781 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BuffaloProject No STP-30-4(161) NDOT Improvement Conc repair, resurf, ADA ramps, br repair

Gibbon - Shelton US-30 285.71 7.3US-30 from just west of L-10C in Gibbon to 0.2 mi east of Shelton

$3,880Estimate ($1,000)FY22

PEState 00 0 0293 0ROWState 00 0 015 0Const / CEState 0804 0 00 0STP 02,768 0 00 0

42782 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PolkProject No NH-81-2(145) NDOT Improvement Conc pvmt reconstruction, repair, mill, asph resurf

In Stromsburg & North US-81 78.26 4.5US-81 from approx 0.1 mi north of south lmts Stromsburg to 0.2 mi south of N-92

$5,218Estimate ($1,000)FY22

PEState 00 0 0243 0ROWState 05 0 00 0Const / CENHPP 3,9760 0 00 0State 9940 0 00 0

42783 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HowardProject No STP-92-4(115) NDOT Improvement Mill, resurf

N-11 West N-92 333.92 10.1N-92 from Sherman/Howard Co line east to 0.4 mi west of N-11 including S-47A

$5,608Estimate ($1,000)FY22

PEState 022 0 00 0Const / CEState 00 0 00 1117STP 00 0 00 4469

53

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202242784 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

AdamsProject No STP-S01D(103) NDOT Improvement Mill, resurf existing rdwy, install granular subdrains, construct beveled edge Trumbull Spur S-1D 0.00 5.4

Trumbull Spur (S-1D) from US-34/281 to Trumbull $2,711Estimate ($1,000)

FY22PEState 01 0 00 0Const / CEState 00 0 00 542STP 00 0 00 2168

42785 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PolkProject No NH-81-2(146) NDOT Improvement Mill, asph resurf rdwy and shld, repair 1 br, replace 2 br Oscelola East & West US-81 83.11 12.2

US-81 from 0.2 mi east of W Jct N-92 west of Osceola east to E Jct N-92 $8,333Estimate ($1,000)

FY22PEState 00 0 0351 0ROWState 055 0 00 0Const / CENHPP 6,3240 0 00 0State 1,6030 0 00 0

42788 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

AdamsProject No NH-6-4(129) NDOT Improvement Replace US-6 conc pvmt; repair conc pvmt seal cracks & joints ADA curb ramps US-6 & US-34, Hastings US-6 211.29 2.3

US-6 & US-34 segments at US-6/34/281 intersection in Hastings $7,100Estimate ($1,000)

FY22PEState 00 0 0382 0ROWLocal 06 0 00 0State 024 0 00 0Local 06 0 00 0Const / CELocal 3200 0 00 0NHPP 5,2050 0 00 0State 1,1570 0 00 0

54

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202242789 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

FillmoreProject No HSIP-81-1(122) NDOT Improvement Right turn lane improvement, lighting, extend median drain pipe Geneva North US-81 40.15 0.2

US-81 approx 1.3 mi north of north lmts of Geneva $380Estimate ($1,000)

FY22PEState 00 0 012 0ROWState 00 0 015 0Const / CESFTY 0317 0 00 0State 036 0 00 0

42791 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HamiltonProject No NH-80-7(163) NDOT Improvement Mill, resurf dual 24'rdwy and shld, conc repair, br repair/overlay, ramp resurf Phillips - Giltner I-80 318.58 6.3

I-80 from 0.4 mi east of Phillips to 0.4 mi west of Giltner $7,786Estimate ($1,000)

FY22PEState 00 321 00 0Const / CENHPP 00 0 00 6719State 00 0 00 746

42792 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

YorkProject No NH-80-8(157) NDOT Improvement Mill, resurf rdwy and shld, conc repair, br repair/overlay Waco - Utica I-80 359.72 5.8

I-80 from approx 0.4 mi west of Waco to the York/Seward Co line $8,448Estimate ($1,000)

FY22PEState 00 0 0168 0Const / CENHPP 07,452 0 00 0State 0828 0 00 0

42794 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BuffaloProject No NH-80-6(113) NDOT Improvement Mill and resurf

Gibbon Interchange - Shelton Interchan I-80 283.70 7.3I-80 from just west Gibbon Interchange to just west Shelton Interchange

$8,349Estimate ($1,000)FY22

PEState 01 0 00 0Const / CENHPP 7,5130 0 00 0State 8350 0 00 0

55

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202242795 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HallProject No NH-80-6(114) NDOT Improvement Conc repair, mill, resurf rdwy and shld, br repair

Shelton - Wood River I-80 290.96 8.7I-80 from just west of Shelton to just west of Wood River

$14,273Estimate ($1,000)FY22

PEState 00 0 0189 0Const / CENHPP-AC 00 12,676 00 0State 00 1,408 00 0NHPP 12,6760 0 00AC Conv 0State -12,6760 0 00AC Conv 0

42816 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PolkProject No STP-39-2(107) NDOT Improvement Mill, resurf existing rdwy & s-shld, br repair and gdrl

N-92 - Silver Creek N-39 0.00 9.8N-39 from N-92 to US-30 west of Silver Creek

$4,796Estimate ($1,000)FY22

PEState 086 0 00 0Const / CEState 00 0 00 942STP 00 0 00 3768

42817 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

NuckollsProject No STP-14-1(123) NDOT Improvement Resurf

Superior North & South N-14 0.00 6.4N-14 in two segments from Nebraska/Kansas State line to S Jct US-136

$3,226Estimate ($1,000)FY22

PEState 00 1 00 0Const / CESTP 00 0 1,7800 0NHPP 00 0 8000 0State 00 0 6450 0

56

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202242821 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PolkProject No STP-66-5(107) NDOT Improvement Mill, resurf existing rdwy & s-shld, br repair, gdrl

Polk East N-66 11.60 9.4N-66 from east lmts Polk to Jct US-81

$4,330Estimate ($1,000)FY22

PEState 024 0 00 0Const / CESTP 00 0 00 3445State 00 0 00 861

42822 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

YorkProject No STP-69-2(105) NDOT Improvement Resurf

Gresham North & South N-69 55.04 21.0N-69 from jct US-34 to Jct US-81 & N-92

$10,651Estimate ($1,000)FY22

PEState 00 1 00 0Const / CEState 00 0 2,1300 0STP 00 0 8,5200 0

42824 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ThayerProject No NH-136-5(112) NDOT Improvement Resurf

US-81 - Gilead US-136 129.74 6.5US-136 from approx 0.2 mi west of Jct US-81 to approx 1.6 mi west Gilead

$3,721Estimate ($1,000)FY22

PEState 00 1 00 0Const / CENHPP 00 0 2,9760 0State 00 0 7440 0

42827 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

AdamsProject No STP-281-1(119) NDOT Improvement Resurf

Ayr North & South US-281 26.79 14.1US-281 from Blue Hill to approx 3.7 mi south Hastings

$7,070Estimate ($1,000)FY22

PEState 00 1 00 0Const / CESTP 00 0 5,6550 0State 00 0 1,4140 0

57

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202242841 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HamiltonProject No NH-80-7(166) NDOT Improvement Conc repair, mill, resurf rdwy and shld, br repair/overlay Hampton - Henderson I-80 337.63 7.9

I-80 from 0.5 mi west of Hamption to 2.9 mi east of Henderson $10,876Estimate ($1,000)

FY22PEState 00 0 085 0Const / CENHPP 9,7120 0 00 0State 1,0790 0 00 0

42841A Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

YorkProject No NH-80-7(167) NDOT Improvement Resurf

Henderson - York I-80 345.00 7.0I-80 from approx 2.9 mi east Henderson Intch to approx 1.1 mi west York Intch

$4,679Estimate ($1,000)FY22

Const / CENHPP 00 0 4,2110 0State 00 0 4680 0

42841B Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

YorkProject No NH-80-7(168) NDOT Improvement Resurf

York - Waco I-80 352.00 7.7I-80 from approx 1.1 mi west York Intch to approx 0.4 mi west Waco Intch

$5,301Estimate ($1,000)FY22

Const / CENHPP 00 0 4,7710 0State 00 0 5300 0

42844 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BuffaloProject No BRO-7467(1) County Improvement Bridge replacement, approach rdwy widen and surfacing, erosion control Poole South 0.00 0.0

Poole Rd bridge approx 0.5 mi south of Poole $1,130Estimate ($1,000)

FY22PEBRO 00 15 00 0State 00 113 00 0ROWBRO 100 0 00 0Const / CEBRO 00 0 00 992

58

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202242852 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BuffaloProject No NH-80-5(83) NDOT Improvement Replace existing rdwy & s-shld with conc pvmt, reconstruct Intch, br replacementOdessa - Kearney (EB) I-80 263.31 9.3

I-80 (EB) approx 0.4 mi west Odessa Link L10-B to 0.4 mi west N-44 gr separation$25,887Estimate ($1,000)

FY22PEState 0899 0 00 0ROWState 00 20 00 0Const / CENHPP 00 0 00 22472State 00 0 00 2496

42852A Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BuffaloProject No NH-80-5(84) NDOT Improvement Construct crossover for Odessa - Kearney (EB) reconst project Odessa - Kearney East Crossover I-80 272.23 0.0

I-80 approx 0.4 mi west of N-44 gr separation in Kearney $922Estimate ($1,000)

FY22PEState 032 0 00 0Const / CEState 890 0 00 0NHPP 8010 0 00 0

42866 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PolkProject No NH-81-2(147) NDOT Improvement Replace existing conc pvmt on rdwy, s-shld and left turn lane; install drainage Columbus South (NB) US-81 106.60 0.3

NB US-81 approx 1.5 mi north of N-64 south of Columbus $664Estimate ($1,000)

FY22PEState 00 0 025 0Const / CENHPP 0512 0 00 0State 0127 0 00 0

42867 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

FillmoreProject No STP-74-5(114) NDOT Improvement Replace asph and base w/conc pvmt on drainable base, gdrl Fillmore/Saline County Line West N-74 86.96 1.0

N-74 from approx 3.4 mi east Ohiowa Spur (S-30C) to Fillmore/Saline county line $1,470Estimate ($1,000)

FY22PEState 00 0 01 0Const / CEState 00 294 00 0STP 00 1,175 00 0

59

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202242868 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

NanceProject No STP-14-3(120) NDOT Improvement Mill, resurf existing rdwy and s-shld, br repair, gdrl

Fullerton North N-14 99.90 7.0N-14 from north limits of Fullerton to just south of N-52

$3,255Estimate ($1,000)FY22

PEState 00 0 01 0Const / CEState 6510 0 00 0STP 2,6030 0 00 0

42869 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PolkProject No NH-81-2(148) NDOT Improvement Resurf

Columbus South US-81 104.80 4.8US-81 from 0.4 mi south of N-64 to 0.7 mi south of S Jct US-30 south of Columbus

$1,954Estimate ($1,000)FY22

PEState 00 0 01 0Const / CENHPP 1,5620 0 00 0State 3910 0 00 0

42870 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ThayerProject No NH-81-1(124) NDOT Improvement Reconstruct shlds and add drainage

Hebron South - Bruning North Shlds US-81 8.10 16.4US-81 from 3.3 mi south of US-136 to 0.5 mi south of the Thayer/Fillmore Co Line

$7,949Estimate ($1,000)FY22

PEState 01 0 00 0Const / CENHPP 00 0 00 6358State 00 0 00 1590

42871 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

FillmoreProject No NH-81-1(125) NDOT Improvement Conc repair, jt and crack sealing, mill, resurf existing rdwy and s-shld Strang North US-81 28.38 6.5

US-81 from approx 0.6 mi north of N-74 to 1.8 mi south of N-41 $1,771Estimate ($1,000)

FY22PEState 01 0 00 0Const / CENHPP 1,4160 0 00 0State 3540 0 00 0

60

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202242883 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BuffaloProject No NH-2-4(113) NDOT Improvement Conc repair and seal, joint and crack seal

Ravenna West N-2 322.91 5.0N-2 from just east of Sweetwater to approx 0.4 mi east of N-68 south of Ravenna

$420Estimate ($1,000)FY22

PEState 00 0 01 0Const / CENHPP 00 335 00 0State 00 84 00 0

42885 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

AdamsProject No HSIP-6-4(130) NDOT Improvement Intersection improvements

US-6 and Adams Central Intersection US-6 208.22 0.0US-6/Adams Central Intersection approx 1.2 mi west S-1C Hastings Regional Center

$3,150Estimate ($1,000)FY22

Const / CESFTY 00 2,520 00 0State 00 630 00 0

51105 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SiouxProject No STP-29-4(106) NDOT Improvement Mill, resurf 22' rdwy w/4' earth shld

Agate North & South N-29 40.84 14.8N-29 from the Niobrara River near Agate north 9.1 mi

$3,050Estimate ($1,000)FY22

PEState 00 0 070 0Const / CEState 5960 0 00 0STP 2,3840 0 00 0

51184 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Scotts BluffProject No STP-71-3(119) NDOT Improvement Asph resurf 24' rdwy w/10' shld, 8' surf, br repair

Scottsbluff North N-71 62.98 8.3N-71 from E jct US-26 north to the Sioux Co. line

$4,791Estimate ($1,000)FY22

PEState 00 133 00 0ROWState 140 0 00 0Const / CESTP 00 0 3,6230 0State 00 0 1,0210 0

61

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202251275A Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CheyenneProject No NH-80-1(169) NDOT Improvement Replace rest area building

Sidney EB Rest Area Buildings I-80 51.40 0.0Along I-80 at the Sidney eastbound rest area

$3,540Estimate ($1,000)FY22

PEState 00 0 0150 0Const / CEState 00 340 00 0NHPP 00 3,050 00 0

51299 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

MorrillProject No RRZ-TMT-26-1(161) NDOT Improvement New viaduct

BNSF, Bridgeport US-26 60.92 0.0US-26 at BNSF grade crossing DOT#089-081B on the west edge of Bridgeport

$11,300Estimate ($1,000)FY22

PEState 00 0 0800 0State 0500 0 00 0Const / CESFTY 8,0000 0 00 0State 2,0000 0 00 0

51302 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CheyenneProject No STP-L17J(107) NDOT Improvement Conc pvmt, br repair/overlay, intersection improvements, shld widening Sidney Link L-17J 0.54 3.2

2.2 mi on Sidney Link (L17J) near I-80 Interchange and 0.9 mi on US-30 $10,886Estimate ($1,000)

FY22PEState 00 0 0399 0ROWState 00 0 010 0Const / CELocal 01,955 0 00 0STP-AC 08,042 0 00 0State 0480 0 00 0State -8,0420 0 00AC Conv 0STP 8,0420 0 00AC Conv 0

62

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202251392 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Scotts BluffProject No STP-92-1(124) NDOT Improvement Mill, resurf rdwy & shld, br repair/overlay, conc repair, ADA in Lyman Wyoming State Line East N-92 0.00 18.9

N-92 from Wyoming Line east to approx 2.5 mi west of Terrytown Spur, S-79H $4,670Estimate ($1,000)

FY22PEState 00 0 046 0ROWState 010 0 00 0Const / CEState 1,0190 0 00 0STP 3,5950 0 00 0

51399 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Box ButteProject No NH-2-1(123) NDOT Improvement Conc repair, mill, resurf variable width rdwy

Cody Ave East, Alliance N-2 86.00 1.5N-2 from 0.3 mi east of Cody Ave east 1.5 mi in Alliance

$2,879Estimate ($1,000)FY22

PELocal 00 0 012 0State 00 0 050 0Local 00 0 012 0ROWLocal 00 0 01 0State 00 0 04 0Local 00 0 01 0Const / CELocal 0467 0 00 0Local 0467 0 00 0NHPP 01,818 0 00 0State 047 0 00 0

51443Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

MorrillProject No S-385-3(1021) NDOT Improvement 4-lane reconstruction

L-62A North US-385 84.50 14.2US-385 from L-62A north 14.2 mi

$38,457Estimate ($1,000) Move const to FY-23, update estimateFY22PEState 00 0 0582 0Const / CEState 01,405 0 00 0State 00 0 23,4700 0EM 00 0 13,0000 0

63

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202251470 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

MorrillProject No NH-385-3(120) NDOT Improvement Mill, resurf existing rdwy and s-shld with asphalt

Dalton North US-385 54.48 8.0US-385 from the Cheyenne Co line north to 3.2 mi south of US-26/N-92

$4,000Estimate ($1,000)FY22

PEState 013 0 00 0ROWState 00 1 00 0Const / CENHPP 00 0 00 3189State 00 0 00 797

51472 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SheridanProject No NH-20-1(142) NDOT Improvement Mill, resurf 24' rdwy w/10' shld, 8' surf, shoulder rumble strips Hay Springs West US-20 71.43 7.5

US-20 from 2.3 mi west of the Dawes Co line east to N-87 near Hay Springs $3,956Estimate ($1,000)

FY22PEState 00 0 0227 0ROWState 00 0 02 0Const / CEState 0745 0 00 0NHPP 02,982 0 00 0

51519 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DeuelProject No NH-80-2(103) NDOT Improvement Replace 4-lane conc pvmt and shld, br repair/replace, remove crossover Chappell - N-27 I-80 84.63 9.9

I-80 from approx 0.6 mi west of L-25A to 0.8 mi west of N-27 $49,058Estimate ($1,000)

FY22Const / CENHPP 033,953 0 00AC Conv 0State 0-33,953 0 00AC Conv 0

64

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202251535 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CheyenneProject No NH-80-1(192) NDOT Improvement 4 Lane conc pvmt replacement, br repair/rehab, rest area ramps, parking Brownson East I-80 46.81 7.1

I-80 from 2.0 mi west of L-17C east 7.4 mi $37,306Estimate ($1,000)

FY22PEState 00 0 01,341 0ROWState 01 0 00 0Const / CENHPP-AC 00 32,368 00 0State 00 3,596 00 0NHPP 00 0 00AC Conv 32368State 00 0 00AC Conv -32368

51541 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SheridanProject No STP-27-4(109) NDOT Improvement Mill, resurf rdwy and shld, urban conc repair, br repair In Gordon & South N-27 210.14 12.5

N-27 from 0.4 mi south of the Niobrara River north through Gordon $6,291Estimate ($1,000)

FY22PEState 00 0 050 0ROWState 010 0 00 0Const / CESTP 4,9840 0 00 0State 1,2470 0 00 0

51544 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SiouxProject No STP-29-4(110) NDOT Improvement Mill, resurf existing rdwy, curb ramps, br repair

In Mitchell & North N-29 12.75 17.5N-29 from Jct US-26 in Mitchell north to approx 5.4 mi north Str# S02902486

$3,962Estimate ($1,000)FY22

PEState 055 0 00 0ROWState 00 10 00 0Const / CEState 00 0 00 780STP-AC 00 0 00 3117State 00 0 -3,1170AC Conv 0STP 00 0 3,1170AC Conv 0

65

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202251546 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

GardenProject No STP-27-3(102) NDOT Improvement Mill, resurf existing rdwy, earth shld const, br repairs, culv and gdrl Oshkosh South N-27 110.18 8.7

N-27 from 4.0 mi north of the Deuel/Garden Co line north to US-26/N92 in Oshkosh$4,723Estimate ($1,000)

FY22PEState 030 0 00 0Const / CEState 00 0 00 939STP 00 0 00 3754

51548 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SheridanProject No NH-20-2(142) NDOT Improvement Mill, resurf, curb & gutter repair, br repair

Hay Springs - Rushville US-20 78.87 12.9N-20 from W Jct N-87 east through Rushville

$4,358Estimate ($1,000)FY22

PEState 00 0 040 0ROWState 00 0 010 0Const / CENHPP 03,446 0 00 0State 0862 0 00 0

51549 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

SiouxProject No NH-20-1(148) NDOT Improvement Mill, resurf 24' rdwy w/10' shld, 8' surf, conc repair, ramp repair Crawford West US-20 25.21 10.7

N-20 from 5.8 mi west of the Sioux/Dawes Co line to just west of Crawford $3,412Estimate ($1,000)

FY22PEState 00 14 00 0Const / CENHPP 00 0 2,7180 0State 00 0 6800 0

66

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202251550 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CheyenneProject No STP-30-1(137) NDOT Improvement Mill, resurf rdwy and shld, conc repair, br repair

Potter East & West US-30 37.11 15.0US-30 from Kimball/Cheyenne Co line east to L-17C, including L-17B & L-17C

$8,697Estimate ($1,000)FY22

PEState 00 0 0397 0Const / CEState 1,6600 0 00 0STP-AC 6,6400 0 00 0State 00 0 00AC Conv -6640STP 00 0 00AC Conv 6640

51558 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DeuelProject No STP-385-2(113) NDOT Improvement Mill, asph resurf rdwy and shld, conc repari, br repair

Colorado Line - Chappell US-385 0.00 8.6US-385 from NE/CO state line to E Jct US-30 in Chappell; includes L-25A segment

$4,118Estimate ($1,000)FY22

PEState 00 0 0155 0ROWState 010 0 00 0Const / CEState 7900 0 00 0STP 3,1630 0 00 0

51560 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KimballProject No STP-30-1(138) NDOT Improvement Mill, Widen/resurf existing 24' rdwy to 28', br repair, gdrl Bushnell - Kimball US-30 9.56 11.4

US-30 from Jct L-53C, east to west limits limits of Kimball $5,857Estimate ($1,000)

FY22PEState 0204 0 00 0ROWState 00 10 00 0Const / CEState 00 0 00 1129STP 00 0 00 4514

67

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202251583 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KimballProject No NH-80-1(196) NDOT Improvement Gr, replace conc pvmt 4-lane divided interstate

Bushnell - West Kimball I-80 9.50 9.5I-80 from 1.0 mi east of Bushnell to 1.7 mi west of Kimball

$48,916Estimate ($1,000)FY22

PEState 01,709 0 00 0Const / CENHPP-AC 00 0 00 42486State 00 0 00 4721NHPP 00 0 42,4860AC Conv 0State 00 0 -42,4860AC Conv 0

51583A Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KimballProject No NH-80-1(200) NDOT Improvement Grading, lighting and paving an interstate median crossover Bushnell - West Kimball Crossover I-80 19.00 0.0

I-80 approx 1.7 mi west N-71 grade separation $904Estimate ($1,000)

FY22PEState 030 0 00 0Const / CENHPP 7870 0 00 0State 870 0 00 0

51589 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CheyenneProject No NH-80-2(111) NDOT Improvement Joint seal

Sunol - Lodgepole I-80 68.67 6.8I-80 from approx 1.0 mi west Sunol link L17E to 1.2 mi west Lodgepole link L17F

$601Estimate ($1,000)FY22

Const / CENHPP 5410 0 00 0State 600 0 00 0

51590 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CheyenneProject No NH-80-1(199) NDOT Improvement Joint seal

West Sidney - East Sidney I-80 53.98 6.7I-80 from approx 1.5 mi west N-19 to 0.8 mi east Sidney East link L17J

$613Estimate ($1,000)FY22

Const / CENHPP 00 0 5520 0State 00 0 610 0

68

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202251598 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KimballProject No ITS-NH-D5(104) NDOT Improvement Install new dynamic message signs

District 5 DMS I-80 2.71 0.0I-80 at locations in Kimball and Deuel counties

$925Estimate ($1,000)FY22

PEState 00 0 04 0Const / CENHPP 00 829 00 0State 00 92 00 0

51599 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CheyenneProject No ITS-NH-D5(105) NDOT Improvement Install variable speed advisory sign systems

D5 Variable Speed Advisory Signs I-80 0.14 0.0Along I-80 at 30 locations in Kimball, Cheyenne and Deuel counties

$3,527Estimate ($1,000)FY22

PEState 00 0 016 0Const / CENHPP 3,1600 0 00 0State 3510 0 00 0

51603 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KimballProject No NH-80-1(201) NDOT Improvement Joint and crack sealing existing bituminous surfacing Bushnell Interchange - West Kimball I-80 9.00 11.0

I-80 from near Bushnell Interchange to just west of Kimball $254Estimate ($1,000)

FY22Const / CENHPP 00 229 00 0State 00 25 00 0

51604 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CheyenneProject No NH-80-1(202) NDOT Improvement Crack seal

West of Sidney - East of Sidney I-80 53.98 6.7I-80 from just west of Sidney to just east of Sidney

$723Estimate ($1,000)FY22

Const / CEState 00 72 00 0NHPP 00 651 00 0

69

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202260823 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HookerProject No STP-97-3(102) NDOT Improvement Mill, widen/resurf existing rdwy to 24', curb & flume, storm sewer, gdrl Tryon - Mullen N-97 44.23 12.7

N-97 from near McPherson/Hooker Co line to approx 9.9 mi south Mullen $9,299Estimate ($1,000)

FY22PEState 00 0 0745 0ROWState 05 0 00 0Const / CEState 01,890 0 00 0STP-AC 06,659 0 00 0State -6,6590 0 00AC Conv 0STP 6,6590 0 00AC Conv 0

60942 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CusterProject No STP-183-3(112) NDOT Improvement Viaduct rehab, replace br with CBC, conc pvmt rdwy reconstruction, gdrl Ansley Viaduct US-183 88.85 0.6

US-183 from just east of W Jct N-2 to approx 0.1 mi north of E Jct N-92 $5,487Estimate ($1,000)

FY22PEState 00 0 0497 0ROWState 00 0 050 0Const / CESTP 03,952 0 00 0State 0988 0 00 0

61370A Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KeithProject No NH-80-3(134) NDOT Improvement Replace rest area building

Ogallala EB Rest Area Buildings I-80 122.70 0.0EB Ogallala rest area 3.5 mi west of the Ogallala Interchange

$2,982Estimate ($1,000)FY22

PEState 00 0 0150 0Const / CENHPP 00 0 02,505 0State 00 0 0327 0

70

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202261380B Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ArthurProject No STP-61-3(111) NDOT Improvement Mill, widen/resurf 22' rdwy to 28'

Arthur South N-61 110.31 14.9N-61 from Keith/Arthur Co line north to 0.2 mi north of N Jct N-92

$11,350Estimate ($1,000)FY22

Const / CEState 0-7,999 0 00AC Conv 0STP 07,999 0 00AC Conv 0

61457 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DawsonProject No RRZ-TMT-1705(3) NDOT Improvement New viaduct

Lexington East Viaduct 0.00 0.0County Rd 435 over UPRR/US-30/E Walnut St in Lexington

$11,175Estimate ($1,000)FY22

PEOther 00 0 02 0STP-AC 00 0 08 0SFTY 00 0 030 0Local 00 0 0821 0State 00 0 02 0ROWLocal 051 0 00 0Other 010 0 00 0SFTY 0170 0 00 0State 010 0 00 0STP 0159 0 00 0Const / CEState 00 281 00 0STP 00 290 00 0Other 00 281 00 0Local 00 4,288 00 0SFTY 00 4,772 00 0

61515 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CusterProject No STP-70-3(108) NDOT Improvement Mill, resurf 24'-rdwy w/s-shld, curb & flume, culv, gdrl, preserve br piles Westerville East N-70 88.12 9.3

N-70 from S Jct US-183 east to approx 0.3 mi east Custer/Valley Co line $5,012Estimate ($1,000)

FY22PEState 0100 0 00 0ROWState 00 1 00 0Const / CEState 00 0 00 982STP 00 0 00 3929

71

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202261522 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DawsonProject No NH-80-4(141) NDOT Improvement Resurf dual 24' divided interstate, shld widening, rumble strips, br Darr - Lexington (Resurf) I-80 230.55 7.1

I-80 from approx 0.6 mi west of Darr to approx 0.4 mi east of Lexington $7,319Estimate ($1,000)

FY22PEState 00 30 00 0Const / CEState 00 0 7290 0NHPP 00 0 6,5600 0

61527 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KeithProject No NH-80-3(154) NDOT Improvement Conc surf seal existing rdwy and s-shlds, joint seal

Roscoe - Paxton I-80 132.89 11.3I-80 from 1.1 mi west of Roscoe east to 1.5 mi west of Paxton

$3,197Estimate ($1,000)FY22

PEState 00 0 015 0Const / CEState 0318 0 00 0NHPP 02,864 0 00 0

61561 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

GrantProject No NH-2-2(117) NDOT Improvement Mill, resurf existing rdwy and s-shld, ADA, erosion control curb, fog seal flumeHyannis - Whitman N-2 145.44 13.6

N-2 from just west of W Jct N-61 in Hyannis east to approx 0.3 mi west Whitman $5,676Estimate ($1,000)

FY22PEState 00 0 0203 0ROWState 00 0 028 0Const / CENHPP-AC 04,356 0 00 0State 01,089 0 00 0NHPP 00 4,356 00AC Conv 0State 00 -4,356 00AC Conv 0

72

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202261565 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KeithProject No NH-STP-80-3(152) NDOT Improvement 4-Lane divided interstate, str, ramps, new rest area, resurf L-51A Brule - Ogallala I-80 115.49 11.3

I-80 from 1.8 mi west of Brule east to 1.0 mi west of Ogallala interchange $42,120Estimate ($1,000) Update estimateFY22

PEState 00 0 0750 0Const / CESTP-AC 01,327 0 00 0State 05,648 0 00 0NHPP-AC 034,395 0 00 0NHPP 00 34,395 00AC Conv 0State 00 -35,722 00AC Conv 0STP 00 1,327 00AC Conv 0

61565A Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KeithProject No NH-80-3(153) NDOT Improvement Crossovers, lighting, temporary ramps

Brule - Ogallala Crossovers I-80 115.49 0.0At Brule Interchange and near Ogalalla Interchange

$4,294Estimate ($1,000)FY22

PEState 00 0 05 0ROWState 00 0 030 0Const / CEState 0426 0 00 0NHPP 03,833 0 00 0

61566 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DeuelProject No NH-80-2(100) NDOT Improvement Gr, conc pvmt, reconfigure interchange, br's, MSE walls, lighting, DMS, gdrl Big Springs West I-80 102.09 7.4

On section of I-80 and all of I-76 from Colorado line to I-80/I-76 interchange $49,066Estimate ($1,000)

FY22PEState 00 0 01,553 0ROWState 00 0 0305 0Const / CENHFP 09,881 0 00 0NHPP-AC 032,604 0 00 0State 04,723 0 00 0NHPP 00 21,597 00AC Conv 0NHFP 00 11,007 00AC Conv 0State 00 -32,604 00AC Conv 0

73

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202261569 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HookerProject No STP-97-3(104) NDOT Improvement Mill, resurf 24' rdwy, urban section in Mullen

Mullen South N-97 56.82 10.2N-97 from N-2 in Mullen south approx 10.2 mi

$5,368Estimate ($1,000)FY22

PEState 00 0 0303 0ROWState 010 0 00 0Const / CESTP 3,9380 0 00 0State 1,1170 0 00 0

61584 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DawsonProject No STP-21-2(113) NDOT Improvement Bridge replacement and associated approach work Farmers/Merchant Canal Bridge, Cozad N-21 13.19 0.0

N-21 at Farmers/Merchant canal near Cozad $468Estimate ($1,000)

FY22PEState 00 17 00 0ROWState 50 0 00 0Const / CEState 00 0 00 98STP 00 0 00 348

61586A Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KeithProject No NH-80-3(157) NDOT Improvement Slip ramps and crossover repair work

Ogallala - Roscoe Crossovers I-80 125.65 0.0Along I-80 from Ogallala to Roscoe

$770Estimate ($1,000)FY22

PEState 020 0 00 0Const / CENHPP 00 0 00 675State 00 0 00 75

74

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202261587 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DawsonProject No NH-80-5(75) NDOT Improvement Conc pvmt

Lexington - Overton (Reconst) I-80 238.27 9.6I-80 from approx 1.1 mi east of US-283 to approx 0.7 mi west of L-24B

$33,528Estimate ($1,000)FY22

PEState 00 0 01,324 0Const / CENHPP-AC 28,9830 0 00 0State 3,2210 0 00 0NHPP 00 0 28,9830AC Conv 0State 00 0 -28,9830AC Conv 0

61587A Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DawsonProject No NH-80-5(78) NDOT Improvement Crossovers

Lexington - Overton Crossovers I-80 238.27 0.0I-80 at two locations between Lexington and Overton

$1,134Estimate ($1,000)FY22

PEState 00 0 080 0Const / CENHPP 00 949 00 0State 00 105 00 0

61590 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

LincolnProject No NH-STP-30-2(144) NDOT Improvement Br deck overlay, br repair, approach work, seal conc rails North Platte Area Bridges US-30 179.01 0.0

I-80, US-30, US-83 and L56G bridges in North Platte area $3,296Estimate ($1,000)

FY22PEState 00 0 0215 0Const / CEState 0677 0 00 0STP 0675 0 00 0NHPP 01,729 0 00 0

75

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202261593 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KeithProject No STP-30-2(146) NDOT Improvement Mill, resurf rdwy w/conc pvmt and resurf s-shld w/asph Ogallala - Roscoe US-30 127.54 6.2

US-30 from approx 0.2 mi east Ogallala to approx 0.1 west Roscoe link (L-51B) $6,766Estimate ($1,000)

FY22PEState 00 0 028 0Const / CEState 1,3480 0 00 0STP-AC 5,3900 0 00 0State 00 0 00AC Conv -5390STP 00 0 00AC Conv 5390

61594 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

LincolnProject No STP-30-2(147) NDOT Improvement Conc repair, mill & resurf rdwy & s-shld w/conc pvmt, asph resurf in villages Maxwell - Brady US-30 191.08 9.8

US-30 approx 0.1 mi east Maxwell, southeast to 0.1 mi west Brady $7,753Estimate ($1,000)

FY22PEState 00 0 0262 0ROWState 00 0 020 0Const / CESTP 05,799 0 00 0State 01,672 0 00 0

61595 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ThomasProject No NH-2-2(120) NDOT Improvement Mill, asph resurf, fog seal curbs, br repair/overlay

Thedford West N-2 202.09 4.6N-2 from approx 6.2 mi east of Seneca Spur (S-86A) to 3.3 mi west of Thedford

$2,886Estimate ($1,000)FY22

PEState 095 0 00 0Const / CEState 5580 0 00 0NHPP 2,2330 0 00 0

76

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202261597 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CusterProject No STP-21-3(105) NDOT Improvement Mill, resurf existing rdwy & s-shld, br repair, culv, ADA curb ramps Oconto North & South N-21 49.60 12.4

N-21 from approx 3.1 mi south to 9.0 mi north of Oconto $5,021Estimate ($1,000)

FY22PEState 00 0 0192 0ROWState 010 0 00 0Const / CEState 1,0650 0 00 0STP 3,7540 0 00 0

61598 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

LincolnProject No NH-83-2(141) NDOT Improvement Resurf

Lake Maloney South US-83 61.82 14.9US-83 from 6.2 mi north of the N Jct N-23 to 0.3 mi south of Maloney Rec Rd

$15,928Estimate ($1,000)FY22

PEState 00 50 00 0ROWState 440 0 00 0Const / CEState 00 0 7,6860 0NHPP 00 0 8,1480 0

61600 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DawsonProject No STP-30-3(118) NDOT Improvement Conc repair, cross stitching, joint seal

US-30 in Lexington US-30 236.74 1.8US-30 from just Erie St to Taft St in Lexington

$1,200Estimate ($1,000)FY22

PEState 05 0 00 0Const / CEState 00 0 2390 0STP 00 0 9560 0

77

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202261605 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DawsonProject No STP-21-2(114) NDOT Improvement Mill, resurf rdwy, conc repair, joint/crack seal, br repair/overlay Eustis - Cozad N-21 2.55 12.5

N-21 from N-23 north to approx 0.2 mi south of I-80 south of Cozad $7,368Estimate ($1,000)

FY22PEState 00 0 0249 0ROWState 010 0 00 0Const / CEState 1,5710 0 00 0STP-AC 5,5380 0 00 0State 00 0 00AC Conv -5538STP 00 0 00AC Conv 5538

61612 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

LincolnProject No STP-30-2(148) NDOT Improvement Br redeck, replace approaches, abutments, GB on pile, bearing devices, gdrl North Platte East Bridge US-30 180.50 0.0

lS-30 over the North Platte River 0.4 mi east of North Plate $2,289Estimate ($1,000)

FY22PEState 00 0 075 0Const / CEState 00 443 00 0STP 00 1,771 00 0

61613 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

McPhersonProject No STP-92-2(111) NDOT Improvement Mill, widen/resurf 24' rdwy to 28'

Tryon West N-92 190.26 13.6N-92 from 0.6 mi east of Arthur/McPherson Co line to 0.1 mi west of Tryon

$5,768Estimate ($1,000)FY22

PEState 00 10 00 0ROWState 50 0 00 0Const / CEState 00 0 1,1510 0STP 00 0 4,6020 0

78

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202261615 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ThomasProject No NH-2-2(121) NDOT Improvement Mill, resurf, ADA

Halsey West & East N-2 221.49 6.7N-2 from approx 5.0 mi west Halsey to 0.6 mi east Thomas/Blaine county line

$3,256Estimate ($1,000)FY22

PEState 00 0 020 0Const / CENHPP 00 2,589 00 0State 00 647 00 0

61616 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BlaineProject No NH-2-3(123) NDOT Improvement Resurf

Halsey - Dunning N-2 228.14 10.6N-2 from approx 0.5 mi east of Halsey east to approx 0.8 mi south of Dunning

$4,810Estimate ($1,000)FY22

PEState 010 0 00 0Const / CEState 00 0 00 960NHPP 00 0 00 3840

61617 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

LincolnProject No STP-30-2(149) NDOT Improvement Mill, resurf existing rdwy and s-shld

Hershey - North Platte US-30 164.13 11.3US-30 from approx 0.1 mi west Jct L-56C in Hershey to North Platte

$6,244Estimate ($1,000)FY22

PEState 0219 0 00 0Const / CEState 00 0 00 1205STP-AC 00 0 00 4820State 00 0 -4,8200AC Conv 0STP 00 0 4,8200AC Conv 0

79

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202261618 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

McPhersonProject No STP-97-3(106) NDOT Improvement Mill, resurf existing 24'-rdwy, curb & flume, earth shld const Tryon North N-97 31.06 13.1

N-97 from W Jct N-92, north to the McPherson/Hooker Co line $5,460Estimate ($1,000)

FY22PEState 022 0 00 0ROWState 00 10 00 0Const / CEState 00 0 00 1086STP-AC 00 0 00 4342STP 00 0 4,3420AC Conv 0State 00 0 -4,3420AC Conv 0

61619 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KeithProject No STP-NH-61-2(115) NDOT Improvement Resurf, br repair

Kingsley Dam South N-61 88.47 10.7N-61 from N Jct US-26 north to the Kingsley Dam

$5,031Estimate ($1,000)FY22

PEState 01 0 00 0Const / CENHPP 00 0 00 1404State 00 0 00 1006STP 00 0 00 2620

61620 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ThomasProject No NH-83-3(110) NDOT Improvement Mill, resurf 24'-rdwy with 10' shld, 8'-surf, curb and flumes Thedford North US-83 149.25 7.3

US-83 from E Jct N-2 north to Thomas/Cherry Co line $3,422Estimate ($1,000)

FY22PEState 00 0 040 0Const / CEState 0676 0 00 0NHPP 02,706 0 00 0

80

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202261628 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CusterProject No NH-2-3(124) NDOT Improvement Resurf

Anselmo - Merna N-2 258.04 12.3N-2 from Anselmo to approx 1.0 mi southeast of W Jct N-92 southeast of Merna

$6,917Estimate ($1,000)FY22

PEState 00 1 00 0Const / CENHPP 00 0 5,5330 0State 00 0 1,3830 0

61629 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KeithProject No STP-61-2(116) NDOT Improvement Conc repair, diamond grinding, joint sealing

Kingsley Dam N-61 96.05 2.4N-61 from near south end Kingsley Dam to approx 0.5 mi south of north end of dam

$844Estimate ($1,000)FY22

Const / CEState 00 0 1690 0STP 00 0 6750 0

61630 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

LincolnProject No STP-25-2(109) NDOT Improvement Resurf

Wallace North N-25 80.51 12.2N-25 from Jct N-23 to approx 4.7 mi south UPRR viaduct

$4,941Estimate ($1,000)FY22

PEState 00 1 00 0Const / CEState 00 0 9880 0STP 00 0 3,9520 0

61631 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KeithProject No NH-26-2(152) NDOT Improvement Mill, resurf rdwy & shld, curb/flumes, cable guardrail Garden/Keith Co. Line East US-26 128.71 7.8

US-26 from 1.7 mi east of Garden/Keith Co line to 2.7 mi west of Lakeview Rd $3,264Estimate ($1,000)

FY22PEState 013 0 00 0Const / CENHPP 00 0 00 2601State 00 0 00 650

81

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202261633 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

McPhersonProject No STP-97-3(107) NDOT Improvement Resurf

Tryon South N-97 19.90 11.1N-97 from approx 3.0 mi north Lincoln/McPherson Co line to E Jct N-92

$6,386Estimate ($1,000)FY22

PEState 00 1 00 0Const / CEState 00 0 1,2770 0STP 00 0 5,1080 0

61634 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

LincolnProject No NH-80-4(146) NDOT Improvement Mill, resurf driving lanes & s-shld, ramps, replace WIM scales. conc repair North Platte I-80 Scales I-80 179.93 0.0

EB & WB segments I-80 starting approx 0.7 & 2.3 mi east L-56G gr separation $2,957Estimate ($1,000)

FY22PEState 00 0 0117 0Const / CENHPP 02,556 0 00 0State 0284 0 00 0

61636 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DawsonProject No STP-21-2(117) NDOT Improvement Mill, asph resurf, repair/extend culv, cable guardrail

Eddyville Road North & South N-21 36.60 13.0N-21 from approx 6.6 mi south to 6.4 mi north of Eddyville Road

$8,088Estimate ($1,000)FY22

PEState 00 0 0286 0ROWState 00 0 040 0Const / CEState 01,716 0 00 0STP-AC 06,046 0 00 0State 00 -6,046 00AC Conv 0STP 00 6,046 00AC Conv 0

82

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202261637 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

LincolnProject No NH-80-4(149) NDOT Improvement Crack seal

South Channel Platte River - Brady I-80 185.74 12.7I-80 from approx 4.7 mi west Maxwell Spur S56A to 0.6 mi west Brady Link L56D

$368Estimate ($1,000)FY22

PEState 00 0 023 0Const / CENHPP 0310 0 00 0State 035 0 00 0

61639 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

LincolnProject No NH-80-3(161) NDOT Improvement Crack seal existing asph rdwy

Sutherland - Hershey I-80 157.74 6.4I-80 from approx 0.3 mi west N-25 grade sep to 0.4 mi west L-56C grade sep

$168Estimate ($1,000)FY22

PEState 00 0 01 0Const / CENHPP 0150 0 00 0State 017 0 00 0

61640 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DawsonProject No NH-80-5(82) NDOT Improvement Crack seal

Overton East I-80 248.10 7.0I-80 from approx 0.5 mi west of L24B to the Dawson/Buffalo Co line

$184Estimate ($1,000)FY22

PEState 00 0 01 0Const / CENHPP 0165 0 00 0State 018 0 00 0

61641 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

LincolnProject No NH-80-4(151) NDOT Improvement Crack seal

Brady East I-80 198.40 7.2I-80 from approx 0.6 mi west of L-56D to 2.6 me we of the Lincoln/Dawson Co line

$196Estimate ($1,000)FY22

PEState 00 0 01 0Const / CENHPP 00 176 00 0State 00 19 00 0

83

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202261642 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DawsonProject No NH-80-4(152) NDOT Improvement Crack seal

Gothenburg - Darr I-80 215.60 15.0I-80 from approx 3.8 mi east of Gothenburg to Darr

$421Estimate ($1,000)FY22

PEState 00 0 01 0Const / CENHPP 00 378 00 0State 00 42 00 0

61645 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DawsonProject No BRO-7024(25) County Improvement Bridge replacement and associated approach work Cozad Southwest 0.00 0.0

East Midway Lake bridge 5.5 mi south & 2.0 mi west of Cozad $1,436Estimate ($1,000)

FY22PEBRO 00 0 0208 0Local 00 0 052 0ROWBRO 08 0 00 0Local 02 0 00 0Const / CEBRO 9330 0 00 0Local 2330 0 00 0

61647 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DawsonProject No STP-21-2(118) NDOT Improvement Mill, resurf rdwy & s-shld, repair 2 andreplace 2-br's w/br sized CBC's, gdrl Lexington North N-21 28.62 8.0

N-21 from approx 0.4 mi So. of north lmts Lexington to 6.6 mi So. Eddyville Road$5,217Estimate ($1,000)

FY22PEState 00 0 048 0ROWState 010 0 00 0Const / CEState 1,0310 0 00 0STP 4,1280 0 00 0

84

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202261650 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

LincolnProject No ITS-NH-D6(106) NDOT Improvement Install overhead dynamic message signs

District 6 Overhead DMS I-80 156.02 0.0I-80 at four locations from Sutherland to Gothenburg

$1,852Estimate ($1,000)FY22

PEState 00 0 08 0Const / CEState 0184 0 00 0NHPP 01,660 0 00 0

61653 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

GrantProject No ITS-NH-STP-D6(107) NDOT Improvement Install sidemount dynamic message signs

District 6 Sidemount DMS N-2 144.87 0.0At 14 highway locations in district 6

$2,447Estimate ($1,000)FY22

PEState 00 0 011 0Const / CEState 0487 0 00 0STP 0557 0 00 0NHPP 01,392 0 00 0

61654 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DawsonProject No ITS-NH-STP-D6(108) NDOT Improvement Install CCTV camera towers

District 6-Districtwide CCTV Cameras US-30 157.00 0.0At 18 highway locations in District 6

$1,012Estimate ($1,000)FY22

PEState 00 0 010 0Const / CENHPP 00 178 00 0State 00 200 00 0STP 00 624 00 0

61655 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

LincolnProject No STP-S56A(108) NDOT Improvement Mill, resurf, br

I-80 South S-56A 2.04 1.9S-56A from just south I-80 grade sep to just south Ft McPherson Nat'l Cemetery

$5,551Estimate ($1,000)FY22

Const / CESTP 00 0 4,4410 0State 00 0 1,1100 0

85

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202261656 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DeuelProject No ITS-NH-D6(109) NDOT Improvement Install variable speed advisory sign system

District 6 Variable Speed Advisory I-80 102.15 0.0Along I-80 corridor in Deuel, Keith, Lincoln and Dawson counties

$4,446Estimate ($1,000)FY22

Const / CEState 00 0 00 445NHPP 00 0 00 4001

61659 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KeithProject No NH-80-3(164) NDOT Improvement Crack seal 4-lane divided interstate and s-shld

West of Ogallala - West of Roscoe I-80 126.25 6.6I-80 from approx 0.1 mi west Ogallala to 1.1 mi west of Roscoe Link L-51B

$165Estimate ($1,000)FY22

PEState 00 0 01 0Const / CENHPP 0148 0 00 0State 016 0 00 0

61661 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DawsonProject No NH-80-4(153) NDOT Improvement Mill, conc repair, resurf rdwy & inside Shld, fog seal outside shld, br repair Gothenburg - Cozad I-80 212.70 9.3

I-80 from approx 0.9 mi east N-47 gr sep to 0.5 mi west N-21 gr sep $3,803Estimate ($1,000)

FY22PEState 01 0 00 0Const / CENHPP 00 0 00 3422State 00 0 00 380

61664 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DawsonProject No NH-80-5(86) NDOT Improvement Interstate reconstruction, br

Overton East (Reconst) I-80 248.11 6.8I-80 from just west Overton Interchange, east to Dawson/Buffalo Co Line

$36,862Estimate ($1,000)FY22

PEState 00 10 00 0Const / CENHPP 00 0 33,1670 0State 00 0 3,6850 0

86

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202270510 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

FranklinProject No STP-10-1(104) NDOT Improvement Mill, asph resurf rdwy & s-shld, curb/flumes, conc repair, br repair, RR Xings Franklin South N-10 0.00 7.9

N-10 from Kansas Line north to S Jct US-136; includes approx 1.0 mi on US-136 $6,034Estimate ($1,000)

FY22PEState 00 0 0225 0ROWState 025 0 00 0Const / CEState 1,2800 0 00 0STP 4,5040 0 00 0

70587 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Furnas Project No STP-47-1(101) NDOT Improvement Asph widen/resurf 24' rdwy to 28' w/4' earth shld Cambridge South N-47 7.70 5.4

N-47 from approximately 4.4 mi south Cambridge, north to jct US-6/34 $3,473Estimate ($1,000)

FY22PEState 00 110 00 0ROWState 150 0 00 0Const / CEState 00 0 7370 0STP 00 0 2,6110 0

70592 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

FranklinProject No STP-136-4(110) NDOT Improvement Mill, widen/resurf existing rdwy to 28' br repair & widening, gdrl Naponee - Bloomington US-136 41.59 5.7

US-136 from just west jct S-31C to just east Central Ave in Bloomington $5,578Estimate ($1,000)

FY22PEState 00 520 00 0Const / CESTP 00 0 4,0460 0State 00 0 1,0120 0

87

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202270639A Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HarlanProject No STP-89-3(111) NDOT Improvement Replace two bridges, add new approaches and gr beam on piles, gdrl Orleans South Bridges N-89 63.28 0.0

N-89 over Flag Creel & Republican River approx 0.5 and 1.5 mi south of Orleans $6,430Estimate ($1,000)

FY22PEState 00 0 0235 0ROWState 030 0 00 0Const / CEState 1,3640 0 00 0STP 4,8010 0 00 0

70850 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Furnas Project No STP-46-1(105) NDOT Improvement Asph resurf 24' rdwy, widen shld from 2' to 6', br

Oxford North N-46 7.96 4.0N-46 from US-136 in Oxford north to US-34

$3,958Estimate ($1,000)FY22

PEState 00 0 080 0ROWState 00 0 040 0Const / CESTP 03,070 0 00 0State 0768 0 00 0

70872 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Furnas Project No STP-46-1(103) NDOT Improvement Widen/resurf 24' rdwy to 28', urban section in Oxford Oxford South N-46 0.00 6.5

N-46 from N-89 north to W Jct US-136 in Oxford $0Estimate ($1,000) Remove, was obligated in FY-18FY22

Const / CESTP 00 0 00 0

88

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202270886A Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HitchcockProject No STP-17-1(108) NDOT Improvement Hydrated lime slurry stablization, resurf, conc repair, br repair Culbertson South N-17 6.80 10.3

N-17 from Culbertons South to 6.8 mi north of the Kansas line $5,116Estimate ($1,000)

FY22PEState 056 0 00 0ROWState 00 60 00 0Const / CEState 00 0 00 1000STP-AC 00 0 00 4000State 00 0 -4,0000AC Conv 0STP 00 0 4,0000AC Conv 0

70919 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ChaseProject No STP-S15A(101) NDOT Improvement Mill, widen/resurf existing 24'-rdwy to 28', urban section, curb & flume, culv Champion Spur S-15A 0.00 6.7

S-15A (Champion Spur) from US-6 in Imperial southwest to Champion $5,335Estimate ($1,000)

FY22PEState 00 112 00 0ROWState 150 0 00 0Const / CEState 00 0 1,0420 0STP 00 0 4,1660 0

71018 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

DundyProject No HSIP-1315(11) County Improvement Gr to widen & re-align existing rdwy to improve sight distance, erosion control Benkelman Northeast 0.00 0.4

Snake Rd realignment to Max-Wanuneta Rd northeast of Benkelman $230Estimate ($1,000)

FY22PELocal 00 0 013 0SFTY 00 0 045 0State 00 0 038 0ROWLocal 00 0 02 0SFTY 00 0 08 0Const / CELocal 025 0 00 0SFTY 099 0 00 0

89

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202271078 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Furnas Project No BRO-7033(33) County Improvement Bridge and associated approach work

Edison Northwest 0.00 0.1Co Rd northwest of Edison

$362Estimate ($1,000)FY22

PEBRO-AC 00 0 028 0Local 00 0 016 0BRO 00 0 03 0Local 0-28 0 00AC Conv 0BRO 028 0 00AC Conv 0ROWBRO 08 0 00 0Local 02 0 00 0Const / CEBRO 00 245 00 0Local 00 60 00 0

71100 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

ChaseProject No STP-61-1(109) NDOT Improvement Mill, resurf 24' rdwy w/6' earth shld, curb/flume

Enders South N-61 26.87 3.6N-61 from approx 2.5 mi north of Dundy/Chase Co line north to E Jct US-6

$1,325Estimate ($1,000)FY22

PEState 00 55 00 0Const / CEState 00 0 2550 0STP 00 0 1,0150 0

71163 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

FranklinProject No STP-10-1(111) NDOT Improvement Mill, widen/resurf 24' rdwy to 28', extend culv, curb & flume, gdrl Franklin North N-10 7.33 6.8

N-10 from US-136 north of Franklin north to approx 6.2 mi south of N-4 $4,422Estimate ($1,000)

FY22PEState 00 0 075 0ROWState 00 0 020 0Const / CEState 0956 0 00 0STP 03,371 0 00 0

90

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202271164 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

FranklinProject No STP-10-1(112) NDOT Improvement Mill, resurf b-b section in Macon, widen/resurf 24' rdwy to 28' Macon - N-4 N-10 14.20 6.2

N-10 from approx 6.9 mi north of N Jct US-136 at Macon north to N-4 $3,758Estimate ($1,000)

FY22PEState 00 0 060 0Const / CEState 0818 0 00 0STP 02,880 0 00 0

71165 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

GosperProject No STP-283-1(117) NDOT Improvement Mill, widen/resurf 24' rdwy to 28', urban resurf, br repair, curb/flume In Arapahoe & North US-283 20.59 10.8

US-283 from Arapahoe to approx 3.0 mi south of N-18 $7,823Estimate ($1,000)

FY22PEState 0265 0 00 0ROWState 00 25 00 0Const / CESTP-AC 00 0 00 5869State 00 0 00 1664State 00 0 -5,8690AC Conv 0STP 00 0 5,8690AC Conv 0

71171 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Furnas Project No NH-6-3(127) NDOT Improvement Br replacement, add approaches

Arapahoe West Bridge US-6 125.68 0.0US-6 over Muddy Creek 0.2 mi west of Arapahoe

$2,127Estimate ($1,000)FY22

PEState 068 0 00 0ROWState 00 1 00 0Const / CENHPP 1,6060 0 00 0State 4520 0 00 0

91

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202271182 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HitchcockProject No STP-25-1(111) NDOT Improvement Mill, resurf rdwy & shld, curb/flumes, br repair/overlay, curb ramps Trenton North N-25 13.24 9.6

N-25 from approx 0.6 mi south of Trenton north to US-6 $6,413Estimate ($1,000)

FY22PEState 00 0 0512 0ROWState 010 0 00 0Const / CESTP 4,7130 0 00 0State 1,1780 0 00 0

71183 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PerkinsProject No STP-61-2(114) NDOT Improvement Mill, widen/resurf 24' rdwy to 28'

Chase/Perkins Co Line North N-61 53.56 10.6N-61 from Chase/Perkins Co line north to the E Jct N-23

$5,215Estimate ($1,000)FY22

PEState 00 0 0111 0Const / CEState 1,0210 0 00 0STP 4,0830 0 00 0

71185 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

GosperProject No STP-283-1(118) NDOT Improvement Mill, resurf 24' rdwy w/10' shld, 8' surf, br repair

Platte River South US-283 47.61 7.7US-283 from 0.16 mi south of the Dawson/Gosper Co line north to the Platte River

$9,678Estimate ($1,000) Advance year of AC conversion to FY-19FY22Const / CESTP 07,235 0 00AC Conv 0State 0-7,235 0 00 0

71189 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PhelpsProject No NH-183-1(118) NDOT Improvement Mill, resurf existing rdwy & s-shld w/asph, ADA curb ramp, br repair, culv, gdrlHoldrege South US-183 20.98 9.3

US-183 from just south jct N-4, north to just south jct US-6 & 34 in Holdrege $4,803Estimate ($1,000)

FY22PEState 010 0 00 0Const / CENHPP 3,8340 0 00 0State 9590 0 00 0

92

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202271190 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

PerkinsProject No STP-23-2(129) NDOT Improvement Resurf

Brandon - E Jct N-61 N-23 8.12 13.3N-23 from just east of Brandon east to just east of E jct N-61 east of Grant

$5,044Estimate ($1,000)FY22

PEState 015 0 00 0Const / CEState 00 0 00 1006STP-AC 00 0 00 4023STP 00 0 4,0230AC Conv 0State 00 0 -4,0230AC Conv 0

71191 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KearneyProject No STP-10-1(113) NDOT Improvement Resurf, br

Minden North N-10 34.20 11.7N-10 from 0.6 mi north of Minden north to 0.5 mi north of the Buffalo Co line

$5,573Estimate ($1,000)FY22

PEState 00 20 00 0Const / CEState 00 0 1,1110 0STP 00 0 4,4420 0

71192 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

FrontierProject No NH-83-1(118) NDOT Improvement Mill, asph resurf, curb/flumes, add passing lanes

Frazier Creek North & South US-83 35.00 9.8US-83 from 8.6 mi north of Frontier Co line north to 3.2 mi south of S Jct N-23

$12,373Estimate ($1,000)FY22

PEState 00 0 028 0ROWState 00 0 059 0Const / CEState 06,944 0 00 0NHPP-AC 05,342 0 00 0State 00 -5,342 00AC Conv 0NHPP 00 5,342 00AC Conv 0

93

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202271196 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

KearneyProject No STP-10-1(114) NDOT Improvement Mill, resurf existing rdwy & s-shld, shld widening, C&G repair, br repair, flumeN-4 - Minden N-10 20.38 13.8

N-10 from N-4 north to just south of US-6/34 in Minden $6,250Estimate ($1,000)

FY22PEState 00 0 0334 0Const / CEState 01,308 0 00 0STP 04,608 0 00 0

71209 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HitchcockProject No NH-6-2(132) NDOT Improvement Resurf, br repair

Palisade - N-25 US-6 57.36 6.6US-6 from Palisade southeast to just southeast of Jct N-25

$3,751Estimate ($1,000)FY22

PEState 00 1 00 0Const / CENHPP 00 0 3,0000 0State 00 0 7500 0

71221 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Red WillowProject No NH-83-1(119) NDOT Improvement Pavement & curb repair, replace broken inlet lids, reseal joints, seal conc In McCook Pavement Repair US-83 15.86 4.9

US-83 from W Jct US-6 in McCook, north approx 2.2 mi;includes approx 2.7 mi US-6$1,600Estimate ($1,000)

FY22PEState 00 0 07 0Const / CENHPP 01,274 0 00 0State 0319 0 00 0

94

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202280640 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CherryProject No STP-61-4(107) NDOT Improvement Mill, resurf 24' rdwy w/3.5' s-shld, erosion erosion control curb & flume, culv Snake River North & South N-61 190.78 15.0

N-61 from 9.6 mi south of Snake River, north to 11.7 mi south of Niobrara River $8,362Estimate ($1,000)

FY22PEState 00 0 0320 0ROWState 00 0 010 0Const / CEState 01,607 0 00 0STP-AC 06,425 0 00 0State 00 -6,425 00AC Conv 0STP 00 6,425 00AC Conv 0

80644 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

WheelerProject No STP-70-4(105) NDOT Improvement Asph widen/resurf 24' rdwy to 28', br widen

N Jct US-281 East N-70 166.92 5.0N-70 from the north Jct US-281 east 5.1 mi

$0Estimate ($1,000) Remove, was obligated in FY-18FY22Const / CEState 00 0 00 0STP 00 0 00 0

80690A Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Keya PahaProject No STP-183-4(113) NDOT Improvement Mill, widen/resurf 24' rdwy to 28', curb/flumes, br repair Niobrara River - N-7 US-183 207.17 4.3

US-183 from just north of Brown/Keya Paha Co line north to N-7 $3,463Estimate ($1,000)

FY22PEState 0120 0 00 0ROWState 00 10 00 0Const / CEState 00 0 00 668STP-AC 00 0 00 2665State 00 0 -2,6650AC Conv 0STP 00 0 2,6650AC Conv 0

95

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202280758 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HoltProject No BRO-7045(28) County Improvement 2 bridge replacements and associated approach work O'Neill West 0.00 0.5

Co Rd 4.0 mi west of O'Neill over the Elkhorn River & overflow stream $2,381Estimate ($1,000)

FY22PEBRO 00 0 0315 0BRO-AC 00 0 032 0Local 00 0 044 0State 00 0 058 0ROWBRO 08 0 00 0Local 01 0 00 0State 01 0 00 0Const / CEBRO 00 1,533 00 0Local 00 197 00 0State 00 192 00 0

80785 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

WheelerProject No BR-2325(3) County Improvement Bridge replacement and associated approach work Ericson South 0.00 0.3

County Rd 0.7 mi southeast of Ericson over the Cedar River $1,728Estimate ($1,000)

FY22PEBRO 00 0 0200 0State 00 0 082 0STP 00 0 060 0ROWState 00 0 015 0STP 00 0 059 0Const / CESTP 01,050 0 00 0State 0262 0 00 0

80804 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Brown Project No STP-7-4(112) NDOT Improvement Mill, widen/resurf 24' to 28' rdwy w/4' earth shld

In Ainsworth & South N-7 36.36 7.2N-7 from US-20 in Ainsworth south 7.3 mi

$3,863Estimate ($1,000)FY22

PEState 00 60 00 0Const / CEState 00 0 8420 0STP 00 0 2,9610 0

96

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202280817Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CherryProject No TCSP-16(36) County Improvement Gr, culv, asph surf, parking area, guardrail

Niobrara Scenic River Corridor 0.00 3.8Sparks River Rd from lookout where surfacing changes to gravel north to N-12

$2,182Estimate ($1,000) Add projectFY22Const / CEState 00 0 02,182 0

80854 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Keya PahaProject No STP-12-3(110) NDOT Improvement Mill, resurf existing 24' rdwy to 28' and gdrl

Norden East N-12 29.13 11.2N-12 from approx 0.1 mi west Norden to approx 5.0 mi west Jct Meadville Road

$6,057Estimate ($1,000)FY22

PEState 00 218 00 0Const / CEState 00 0 1,1680 0STP 00 0 4,6710 0

80863 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Brown Project No NH-20-3(113) NDOT Improvement Replace pvmt, curb, drainage, curb ramps

In Ainsworth US-20 241.95 1.4US-20 in Ainsworth

$5,653Estimate ($1,000)FY22

PEState 00 0 0206 0ROWState 00 0 050 0Const / CEState 01,193 0 00 0NHPP-AC 04,204 0 00 0NHPP 00 4,204 00AC Conv 0State 00 -4,204 00AC Conv 0

97

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202280864 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HoltProject No NH-281-4(124) NDOT Improvement 40'-66' b-b urban reconstruction

E Jct US-20 South In O'Neill US-281 182.81 0.5US-281 from approx 0.4 mi north Elkhorn River to E Jct US-20 & US-275 in O'Neill

$3,395Estimate ($1,000)FY22

PEState 00 0 0118 0ROWState 020 0 00 0Const / CENHPP 2,5370 0 00 0State 7200 0 00 0

80865 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CherryProject No NH-STP-83-4(117) NDOT Improvement Urban reconstruction, curb inlets & storm sewer, curb & flume, br repair, resurfIn Valentine US-83 212.78 2.1

US-83 from N Jct US-20 in Valentine NW to Minnechaduza Cr br; approx 0.7 mi N-12$6,471Estimate ($1,000)

FY22PEState 00 0 0205 0ROWState 0100 0 00 0Const / CENHPP 4,4990 0 00 0State 1,3480 0 00 0STP 3190 0 00 0

80866 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

LoupProject No STP-96-3(101) NDOT Improvement Widen/resurf 22' rdwy to 28', br repair/overlay, curb/flumes US-183 Southeast N-96 0.00 13.6

N-96 from US-183 southeast to approx 1.7 mi north of the Calamus River $7,434Estimate ($1,000) Correct STIP entryFY22

PEState 00 0 0238 0ROWState 00 0 010 0Const / CESTP-AC 05,600 0 00 0State 01,586 0 00 0State 00 -5,600 00AC Conv 0STP 00 5,600 00AC Conv 0

98

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202280867 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CherryProject No STP-12-2(107) NDOT Improvement Asph resurf existing rdwy and shld

Sparks East N-12 18.64 3.5N-12 from 0.6 mi east of Sparks Rd to juest west of the Cherry/Keya Paha Co line

$1,659Estimate ($1,000)FY22

PEState 06 0 00 0Const / CEState 00 0 00 400STP 00 0 00 1253

80868 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Keya PahaProject No STP-7-4(118) NDOT Improvement Mill, resurf existing rdwy & s-shld with asph, curb & flume, br repair, gdrl Rock/Keya Paha County Line North N-7 73.35 4.3

N-7 from just south Niobrara River bridge to approx 6.7 mi SE of jct US-183 $2,807Estimate ($1,000)

FY22PEState 025 0 00 0ROWState 00 10 00 0Const / CESTP-AC 00 0 00 2217State 00 0 00 555State 00 0 -2,2170AC Conv 0STP 00 0 2,2170AC Conv 0

80869 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

RockProject No STP-183-4(115) NDOT Improvement Mill, widen/resurf 24' rdwy to 28'

Rose South US-183 148.23 6.4US-183 from Loup/Rock Co line north 6.4 mi to Rose

$2,631Estimate ($1,000)FY22

PEState 00 9 00 0Const / CEState 00 0 5250 0STP 00 0 2,0970 0

80883 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Keya PahaProject No STP-137-4(106) NDOT Improvement Mill, asph resurf, br repair

Keya Paha River - South Dakota Line N-137 27.28 8.0N-12 from 0.5 mi north of S jct N-137 east to Boyd Co line; north N-137 to SD

$0Estimate ($1,000) Remove, was obligated in FY-18FY22Const / CEState 00 0 00 0STP 00 0 00 0

99

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202280902 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BlaineProject No STP-7-3(103) NDOT Improvement Mill, asph resurf rdwy and shld, br repair

Brewster North N-7 0.00 8.4N-7 from N-91 south of Brewster, north to 2.5 mi south of Blaine/Brown Co line

$3,302Estimate ($1,000)FY22

PEState 00 0 016 0Const / CEState 6570 0 00 0STP 2,6290 0 00 0

80944 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CherryProject No STP-12-2(106) NDOT Improvement Bridge replacement, re-aligned rdwy resurf, curb & flume, gdrl Minnechaduza Creek Bridge N-12 3.78 0.4

N-12 bridge over Minnechaduza Cr on new alignment approx 3.0 mi east Valentine $2,293Estimate ($1,000)

FY22PEState 00 74 00 0ROWState 500 0 00 0Const / CESTP 00 0 1,7350 0State 00 0 4340 0

80967 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Brown Project No NH-20-3(114) NDOT Improvement Bridge repair/overlay

Long Pine Bridge US-20 250.01 0.2US-20 over Long Pine Creek 1.7 mi west ot the Brown/Rock Co line

$1,396Estimate ($1,000)FY22

PEState 00 0 050 0Const / CENHPP 00 1,077 00 0State 00 269 00 0

100

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202280985 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CherryProject No NH-STP-20-2(143) NDOT Improvement Microsurfacing

Merriman West & Niobrara River N & S US-20 126.64 12.8US-20 west of Merriman and N-61 north & south of the Niobrara River

$1,048Estimate ($1,000)FY22

PEState 00 0 04 0Const / CENHPP 0603 0 00 0State 0209 0 00 0STP 0232 0 00 0

80991 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CherryProject No NH-83-4(119) NDOT Improvement Microsurfacing

S-16B North & South US-83 186.93 10.2US-83 from 9.1 mi south of Valentine Refuge Spur (S-16B) north approx 10.2 mi

$984Estimate ($1,000)FY22

PEState 00 0 01 0Const / CEState 00 197 00 0NHPP 00 786 00 0

80992 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

LoupProject No STP-183-3(120) NDOT Improvement Microsurfacing rdwy

Taylor North & South US-183 121.91 13.9US-183 from Custer/Loup Co line north to just north of Jct N-96

$1,241Estimate ($1,000)FY22

PEState 00 0 05 0Const / CESTP 0989 0 00 0State 0247 0 00 0

80993 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

RockProject No STP-183-4(117) NDOT Improvement Microsurface 24' rdwy w/8' shld, 2' s urf

Rose North US-183 154.62 17.6US-183 from Rose to 9.8 mi south of Bassett

$1,648Estimate ($1,000)FY22

PEState 00 0 01 0Const / CEState 00 329 00 0STP 00 1,318 00 0

101

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202281002 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CherryProject No STP-61-4(116) NDOT Improvement Mill, resurf rdwy and shld, curb/flumes

Snake River - Niobrara River N-61 205.77 10.3N-61 from approx 5.4 mi north of Snake River to 1.4 mi south of Niobrara River

$3,652Estimate ($1,000)FY22

PEState 00 0 0198 0Const / CEState 6910 0 00 0STP 2,7630 0 00 0

81003 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BoydProject No STP-11-4(118) NDOT Improvement Resurf, br

In Butte & North N-11 181.82 7.3N-11 from approx 0.3 mi west of Butte north to the South Dakota line

$2,657Estimate ($1,000)FY22

PEState 00 15 00 0Const / CESTP 00 0 2,1140 0State 00 0 5280 0

81005 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

RockProject No STP-183-4(118) NDOT Improvement Resurf

Bassett South US-183 172.21 10.1US-183 from approx 9.9 mi South Bassett, north to E Jct US-20 & N-7 in Bassett

$3,770Estimate ($1,000)FY22

PEState 01 0 00 0Const / CEState 00 0 00 754STP-AC 00 0 00 3015State 00 0 -3,0150AC Conv 0STP 00 0 3,0150AC Conv 0

102

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202281007 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Brown Project No STP-NH-7-4(122) NDOT Improvement Microsurfacing

Ainsworth Area Microsurfacing N-7 8.36 31.6Various locations on US-20 and N-7 in the Ainsworth area

$2,158Estimate ($1,000)FY22

PEState 01 0 00 0Const / CENHPP 8340 0 00 0State 4310 0 00 0STP 8920 0 00 0

81008 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CherryProject No NH-STP-20-2(148) NDOT Improvement Microsurfacing

Valentine Area Microsurfacing US-20 111.94 58.3Various locations on US-20, US-83 and N-12 in the Valentine area

$3,975Estimate ($1,000)FY22

PEState 01 0 00 0Const / CEState 00 0 00 795STP 00 0 00 309NHPP 00 0 00 2870

81010 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HoltProject No RD-20-4(1031) NDOT Improvement Diamond grinding, joint and panel repair

In O'Neill US-20 307.61 1.8US-20 from just west of E Jct US-281 & NW Jct US275 to just southeast of O'Neill

$387Estimate ($1,000)FY22

Const / CEState 00 0 00 387

103

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202281014 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BoydProject No BRO-7442(1) County Improvement Bridge replacement and associated approach work Naper Southeast 20.96 0.0

Co Rd 902 bridge C000801605 4.0 mi south and 5.0 mi west of Naper $1,172Estimate ($1,000)

FY22PEBRO 00 0 0167 0Local 00 0 042 0ROWBRO 08 0 00 0Local 02 0 00 0Const / CEBRO 7620 0 00 0Local 1910 0 00 0

81015 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

BoydProject No BRO-7008(13) County Improvement Bridge replacement and associated approach work Monowi West 0.00 0.0

Co Road 897 bridge C000822615 approx 0.5 mi west of Monowi $1,215Estimate ($1,000)

FY22PEBRO 00 151 00 0Local 00 38 00 0State 00 5 00 0ROWBRO 80 0 00 0Local 20 0 00 0Const / CELocal 00 0 00 202BRO 00 0 00 809

81017 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

GarfieldProject No ITS-STP-D8(103) NDOT Improvement Deploy CCTV cameras

District 8 CCTV Cameras N-11 93.70 0.0Distict 8 - at 5 locations districtwide

$278Estimate ($1,000)FY22

PEState 00 0 09 0Const / CEState 054 0 00 0STP 0215 0 00 0

104

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202281020 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

RockProject No STP-7-4(119) NDOT Improvement Mill, resurf existing rdwy

Niobrara River South N-7 67.46 5.1N-7 from approx 6.1 mi north of Bassett to 0.1 mi south Rock/Keya Paha Co Line

$1,339Estimate ($1,000)FY22

PEState 00 0 01 0Const / CEState 0268 0 00 0STP 01,070 0 00 0

81021 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CherryProject No STP-97-4(112) NDOT Improvement Install culvert to prevent Alkali Pond from over topping N-97 Alkali Pond Culvert N-97 104.17 0.0

N-97 approx 1.3 mi north of Brownlee Road $105Estimate ($1,000)

FY22PEState 00 0 01 0Const / CESTP 083 0 00 0State 021 0 00 0

81024 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HoltProject No NH-281-4(128) NDOT Improvement Resurf rdwy and s-shld, br repair

Boyd/Holt Co Line North & South US-281 204.09 5.1US-281 from approx 3.9 south to 1.9 mi north Holt/Boyd county line

$2,530Estimate ($1,000)FY22

PEState 00 1 00 0Const / CEState 00 0 00 506NHPP 00 0 00 2023

81025 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HoltProject No NH-281-4(129) NDOT Improvement Mill, resurf existing rdwy & s-shld with asph, br repair and gdrl Eagle Creek North & South US-281 196.88 7.5

US-281 from approx 11.6 mi north O'Neill to 3.9 mi south Holt/Boyd county line $3,439Estimate ($1,000)

FY22PEState 00 0 080 0Const / CENHPP 00 2,687 00 0State 00 672 00 0

105

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 202281026 Control No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

HoltProject No NH-20-4(127) NDOT Improvement Resurf rdwy & s-shld

Stafford - Holt/Antelope County Line US-20 320.74 8.1US-20 from approx 4.7 mi southeast Inman to Holt/Antelope county line

$3,855Estimate ($1,000)FY22

PEState 00 1 00 0Const / CENHPP 00 0 3,0830 0State 00 0 7710 0

81027 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CherryProject No NH-20-2(145) NDOT Improvement Mill, resurf existing rdwy & s-shld, curb & flume, culv, gdrl Merriman - Eli US-20 135.84 10.2

US-20 from just west of E Jct N-61 in Merriman, east to intersection with Eli Rd$4,884Estimate ($1,000)

FY22PEState 01 0 00 0Const / CENHPP 00 0 00 3906State 00 0 00 977

81028 Control NoCountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

CherryProject No NH-83-4(120) NDOT Improvement Microsurfacing rdwy, fog seal s-shld

North of Thomas/Cherry Co Line North US-83 160.48 10.1US-83 from 3.9 mi north of Thomas/Cherry Co line to just south of Brownlee Road

$946Estimate ($1,000)FY22

PEState 00 0 01 0Const / CENHPP 0756 0 00 0State 0189 0 00 0

106

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 2022GIAMPOControl No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Project No Improvement

Estimate ($1,000)FY22

SFTY 0581 0 00 0State 026,686 0 00 0Local 02,178 0 00 0State 00 10 00 0State 1,6670 0 00 0Local 6180 0 00 0SFTY 1,1190 0 00 0NHPP 7,2920 0 00 0State 00 0 00 936Local 00 0 00 60NHPP 00 0 00 3420

107

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 2022LincolnControl No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Project No Improvement

Estimate ($1,000)FY22

STP 035 0 00 0Other 01,021 0 00 0LN 023,390 0 00 0State 011,376 0 00 0EM 08,322 0 00 0SFTY 0919 0 00 0LC 06,000 0 00 0NHPP 08,498 0 00 0TAP 00 77 00 0EM 00 25,000 00 0LC 00 6,000 00 0NHPP 00 2,427 00 0LN 00 10,719 00 0State 00 15,313 00 0TAP 8140 0 00 0LC 6,0000 0 00 0State 41,4660 0 00 0LN 9,2210 0 00 0STP 5,7420 0 00 0LN 00 0 00 8758.3NHPP 00 0 00 3204LC 00 0 00 6000State 00 0 00 40801Other 00 0 00 915.4

108

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 2022MAPAControl No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Project No Improvement

Estimate ($1,000)FY22

State 014,468 0 00 0NHPP 030,396 0 00 0Local 010,591 0 00 0TAP 0313 0 00 0EM 017,369 0 00 0SFTY 014,474 0 00 0MAPA 020,908 0 00 0STP 0238 0 00 0MAPA 00 37,853 00 0Local 00 9,593 00 0NHPP 00 27,291 00 0TAP 00 150 00 0STP 00 2,334 00 0State 00 5,357 00 0Local 9,2940 0 00 0State 5,0190 0 00 0TAP 3,3640 0 00 0MAPA 15,1300 0 00 0STP 4,4440 0 00 0NHPP 19,0030 0 00 0Local 00 0 00 -3804.03MAPA 00 0 00 17187.53NHPP 00 0 00 6688TAP 00 0 00 1762State 00 0 00 1538

109

Nebraska's Statewide Transportation Improvement Program FY 2019 Thru FY 2022SIMPCOControl No

CountyLengthHwy Begin RP

Total Project Cost:

JurisdictionLocation:Detailed Termini:

Prev FY FY21FY19 FY20 Future FY

Project No Improvement

Estimate ($1,000)FY22

TAP 0214 0 00 0SFTY 030 0 00 0NHPP 07,448 0 00 0State 0830 0 00 0Local 062 0 00 0SFTY 00 30 00 0Local 00 8 00 0Local 80 0 00 0SFTY 300 0 00 0Local 00 0 00 7.5SFTY 00 0 00 30

110

FTA Program Description 2018-2019 2019-2020 2020-2021 2021-20225307 Congestion Mitigation (CMAQ) Statewide Vanpool Project

Third Party Contract Federal 123,600$ 152,640$ -$ -$ Local 30,900$ 38,160$ -$ -$

5310 Enhanced Mobility of Seniors and Individuals with DisabilitiesOperating Assistance Federal 5,000$ 10,000$ 10,000$ 10,000$

Capital, Vehicle Purchase, Replacement Vehicles Federal 1,300,000$ 650,000$ 650,000$ 650,000$ Local 325,000$ 162,500$ 162,500$ 162,500$

Capital, Vehicle Purchase, Expansion of Serivce Federal 125,000$ 135,000$ 135,000$ 135,000$ Local 31,250$ 33,750$ 33,750$ 33,750$

5309 RYDE Public Transportation, Vehicle Purchase Federal 300,000$ -$ Local 75,000$ -$

5311 Intercity Bus Federal 535,000$ 535,000$ 535,000$ 535,000$ State, 305 Program 535,000$ 535,000$ 535,000$ 535,000$

5311 Rural Transportation Assistance, Operating and CapitalOperating Assistance Federal 6,700,000$ 6,850,000$ 7,000,000$ 7,000,000$ Operating Assistance State, 305 Program 2,075,000$ 2,125,000$ 2,200,000$ 2,200,000$ Operating Assistance Local 2,075,000$ 2,125,000$ 2,200,000$ 2,200,000$

Capital, Replacement Vehicles Federal 300,000$ 300,000$ 300,000$ 300,000$ Capital, Replacement Vehicles Local 75,000$ 75,000$ 75,000$ 75,000$ Capital, Expansion of Vehicles Federal 125,000$ 125,000$ 125,000$ 125,000$ Capital, Expansion of Vehicles Local 31,250$ 31,250$ 31,250$ 31,250$

Capital Construction, Bus storage facilities Federal 300,000$ 600,000$ 600,000$ 600,000$ Capital Construction, Bus storage facilities Local 75,000$ 150,000$ 150,000$ 150,000$

Mobility Management Consultant Federal 180,000$ 180,000$ 180,000$ 180,000$ State Cash 45,000$ 45,000$ 45,000$ 45,000$

Statewide Transit Initiative, University of Nebraska Federal 1,123,000$ 1,200,000$ 1,105,000$ 1,155,000$ Statewide Transit Initiative, University of Nebraska State Cash 280,750$ 300,000$ 276,250$ 288,750$

Drug and Alcohol Compliance Federal 50,000$ 50,000$ 50,000$ 50,000$ 5311 Rural Technical Assistance (RTAP)

Nebraska Association of Transportation Providers Federal 58,000$ 58,000$ 58,000$ 60,000$ Training and Travel Federal 74,000$ 74,000$ 74,000$ 72,000$

5303/5304 Metropolitan Planning & Research Federal 565,000$ 565,000$ 565,000$ 565,000$ Local 141,250$ 141,250$ 141,250$ 141,250$

5339 Bus & Bus Facilities - Small Urban Federal 100,000$ 100,000$ 100,000$ 100,000$ Local 25,000$ 25,000$ 25,000$ 25,000$

5339 Bus & Bus Facilities - Large Urban Federal -$ -$ -$ -$ Local -$ -$ -$ -$

Transit