AWATEA ST- MUNGAVIN RD INTERSECTION N/A AS-003 COPYRIGHT This drawing, the design and concept, remain the exclusive property of Downer NZ Ltd and may not be used without approval. Copyright reserved. REVISION: 2 SHEET: 3 of 6 DWG #: 04-10-2019 DATE: SCAL E: DOWNER NZ Ltd 14 – 16 Makaro St, Porirua PO Box 50-465, Porirua Wellington NEW ZEALAND Issued - - - - - - Status FOR CONSULTATION - - - - - Surveyed Drawn Checked Approved Name C COVICH J. RING Date 15-10-2019 INTERSECTION OF AWATEA ST AND MUNGAVIN AVE APPLIES TO OPTIONS 1 AND 2 WIDEN ROAD: REMOVE EXISTING FOOTPATH, BERM, KERB AND CHANNEL SAW CUT EXISTING ROAD SEAL AND REMOVE APPROX 1.25m x 20m CONSTRUCT NEW PAVEMENT ON ADDITIONAL LANE WIDTH EXISTING NO-STOPPING LINES TO BE REINSTATED MOVE GIVE-WAY SIGN NEW DROP DOWN KERB AND TACTILES REFORM BERM AND CHANNEL PRAM CROSSING WITH TACTILES NEW FLUSH MEDIAN NEW LANE DIRECTION ARROWS AND GIVE WAY SYMBOLS CONSTRUCT NEW FOOTPATH 1.5M WIDE TIE IN TO EXISTING FOOTPATH NEW DROP DOWN KERB WITH TACTILES KEY EXISTING MARKINGS REMOVED NEW WHITE LINE MARKINGS NEW PRAM CROSSING SIGN RG17 NEW FOOTPATH TACTILES GIVE WAY SIGN

Upload: others

Post on 15-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INTERSECTION OF AWATEA ST AND MUNGAVIN AVE KEY€¦ · awatea st and mungavin ave applies to options 1 and 2 widen road: remove existing footpath, berm, kerb and channel saw cut existing

AWATEA ST- MUNGAVIN RD

INTERSECTION

N/A

AS-003

COPYRIGHTThis drawing, the design and concept, remain the exclus ive property of Downer NZ Ltd and may not be used without approval.

Copyright reserved. REVISION:

2SHEET:

3 of 6

DWG #:

04-10-2019

DATE:SCALE:DOWNER NZ Ltd14 – 16 Makaro St, PoriruaPO Box 50-465, PoriruaWellington NEW ZEALAND

Issued-

-----

StatusFOR CONSULTATION

-

----

Surveyed

Drawn

Checked

Approved

Name

C COVICH

J. RING

Date

15-10-2019

INTERSECTION OFAWATEA ST AND MUNGAVIN AVEAPPLIES TO OPTIONS 1 AND 2

WIDEN ROAD:REMOVE EXISTING FOOTPATH, BERM, KERB AND CHANNEL

SAW CUT EXISTING ROAD SEAL AND REMOVE APPROX 1.25m x 20mCONSTRUCT NEW PAVEMENT ON ADDITIONAL LANE WIDTH

EXISTING NO-STOPPING LINES TO BE REINSTATED

MOVE GIVE-WAY SIGN

NEW DROP DOWN KERB AND TACTILESREFORM BERM AND CHANNEL

PRAM CROSSING WITH TACTILES

NEW FLUSH MEDIAN

NEW LANE DIRECTION ARROWS AND GIVE WAY SYMBOLS

CONSTRUCT NEW FOOTPATH 1.5M WIDETIE IN TO EXISTING FOOTPATH

NEW DROP DOWN KERB WITH TACTILES

KEY

EXISTING MARKINGS REMOVED

NEW WHITE LINE MARKINGS

NEW PRAM CROSSING

SIGN RG17

NEW FOOTPATH

TACTILES

GIVE WAY SIGN

Page 2: INTERSECTION OF AWATEA ST AND MUNGAVIN AVE KEY€¦ · awatea st and mungavin ave applies to options 1 and 2 widen road: remove existing footpath, berm, kerb and channel saw cut existing

AWATEA ST – ARAWHATA ST

INTERSECTION

N/A

AW-004

COPYRIGHTThis drawing, the design and concept, remain the exclus ive property of Downer NZ Ltd and may not be used without approval.

Copyright reserved. REVISION:

1SHEET:

4 of 6

DWG #:

04-10-2019

DATE:SCALE:DOWNER NZ Ltd14 – 16 Makaro St, PoriruaPO Box 50-465, PoriruaWellington NEW ZEALAND

Issued11-10-2019

-----

StatusFor consultation only

-

----

Surveyed

Drawn

Checked

Approved

Name

C COVICH

J. Ring

Date

04-10-2019

04-10-2019

B C

AW

ATEA

ST

TURN TRAFFIC PERPENDICULAR TO AWATEA ST

TURN THE TRAFFIC PERPENDICULAR TO AWATEA ST

MOVE THE LIMIT LINE FURTHER OUT TO IMPROVE VISIBILITY DOWN AWATEA ST IN BOTH DIRECTIONS

USE EDGE LINES AND NEW CENTRELINE TO REDEFINE THE TRAFFIC LANE, SHIFTING BOTH LANES OF AWATEA ST TRAFFIC TOWARD THE WEST

KEY

EXISTING MARKINGS REMOVED

NEW WHITE LINE MARKINGS

NEW TRAFFIC ISLAND

SIGN RG17

IMPROVED DRIVER SIGHT LINES

CRITICAL DRIVER SIGHT LINE, IMPROVED BUT STILL LIMITED BY TREE

INTERSECTION OFAWATEA ST AND ARAWHATA ST

DRIVER S VIEW OF IMPROVED LAYOUTHEADING SOUTH ON AWATEA ST, APPROACHING ARAWHATA ST INTERSECTION

APPLIES TO OPTIONS 1 AND 2

Page 3: INTERSECTION OF AWATEA ST AND MUNGAVIN AVE KEY€¦ · awatea st and mungavin ave applies to options 1 and 2 widen road: remove existing footpath, berm, kerb and channel saw cut existing

AWATEA ST

OPTION 2

ISLAND CHICANES LAYOUT

N/A

AS-009

COPYRIGHTThis drawing, the design and concept, remain the exclus ive property of Downer NZ Ltd and may not be used without approval.

Copyright reserved. REVISION:

2SHEET:

2 of 6

DWG #:

06-11-2019

DATE:SCALE:DOWNER NZ Ltd14 – 16 Makaro St, PoriruaPO Box 50-465, PoriruaWellington NEW ZEALAND

Issued06-11-2019

-----

StatusFor consultation only

-

----

Surveyed

Drawn

Checked

Approved

Name

C COVICH

J RING

Date

06-11-2019

06-11-2019

B

22a

24

26b

28

30

23

25

27

29

C

NEW CHICANE

EXISTING NO-PARKING LINES

PROPOSED INTERSECTION DESIGN

A

NEW CHICANE

10

8

A

C

BNEAR NUMBER 14

NEAR THE SCHOOL AND KINDRGARTEN ENTRANCE

EXISTING PRAM CROSSING

NEAR NUMBER 10

CAN TIE-IN WITH THE PROPOSED INTERSECTION DESIGN

NEAR NUMBER 28

AWATEA ST OPTION 2 – ISLAND CHICANES