Page 1: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

Long Baseline Neutrino Facility, DUNE & CERN Neutrino Platform

Document EDMS identifier: Fermilab LBNF DocDB: Created:

Last Modified: Rev. No.: 1.0

https ://edms.cern.ch/document/

Page 2: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

History of Changes

Date Version Changes/Comments Authors

SP Detector#1 Installation PLANAbstract

The installation process for the DUNE detector module #1 is described.

Prepared by:

B. Miller, U. of Minnesota

J. Freitag FNAL

J. Stewart, BNL

Checked by: To be approved by:

Distribution List

Page 3: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

1 First draft

Page 4: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

EDMS : TBD

Page: 4 of 21

Table of Contents

1 INTRODUCTION..........................................................................................................

2 UNDERGROUND CONDITIONS AT THE START OF DETECTOR

INSTALLATION...................................................................................................................

3 INSTALLATION ASSUMPTIONS................................................................................

4 CRYOGENIC INSTRUMENTATION INSTALLATION.................................................

4.1 Scissor lift installation.............................................................................................

4.2 Install instrumentation behind the east end wall..................................................

5 EAST END WALL INSTALLATION.............................................................................

5.1 Prepare for EW installation.....................................................................................

5.2 Install EW Panel #2..................................................................................................

5.3 Install EW Panel #3..................................................................................................

5.4 Install CPA/FC row 1 N............................................................................................

5.5 Install CPA/FC row 1 S............................................................................................

5.6 Install the HVFT........................................................................................................

Page 5: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

EDMS : TBD

Page: 5 of 21

5.7 Prepare for EW panel 1 and 2 installation.............................................................

5.8 Install EW Panel #1..................................................................................................

5.9 Install EW Panel #4..................................................................................................

5.10 East end wall testing...............................................................................................

6 APA INSTALLATION.................................................................................................10

6.1 APA rotation and mounting on Cart.....................................................................10

6.2 PD integration........................................................................................................10

6.3 Position B-APA for assembly...............................................................................10

6.4 Position T-APA for assembly................................................................................10

6.5 Connect top and Bottom APA to Form a Doublet...............................................11

6.6 Prepare doublet for Cabling..................................................................................11

6.7 Move doublet to station 2......................................................................................11

6.8 Insert CE Cables and cable trays.........................................................................11

6.9 Cable management................................................................................................12

6.10 Test electronics and prepare cold test................................................................12

Page 6: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

EDMS : TBD

Page: 6 of 21

6.11 Move APA to Coldbox...........................................................................................12

6.12 Cold test APA.........................................................................................................12

6.13 Move APA to Cryostat Entrance...........................................................................12

6.14 Move APA into Cryostat........................................................................................12

6.15 Move APA into Position........................................................................................13

6.16 Connect APA cables to CE crosses.....................................................................13

7 CPA/FC ASSEMBLY INSTALLATION......................................................................14

7.1 Assemble CPA panel#1.........................................................................................14

7.2 Assemble CPA panel#1.........................................................................................14

7.3 Prepare CPA module for FC installation..............................................................14

7.4 Install Bottom FC Module (BFC)...........................................................................14

7.5 Install Top FC module...........................................................................................14

7.6 Install CPA/FC in cryostat.....................................................................................14

8 UPPER GROUND PLANE INSTALLATION..............................................................15

8.1 Install the transverse GP support beams............................................................15

Page 7: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

EDMS : TBD

Page: 7 of 21

8.2 Install GP modules on the CPA............................................................................15

8.3 Deploy GP modules...............................................................................................15

9 FC DEPLOYMENT.....................................................................................................15

9.1 Prepare FC top modules for deployment............................................................15

9.2 Deploy FC module pair..........................................................................................15

9.3 Remove hoisting equipment.................................................................................15

9.4 Prepare bottom FC modules for deployment......................................................15

9.5 Deploy bottom FC modules (Note: This step needs to be done

simultaneously on both BFC modules connected to the same CPA).........................15

10 WEST END WALL INSTALLATION (NOTE: AFTER APA/CPA ROW 25 IS

COMPLETE BUT BFC MODULES ARE NOT DEPLOYED).............................................16

10.1 Construct EW panel#1 module 1-5.......................................................................16

10.2 Construct EW panel#2 module 1-5.......................................................................16

10.3 Deploy BFC module and install lower EW panel................................................16

11 ANNEXES..................................................................................................................17

Page 8: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

EDMS : TBD

Page: 8 of 21

1 IntroductionThis document describes the installation process for the first DUNE detector module. The first detector module is a single-phase TPC with integrated photon detection.

Figure 1: 3-D model of the installation area outside the cleanroom during APA installation.

2 Underground Conditions at the Start of Detector Installation

● Cryostat status at the start of installation

o The cryostat is leak tested and clean.o Cryogenic internal piping is completeo The temporary floor inside the cryostat is installed o Internal cryostat lighting is functionalo Temporary power inside the cryostat is availableo The HVAC is operating according to ISO-14644/ISO-8.o The inside of the cryostat has passed cleanroom inspection

Requires particle count survey is done, air velocity OK, and all procedures are in place.o The outer cleanroom may not be fully operational at the start and a temporary tent outside the TCO

may be needed initially. o The inside of the cryostat may be used for clean assembly space.

Page 9: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

EDMS : TBD

Page: 9 of 21

● DSS status at the start of installation

o The DSS is installed during cryostat installation. This will allow the use of the scaffolding needed to install the membrane for installing the DSS.

o The DSS will be surveyed in position and the feedthroughs adjusted.o The DSS support flanges will be tight and leak tested.o The shuttle system will be fully commissioned

● The DAQ has installed and tested a portion of the final system including the racks for rows 1 and row 24 and 25

o Row 1 will be the first installed.o Rows 24 and 25 will supply power to the TPC readout electronics for the cold boxes.o DAQ installation and testing will proceed in parallel to the detector installation.

● All CE crosses and WEC are installed prior to start of TPC installation.

o The flanges are closed and light tight. Rubber seals are installed where the flanges will need opened during installation. The CE components are clean.

● Slow control monitoring is debugged and operational

● Detector Safety System is operational

● The cryostat/detector ground monitoring is functional

3 Installation AssumptionsThe list of assumptions summarizes the fundimental decision upon which the installation plan is based. Changing any of the assumptions will have significant impact on the installation schedule, underground occupancy, and risks.

o APA doublets are tested using 3 cold boxes underground immediately outside the cryostat.o The area outside the cleanroom is used to store 1 month of materials.o The assembly area outside the cryostat and the inside of the cryostat meet the ISO-8 cleanroom

requirements according to ISO-14644.o The PD modules can be inserted into the sides of the APA though pre-installed conduits.o The APA wire tension measurement is performed on the assembly tower after the doublet is assembled.o The APS transport boxes are rotated into vertical orientation, placed on a custom cart, and the outer

covers are removed in the cavern area. The APA protective plastic bags are removed in the SAS.

o Photon detector module scanning is performed in the cleanroom.

Page 10: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

EDMS : TBD

Page: 10 of 21

o The detector installation is considered part of the underground construction process and the cleanroom is considered a temporary construct needed only during installation.

4 Cryogenic instrumentation Installation4.1 Scissor lift installation1. Crane Scissor lifts into the cryostat

4.2 Install instrumentation behind the east end wall5 East End Wall Installation

5.1 Prepare for EW installation2. Install temporary EWFC support beams with winches over the CPA and APA DSS beams.

5.2 Install EW Panel #23. Move a cart with 6 end wall modules to the TCO area4. A cart with 6 end walls modules is moved in front of the TCO pedestal 5. A forklift is used to lift the cart onto the pedestal and the cart is wheeled into the cryostat6. Lower hoist cable and connect to the top EW panel7. Lift the top most EWFC module under the support beam 2+m above the floor, 8. Connect the 2nd EWFC module to the top module and lift both up 2m, 9. Connect the 3rd EW module to the first two and lift 2m, 10. Install module 411. Install module512. Install module 6

5.3 Install EW Panel #313. Repeat steps 5 to 14

5.4 Install CPA/FC row 1 N14. Install CPA/FC row 1 north unit

5.5 Install CPA/FC row 1 S15. Install CPA/FC row 1 south unit

5.6 Install the HVFT16. Install the HV cups on the row 1 CPAs from inside the TPC over the lowered EWFC stacks 17. Install the HVFT

5.7 Prepare for EW panel 1 and 2 installation18. Move scissor lift from behind EW19. Remove the floor behind the east end wall.

Need to install the first CPAs and the HV feedthrough before the EW goes in

Page 11: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

EDMS : TBD

Page: 11 of 21

20. Clean area behind the EW as it is not accessible after EW is installed.21. Raise the EWFC panel#1 to designed height. Transfer their weight to the final EWFC support structure.22. Connect the EWFC Panel#1 RDBs to the CPA. Install the guiding plates between the EWFC and the CPA23. Raise the EWFC panel#2 to designed height. Transfer their weight to the final EWFC support structure.24. Connect the EWFC Panel#2 RDBs to the CPA. Install the guiding plates between the EWFC and the CPA

5.8 Install EW Panel #125. Repeat steps 3-12 for Panel #1

5.9 Install EW Panel #426. Repeat steps 3-12 for Panel #1

5.10 East end wall testing27. Verify electrical connections by measuring the current flowing through the EWFC with a small bias on

the HVFT.

6 APA Installation6.1 APA rotation and mounting on Cart28. Move APA transport box to rotation location under monorail 29. Move vertical cart to rotation area30. Rig APA transport box for rotation31. Rotate transport box32. Bolt transport box to vertical cart33. Remove covers and outer frame34. Move APA to SAS 35. Wait for air to clean and dust everything36. Remove outer bags and dispose

6.2 PD integration37. Move transport cart to PD integration area 38. Test electrical connections39. Install lower PD modules40. Install PD installation tooling41. Move lifts into position42. Install upper PD modules and top t-brackets 43. Test PD connections44. Remove insertion tooling

How do we access the electrical connections for the PD? Do we need a small one person lift on a short raised-platform/shelf behind the APA cart for this? We can use this to install the top t-brackets.

Can we use only one scissor lift for the insertion of the modules and move it from side to side?

Need PD tool concept.

Page 12: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

EDMS : TBD

Page: 12 of 21

6.3 Position B-APA for assembly45. Move APA from PD assembly area46. Open bridges and drop hoist47. Connect B-APA lifting fixture to hoist and raise48. Adjust APA cart and insert lifting fixture into foot tube 49. Free B-APA from frame50. Hoist B-APA to top level and shift to connect rails51. Shift B-APA to station 152. Move hoist to station 153. Lower B-APA and lock in position54. Test actuator and positioning pins while hoist if connected.55. Free and lift B-APA lifting fixture56. Move hoist to lifting station and shift beam to lifting location57. Lower host and remove B-APA fixture

6.4 Position T-APA for assembly58. Connect trollies and Yoke (40lb?) to hoist and beam. 59. Raise hoist and connect yoke to the T-APA60. Free T-APA from transport box61. Hoist APA to top level and shift to connect rails62. Shift T-APA to station 163. Close bridges 64. Lock T-APA in position

6.5 Connect top and Bottom APA to Form a Doublet65. Insert linkage to top APA66. Raise B-APA to 234mm position67. Connect PD cables and test68. Raise bottom APA to nominal height69. Bolt upper and lower APA together70. Retract actuator71. Measure top-bottom isolation72. Short top and bottom APA and check impedance.

6.6 Prepare doublet for Cabling73. Test Wire tension 74. Crane pallet of CR boards and FEMB to top level and move pallet of CR+FEMB to bottom level75. Insert CR boards76. Mount remaining omega brackets77. Mount cable harnesses for PD, Bias, and grounding 78. Mount FEMB79. Test FEMB

Page 13: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

EDMS : TBD

Page: 13 of 21

6.7 Move doublet to station 280. Free APA pair on station 181. Move APA pair to station 282. Lock APA pair in place on station 2 83. Crane pallet with 2 reels of CE cable to the top level

6.8 Insert CE Cables and cable trays84. Transfer cable#1 to deployment spool85. Connect cable guide to cable86. Remove I-Beam over cable#1 path87. Lower cable through tube88. Re-install I-Beam above cable#189. Transfer cable#2 to deployment spool90. Connect cable guide to cable 91. Remove I-Beam over cable#2 path92. Lower cable through tube93. Re-install I-Beam over cable#294. Connect lower cables to the FEMB95. Connect bottom protection cover96. Mount lower latches 97. Mount cable trays to top of APAs 98. Install PD cables99. Crane pallet with cables 3 and 4 to the top level100. Lay cable 3 in the cable tray and connect cables101. Lay cable 4 in the cable tray and connect cables

6.9 Cable management102. Lay cables 1 and 2 into cable trays 103. Arrange cables 3 and 4 in the cable trays

6.10 Test electronics and prepare cold test

104. Test FEMB and cables105. Test PD cables 106. Test Bias connections107. Remove protective panels108. Photogrammetry/Survey

6.11 Move APA to Coldbox109. Open Cold box door110. Move APA in front of cold box111. Connect splice I-Beam

Need to confirm latches can be mounted on the towers. Check clearances

The optimum time to install the cable trays needs to be determined.

Possible this is better done before cables installed have to seeThe PD cable installation process is not known yet and needs determined.

Use hoist to secure heavy structural protection panels

Insert survey points into M10 RivNuts

Move to under crane shuttle beam and secure bottom of APA Double for photogrammetry and survey.

Do survey and photogrammetry

Page 14: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

EDMS : TBD

Page: 14 of 21

112. Move APA into Cold box113. Remove Splice beam114. Connect CE and PD cables115. Close cold box door116. Warm Test electronics and PD

6.12 Cold test APA117. Purge air from cold box118. Cool down APA119. Run Electronics tests120. Warm up APA121. Purge cold box with air

6.13 Move APA to Cryostat Entrance122. Open Cold box door123. Disconnect cables124. Move transport beam to crawler parking position and connect crawler to APA.125. Move transport beam into location126. Insert splice beam127. Move APA into transport beam128. Remove splice beam129. Move APA to TCO beam

6.14 Move APA into Cryostat130. Connect grounds between TCO beam and cleanroom switchyard beam. Disable ground alarm.131. Connect transport beam to TCO beam132. Move DSS switchyard beam to align with TCO beam.133. Connect DSS switchyard to TCO134. Move APA onto cryostat and onto the DSS switchyard.135. Lock APA into position136. Move beam crawler power into cryostat137. Disconnect Cleanroom and DSS switchyards from the TCO138. Re-enable the ground monitor

6.15 Move APA into Position139. Translate DSS switchyard beam to correct row.140. Connect Switchyard to DSS beam141. Remove APA stop on the east end142. Remove cryostat floor panel below where APA will be located143. Push APA into position 144. Position Scissor lift for cabling145. Connect APA center mount to the DSS beam146. Disconnect the beam crawler and back it out to the switchyard

Page 15: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

EDMS : TBD

Page: 15 of 21

147. Ground APA to DSS beam148. Remove trollies from the APA149. Move DSS Switchyard beam to TCO area

6.16 Connect APA cables to CE crosses150. Remove floor tiles on cryostat roof near CE cross151. Position clean tent over CE cross and filter air152. Mount Flange extraction tooling on CE cross153. Remove PD flange, extract WIEC crates, mount Cu seal to WEIC flange154. Drop fish through CCT155. Prepare strain relief plate inside crystat for cabling156. Connect fish to PD cable bundle and lift through the CCT157. Clamp PD bundle at CCT flange and temporarily hold PD bundle in location158. Drop fish through CCT and connect to CE cable bundle #1159. Draw CE cable bundle 1 through CCT, clamp bundle at CCT flange160. Clamp cables to WEIC strain relief bracket. 161. Connect cable to feedthru flange162. Test CE FEMB attached to cable bundle #1163. Repeat steps for cable bundles 2-4164. Close WEIC flanges165. Test Electronics on CE cross166. Position Cu seal on cross for PD flange167. Connect PD cables to PD flange168. Sit PD flange in position169. Test PD electronics170. Seal flanges on CE cross and leaktest

7 CPA/FC Assembly Installation7.1 Assemble CPA panel#1171. Remove bottom CPA unit (4m) from crate and attach to assembly tower. 172. Remove middle CPA unit from crate and attach to assembly tower, make electrical connections between

units, join HV bus segments if applicable.173. Remove top CPA unit and attach to assembly tower, make electrical connections between units, join HV

bus segments if applicable.174. Transfer the CPA panel 1 to the TCO beam. Remove top lifting shackles.

7.2 Assemble CPA panel#1175. Repeat above 4 steps to build the second CPA panel and raise to TCO beam.

Page 16: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

EDMS : TBD

Page: 16 of 21

7.3 Prepare CPA module for FC installation176. Connect the HV bus on top and bottom of the CPA plane. Connectivity check, clean.177. Route PD diffuser fibers between the diffusers and the connectors on the top edge of the CPA.

7.4 Install Bottom FC Module (BFC)178. Lift one BFC module 179. connect it to the CPA on the bottom hinges. 180. Temporarily secure the BFC module to the CPA. 181. Make RDB connection to the FSS.182. Connect the second BFC module to the CPA hinges183. Make RDB connection to the FSS.184. Tie both BFCs together in the folded-up position

7.5 Install Top FC module185. Lift one TFC module using a temporary lift bar on the FC, 186. connect it to the CPA hinges, 187. remove the lift bar, 188. make electrical connections between TFC and FSS189. Lift the second TFC module190. Connect it to the CPA hinges, 191. Make electrical connections.

7.6 Install CPA/FC in cryostat192. Move the CPA/FC assembly into the cryostat,193. Lock the CPA trolleys to the DSS beam.194. Make electrical interconnect between the HV bus segments on each CPA plane. 195. (PDS/TC) connect the optical fibers on top of the CPA to the pre-routed fibers leading to the

feedthroughs. 196. Check connection using visible light through the fibers.

8 Upper ground plane installation

8.1 Install the transverse GP support beams 197. Support beams are installed between the DSS CPA and APA beams. The timing of this step is flexible: this

can be done anytime after the DSS beams are installed and before the FC deployment. 100 beams are installed. How many can be done in a 10hr shift?

8.2 Install GP modules on the CPA.198. Raise a GP module and attach it to the transverse GP support beams on the CPA side only and let it hang

vertically. 199. Connect the GP monitoring cables to the GP module.

Page 17: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

EDMS : TBD

Page: 17 of 21

200. Install temperature sensors and connect them to pre-routed cables before GP deployment.

8.3 Deploy GP modules201. After the CE cable routing through the CE FT ports, and before the FC deployment, rotate the GP module

and lock it to the APA side of the transverse beams.

9 FC Deployment9.1 Prepare FC top modules for deployment 202. Mount the TFC deployment winch bars to the transverse GP support beams. 203. Install the temporary lift bar to the TFC riser blocks. 204. Tie rope between the winch and the lift bar.

9.2 Deploy FC module pair205. Rotate this TFC using the winches until it engages with the top APA latches. 206. Connect the FC termination cable to the FC termination filter board on the riser block. 207. Verify termination resistances.

9.3 Remove hoisting equipment208. Remove the rope, lift bar, and the FC deployment winch bar

9.4 Prepare bottom FC modules for deployment209. Install the BFC deployment winch bar to the pair of deployed TFCs near the CPA.210. Install the BFC lift bars to the APA ends of the BFC pair. 211. Tie ropes between the winch bars and the lift bars.212. Remove the floor under this two BFC modules 213. Clean the cryostat floor.

9.5 Deploy bottom FC modules (Note: This step needs to be done simultaneously on both BFC modules connected to the same CPA)

214. Tension the ropes between the BFC and the winch bar.215. Loosen the ties holding the BFC to the CPA. 216. Slowly release the ropes to lower the BFCs in a symmetric fashion until engaged to the APA bottom

latches. 217. Connect the bottom FC termination cable to the termination filter board on the BFC’s riser block. 218. Verify connections.219. Remove ropes, lifting bars on the BFCs, and the deployment winches on the TFCs.

Page 18: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

EDMS : TBD

Page: 18 of 21

10 West End Wall Installation (Note: After APA/CPA row 25 is complete but BFC modules are not deployed)

10.1 Construct EW panel#1 module 1-5 220. Repeat Steps 2-11

10.2 Construct EW panel#2 module 1-5221. Repeat Steps 2-11

10.3 Deploy BFC module and install lower EW panel222. Remove the floor under the BFC modules223. Clean the membrane.224. Attach the #6 EWFC modules using two step ladders over the membrane floor. 225. Raise the entire 6U stack for people to exit the TPC. 226. Lower it back as much as one can to leave room on the top.227. Deploy the 2 BFC modules on both sides of the CPA in a symmetric fashion using the winches attached to

the TFC modules through the gaps between the lowered EWFC stacks and the TFC modules.228. Remove the winch bars on the TFCs. 229. Raise the EWFC stacks to designed height. 230. Transfer weight of the EWFC modules to the final EWFC support points.231. Connect the BFC termination cables. Verify connection232. Unlock and rotate the FC profiles on the side of the CPA units to make electrical connection between the

EWFC RDBs to the HV bus. 233. Connect the EWFC guiding plates to the CPA and APAs at mid height and bottom. 234. Restore the profiles in final positions. 235. Connect the EWFC termination cables to the EWFC termination boards.236. Install the HV cup to the CPA.

Page 19: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

EDMS : TBD

Page: 19 of 21

11 Annexes

1- Underground 2 detectos layout

2- ProtoDUNE cryostat top example

Page 20: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

EDMS : TBD

Page: 20 of 21

3- Clean rooms layout

Page 21: Introduction - INDICO-FNAL (Indico)€¦ · Web viewThe HVAC is operating according to ISO-14644/ISO-8. The inside of the cryostat has passed cleanroom inspection Requires particle

EDMS : TBD

Page: 21 of 21