INTRODUCTION TO

KUALA LUMPUR INTERNATIONAL AIRPORTS (KLIA)

Page 3: introduction to klia

OBJECTIVESOn completion of the training program,

participants will be able to:-

Acquire in-depth knowledge of KLIA

Understand the basic concepts of KLIA

Gain insights into the layout and development of KLIA

Page 4: introduction to klia

ACCESS TO KLIA

Page 5: introduction to klia
Page 6: introduction to klia

DEVELOPMENT PHASE

PHASE 1 (1998-2008) 25 million passengers per annum

PHASE 2 (2008-2015) 35 million passengers per annum

PHASE 3 (2015-2020) 45-60 million passengers per annum

NEXT PHASE (beyond 2020) 100 million passengers per annum

Page 7: introduction to klia

Runway 1

Runway 2

Runway 3

Runway 5

Runway 4

5 RUNWAYS (KLIA MASTERPLAN)

Page 8: introduction to klia

AIRLINES AT KLIA

Total : 48 (Passenger & Cargo)

Page 9: introduction to klia

Both MAS and KLAS are the 2 ground handlers and cargo terminal operators for KLIA

GROUND HANDLERS AT KLIA

MAS KLAS

Page 10: introduction to klia

GOVERNMENT AGENCIES IN KLIA

Department of Civil AviationsDepartment – ImmigrationDepartment – Royal CustomDepartment – Royal PoliceDepartment – HealthDepartment - PharmacyDepartment – MeteorologicalDistrict Fire & Rescue Services – SepangQuarantine – AnimalsQuarantine – FisheriesQuarantine – Plants

Page 11: introduction to klia

“Airport in the forest, forest in the airport”

DESIGN THEME

Page 12: introduction to klia

Total Floor Area = 479,404sqm

Main Terminal Building = 241,000sqm

Contact Pier = 95,000sqm

Satellite = 143,404sqm

Passenger Comfort Level = 55sqm per peak hour passenger

Peak hour passengers = 7,130 passengers (two-way)

SPACE UTILISATION

Page 13: introduction to klia

5 levels

Level 1 – Tour Buses

Level 2 – Link To Parking, Hotel & Food Court

Level 3 – Arrival Area

Level 4 – Airline Offices

Level 5 – Departure Area

MAIN TERMINAL BUILDING

Page 14: introduction to klia

3 Levels Level 1 – Ground Handling & BHS servicesLevel 3 – Domestic Arrivals & DeparturesLevel 4 – International Arrivals & Departures

Aerotrain Station18 Immigration Trans-border Counters6 Custom Trans-border CountersAirline Transfer CounterBus Lounges

CONTACT PIER

Page 15: introduction to klia

26 Gates International Arrivals and DeparturesDuty Free & Specialty shopsAirline LoungesF & B AreaTransfer CountersAirside Transit HotelBusiness CentresAerotrain StationBus Lounges

SATELLITE

Page 16: introduction to klia

RUNWAY

Two runways (4,000m x 60m)

Terminal, apron and support facilities located between runways

Parallel - 2.5km apart- capable of:• up to 70 movements/hour

(mixed mode independent operations )

Flexible bitumen except 270m. at both end concrete pavement

Grooved for :• additional friction• drain off water

AFRS - ICAO Category 9

1 main fire station + 1 sub station

Page 17: introduction to klia

Main Terminal/Contact Pier:20 aerobridge stands23 remote stands next to the MTB1 VVIP remote stand

Satellite Building:26 aerobridge stands15 remote stands

Remote Bays:21 stands

Integrated facilities:potable water supply400Hz powerpre-conditioned airglass wall

PARKING BAYS AND FACILITIES

Page 18: introduction to klia

34km of conveyor length

2 main sorters

4 final sorters

24 breakdown conveyors

12 reclaim conveyors

4 Out Of Gauge (OOG) conveyors

Baggage reclaims

International 9 + (1)

carousels

Domestic 2 + (1)

carousels

BAGGAGE & SECURITY SYSTEM

Page 19: introduction to klia

Managed by Department of Civil Aviation.Facilities:

terminal area radarsurface movement radarautomatic terminal information service

Servicesaerodrome controlsurface movement control

Air Traffic Control Tower

AIR TRAFFIC SERVICES

Page 20: introduction to klia

KLIA Total Airport Management System (TAMS), integrates all Airport Systems and function to enhance operational efficiency

Making KLIA the first totally integrated airport in the world

Centralized information system for management of

* Facilities* Human* Financial* Information asset

TAMS

Page 21: introduction to klia

TAMS INTEGRATION

42 Systems

Page 22: introduction to klia

Airside Transit Hotel –

Located at gate C5 of the Satellite building

80 rooms.

Pan Pacific Hotel -

Located 5 mins. Walk from the Airport through Link Bridge.

441 rooms

Facilities provided;

– business center

– health and fitness center

– shower facilities

HOTELS

Page 23: introduction to klia

Commercial Operations : 19 April, 2002Type of Services : KLIA Ekspress & KLIA TransitJourney Time KLIA to City Air Terminal (KL Sentral) : 28 minutes

EXPRESS RAIL SERVICE

Page 24: introduction to klia

A380 OPERATIONS

Page 25: introduction to klia

Designated A380 Gates

C17

C27

C37

Page 26: introduction to klia

Commencement of work : Jun 2005

Total Area : 28,000sqm

Capacity : 10million

Parking Bay : 30 bays

Operational : Expected March 2006

LOW COST CARRIER TERMINAL (LCC)

Page 27: introduction to klia

Check-In Counters – 72 Counters

Centralized Security Screening Machines – 9 sets

Immigration Counters – 24 Counters 12 for arrival / 12 for departure

Baggage Carousels – 5 3 - Domestic Arrival Hall 2 - International Arrival Hall

Transportation of Transit Passengers Shuttle buses will be provided to ferry passengers from KLIA to LCC and

vice-versa

LOW COST CARRIER TERMINAL (LCC)

Page 28: introduction to klia

LOW COST CARRIER TERMINALOVERALL PLAN

Page 29: introduction to klia

Public route Airside transfer Shuttle to/from MTB to LCT

TRAFFIC FLOW

Page 30: introduction to klia