THE SITE IS CLEAREDTHE SITE IS CLEARED
![Page 2: Introduction to Setting Out a Building](https://reader035.vdocument.in/reader035/viewer/2022081416/58798a6a1a28ab6c358b74ab/html5/thumbnails/2.jpg)
MARKING OUT THE SITEMARKING OUT THE SITEOnce the topsoil has been removed (and levels reduced if necessary), the foundation can be set-out by surveyors or engineers. The graphic on the left shows the foundation plan superimposed over the site.
The line of the foundations can be highlighted using hydrated lime - here the trench centre line is being marked. On some sites you will find both sides of the trench marked. Digger buckets are available in various widths to suit specific trenches.
![Page 3: Introduction to Setting Out a Building](https://reader035.vdocument.in/reader035/viewer/2022081416/58798a6a1a28ab6c358b74ab/html5/thumbnails/3.jpg)
ESTABLISH AND TRANSFER SITE DATUMESTABLISH AND TRANSFER SITE DATUM
Normally found on numerous public buildings, usually incised into walls.
Ordnance Survey Bench Mark
(O.B.M.) (T.B.M)
![Page 4: Introduction to Setting Out a Building](https://reader035.vdocument.in/reader035/viewer/2022081416/58798a6a1a28ab6c358b74ab/html5/thumbnails/4.jpg)
TRANSFERRING LEVELSTRANSFERRING LEVELS
Always reverse straight edge and level together
![Page 5: Introduction to Setting Out a Building](https://reader035.vdocument.in/reader035/viewer/2022081416/58798a6a1a28ab6c358b74ab/html5/thumbnails/5.jpg)
SETTING OUTSETTING OUT
![Page 6: Introduction to Setting Out a Building](https://reader035.vdocument.in/reader035/viewer/2022081416/58798a6a1a28ab6c358b74ab/html5/thumbnails/6.jpg)
CHECKING FOR SQUARECHECKING FOR SQUARE
![Page 7: Introduction to Setting Out a Building](https://reader035.vdocument.in/reader035/viewer/2022081416/58798a6a1a28ab6c358b74ab/html5/thumbnails/7.jpg)
![Page 8: Introduction to Setting Out a Building](https://reader035.vdocument.in/reader035/viewer/2022081416/58798a6a1a28ab6c358b74ab/html5/thumbnails/8.jpg)
POSITION PROFILESPOSITION PROFILES
Boning Rods Datum
Temporary Bench Mark
![Page 9: Introduction to Setting Out a Building](https://reader035.vdocument.in/reader035/viewer/2022081416/58798a6a1a28ab6c358b74ab/html5/thumbnails/9.jpg)
POSITION CORNER PROFILESPOSITION CORNER PROFILES
![Page 10: Introduction to Setting Out a Building](https://reader035.vdocument.in/reader035/viewer/2022081416/58798a6a1a28ab6c358b74ab/html5/thumbnails/10.jpg)
CHECK THE DIAGONALSCHECK THE DIAGONALS
![Page 11: Introduction to Setting Out a Building](https://reader035.vdocument.in/reader035/viewer/2022081416/58798a6a1a28ab6c358b74ab/html5/thumbnails/11.jpg)
SETTING OUT WALLINGSETTING OUT WALLING
![Page 12: Introduction to Setting Out a Building](https://reader035.vdocument.in/reader035/viewer/2022081416/58798a6a1a28ab6c358b74ab/html5/thumbnails/12.jpg)