investor presentation (q1 fy19) aug 18 · 2019-10-22 · project cost-rs. 500 cr ... promoters...

21
Cochin Shipyard Limited Investor Presentation (Q1 FY19) – Aug 18

Upload: others

Post on 11-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

Cochin Shipyard Limited Investor Presentation (Q1 FY19) – Aug 18

Page 2: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

REVENUE MIX (Rs Cr.)

Quarterly Performance

Particulars (Rs. Cr) FY 19 Q1 FY 18 Q1 YoY %

FY 18 Q4

Shipbuilding 454.39 398.25 14% 503.53

Ship Repair 204.34 158.00 29% 97.07

Turnover 658.73 556.25 18% 600.60

Other Income 57.58 38.81 48% 38.09

Total Income 716.31 595.06 20% 638.69

Page 3: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

HIGHLIGHTS: FY19 – Q1 SHIP BUILDING

Block fabrication of 1200 Pax cum 1000 Tonne Cargo vessels (2 nos) in advanced stages. Block erection to commence by Oct 2018.

Commenced Block erection of 500 Pax cum 150 T Cargo vessels (2 nos) for A&N Administration on 28 April 2018. Project at advanced stages. Scheduled for launching by end Sep 2018.

Page 4: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

HIGHLIGHTS: FY19 – Q1 SHIP BUILDING

Secured order for construction of 10 nos. Ro-Ro and Ro Pax vessels for Inland Waterways Authority of India (IWAI) @ Rs. 102 Crores.

Steel cutting ceremony for the vessels held on 10 Aug 18.

Other vessels

Outfitting of equipments, pipes and electrical systems progressing onboard IAC. Trials commenced.

Jobs onboard Technology Demonstration Vessels progressing.

Works progressing on Fishing vessels

Page 5: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

HIGHLIGHTS: FY19 – Q1 SHIP REPAIR

53 vessels handled since April 2019.

20 vessels are undergoing repairs presently at CSL.

INS Vikramaditya docked for refit. Project cost-Rs. 500 Cr. approx. Vessel repairs progressing on schedule.

Other Defence vessel of order value of Rs. 100 Cr. Approx. Undergoing repairs at CSL.

Repairs progressing onboard MODU Sagar Bhushan of ONGC. Scheduled Delivery – Nov 2018.

Page 6: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

ORDERBOOK – UPDATE (as on 13 Aug 18)

* Doesn’t include Coastal Security boat for MHA

Sl. No.

Project Total No. of Vessels

Total Value (INR Cr.)

Balance orders in hand (INR Cr.)

1 Indigenous Aircraft Carrier for Indian Navy 1 2848.00 616.00

2 Technology Demonstration Vessel for DRDO 1 365.00 142.00

3 500 Pax cum 150 Ton Cargo Vessels for A&N Administration

2 474.78 322.85

4 1200 Pax cum 1000 Ton Cargo Vessels for A&N Administration

1 819.22 765.97

5 Fishing Vessels for Tamil Nadu Fishermen (under the scheme of Dept. of Fisheries, Tamil Nadu)

16 13.00 13.00

6 Ro-Ro & Ro-Pax Vessels 10 102.60 102.60

Total (INR) 4622.60 1962.42

Contracts to be signed*

1 ASW SCW Corvette for Indian Navy 8 5392.00

2 IAC – Phase III To be decided

Page 7: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

ANNUAL PERFORMANCE

Page 8: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

REVENUE MIX (Rs Cr.)

Annual Performance

Particulars (Rs cr) FY18 FY17 YoY %

Shipbuilding 1731.86 1515.82 14%

Ship Repair 623.27 543.05 15%

Turnover 2355.12 2058.87 14%

Other Income 189.16 158.63 19%

Total Income 2544.28 2217.50 15%

Page 9: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

KEY FINANCIAL PARAMETERS

Particulars (INR cr) FY18 FY17

Networth 3256 2029

Book value / share (Rs) 240 179

Net Debt 123 123

EBITDA (%)* 28 26

EPS (Rs) 31.03 28.39

* Includes other income but excludes one off items

Page 10: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

TURNOVER (RS CR) & EBITDA MARGINS

1256 1249

1462 1405 1554

1637

1860

1996 1996

2355

22.00%

29.21%

26.69%

20.23% 20.45%

20.61% 22.81%

23.71%

26.35%

27.76%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

0

500

1000

1500

2000

2500

FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18

Turnover EBITDA Margins %

Page 11: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

PROFIT AFTER TAX (Rs Cr.) & PAT MARGINS (%)

160

223 228

172 185

194

235

275

322

397

12.74%

17.86%

15.57%

12.27% 11.92%

11.86% 12.64%

13.78%

15.62%

16.85%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

14.00%

16.00%

18.00%

20.00%

0

50

100

150

200

250

300

350

400

450

FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18

PAT PAT Margins %

Page 12: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

RETURN EFFICIENCIES

1176 1353

1561 1732

2029

3256

16%

14%

15%

16% 16%

12%

FY13 FY14 FY15 FY16 FY17 FY18

Networth Return on Networth

Networth (INR cr), Return on Networth (%)

Debt Equity Ratio 0.04

Page 13: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

SHAREHOLDING PATTERN

Page 14: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

SHAREHOLDING PATTERN

as on August 07, 2018

75

10.29

3.45 11.26

Percentage Holding

Promoters Mutual Funds FPIs Others

Top 5 Public Shareholders

FY18

Reliance MF 5.94%

HDFC MF 2.30%

Pinebridge Global Fund

2.00%

ICICI Lombard 0.81%

Aditya Birla Sunlife 0.62%

Page 15: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

EXPANSION PROJECTS

OVERVIEW

Page 16: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

MAJOR EXPANSIONS

NEW LARGE DRYDOCK

Facility : Dock : 310m x 75/60m x 13m and other

allied facilities Estimate : Rs. 1799 Crores Target Completion : June 2021

Present Status: Construction works of Plant and Machinery awarded

to M/s. Larsen & Toubro Ltd on 27 April 18. Construction works commenced in May 18 after

mobilisation of equipment and labour. 600T Gantry Crane under procurement.

Page 17: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

MAJOR EXPANSIONS

INTERNATIONAL SHIP REPAIR FACILITY (ISRF)

Present Status: Major equipment – Shiplift & transfer system

ordered on consortium of M/s. Broehl & M/s. IMG, Germany in Jan 17.

Construction contract awarded to M/s. Simplex Infrastructures Limited, Kolkata in Oct 2017.

Construction commenced on 17 Nov 17. Land and Marine Piling works in progress. Precast works in progress.

Facility : Shiplift: 130m x 25m x 6000T with

6 workstations Estimate : Rs 970 Crores Target Completion : Nov 2019

Page 18: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

Modern Small Ship building facility being set up at Nazirgunje in Kolkata

Investment of Rs. 160 Cr. envisaged

Contractors shortlisted

Pre-bid meeting conducted. Tendering process progressing

Construction activities to commence in Oct 2018. Targeting commencement of Operations in 18 months

GEOGRAPHICAL EXPANSIONS

HOOGHLY COCHIN SHIPYARD LIMITED, KOLKATA (JVC : CSL - 74% equity)

Page 19: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

GEOGRAPHICAL EXPANSIONS SHIP REPAIR AT PORTS

Mumbai Port Trust

MoU signed with Mumbai Port Trust in Jan 2018 for ‘Development, Management and Operations’ of Ship Repair Facility at Indira Dock.

Formal Agreement to be signed shortly. Operations to commence in Oct 18.

Kolkata Port Trust

MoU inked with Kolkata Port Trust in Mar 2018 for ‘Development, Management and Operations’ of Ship Repair Facility at Netaji Subhas Dock.

Formal Agreement under discussion.

Operations to commence after handing over of facility after civil works by KoPT.

Page 20: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%

20

This presentation and the following discussion may contain “forward looking statements” by Cochin Shipyard Limited

(“Cochin” or “CSL” or the “Company”) that are not historical in nature. These forward looking statements, which may

include statements relating to future results of operations, financial condition, business prospects, plans and objectives are

based on the current beliefs, assumptions, expectations, estimates and projections of the management of CSL about the

business, industry and markets in which CSL operates.

These statements are not guarantees of future performance and are subject to known and unknown risks, uncertainties and

other factors, some of which are beyond CSL’s control and difficult to predict, that could cause actual results, performance

or achievements to differ materially from those in the forward looking statements.

Such statements are not and should not be construed as a representation of future performance or achievements of CSL. In

particular, such statements should not be regarded as a projection of future performance of CSL. It should be noted that the

actual performance or achievements of CSL may vary significantly from such statements.

Disclaimer

For further information please contact:

Cochin Shipyard Ltd Concept Investor Relations

Kala V, Company Secretary Snighter A

Tel: +91 4842501306 Mo: +91 9819123804

Email: [email protected] Email: [email protected] /

[email protected]

Page 21: Investor Presentation (Q1 FY19) Aug 18 · 2019-10-22 · Project cost-Rs. 500 Cr ... Promoters Mutual Funds FPIs Others Top 5 Public Shareholders FY18 Reliance MF 5.94% HDFC MF 2.30%