  SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN] PROCEDURE Non-confidential APPROVAL REGISTER APPROVAL REGISTER APPROVAL REGISTER APPROVAL REGISTER DOCUMENT NUMBER: IOG 115 TITLE: USE OF SPADES AND BL USE OF SPADES AND BL USE OF SPADES AND BL USE OF SPADES AND BLINDS INDS INDS INDS DOCUMENT OWNER: UIG/P/CB SECURITY: NON CONFIDENTIAL Document History: Revision Revision Revision Revision Date Date Date Date Pages Pages Pages Pages Reason Reason Reason Reason 3 Oct t 2010 All 3 Yearly Review 2 May 2006 All 3 Yearly Review 1 April 2003 All Reviewed and Work Practice updated. 0 July 1999 All Initial Publication

Upload: anthony-rosa

Post on 04-Nov-2015

34 views

Category:

Documents


2 download

DESCRIPTION

use of spades

TRANSCRIPT

  • SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]

    PROCEDURE

    Non-confidential

    APPROVAL REGISTERAPPROVAL REGISTERAPPROVAL REGISTERAPPROVAL REGISTER

    DOCUMENT NUMBER: IOG 115

    TITLE: USE OF SPADES AND BLUSE OF SPADES AND BLUSE OF SPADES AND BLUSE OF SPADES AND BLINDSINDSINDSINDS

    DOCUMENT OWNER: UIG/P/CB

    SECURITY: NON CONFIDENTIAL

    Document History:

    Revision Revision Revision Revision Date Date Date Date Pages Pages Pages Pages Reason Reason Reason Reason

    3 Oct t 2010 All 3 Yearly Review

    2 May 2006 All 3 Yearly Review

    1 April 2003 All Reviewed and Work Practice

    updated.

    0 July 1999 All Initial Publication

  • SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]

    PROCEDURE

    Non-confidential

    Doc No :IOG:115 Rev: 3 Issues: 19/10/2010

    Doc Owner: UIG/P/C Custodian: UIG/P/CB Review: 19/10/2013

    Page 2 of 10 Printed copies are uncontrolled

    Table of ContentTable of ContentTable of ContentTable of Content

    1.0 PURPOSE ..................................................................................................................................... 3

    2.0 SCOPE ........................................................................................................................................ 3

    3.0 HEALTH SAFETY AND ENVIRONMENT ..................................................................................... 3

    4.0 PROCEDURE ................................................................................................................................ 3

    4.1 GENERAL .......................................................................................................... 3

    4.2 SPADING/BLINDING ACTIVITIES ......................................................................... 4

    5.0 LIST OF APPENDICES .................................................................................................................. 5

    6.0 RELATED DOCUMENTS/REFERENCES .................................................................................... 10

  • SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]

    PROCEDURE

    Non-confidential

    Doc No :IOG:115 Rev: 3 Issues: 19/10/2010

    Doc Owner: UIG/P/C Custodian: UIG/P/CB Review: 19/10/2013

    Page 3 of 10 Printed copies are uncontrolled

    1.0 1.0 1.0 1.0 PURPOSEPURPOSEPURPOSEPURPOSE

    This procedure provides the details for the use of spectacle or spade type blinds and the administration control associated with the application.

    2.0 2.0 2.0 2.0 SCOPE SCOPE SCOPE SCOPE

    This procedure details the reasons for the insertion of spectacle or spade type blinds and all the precautions and operations associated with them.

    3.0 3.0 3.0 3.0 HHHHEALTH SAFETY AND ENVIRONMENTEALTH SAFETY AND ENVIRONMENTEALTH SAFETY AND ENVIRONMENTEALTH SAFETY AND ENVIRONMENT

    Wear personal protective equipment (PPE) such as coveralls, safety boots, safety helmet, etc. as specified in SPDC Safety Manual.

    Avoid hydrocarbon spillage to the environment and emission to air in accordance with ISO 14001 standards.

    Report any potential threat to the environment to the Asset Holders Site Representative and act on instructions in accordance with the HSE-MS policy

    4.0 4.0 4.0 4.0 PROCEDUREPROCEDUREPROCEDUREPROCEDURE

    4.14.14.14.1 GENERALGENERALGENERALGENERAL 1. Positive isolation of equipment shall be in accordance with IOG 137

    Procedure for Preparation of Equipment for Work Activity. This is by either breaking pipelines to and from an item of equipment (e.g. removal of a valve in a line) or by inserting a spectacle or spade type blind between a pair of flanges on a pipeline.

    2. The spectacle or spade blind used for isolation must conform in rating (in accordance with DEP 30.38.01.11-Gen. Section 8. Piping Components) to the pipe or flange classification to which it is to be fitted. This is also the case for blind flanges that may be fitted. This shall apply whether it is a permanent or temporary one.

    3. In the case of removing a valve, a blind flange should be fitted to both open ends of the pipeline.

    4. In the case of open drain systems, the spectacle or spade blind should be installed on the downstream side of the drain valve for all permanent vessel

  • SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]

    PROCEDURE

    Non-confidential

    Doc No :IOG:115 Rev: 3 Issues: 19/10/2010

    Doc Owner: UIG/P/C Custodian: UIG/P/CB Review: 19/10/2013

    Page 4 of 10 Printed copies are uncontrolled

    drain connections.

    5. Closed drain systems with a double block and bleed arrangement shall have the blind installed on the upstream side of the last valve used.

    6. In all other cases, isolating spectacle or spade type blinds shall be installed on the equipment side of isolation valves, so that the individual item can be positively isolated from the process.

    4.24.24.24.2 SPADING/BLINDING ACTIVITIESSPADING/BLINDING ACTIVITIESSPADING/BLINDING ACTIVITIESSPADING/BLINDING ACTIVITIES

    1. Blinding of process equipment (vessels, columns, pipelines, flowlines, etc.) shall be done under a Permit to Work system.

    2. All equipment and pipings must be depressurised to 0 barg (atmospheric) and drained before any line breaking or insertion of spectacle or spade type blinds takes place.

    3. A checklist of the status of all spectacle and spade type blinds will be maintained and kept up to date and maintained in the facility check list register (appendix 2) by the Site Operator.

    4. Any change to the normal blind position shall be recorded in the blind checklist. The authourisation shall be given by the Asset Holder Site Supervisor using the form in appendix 1.

    5. The Site Operator shall check the actual valve status of the blinds every two weeks (14days)

    6. The Asset Holders Site Representative shall audit the blind check list status under his control every six months using the checklist in appendix 2 to ensure that the check list is up to date, and confirm that the actual position of the blinds are correct on site.

  • SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]

    PROCEDURE

    Non-confidential

    Doc No :IOG:115 Rev: 3 Issues: 19/10/2010

    Doc Owner: UIG/P/C Custodian: UIG/P/CB Review: 19/10/2013

    Page 5 of 10 Printed copies are uncontrolled

    5555.0.0.0.0 LIST OF APPENDICESLIST OF APPENDICESLIST OF APPENDICESLIST OF APPENDICES

    Appendix 1Appendix 1Appendix 1Appendix 1: : : : Approval for change in blind status

    BLIND BLIND BLIND BLIND No No No No

    LINE LINE LINE LINE No No No No

    SIZE SIZE SIZE SIZE and and and and

    CLASS CLASS CLASS CLASS

    PEFS NoPEFS NoPEFS NoPEFS No PTW PTW PTW PTW No No No No

    BLINDBLINDBLINDBLIND----IN IN IN IN BLINDBLINDBLINDBLIND----OUT OUT OUT OUT

    DateDateDateDate Name of Name of Name of Name of PersonnelPersonnelPersonnelPersonnel

    AuthorisedAuthorisedAuthorisedAuthorised by AHSSby AHSSby AHSSby AHSS

    DateDateDateDate Name of Name of Name of Name of PersonnelPersonnelPersonnelPersonnel

    ConfirmedConfirmedConfirmedConfirmed By By By By AHSSAHSSAHSSAHSS

  • SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]

    PROCEDURE

    Non-confidential

    Doc No :IOG:115 Rev: 3 Issues: 19/10/2010

    Doc Owner: UIG/P/C Custodian: UIG/P/CB Review: 19/10/2013

    Page 6 of 10 Printed copies are uncontrolled

    Appendix 2Appendix 2Appendix 2Appendix 2: Facility blind checklist

    Drawing Drawing Drawing Drawing NumberNumberNumberNumber Line NoLine NoLine NoLine No

    Size & Size & Size & Size & ClassClassClassClass LocationLocationLocationLocation ReasonReasonReasonReason

    Date

    Installed

    I have personally completed the blind checks and confirm the status is as noted above:I have personally completed the blind checks and confirm the status is as noted above:I have personally completed the blind checks and confirm the status is as noted above:I have personally completed the blind checks and confirm the status is as noted above:

    NameNameNameName:__________________________________________________

    Signed:_________________________________________________Signed:_________________________________________________Signed:_________________________________________________Signed:_________________________________________________

    DateDateDateDate:___________________________________________________

    CommentsCommentsCommentsComments:

  • SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]

    PROCEDURE

    Non-confidential

    Doc No :IOG:115 Rev: 3 Issues: 19/10/2010

    Doc Owner: UIG/P/C Custodian: UIG/P/CB Review: 19/10/2013

    Page 7 of 10 Printed copies are uncontrolled

    Appendix Appendix Appendix Appendix 3333: Example of spades/blinds & colour codes

    Appendix 3Appendix 3Appendix 3Appendix 3.1.1.1.1: Spectacle blinds

    Appendix 3Appendix 3Appendix 3Appendix 3.2.2.2.2:::: Raised face blind

  • SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]

    PROCEDURE

    Non-confidential

    Doc No :IOG:115 Rev: 3 Issues: 19/10/2010

    Doc Owner: UIG/P/C Custodian: UIG/P/CB Review: 19/10/2013

    Page 8 of 10 Printed copies are uncontrolled

    Appendix 3.3Appendix 3.3Appendix 3.3Appendix 3.3:::: . Audit Checksheet

    Guidelines for Completing Audit Check sheetGuidelines for Completing Audit Check sheetGuidelines for Completing Audit Check sheetGuidelines for Completing Audit Check sheet

    (1) Select an activity to be audited relevant to the document. (2) Review activity for actions/procedures, which are covered by the document. (3) Audit `as-found' condition/performance against requirements identified in document. (4) Note whether `as-found' is acceptable, highlighting areas of non-compliance. (5) Report audit findings to Line Management, identifying any remedial actions required, along

    with action plan. Audit Check SheetAudit Check SheetAudit Check SheetAudit Check Sheet

    Auditors:Auditors:Auditors:Auditors: Check Sheet Custodian: UIG/P/CBCheck Sheet Custodian: UIG/P/CBCheck Sheet Custodian: UIG/P/CBCheck Sheet Custodian: UIG/P/CB

    Date of Audit:Date of Audit:Date of Audit:Date of Audit:

    Type:

    Ref:

    Objective

    Evidence Acceptable? Remarks

    YYYY NNNN YYYY NNNN

    Is blinding of process equipment

    (vessels, columns, pipelines, flowlines,

    etc.) done under a Permit to Work

    system?

    4.2

    Is a checklist of the status of all spectacle or spade type blinds maintained and kept up to date in the facility register by the Asset Holders Site Representative.

    4.2

    Is any change to the normal blind

    position recorded in the blind

    checklist together with the authorisation

    (Name and Reference Indicator) for the

    change and the number of the permit

    (if applicable)?

    4.2

    Does the Site Operator check the actual valve status of the blinds every

    4.2

  • SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]

    PROCEDURE

    Non-confidential

    Doc No :IOG:115 Rev: 3 Issues: 19/10/2010

    Doc Owner: UIG/P/C Custodian: UIG/P/CB Review: 19/10/2013

    Page 9 of 10 Printed copies are uncontrolled

    two weeks (14days)? Does the Asset Holders Site

    Representative audit the blind check list

    status under his control every six

    months to ensure that the check list is

    up to date, and confirm that the actual

    position of the blinds are correct on

    site.

    4.2

    In the case of removing a valve, is a

    blind flange fitted to both open ends of

    the pipeline?

    4.1

    DefinitionsDefinitionsDefinitionsDefinitions

    Objective EvidenceObjective EvidenceObjective EvidenceObjective Evidence: Includes data, records etc that shows or proves compliance to the requirements.

    Acceptable:Acceptable:Acceptable:Acceptable: Indicates that evidence meets the required standard or judged to be in conformity with the

    standard.

  • SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]

    PROCEDURE

    Non-confidential

    Doc No :IOG:115 Rev: 3 Issues: 19/10/2010

    Doc Owner: UIG/P/C Custodian: UIG/P/CB Review: 19/10/2013

    Page 10 of 10 Printed copies are uncontrolled

    6.06.06.06.0 RELATED DOCUMENTS/REFERENCESRELATED DOCUMENTS/REFERENCESRELATED DOCUMENTS/REFERENCESRELATED DOCUMENTS/REFERENCES

    Permit to Work Procedure SEPCiN- HX -2010-0003

    SPDC IOG/137 Preparation of Equipment for Work Activity

    DEP 30.38.01.11-Gen. SECTION 8. Piping Components.