iran electrical equipment engineering...
TRANSCRIPT
IRAN ELECTRICAL EQUIPMENT ENGINEERING (IREEE) CO.
Date of establishment: 1991
Type of company: PJS
Registered in: Tehran, Iran
Registration number: 85754
Field of activities: Engineering, Contracting and Manufacturing
Established in 1991, Iran Electrical Equipment Engineering (IREEE) Co PJS is classified as a GRADE ONE EPC contracting company in the Electrical Power Sector in Iran. It has successfully designed and constructed numerous grand power distribution/ transmission lines, substations (AIS, GIS, Mobile, etc.), up to 400KV, projects on EPC and turnkey basis all over Iran and the Middle Eastern countries. Besides distribution/ transmission lines and substations, IREEE is also actively involved in the engineering and execution of Instrumentation and Control, Wind Energy, Static VAR Compensator (SVC) Projects and marketing and sales of POSITRON Insulator Testers as well as POSITRON access solutions devices. Iran Electrical Equipment Engineering Co PJS designs, engineers, manufactures, tests, supplies, installs and commissions what the Employer wishes for.
INTRODUCTION
Iran Electrical Equipment Engineering (IREEE) Company was established in 1991 as a quality inspection company to inspect electrical equipment used in the electrical power sector. Later on, it was delegated with the task of transferring knowledge and technology of production of electrical equipment from the most advanced countries in the world. Along this line, it succeeded in transferring the knowhow and technology of production lines for eleven (11) very important electrical equipment such as hardware fittings for transmission lines, composite and multimode OPGW (optical fiber composite overhead ground wire) cables, 20,33KV surge arresters, 400 amps automatic transfer switch, all types of metal halide and sodium-vapor lamps, designing Overhead Transmission Line Lattice Towers, Toughened Glass Insulators and Replacing of existing ground wires with OPGW under hot-line conditions, etc. Then, most of the aforementioned equipment were mass produced for the first time in the production lines/facilities of this company making this country self-sufficient in the said areas. IREEE established Tarrah Gostaran Pooya Company in 1996, and ventured into designing and producing lattice towers for transmission line. Subsequently, IREEE expanded further and started executing transmission line projects on EPC/ turnkey basis very actively and seriously. Sim Noor Pooya Company was founded in 1997 to be the pioneering producer of OPGW in the country. Later on, Yaragh Avaran Pooya (Y.A.P) and Noor Afshan Companies were established in 1999 to produce hardware fitting and lamps, respectively. Continuing establishing production units, IREEE established yet another company, Pars Maghareh, in 2001 to produce toughened glass insulators. Developing company’s activities in oil and gas projects, IREEE established Arya Petro Gas Company in 2002. Following the privatization policy in Iran, the governmental shares of subsidiaries of IREEE were first transferred/ sold to the private sector, and then the shares of the mother company, too. The new private shareholding managers of IREEE rejuvenated the company making it a leading company in the power industry to manage all aspects of power industry projects at optimized cost and from front end engineering design to turnkey delivery. Now, IREEE, one hundred per cent (100%) private, has in its group three other companies: YAP Co, hardware fittings manufacturer, Persian Sazeh Co, tower manufacturer and Nikan Niroo Sanat Co, involved in test and commission of substations.
Fariborz Saqafi: Chairman of the Board
Mohammad Nikan: Vice-chairman of the Board and Managing Director
Hashem Saqafi: Member of the Board
Fazel Saghafi: Member of the Board
HISTORY
BOARD OF DIRECTORS
The four pillars on which IREEE Company's successful businesses have been built on are the priorities that define and shape the way we do business today. Unwavering focus on these priorities will shape our businesses for years to come. FINANCIAL STRENGTH Financially, we are involved in diverse businesses. We invest in and focus on long-term opportunities that will contribute to strength of our company in the future. CUSTOMER SERVICE AND SATISFACTION Our customers around the world expect reliability, dependability and exceptional services. We are relentlessly at their service. EMPLOYEE COMMITMENT We equip our employees with the resources and support necessary to be successful. We encourage teamwork and provide a safe and rewarding work environment. Our employees understand that we make no compromises when it comes to safety. Simply put, we take care of our employees and they, in turn, take care of pour clients.
OPERATIONAL EXCELLENCE Our employees pride themselves on operational excellence in every facet of the work they perform. Our high operational standards allow us to meet and exceed our customers' expectations, perform our work safely and preserve our assets
PRIORITIES
HEALTH, SAFETY AND ENVIRONMENT (HSE)
HSE is not only our priority, it is our core value. We strive for excellence and try our level best to avoid accidents. The safety of our employees, clients and the public supersedes everything else.
Iran Electrical Equipment Engineering Co has adopted Safety First as part of its commitment to improve safety standards within the company and the industry. It operates several safety initiatives to create, foster and enforce a culture where everyone goes home every day unharmed. The role and responsibilities of this department are:
• Coordinating the overall activities of the company to meet quality, health and safety standards; • Monitoring and giving advice and guidelines on performance issues related to Quality Management Systems and Health
and Safety; • Liaising with managers and staff members throughout the company to ensure that quality and safety systems are
functioning properly; • Promoting quality achievement and performance improvement throughout the company; • Serving as the primary quality control and safety source for problem identification, resolution, loss reporting and
continuous improvement; • Developing and implementing quality management strategy and plans to support, contribute to and integrate within the
company’s business plan and long term strategy; • Designing, developing and ensuring full implementation of quality control and safety systems; • Submitting reports on quality and safety violations and performing root-cause analysis and other problem solving
activities to identify effective corrective actions and process improvements; • Ensuring the application of all related processes, policies and procedures prior to commencement of company`s projects
and respected throughout the full life cycle of the projects; • Ensuring compliance with national and international standards and legislation; • Establishing and implementing necessary communications strategy for the improvement and awareness of quality and
safety issues across all departments; • Preparing and managing department budget in line with the company`s objective and in full coordination with the CFO; • Approving the annual safety and security plan and goals, identifying projects, setting budgets and managing expenditures; • Monitoring the implementation of the safety and security plan, supporting the Company’s goals and objectives; • Performing systematic and periodical reviews and reports to management on quality and safety issues, trends and losses; • Performing periodical visits to different locations to ensure full implementation of quality and safety standards; • Managing and monitoring quality control and safety personnel on day-to-day basis; • Providing ongoing training and communication to quality and safety personnel located in different business units within
the company and • Monitoring and approving investigation reports regarding theft, alarms, accidents, injuries and other incidents that may
occur.
HSE, QA AND QC
1) ENGINEERING Transmission Line Engineering Substation Engineering
2) MANAGEMENT Project Management Construction Management
3) PROCUREMENT Selecting Vendors of goods/equipment and/or services Preparing and sending RFQs/ RFPs Evaluating RFQs/ RFPs, and sending purchasing order Receiving the goods and/or services Vendor Payment
4) EXECUTION Temporary camp site establishment Civil/ foundation construction Transmission line tower erection and stringing Substation equipment erection
5) MECHANICAL COMPLETION AND
PROJECT COMMISSIONING
Testing, commissioning and handing over the project
6) HOTLINE INSULATOR TESTING SERVICES
Porcelain Insulator Tester Composite Insulator Tester Universal Insulator Tester
OUTLINE OF ACTIVITIES AND SERVICES
The Engineering Department is responsible for all the engineering calculations of transmission lines (overhead and subterranean) and their relevant equipment and telecommunication towers. Designing and engineering activities in connection with construction, expansion, upgradation of all types of distribution, transmission lines (up to 400 KV) and substations (AIS, GIS and Mobile) are also done in this department. All the engineering calculations are done in accordance with IEC and IEEE Standards. Software such as MS-TOWER, AUTOCAD, PLS-CADD, etc. for transmission lines and DIgSILENT, CYMEDIST, CALCULUX, DIALUX , ETAP, SAP, etc. for substations are extensively used in this department.
ENGINEERING
TRANSMISSION LINE ENGINEERING
Survey and route finding Plan and Profile Tower Spotting Sag and Tension Calculations
OVERHEAD TRANSMISSION LINE PRODUCT ENGINEERING
Modelling and Analysis of Lattice Tower Systems Shop Drawing
SUBSTATIONS
The primary objective of this unit is to design, engineer, supply, install, commission and test all types of substations (AIS, GIS, MOBILE, etc.) including Power and Auxiliary Transformers, CB, DS/ES, LA, LT, Power Cables, Grounding, etc.
Eight (8) years of experience in designing and execution of substation projects, up to 400KV, for different industries such as steel, copper, oil, gas and food in Iran.
LOW VOLTAGE ENGINEERING FOR SUBSTATION AND INDUSTRIES
Current Transformer Calculation Capacitive Voltage Transformer General Single Line Diagram Protection and Metering SLD. LVAC and LVDC Calculation and detailed design Control Logic diagram and Trip tables Signal and alarm list Panels front views Schematic
HIGH VOLTAGE ENGINEERING FOR SUBSTATION
Lightning Calculation Ground grid Calculation and detailed design Surge Arrester Calculation Buswork Calculation Lighting Calculation and detailed design Cable Calculation General layout and sections Clamp and fitting
CIVIL ENGINEERING Foundation calculations and design Structure calculations and design Landscaping design Building foundation and structure calculations and design Electrical and mechanical calculations and design Surface water draining Excavation Stub setting
Management is more than simply telling employees what to do. Management involves problem-solving, decision-making, planning, delegation, communication, and time management. Top managers of IREEE strictly observe the execution of the fundamental functions of management, i.e., planning, organizing, coordinating, directing, and oversight. In another word, management is the dynamic, life-giving element in every business.
PROJECT MANAGEMENT
Today’s Engineering, Procurement, Construction (EPC) projects are becoming more complex and more implemented on much larger scales. IREEE uses PRIMAVERA, MS PROJECT, PMBOK SOFTWARE to equip its project staff with the knowledge of EPC activities from initial feasibility studies, to detailed engineering, construction and operations, management of the actual project facilities and their benefits in effectively and efficiently managing EPC projects that they can apply immediately in their EPC project environment.
CONSTRUCTION PROJECT MANAGEMENT (CM)
At IREEE, we use specialized project management techniques to define and oversee the planning, design, coordination, performance requirements and construction of a project, from conception to completion. We control a project's time, cost and quality.
To cater to the needs and requirements of the projects and employers, IREEE has established and maintained excellent business relationships with reputed vendors of goods and services.
After a project contract has been signed, the procurement team develops a plan to purchase goods or outsource services that includes the following: initiating and planning, selecting, contract writing, monitoring, and closing and completing.
MANAGEMENT
PROCUREMENT
Every project and project team starts out with the aim of executing a project successfully. Successful project execution is measured by several parameters, but, almost without exception, two measures of success are minimized cost and schedule duration.
Project success is a function of the people skills and a broad understanding of diverse subject matter of the project management team. Scope definition, execution considerations, construction strategy, planning and schedule impact, resource utilization, overcoming difficulties and problem solving are just a few to enumerate even without addressing the technical side. Then, there is the cost, estimating, and estimate side, factor estimates, detail estimates, forced detail estimates, basis of estimate, construction wage rates, and so on. Then, there is the technical side, material issues, piping systems, equipment considerations, civil and structural, electrical and control systems, document control, specifications, standards, and regulations.
Mechanical Completion, the final phase of construction activities, is to verify the completeness of the plant and that each installed component conforms to or is fabricated, installed and tested in accordance with the project specifications and procedures after all mechanical works including pre-commissioning activities are completed. Mechanical Completion is one of the project key milestones. When it is achieved, owner (client) releases the Mechanical Completion Certificate and a plant is handed over for the commissioning and operation activities from the construction to the plant operation group.
The main objective of commissioning, the riskiest step in any EPC project, is to affect the safe and orderly handover of the project from the contractor to the owner, guaranteeing its operability in terms of performance, reliability, and safety and information traceability. Additionally, when executed in a planned and effective way, commissioning normally represents an essential factor for the fulfilment of schedule, costs, and safety and quality requirements of the project. IREEE Team commissions the projects as per the above and to the uttermost satisfaction of the Employer.
Using insulator testers such as porcelain, composite and universal, we test insulators under hotline conditions.
EXECUTION
MECHANICAL COMPLETION AND PROJECT COMMISSIONING
INSULATOR TESTING
IREEE prides itself in offering construction services for automation, instrumentation and control solutions to clients in energy sector on turnkey /EPC basis.
Relying on our years of experience, our highly qualified project management teams are there to design tailored automation solutions and to help you achieve your project targets/goals. Our services in installation and commissioning assure timely completion of your projects.
Static Var Compensator (SVC) solutions, efficient means to maintain the reliability and efficiency of power supply either in the grid or for large industrial loads, are a recent addition to the list of services of IREEE. We configure and customize the SVC to fit each customer with their specific needs.
SVC
AUTOMATION, INSTRUMENTATION AND CONTROL
ITEM PROJECT NAME CLIENT LOCATION START-COMPLETE
1 Dehkanan-kamyaran 63Kv T/L Kordestan Distribution Co Sanandaj, Iran 2018 Under-construction
2 Saveh City 63 Kv T/L West Regional Electric Co Saveh, Iran 2018 Under-construction
3 AZAD University 20Kv T/L AZAD University Tehran, Iran 2016 Under-construction
4 Karbala Refinery Project OHL, 33 Kv, SC, 30 KM long
Power Eng. World Najaf -Karbala 2015 Under-construction
5 Saraya Bandar 11Kv T/L ONEIC Masqat, Oman 2013-2015
6 Beiram-Emadeh 132kv T/L F.R.E.Co. Fars, Iran 2006-2009
7 Takestan-Heydarieh 63kv T/L Z.R.E.Co. Zanjan, Iran 2006-2007
8 Chabahar-Chabahar3 63kv T/L S.B.R.E.Co. Semnan, Iran 2007-2010
9 Golpayegan –Boin 63Kv T/L I.P.D.Co. Esfahan, Iran 2000-2001
10 400 Kv T/L I.P.D.CO Khuzestan, Iran 1999-2002
11 Sarcheshmeh 132Kv T/L N.I.C.I.Co. Kerman, Iran 2011- 2012
12 Mehran–Azar 132 KV T/L GH.R.E.Co. Kermanshah, Iran 2011- 2013
13 Satarkhan Dam 63kv T/L N.I.C.I.Co. Ahar, Iran 2011-2013
14 Dehloran 11Kv T/L O.E.I.D Ilam, Iran 2011 - 2012
15 Kohdasht-Seimareh 230kv T/L GH.R.E.Co. Kermanshah, Iran 2011 -2012
16 Javeh Dam T/L 20KV I.W.P.Co. Sanandaj, Iran 2014- 2015
TRANSMISSION LINE PROJECTS
ITEM PROJECT NAME CLIENT LOCATION START-COMPLETE 1 Electrical Equipment instrument
for Dehloran Oil Field O.E.I.D Dehloran, IRAN 2011- 2013
ITEM PROJECT NAME CLIENT LOCATION START-COMPLETE
1 Electrical infrastructure development including a Substation
Anzali Trade-Industrial Freezone Organization
Gilan, Iran 2018 Under-Construction
2 NGL3200 , West of Karoun 230/33 Kv Substation
Petrochemical Co. Ahwaz, Iran 2016-Under-Construction
3 Development Alvand 63/20 Kv Substation
Z.R.B.Co. Zanjan, Iran 2016-Under-Construction
4 Oilfield Azar 132/20Kv Substation
P.E.D.E.Co. Mehran, Iran
2013- 2015
5 Kalleh 63/20Kv Substation Kalleh Co. Amol, Iran 2013-2015
6 Sonegon Dam 63/6kv Substation
N.I.C.I.Co. Ahar, Iran
2011- 2013
7 Semnan Fajr Steel 63/20 kV Substation
S.F.S Co. Semnan, Iran
2012- 2013
SUBSTATION PROJECTS
AUTOMATION, INSTRUMENTATION & CONTROL PROJECTS
Item Project Name Employer Total Weight(ton)
1 Towers & stub of 400Kv ( Aliabad-Esfarayen)
Iran Power Development Co 10226
2 Towers of 400Kv ( Tiran 3- Karoon ) Isfahan Regional Electric Co 6359
3 Towers of double circuit 400Kv transmission line (Firoozkooh-Semnan)
Semnan Regional Electric Co 5355
4 Towers of double circuit 230Kv (Neka-Dehak)
Mazandaran Regional Electric Co 768
5 Towers of double circuit 230Kv (Neka-Dehak)
Mazandaran Regional Electric Co
532
6 Towers of 230Kv (Islam Abad Cheshme sefid)
West Regional Electric Co 889
7 Towers of 230Kv (Islamabad- Sarpole zahab)
West Regional Electric Co 814
8 Towers of 230Kv (Sanandaj- Cheshme sefid)
West Regional Electric Co 725
9 Towers of double circuit 230Kv Mazandaran Regional Electric Co 227
10 Towers of double circuit 230Kv Kerman Regional Electric Co 375
11 Towers of 66Kv Fars Regional Electric Co 600
12 Towers of 66Kv Fars Regional Electric Co 400
13 Towers of 63Kv Fars Regional Electric Co 700
14 Towers of 63Kv (Koohdasht- Dareshahr) West Regional Electric Co 600
15 Towers of double circuit 63 KV West Regional Electric Co 600
16 Towers of double circuit of 63Kv Isfahan Regional Electric Co 600
TOWER SUPPLY REFERENCE LIST
The Islamic Republic of Iran Reg No: 952/60/302734 The Ministry of Cooperatives, Labour, and Social Welfare Date: Dec 11, 2016 Tehran Main office of Cooperatives, Labour, and Social Welfare
SAFE-CONTRACTOR ACCREDITATION CERTIFICATE For Legal Entities Only
In consideration of implementation of Article 2 Note, on Safety Regulations for the Contractors’ affairs, resolved by the SUPREME COUNCIL on TECHNICAL SAFETY, Safe-Contractor Accreditation Certificate in favor of Company/Institute/ workshop: IRAN ELECTRICAL EQUIPMENT ENGINEERING COMPANY PJS , Managed by Ms. / Mr. Fariborz Saqafi, holder of National ID Card No: 2141982881, having legal address at: First Floor, No. 129, Dr. Fatemi Ave, Postal Code 1414713713, Tel No: 88985282, Cell Phone No: 09123379914, Fax No: , Email: , Reg No: 85754, Reg Date: Sept 25, 1991, and Commercial Card ID No: 10101302040 active in the field of : Electrical Power- Electrical and Mechanical –Construction and Civil Works, was approved by the Provinial Committee for Safe-Contractor and hereby issued. This certificate reserving the rights of cancellation and suspension as per the Safety Regulations for the Contractors’ affairs (Articles appear on the back page of this Certificate) is valid for Two years from the date of issue and is non-transferrable. Hatam Shakarami Signed on Nov 29, 2016
General Manager
No. Description Person 1 PHD 2 2 M.S 16 3 B.S 94 4 Technical Men 16
Total: 128
MAIN HUMAN RESOURCES (DEGREE)
No. Description Person 1 (5-10 Years) 74 2 (10-15 Years) 28 3 (15-20 Years) 14 4 (20-25 Years) 6 5 (25-30 Years) 6
Total: 128
EXPERIENCE OF HUMAN RESOURCES
To: Iran Electrical Equipment Engineering Co. Subject: Announcement of finished projects Referring to the letter number 1/76546 dated 02/06/2005, this is to declare that the Following projects have successfully been carried out and we look forward to better cooperation and promotion of your abilities and capabilities in the upcoming projects.
No Subject Date of contract Employer’s
contract number
IREEE contract number
1 Double circuit towers 63Kv 24/02/1995 73/161 1210/161
2 Double circuit towers 63Kv 08/12/1995 73/162 1210/162 3 Fittings of 63Kv OHTL 32 03/02/1995 74/202 1010/1 4 Fittings of 63Kv OHTL 14/11/1997 76/225 1010/639 5 Fittings of 63Kv OHTL 28/08/1998 1010/739
Zanjan Regional Electric Co., To: Iran Electrical Equipment Engineering (IREEE), With Regards, According to the letter no. 4/81566 dated 21/04/2009, we hereby declare our satisfaction of your co. in execution of Contract no. 85/102 about the purchase of equipment, construction of foundation, installation as well as erection and stringing the 63 k.v. double circuit transmission line in Takestan- Heidariyeh. Asghar Alimohammadi Transmission line project manager
To: Iran Electrical Equipment Engineering (IREEE), From: Sistan and Balochestan Regional Electric Co., According to the letter no. 1/76546 dated 22/08/2005, we hereby confirm our purchase of hardware and fittings of 63 and 230 k.v. as per the attached table. We also declare our satisfaction of procurement of the nominated agreement. Rahman Rigi Commercial Manager
Islamic Republic of Iran Ministry of Power Semnan Regional Electric Co. To: Engineer Mohammad Jafar Shoukohi nia, Managing Director of Iran Electrical Equipment Engineering (IREEE), We hereby thank God for your kind and long term effort in power industry develop social welfare, agriculture, industry. It is our proud to declare that you have executed the 400 KV of Semnan Firoozkooh turnkey project in this province. Hope your will be more successful in all of your activities though out Islamic Republic of Iran. Karim Azadegan, Managing Director and Chief of the boards
To: Mr. Mir Hosseini Tower Project Manager of Iran Electrical Equipment Engineering (IREEE), Further to the letter no. 41/61872 dated 09/09/2000, We hereby declare our satisfaction of the procurement of manufacturing the towers of Karoon 3 to Tiran transmission line which one the important and strategic projects in Iran’s transmission line. It is necessary to announce that your precise attention as well as your co. is the major parts of the execution of this project as follows:
1- Technical and Engineering in design and manufacturing of transmission line. 2- Time Managing as well as the cooperation with all the contractors for both
consultants and principle. 3- Risk management in solving the issues in designing, manufacturing as well as
installation. 4- Making progress in procurement of the project with all the limitations facing with
local manufacturing. Finally, we hope you will be successful in all your projects as well as your life. Regards, Reza Tofighi Project manager of distribution, transmission and dispatching
To: Iran Electrical Equipment Engineering (IREEE), Subject: Satisfaction letter Further to your kind completion of Contract no. 385018 about Construction of 132 KV of Birom – Emadeh transmission line on turnkey basis, We hereby appreciate you and your kind colleagues’ efforts and wish all the managers and experts of your organization be successful. Mahmood Ketabi Project Manager of over distribution lines
To : Iran Electrical Equipment Engineering Company Subject: End user certificate and declaration of satisfaction from the contract made between both parties We are writing this to announce our satisfaction of al of construction and declare that the following contracts have successfully been finished and performed as below.
No. Subject Contract Contract Date Contract Number IREEE Contract number
1 Fittings of 400Kv OHTL (Khoram abadKermanshah-Hamedan) 1994/11/24 02-73-14 1040/114
2 Fittings of 400Kv OHTL (South-North) 1994/03/29 B-74-17 1010/178
3 Fittings of 230Kv (Ahar-Magry) 1994/07/17 B-74-21 1240/179
4 6254 tons of single circuit towers of 400Kv (Aliabad-Esfarayen) 1995/9/1 B-74-13 1040/282
5 Fittings of 400Kv OHTL (Zanjan-Maraghe-Tabriz) 1995/11/9 1240/338 6 Stub towers of 400Kv (Aliabad-Esfarayen) 1996/08/28 B-77-63 1040/780 7 Fittings of 400Kv OHTL (Gilan-Zanjan-Hamedan) 1996/12/01 B-77-63 1240/780 8 10226/584 tons of 400Kv towers 1998/12/01 B-75-19 1040/270 9 Fittings of 400Kv (Golpaygan-Abaspoor-Golandar) 2000/12/10 B-78-106 1040/1069
Islamic Republic of Iran Ministry of Power Isfahan Regional Electric Co. To: Iran Electrical Equipment Engineering (IREEE), From: Isfahan Regional Electric - deputy of design and development. Subject: Satisfaction letter Kindly, We hereby announce our satisfaction in technical and engineering, cooperation as well as solving the problems of design, manufacturing and procurement of the related project. We hope that our cooperation will be continued in future. Ahamad Reza Daneshman Deputy of design and development