    Broadband over Powerlinefor Internet Ready Building

    Establishing fast, simple and elegant in building IP multi-service

    Broto Santoso

    CTO, Global Solution Comindo

    [email protected]

    1Internet Ready Building (C) GSCOM 2010

  • 8/9/2019 IRB Made Simple 2

    2/26

    Agenda

    Building Infrastructure

    BPL as Choice for Internet

    BPL Architecture

    BPL Implementation

    BPL Site Examples

    Demo

    Internet Ready Building (C) GSCOM 2010

    2

  • 8/9/2019 IRB Made Simple 2

    3/26

    Building cabling infrastucture

    1) Electrical Network

    2) Coax (Cable TV) Network

    3) Telephone Network

    4) Data Network

    3

    Internet Ready Building (C) GSCOM 2010

  • 8/9/2019 IRB Made Simple 2

    4/26

    Transmission Media Comparison

    Internet Ready Building (C) GSCOM 2010

    4

    Type Distance

    (meter)

    Bandwidth

    (Mbps)

    Active Device

    (investment)

    UTP-Cat5 100 100 Low

    UTP-Cat6 100 1.000 Low

    Powerline 300 200 Low

    Coax 1.000 200 Low

    Fiber

    MM 550 10.000 High

    Fiber - SM 20,000 10.000 High

  • 8/9/2019 IRB Made Simple 2

    5/26

    Wired LAN, Wireless LAN, and

    Broadband over Powerline

    Internet Ready Building (C) GSCOM 2010

    5

    Wired LAN Wireless LAN BPL

    Installation Time-consuming,

    expensive,

    disruptive.

    Easier than wired, but physical

    or environmental issues can limit

    effective deployment.

    Simple installed within

    days with minimal

    equipment and without

    disruption

    Cost High initial sunken

    costs; minimalongoing costs.

    High initial costs, minimal ongoing

    costs. Can cost more than wired withthe need to run cables and install

    additional access points

    Low installation and

    operatingcosts.

    Reliability Extremely reliable Reliability is reduced by interference

    from various sources and types of

    construction.

    Highly reliable

    Performance Very good up to1000 Mbps Fair, common is 54 Mbps, few up to 108Mbps Good, up to 200 Mbps,1000 Mbps is

    development

    Security Physical security only Fair, WEP, WPA-PSK,, WPA2-PSK DES/3DES encryption

    Mobility Limited Very Good Good

  • 8/9/2019 IRB Made Simple 2

    6/26

    Internet ready building

    Making multi tenant unit (MTU) ready for high-

    speed broadband services using IP with the entire

    required infrastructure, network, operation, and

    service function. Internet service has become the next utility after

    electricity, telephone, water and gas.

    Internet Ready Building (C) GSCOM 2010

    6

  • 8/9/2019 IRB Made Simple 2

    7/26

    What is Broadband over

    Powerline ?

    Internet Ready Building (C) GSCOM 2010

    7

    BPL* (broadband over

    power line) uses low

    voltage/LV (80-240v)

    or medium voltage(MV) for high speed

    data transfer instead

    of phone line cable or

    fiber optics as medium

    *BPL also know as PLC: Powerline Communication

  • 8/9/2019 IRB Made Simple 2

    8/26

    BPL Architecture

    Internet Ready Building (C) GSCOM 2010

    8

  • 8/9/2019 IRB Made Simple 2

    9/26

    In Building Broadband Access

    Technology Options

    Internet Ready Building (C) GSCOM 2010

    9

    Powerline (and Powerline over Coax)are the only In-Homedistribution technologies suitable for all Applications

    Technology Strengths Weaknesses

    Wi-Fi Widespread No Video

    Dead spot

    Interference (no QoS/QoE)Wired (FO or UTP) Well known Need new wiring system

    Coax (EOC, MoCA, HPNA) TV Location Not available everywhere

  • 8/9/2019 IRB Made Simple 2

    10/26

    Benefits

    Triple play (Data, Voice, Video) capability for users

    Low cost installation

    Plug-it, simple installation

    Time to revenue for building owner

    Increase building value

    Central manageability

    High scalability

    Creating reliable, secure users access to Broadband beyondwireless hot spots ingress and intermediate RF outage

    Internet Ready Building (C) GSCOM 2010

    10

  • 8/9/2019 IRB Made Simple 2

    11/26

    Connection Flow

    Internet Ready Building (C) GSCOM 2010

    11

  • 8/9/2019 IRB Made Simple 2

    12/26

    BPL Implementation MDU12

    Internet Ready Building (C) GSCOM 2010

  • 8/9/2019 IRB Made Simple 2

    13/26

    In Building Coaxial (Cable TV)

    Network

    Internet

    M

    R

    R

    CPE

    M

    R

    CPE

    Master

    Repeater

    CPE/Modem

    TV Cable Amplifier

    Data Cable

    Coaxial Cable

    13

    Internet Ready Building (C) GSCOM 2010

  • 8/9/2019 IRB Made Simple 2

    14/26

    BPL Housing Complex

    Implementation14

    Internet Ready Building (C) GSCOM 2010

  • 8/9/2019 IRB Made Simple 2

    15/26

    Hotel/Apartment Configuration

    Internet Ready Building (C) GSCOM 2010

    15

    Internet

    `

    Ethernet Cable

    Powrline CableMaster

    Repeater

    CPE

    DistributionBox

    MainDistribution

    Box

    `

    1st Floor

    2nd

    Floor

    3rd

    Floor

    4th Floor

    5th Floor

    UTP Cable

  • 8/9/2019 IRB Made Simple 2

    16/26

    House/Room Connection

    Internet Ready Building (C) GSCOM 2010

    16

  • 8/9/2019 IRB Made Simple 2

    17/26

    BPL Application

    Internet access

    Video streaming and Home Entertainment Network

    Surveillance and monitoring

    IP telephony

    Internet Ready Building (C) GSCOM 2010

    17

  • 8/9/2019 IRB Made Simple 2

    18/26

    Internet Access

    Internet Ready Building (C) GSCOM 2010

    18

  • 8/9/2019 IRB Made Simple 2

    19/26

    Home Entertainment Network

    Internet Ready Building (C) GSCOM 2010

    19

    BPL

  • 8/9/2019 IRB Made Simple 2

    20/26

    Surveillance and Monitoring

    Internet Ready Building (C) GSCOM 2010

    20

  • 8/9/2019 IRB Made Simple 2

    21/26

    IP Telephony

    Internet Ready Building (C) GSCOM201021

  • 8/9/2019 IRB Made Simple 2

    22/26

    As simple as Pick, Plug, Play

    Internet Ready Building (C) GSCOM 2010

    22

    Plug

    Play

    Pick

  • 8/9/2019 IRB Made Simple 2

    23/26

    Site Example MDB Installation

    Internet Ready Building (C) GSCOM 2010

    23

    BPLMaster or Repeater

  • 8/9/2019 IRB Made Simple 2

    24/26

    Site Example Out door

    Internet Ready Building (C) GSCOM 2010

    24

  • 8/9/2019 IRB Made Simple 2

    25/26

    Site Example In Unit or House

    Internet Ready Building (C) GSCOM 2010

    25

    BPLCPE/Modem

  • 8/9/2019 IRB Made Simple 2

    26/26

    PT Global Solution Comindo

    Ruko Apartment WGP

    Blok R01-36Kelapa Gading Permai

    Jakata 14240

    Indonesia

    Tel: +62-21-45844975

    Fax: +62-21-45844976

    [email protected]

    www.gscom-asia.com

    Contact

    mailto:[email protected]://www.gscom-asia.com/http://www.gscom-asia.com/http://www.gscom-asia.com/http://www.gscom-asia.com/mailto:[email protected]:[email protected]:[email protected]