irb made simple 2
TRANSCRIPT
-
8/9/2019 IRB Made Simple 2
1/26
Broadband over Powerlinefor Internet Ready Building
Establishing fast, simple and elegant in building IP multi-service
Broto Santoso
CTO, Global Solution Comindo
1Internet Ready Building (C) GSCOM 2010
-
8/9/2019 IRB Made Simple 2
2/26
Agenda
Building Infrastructure
BPL as Choice for Internet
BPL Architecture
BPL Implementation
BPL Site Examples
Demo
Internet Ready Building (C) GSCOM 2010
2
-
8/9/2019 IRB Made Simple 2
3/26
Building cabling infrastucture
1) Electrical Network
2) Coax (Cable TV) Network
3) Telephone Network
4) Data Network
3
Internet Ready Building (C) GSCOM 2010
-
8/9/2019 IRB Made Simple 2
4/26
Transmission Media Comparison
Internet Ready Building (C) GSCOM 2010
4
Type Distance
(meter)
Bandwidth
(Mbps)
Active Device
(investment)
UTP-Cat5 100 100 Low
UTP-Cat6 100 1.000 Low
Powerline 300 200 Low
Coax 1.000 200 Low
Fiber
MM 550 10.000 High
Fiber - SM 20,000 10.000 High
-
8/9/2019 IRB Made Simple 2
5/26
Wired LAN, Wireless LAN, and
Broadband over Powerline
Internet Ready Building (C) GSCOM 2010
5
Wired LAN Wireless LAN BPL
Installation Time-consuming,
expensive,
disruptive.
Easier than wired, but physical
or environmental issues can limit
effective deployment.
Simple installed within
days with minimal
equipment and without
disruption
Cost High initial sunken
costs; minimalongoing costs.
High initial costs, minimal ongoing
costs. Can cost more than wired withthe need to run cables and install
additional access points
Low installation and
operatingcosts.
Reliability Extremely reliable Reliability is reduced by interference
from various sources and types of
construction.
Highly reliable
Performance Very good up to1000 Mbps Fair, common is 54 Mbps, few up to 108Mbps Good, up to 200 Mbps,1000 Mbps is
development
Security Physical security only Fair, WEP, WPA-PSK,, WPA2-PSK DES/3DES encryption
Mobility Limited Very Good Good
-
8/9/2019 IRB Made Simple 2
6/26
Internet ready building
Making multi tenant unit (MTU) ready for high-
speed broadband services using IP with the entire
required infrastructure, network, operation, and
service function. Internet service has become the next utility after
electricity, telephone, water and gas.
Internet Ready Building (C) GSCOM 2010
6
-
8/9/2019 IRB Made Simple 2
7/26
What is Broadband over
Powerline ?
Internet Ready Building (C) GSCOM 2010
7
BPL* (broadband over
power line) uses low
voltage/LV (80-240v)
or medium voltage(MV) for high speed
data transfer instead
of phone line cable or
fiber optics as medium
*BPL also know as PLC: Powerline Communication
-
8/9/2019 IRB Made Simple 2
8/26
BPL Architecture
Internet Ready Building (C) GSCOM 2010
8
-
8/9/2019 IRB Made Simple 2
9/26
In Building Broadband Access
Technology Options
Internet Ready Building (C) GSCOM 2010
9
Powerline (and Powerline over Coax)are the only In-Homedistribution technologies suitable for all Applications
Technology Strengths Weaknesses
Wi-Fi Widespread No Video
Dead spot
Interference (no QoS/QoE)Wired (FO or UTP) Well known Need new wiring system
Coax (EOC, MoCA, HPNA) TV Location Not available everywhere
-
8/9/2019 IRB Made Simple 2
10/26
Benefits
Triple play (Data, Voice, Video) capability for users
Low cost installation
Plug-it, simple installation
Time to revenue for building owner
Increase building value
Central manageability
High scalability
Creating reliable, secure users access to Broadband beyondwireless hot spots ingress and intermediate RF outage
Internet Ready Building (C) GSCOM 2010
10
-
8/9/2019 IRB Made Simple 2
11/26
Connection Flow
Internet Ready Building (C) GSCOM 2010
11
-
8/9/2019 IRB Made Simple 2
12/26
BPL Implementation MDU12
Internet Ready Building (C) GSCOM 2010
-
8/9/2019 IRB Made Simple 2
13/26
In Building Coaxial (Cable TV)
Network
Internet
M
R
R
CPE
M
R
CPE
Master
Repeater
CPE/Modem
TV Cable Amplifier
Data Cable
Coaxial Cable
13
Internet Ready Building (C) GSCOM 2010
-
8/9/2019 IRB Made Simple 2
14/26
BPL Housing Complex
Implementation14
Internet Ready Building (C) GSCOM 2010
-
8/9/2019 IRB Made Simple 2
15/26
Hotel/Apartment Configuration
Internet Ready Building (C) GSCOM 2010
15
Internet
`
Ethernet Cable
Powrline CableMaster
Repeater
CPE
DistributionBox
MainDistribution
Box
`
1st Floor
2nd
Floor
3rd
Floor
4th Floor
5th Floor
UTP Cable
-
8/9/2019 IRB Made Simple 2
16/26
House/Room Connection
Internet Ready Building (C) GSCOM 2010
16
-
8/9/2019 IRB Made Simple 2
17/26
BPL Application
Internet access
Video streaming and Home Entertainment Network
Surveillance and monitoring
IP telephony
Internet Ready Building (C) GSCOM 2010
17
-
8/9/2019 IRB Made Simple 2
18/26
Internet Access
Internet Ready Building (C) GSCOM 2010
18
-
8/9/2019 IRB Made Simple 2
19/26
Home Entertainment Network
Internet Ready Building (C) GSCOM 2010
19
BPL
-
8/9/2019 IRB Made Simple 2
20/26
Surveillance and Monitoring
Internet Ready Building (C) GSCOM 2010
20
-
8/9/2019 IRB Made Simple 2
21/26
IP Telephony
Internet Ready Building (C) GSCOM201021
-
8/9/2019 IRB Made Simple 2
22/26
As simple as Pick, Plug, Play
Internet Ready Building (C) GSCOM 2010
22
Plug
Play
Pick
-
8/9/2019 IRB Made Simple 2
23/26
Site Example MDB Installation
Internet Ready Building (C) GSCOM 2010
23
BPLMaster or Repeater
-
8/9/2019 IRB Made Simple 2
24/26
Site Example Out door
Internet Ready Building (C) GSCOM 2010
24
-
8/9/2019 IRB Made Simple 2
25/26
Site Example In Unit or House
Internet Ready Building (C) GSCOM 2010
25
BPLCPE/Modem
-
8/9/2019 IRB Made Simple 2
26/26
PT Global Solution Comindo
Ruko Apartment WGP
Blok R01-36Kelapa Gading Permai
Jakata 14240
Indonesia
Tel: +62-21-45844975
Fax: +62-21-45844976
www.gscom-asia.com
Contact
mailto:[email protected]://www.gscom-asia.com/http://www.gscom-asia.com/http://www.gscom-asia.com/http://www.gscom-asia.com/mailto:[email protected]:[email protected]:[email protected]