irmis3 status and plans gabriele carcassi 10/11/2010
TRANSCRIPT
IRMIS3 modules
Module name Goal Status
Infrastructure
Components
(Lightweight) inventory
Cabling
eLog
Lattice
Save Restore
Magnet measurement
PV Crawler
Epics DB generation
Nothing Prototype Alpha Beta Production
Infrastructure
Requirements• Build/packaging – production• Logging – production• Security (AuthZ/AuthN) – prototype
TBD• Improve logging
Not covered• Nothing that we are aware
Available in the distribution with general support• Maintainer: Gabriele Carcassi
Component module
Requirements• Ability to edit component types – production• Ability to edit components (installations) in hierarchy –
production
TBD• Final UI touches
Not covered• Nothing that we are aware
Available in the distribution with general support• Maintainer: Gabriele Carcassi
Cabling module
Requirements• Ability to edit cable types – production• Ability to edit cable tray/partition/paths – production• Ability to edit cables – production
TBD• Load test (missing data)• UI consolidation
Not covered• Nothing that we are aware
Available in the distribution with general support• Maintainer: Gabriele Carcassi
Lightweight inventory module
Requirements• Ability to track parts – production• Ability to install/uninstall parts – production
TBD• Installation/uninstallation history – will export to the eLog
Not covered• Shipping and receiving – not planned• Components lifecycle – not planned• Travelers – not planned
Available in the distribution with general support• Maintainer: Gabriele Carcassi
eLog module
Requirements• Data model – prototype• UI – prototype• API – nothing
TBD• Requirement verification and implementation
Not covered
Not available• Maintainer: Don Dohan
Lattice module
Requirements• Data model – prototype• PVAccess service/API – prototype
TBD• Requirement verification and implementation
Not covered• Multiple lattices using different “as-built” parameters
Not available• Maintainer: Don Dohan
Old version available in the distribution as is• Maintainer: Gabriele Carcassi
Save restore module
Requirements• Data model – prototype• PVAccess service/API – prototype
TBD• Requirement verification and implementation
Not covered
Not available• Maintainer: Don Dohan
Magnetic measurement module
Requirements• Data model – prototype
TBD• Requirement verification and implementation
Not covered
Not available• Maintainer: Don Dohan
PV Crawler module
Requirements• PV Crawler – production in IRMIS2• API – alpha• UI – nothing
TBD• Test and bundle the crawler with IRMIS3, finalize API and
implement UI
Not covered• Nothing that we are aware
Not available• Maintainer: ?