Disclosure to Promote the Right To Information Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information under the control of public authorities, in order to promote transparency and accountability in the working of every public authority, and whereas the attached publication of the Bureau of Indian Standards is of particular interest to the public, particularly disadvantaged communities and those engaged in the pursuit of education and knowledge, the attached public safety standard is made available to promote the timely dissemination of this information in an accurate manner to the public. इंटरनेट मानक !ान $ एक न’ भारत का +नम-णSatyanarayan Gangaram Pitroda “Invent a New India Using Knowledge” प0रा1 को छोड न’ 5 तरफJawaharlal Nehru “Step Out From the Old to the New” जान1 का अ+धकार, जी1 का अ+धकारMazdoor Kisan Shakti Sangathan “The Right to Information, The Right to Live” !ान एक ऐसा खजाना > जो कभी च0राया नहB जा सकता ह Bharthari—Nītiśatakam “Knowledge is such a treasure which cannot be stolen” IS 9013 (1978): Method of making, curing and determining compressive strength of accelerated cured concrete test specimens [CED 2: Cement and Concrete]

Upload: others

Post on 11-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IS 9013 (1978): Method of making, curing and determining ...IS I 901S • 1978 Indian Standard METHOD OF MAKING, CURING AND DETER MINING COMPRESSIVE STRENGTH OF ACCELERATED-CUREDCONCRETE

Disclosure to Promote the Right To Information

Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information under the control of public authorities, in order to promote transparency and accountability in the working of every public authority, and whereas the attached publication of the Bureau of Indian Standards is of particular interest to the public, particularly disadvantaged communities and those engaged in the pursuit of education and knowledge, the attached public safety standard is made available to promote the timely dissemination of this information in an accurate manner to the public.

इंटरनेट मानक

“!ान $ एक न' भारत का +नम-ण”Satyanarayan Gangaram Pitroda

“Invent a New India Using Knowledge”

“प0रा1 को छोड न' 5 तरफ”Jawaharlal Nehru

“Step Out From the Old to the New”

“जान1 का अ+धकार, जी1 का अ+धकार”Mazdoor Kisan Shakti Sangathan

“The Right to Information, The Right to Live”

“!ान एक ऐसा खजाना > जो कभी च0राया नहB जा सकता है”Bhartṛhari—Nītiśatakam

“Knowledge is such a treasure which cannot be stolen”

“Invent a New India Using Knowledge”

है”ह”ह

IS 9013 (1978): Method of making, curing and determiningcompressive strength of accelerated cured concrete testspecimens [CED 2: Cement and Concrete]

Page 2: IS 9013 (1978): Method of making, curing and determining ...IS I 901S • 1978 Indian Standard METHOD OF MAKING, CURING AND DETER MINING COMPRESSIVE STRENGTH OF ACCELERATED-CUREDCONCRETE
Page 3: IS 9013 (1978): Method of making, curing and determining ...IS I 901S • 1978 Indian Standard METHOD OF MAKING, CURING AND DETER MINING COMPRESSIVE STRENGTH OF ACCELERATED-CUREDCONCRETE
Page 4: IS 9013 (1978): Method of making, curing and determining ...IS I 901S • 1978 Indian Standard METHOD OF MAKING, CURING AND DETER MINING COMPRESSIVE STRENGTH OF ACCELERATED-CUREDCONCRETE

IS : 9013 -1978( Reaffirmed 2008 )

Indian StandardMETHOD OF MAKING, CURING AND DETER­

MINING COMPRESSIVE STRENGTH OFACCELERATED-CURED CONCRETE

TEST SPECIMENS

(Fourth Reprint DECEMBER 1998)( Incorporating Amendment No.1)

UDC 666.97.035.5 ; 620.173

1998

B U R E A U O F I N D I A N S T A N D A R D SMANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG

NEW DELHI 110002

Gr 3 April 1979

© Copyright

Page 5: IS 9013 (1978): Method of making, curing and determining ...IS I 901S • 1978 Indian Standard METHOD OF MAKING, CURING AND DETER MINING COMPRESSIVE STRENGTH OF ACCELERATED-CUREDCONCRETE

IS I 1013• 1978

Indian Standard

METHOD OF MAKING, CURING AND DETER­MINING COMPRESSIVE STRENGTH OF

ACCELERATED-CURED CONCRETETEST SPECIMENS

Cement and Concrete Sectional Committee, BDC 2

CluJirrMlIDa H. C. VIIVEIVABAVA

ltI/W,unJililCement Researcb Inltitute of Indi., New Delhi

Structural Engineering Research Centre ( CSIR ),Roorkee

Irrigation Department, Government of Puojab,Chandigarh

DlnECT<JR. I PRI (..4ltmUJlI)DIRECTOR ( CSMRS ) Central Water CommiaaioD, New Delbi

DEPUTY DIRECTOR. ( CSMRS ) (ltllmual4 )ENGINEER-IN-eRIEI' Central Public Woru Dep&l1meat, New Delhi

SUPSRJIITBNDING ENGINUR.DBLHI CS:-FTRAL CIBCL. No.2 (.Al'''''''' )

SaBI AKITABHA GH08R N.tioaal Teat HOUle, CalcuttaSHBI E. K. RAIIACBAlfD.... ( A"."." )

CUIEr ESOINEEI\ ( Pno.JJ·:cT8)

MIfIlMSADDITIONAL DIRZCTOll, ST..L~D.AaD. Research. Designl It Standarda Orlanizatioa

( BatS) ( Ministry of Railways), LucknowDEPUTY DIRKOTOR. STAlfDARD8

( BatS) (.AllIr1lil11)SUBI K. C. AOOAR\VAL Hindu.tan Prefab Ltd, New Delhi

Snnr C. L. KAtU41WAL (All.""')Sunl D. C. BANRAJEE Cement Corporation of India Ltd. New Delhi

Sn m A. U. RIJHSfNOnANI ( AI,,,,..,,)SHnI K. P. 8ANEUJJ::)o; Larsen It Toubro Ltd, Bombay

SUBI HA1U8H N. t.1ALANI ( Altnlld")StiRI R. N. BAN8AL Beas Designs Organization, NaDIa. Township

SaRI T. C. GAno ( .41l,rrualt )DR N. S. BHAL

( Cotll;"tl 1M"" 2 )

r() Copyright 1998

l3UREAlJ ()F INDIAN STANIlARllS

This publication is protected under the Indian Copyright Act (XIV of 1957) andreproduction in whole or in part by any means except with written permission of thepublisher shall be deemed to be an infringement of copyright under the said Act.

Page 6: IS 9013 (1978): Method of making, curing and determining ...IS I 901S • 1978 Indian Standard METHOD OF MAKING, CURING AND DETER MINING COMPRESSIVE STRENGTH OF ACCELERATED-CUREDCONCRETE

.1 .1011 • 1171

( C.fIli..~fr- /M" 1 )

MIIn/wrsDB Ro. K. OHOIR

DB R. R. HATTIAlfOADISaal P. J. JA008 ( AII"MI, )

DR IQBAL ALISHAI M. T. K ••••

R,pru.,.,ill,Central Road Research Institute (CS1R). ~ew

Delhi; Grad Indian Roads Congress, New DelhiSSRI Y. R. PauLL (AII"u" I) Central Road Research Institute (CSIR), New

DelhiS H RIM. DIN A K A nAN Central Road Research Institute (<;SIR), New

(AI'Ir"Gt, 11 ) DelhiSHRI B. R. GOVllfD Enlineer-in-ChieC's Branch, Army Headquarters,

New DelhiSURI G. R. MrBCHANDANI ( AI'muJu )

SH.I A. K. GunA Hyderabad Asbestol Cement Products Ltd,Hyderabad

The Associated Cement Companies I... td, Bombay

EnlineeriDI Research Laboratories, HyderabadDirectorate General of Supplies It Disposals,

New DelhiSRBI S. R. KULKA••I M. N. Dutur It Co (Pvt) Ltd. CalcuttaSaBI S. K. LASA The Institution of Enlineerl ( India ). Calcutta

S••I B. T. UXWALLA (AI'ImIJ")DR MOBAX RAJ Central Building Re.earcb Institute (CSIR),

Roorkee

Director General) lSI (&-'!f/ieiDMM. )

DR S. S. R.BII ( Altmaal, )Sa.l K. K. NAIIBIAB In personal capacity (. RauJ.I.YIJ' J1 First

C"$c"" Parle Ro"d, C",."",a" Ad.",." M4d,tu )DR A. V. R. R40 National Building. Organaation. New Delhi

SR1\1 K. S. SRINIVA8AN (Alt"nat,)S.nJ R. V. CHALAPATHJ RAO Geological Survey of India, Calcutta

SHRJ S. Roy ( Altlrut, )SaBI T. N. S. RAO Gammon Indi. Ltd, Bombay

8Bal S. R. PurBEIBO (AI,.,..,.)S.cRftAay Central Board of Irrigation and Power, New Delhi

DRuTY SJ:O••T.AJlY ( I ) ( MImuJI,)S.BI N. S.. Roads Winl. Ministry of Shipping and Transport

S••IJ. R. K. PB.AIAD ( AI-,..,.)SR"! K. A. Subramaniam The India Cements Ltd, Madras

S.BI P. S. RAMAOHANDRAN ( AltlrratJ', )S V P •• I If T I: If DIN Q ElfOINBER Public Works Department, Government of

( DUIGNa ) Tamil Nadu, MadrasE%BCt1S'IVI: El'tJU'.J:R (SM&R

DJVI.IOK) (AI'mlGI, )SHill L. SWAROOP , Dalmia Cement ( Bbarat ) Ltd) New Delhi

SSRI A. V. RAMANA ( AI,.,.." )SHRI B. T. UNWALLA The Concrete Auociation of Indi•• Bombay

SHRI T. M. MBNON ( All""at, )SBRI D. AJITHA SIIIB.. ,

Director ( Civ Engg )

S«;,~

SSRI M. N. NBBLAltAlfDBANAssistant Director (Civ Engg), lSI

( C.n,i"".tI Oil /M" 12)

2

Page 7: IS 9013 (1978): Method of making, curing and determining ...IS I 901S • 1978 Indian Standard METHOD OF MAKING, CURING AND DETER MINING COMPRESSIVE STRENGTH OF ACCELERATED-CUREDCONCRETE

IS I 901S • 1978

Indian Standard

METHOD OF MAKING, CURING AND DETER­MINING COMPRESSIVE STRENGTH OF

ACCELERATED-CURED CONCRETETEST SPECIMENS

o. FOREWORD

0.1 This Indian Standard was adopted by the Indian Standards Institutionon 30 November 1978, after the draft finalized by the Cement and ConcreteSectional Committee had been approved by the Civil Engineering DivisionCouncil.

0.2 Traditionally, quality of concrete in construction works is calculatedin terms of its 28 days compressive strength, This procedure requires 28days of moist curing before testing, which is too long a period to be of anyvalue for either concrete construction control or applying timely correctivemeasures. If after 28 days. the quality of concrete is found to be dubious,it would have considerably hardened by that time and also might havebeen buried by subsequent construction. Thus replacement of the concretemass of questionable attributes becomes very difficult and often impracti­cal. On the other hand, if the concrete is found to possess excessive strengththan required, it would be too late to prevent wasteful use of cement onuneconomical mix proportioning. Hence, standard 28 days cube testingof concrete is not feasible for quality control.

0.3 What is essentially needed for assessing quality of controlled concreteis an acceptance test which can supply results, while the concrete is stillaccessible and sufficiently green to make its removal practicable, that is,within about 24 hours after casting. With the assistance of 1eliablc testmethods employing accelerated curing techniques, it is now possible to testthe compressive strength of concrete within a short period and thereby toestimate whether it is likely to reach the specified strength at 28 days ornot.

0.4 The need for having a reliable and fast method for evaluatingcontrolled concrete in the field using accelerated curing technique wasrecognized by Cement and Concrete Sectional Committee and as a result,the Committee decided to evolve a standard method of determining

3

Page 8: IS 9013 (1978): Method of making, curing and determining ...IS I 901S • 1978 Indian Standard METHOD OF MAKING, CURING AND DETER MINING COMPRESSIVE STRENGTH OF ACCELERATED-CUREDCONCRETE

II • 9013• 1971

compressive strength of test specimens cured by accelerated curinemethods.

0.5 This standard lays down the method of making, curing and testing incompression concrete specimens cured by two accelerated methods namelywarm-water method and boiling-water method. The method laid downin this standard may be used for quality-control purposes, or for theprediction of normal strength of concrete at later ages, by the use of anappropriate correlation-curve obtained by testing normally-cured andaccelerated cured concrete specimens of the mix proportion and materialsto be used at the site. Such correlation-curves prepared on the basis ofsome case studies have been given in Appendix A. In this standard, themethod of test has been so defined as to be readily applicable to themajority of test specimens made on construction sites and to give resultsof low variability.

0.6 High pressure steam curing is also used as an accelerated-curingmethod, but has not been covered due to its inherent limitations in appli­cation. However, this method may be useful for internal quality controlpurposes under special circumstances.

0.7 In the formulation of this standard, due weightage has been given tointernational coordination among the standards and practices prevailing indifferent countries in addition to relating it to the practices in the field inthe country. Assistance has also been rendered by the researchesconducted by Cement Research Institute or India, New Delhi.

0.8 For the purpose of deciding whether a particular requirement of thisstandard is complied with, the final value, observed or calculated, express­ing the result of-a test or analysis, shall be rounded off in accordancewith IS : 2-1960*. The number of significant places retained in the roundedoff value should be the same as that of the specified value in thisstandard.

1. SCOPE

1.1 This standard lays down the method for making, curing and testing incompression, specimens of concrete stored under conditions intended toaccelerate the development of strength.

The following two methods of accelerated curing have been coveredin this standard:

a) Warm-water method, andb) Boiling-water method.

·Rules for rounding off numer-ical values ( reoised ],

Page 9: IS 9013 (1978): Method of making, curing and determining ...IS I 901S • 1978 Indian Standard METHOD OF MAKING, CURING AND DETER MINING COMPRESSIVE STRENGTH OF ACCELERATED-CUREDCONCRETE

IS I 901S· 1978

2. APPARATVS

2.1 Moald - The mould shall conform to IS: 516-1959·.

2.2 Mould Cover Plate - Each mould shall be provided with a flat steelcover plate, rigid enough so as to avoid distortion during usc and ofdimensions such that the plate completely covers the top edge of themould.

2.3 CariDI Tank2.3.1 The curing tank shall be constructed from any material of

suitable strength that will resist the effects of corrosion. The internaldimensions of the tank shall be adequate to accommodate the requirednumber and size of the test specimens such that test specimens can beeasily removed.

2.3.2 The tank shall contain sufficient water and be controlled so thatthe temperature of the water around the specimens immersed in the tankis maintained at the desired level at all times except for a period notexceeding 15 minutes immediately after the immersion of a freshly madespecimen into the tank.

2.3.3 A typical diagrammatic layout of a tank suitable for acceleratedcuring of test specimens is given in F ig , 1.

3. PREPARATION OF TEST SPECIMENS

3.1 The preparation of test specimen including sampling of materials,preparation of materials, proportioning, weighing, mixing, testing forworkability, choice of the size of test specimens, compacting, and cappingof specimen sh.all be in accordance with IS: 516-1959*, jf tests areintended to draw correlation curve between the results from compressivestrength tests on specimens cured by normal curing method and acceleratedcuring method.

3.2 If the tests are intended for control purposes, sampling shall be donein accordance with IS: 1199-1959t and choice of the size of test specimens,compacting, and capping of specimen shall be in accordance withIS : S16-1959·.3.3 Immediately after moulding, each specimen shall be covered with asteel plate thinly coated with mould oil to prevent adhesion of concrete.

4. ACCELERATED CURING BY WARM WATER METHOD

4.1 After the specimens have been made, they shall be left to standundisturbed in their moulds in a place free from vibration at a temperature

.Method. of tests for strength of concrete.tMethods of sampling and analysis of concrete.

s

Page 10: IS 9013 (1978): Method of making, curing and determining ...IS I 901S • 1978 Indian Standard METHOD OF MAKING, CURING AND DETER MINING COMPRESSIVE STRENGTH OF ACCELERATED-CUREDCONCRETE

II - ! .. • i

'"SW

ITC

HG

EAR

AN

DF

US

ES

a

HE

AT

ING

EL

EM

EN

TS

WIT

HTH

ER

OM

OS

TATS

-==-

==-

-=---

==--

--==-

=--

-==-

==--=

-------

=--=

--==

==---

---------

----

---.

...-

..--

-=---

--=----

=---

-_-

-._-

b

SP

EC

IME

NM

OU

LD

INL

ET

TA

P

cR

EM

OV

AB

LES

UP

PO

RT

S

NO

T.-

Th

edi

men

sion

aG.

6an

df

ofc

urin

gta

nk

luit

able

for

acco

mm

odat

iDI

twel

ve,

150

mm

cu

ba

are

1-60

BI,

.()·S

Om

and

0-65

Dlr.

pec

tiv

ely

.

FlO

.1

DIA

OIl

AlO

lAT

ICL

AY

OU

TO

PS

UIT

AB

LB

CU

lliN

GT

AN

K

0\

Page 11: IS 9013 (1978): Method of making, curing and determining ...IS I 901S • 1978 Indian Standard METHOD OF MAKING, CURING AND DETER MINING COMPRESSIVE STRENGTH OF ACCELERATED-CUREDCONCRETE

lie 1111 .1171

of27 ± 2f1!C for at leut one hour, prior to immenion in the curiDr taDk.The time between the addition of water to the insredientl and immenioDor the teat apecimens in the curing tank shall be at le.lt Ii houn but aballnot exceed 31 houn.

4.2 The specimens in their moulds ahall be ,endy lowered into the c:uriqtank and shall remain totally immersed at 55 ± 2°C for. period of Dotless than 19 houn 50 minutes. The specimens shall then be removed fromthe water, marked for identification. removed from the mould. andimmersed in the cooling tank at 27 ± 2°C before the completion of20 hours 10 minutes from the start of immenion in the curing tank. Theyshall remain in the cooling tank for a period of not leu than one hour.

NOT. - For control purposes, the above time tolerance. may be relaxed aDdan appropriate correction factor applied.

5. ACCELERATED CURING BY BOILING WATER METHOD

5.1 After the specimens have been made, they shall be stored in a placefree from vibration, in moist air of at least 90 percent relative humidityand at a temperature of 27 ± 2"C for 23 hours :J: 15 minutes from thetime of addition of water to the ingredients.

5.2 The specimens shall then be gently lowered into the curing tank andshall remain totally immersed. for a period of 3i houn ± 5 minutes. Thetemperature of the water in the curing tank .hall be at boiling ( 100°C)at sea Ievel, The temperature of water .ball Dot drop more thaDgoC after the specimens are placed and .hall retur~ to boUing within15 minutes.

NOT. -In confined places the temperature or the water may be kept just belowthe boiling point to avoid excessive evaporatioD.

5.3 After .euring for 31 houn ± 5 minute. in'the curing tani, the .~imenshall be. removed from the boiling water, removed frolllJhe mould. andcooled -by immersing in cooling tank at 27 ± 2°0 Cor 2 b.

I. TESTING

6.1 The specimens shall be tested in accordance with IS: 516.1959·.

8.2 In the warm water method specimens shall be tested while stiD wet,not more than 2 hours from the time of immerslon in the cooling tank.

6.3 In the boiling water method. the age at the time of teat .haI1 be 2B~haull :t. 20 miaUIa.

• J,fetbod. of tel" for ,eren,th of concrete.

7

Page 12: IS 9013 (1978): Method of making, curing and determining ...IS I 901S • 1978 Indian Standard METHOD OF MAKING, CURING AND DETER MINING COMPRESSIVE STRENGTH OF ACCELERATED-CUREDCONCRETE

III illS • 1171

7. CALCULATION

7.1 The calculation of compressive strength shaJJ be done in accordancewith IS: 516-1959-.

I. REPORT

8.1 The following information shall be included in the report on each testspecimen:

a) Identification mark (including the size and type) of test speci-mens and date of casting;

b) Date and time of test and age of specimen;c) Particulars of concrete from which test specimen was made;d) Method of compaction;e) Size of specimen;f) Mass of specimen;g) Defects, if any, in specimen;h) Time of adding water to concrete materials;j) Time of making test specimen;k) Time of immersion of test specimen into curing tank;

m) Time of removal of test specimen from curing tank;n) Time of immersion of test specimen into cooling tank;p) Time of removal of test specimen from cooling tank;q) Thermographic record of temperature of water in curing tank;r) Maximum load at crushing;s) Compressive strength; andt) Description of fractured face.

9. PRECAUTIONS

9.1 The following precautions shall be taken:a) The curing tank shall be cleaned and the water renewed periodi­

cally so as to prevent accumulation of detritus which may impairthe heating or circulating system,

b) The use of boiling water imposes the need for safety measures toprevent scalding or eye-burns. resulting from sudden escape ofsteam, upon opening the cover. Also care shall be exercised whenimmersing the specimens to avoid splashing of hot water.

-Method! of t~st:. for strength of concrete.

8

Page 13: IS 9013 (1978): Method of making, curing and determining ...IS I 901S • 1978 Indian Standard METHOD OF MAKING, CURING AND DETER MINING COMPRESSIVE STRENGTH OF ACCELERATED-CUREDCONCRETE

III1111. 1171

c) Strict attention .hall be liven to the protection and Itorap of theapecimens during the initial period of curing.

d) Suitable aafety devices and indicators ahall be provided with theset up. A separate panel or switch-board .hall be providedincorporating the thermograph and related heating equipmentcontrols.

10. INTERPRETATION 07 RESULTS

10.1 Since strength requirement. in existing specifications arc not basedupon accelerated curing, resultl from this method in checking the com­pliance of specified strengths at later ages shall be applied with greatcaution.

10.2 The results can be used in rapid assessment of variability for processcontrol and signalling the need for indicated adjustments.

10.3 The magnitude of the strength values from strength tests is influencedby the specific combination of materials. Therefore the use of the resultsfrom either conventional tests at any arbitrary age or those from thismethod shall be supported by experience or correlations developed for theexisting local conditions and materials ( s., Appendix A ).

APPENDIX A( Clauses 0.5 and 10.3 )

CORRELATION OF RESULTS FROM COMPRESSIVE STRENGTHTESTS ON SPECIMENS CURED BY NORMAL AND

ACCELERATED CURING METlfODS

A-I. Accelerated curing of concrete hastens the process of hydration ofcement and as a result, a substantial proportion of the strength to beattained in 28 days under normal curing conditions is achieved within ashorter time. The rate and extent of hydration of cement under a parti­cular curing regime depend mainly upon the chemical composition ofcement, water-cement ratio and mix proportions, which are considered tobe important parameters in the correlation of results from compressivestrength tests on specimens cured by accelerated curing method and normalcuring method.

The accelerated curing regime, in itself, is another variable in thatthe higher temperature employed may alter the morphology of the hydra­tion products apart from thermally activating the chemical reactions ofhydration of cement.

9

Page 14: IS 9013 (1978): Method of making, curing and determining ...IS I 901S • 1978 Indian Standard METHOD OF MAKING, CURING AND DETER MINING COMPRESSIVE STRENGTH OF ACCELERATED-CUREDCONCRETE

1& I toiS. 1978

A-2. The variability ariling (rom the curing regime to be adopted. iseliminated by standardizing them. al is -done in this standard. Figures 2and 3 (I" Note) show typical results on the correlation of com pressivestrength of concrete specimens normaJly cured and accelerated-cured bythe Boiling Water Method and the Warm Water Method respectively. Itis found that a correlation exists between the results obtained on concretespecimens, cured by accelerated method and cured by normal method, formixes employing different material. and mix proportions. It is also foundthat the strength of concrete after accelerated curing (by either method)is of the order of 50 percent of that obtained on normaJly cured, 28 daysold specimens. When results of concrete with specific ingredients and mixproportions are considered, the dispersion of results is considerably

70

•N 10•N 1

EE,

50~

% REGRESSION E Tt; R21 • 8·09 .t·6' RQzau 4OI!enII'> •iii 30 100 C ----....... -cD1&1~Q.Z

200u>- 27 t. 2°CCc• 10• 23~·2S h

NCCELERATE

CURING CYCLE

00 10 20 30 40 50 80 70

ACCELERATED STRENGTH2

N/mm-R Q

FlO. 2 TYPICAL RELATION BETWBItN ACCJ!.LERATED AND 28-DAYCoMPRESSIVE STRENGTH OF CONCRETE (BOILING WATItR METROD)

10

Page 15: IS 9013 (1978): Method of making, curing and determining ...IS I 901S • 1978 Indian Standard METHOD OF MAKING, CURING AND DETER MINING COMPRESSIVE STRENGTH OF ACCELERATED-CUREDCONCRETE

III 9013 • 1978

reduced. and the coefficient of variation of results from accelerated curingmethods may, in that case, be expected to be of the same order asobtained in normally cured, 28 days conventional tests, Although thetests have shown that the correlation between results from acceleratedcuring method and normally cured 28 days conventional tests is notmaterially affected by the chemical composition, fineness and strength ofcements, the mix proportions or use of some indigenous admixtures, it ispreferable to establish the actual correlation under site conditions for thespecific materials and mix proportions to be adopted, for use in each case.

NOT. - The typical correlation curves liven in Fig. 2 and 3 are based on aleries of teatl conducted at the Cement Research Institute of India, New Delhi.

REGRESSION EOUATiON

\ R28:112·SS+ RQ

\V~'/

/ 5S t,oC---

-/

/ 27 t 2·C n Ii. ,I -I

'-5 TO 3·Sh---- h20h j: 10min ~ ~ -lh

IAC~ELERATEOCU ·NG CYCLE

t t

70

•NOC 60

N 1

Ee

......z

50Xt-OZW

.0cr:...en

w>fn 30enIII~CL:J: 200u>-<fc

10IGON

oo 10 20 30 40 50 602

ACCELERATED STRENGTH N/mm-R Q

7Q

Flo.3 TYPICAL RSI"ATION BETWEEN ACCELERATED AND 28-DAYCOMPRESSIVE STRENGTH OP CONCRETE (WARM "TATER METHOD)

J J

Page 16: IS 9013 (1978): Method of making, curing and determining ...IS I 901S • 1978 Indian Standard METHOD OF MAKING, CURING AND DETER MINING COMPRESSIVE STRENGTH OF ACCELERATED-CUREDCONCRETE

fS I 9013 • 1978

( CtnaIi".df,.. /NI". 2 )Concrete Subcommittee, BDC 2: 2

In personal capacity (C RamanalaYd' 11 FirstCrescent Park Road, Gandhinogar, AdYllr, Mat/ras)

Roads Wing ( Ministry of Shipping andTransport )

SHRIN.S.RAMASWAMY

M",,6ns R,p,tsmtinlSum C. R. ALJMCHANDANJ Stup Consultants Ltd, Bombay

SURI M. C. TANDON (Altertlat,)SHRf D. CHAXRAVAltTY Engineers India J..td, New DelhiD E PUT Y DUlECTon, STANDARDS Research Designs and Standard. Ora_Di••doD

( B & S ) ( Ministry of Railway. ) J LuckDOWA 88'1 8 TAN T D IRE C TOft.

STANDARDS ( M/C) ( AII.rMt,)DIRECTOR Engineering Research Laboratories, Hyder.badDIREcTon ( C & MDD ) Central Water Commission. New Delhi

DEPUTY DIRECTOR ( C & MOD)( Alltrnal, )

SHRI V. K. GSANEKAR. Structural Engineering Research Centre ( CSIJl ),Roorkee

Sunr A. S. PRASADA RAO ( Altemat« )DR R. K. GHOSH Central Road Research Inatitute (CSIR), New

DelhiSnnr M. R. CR~TTEJtJEB ( Altemat« )

SHRI V. K. GUPTA Engineer..in-Chief'. Branch, Army Headquarters,New Delhi

SItRI S. V. TIGARE (Alternal, )Snn r J. S. I-lfNoORANI Associated Consulting Services, Bombay

SItKr A. P. REMl!:lHOS ( Allernat,)SURI P.]. JAOUS The Associated Cement Oompanics Ltd, Bombay

SHUI ~1. R. \'.NAYAlCA ( Alternate )Sunr G. C. l\fATllun National Buildings Organization, New Delhi

Snn r G. 'I". BJlJDE ( Alternat« )Snnr K. K. NAMBIAH.

SJlRI R. P. SIKKA ( Alternate)SUR1 T. N. S. RAO Gammon India Lrd, Bombay

SURI S. R. PINlIJl:JUO ( Alternate)SO&1 M. P. GAJAPATHY RAO Public \\·orks and Housing Department, BombaySUPERINTKNIlINO E N' 0 1 :N P.: E R, Central Public Works Department, New Delhi

Df:LJU CENTRAL CIRCLE No.2SIIRI S. G. V AIDYA ( Altemat« )

DR C. A. TANEJA Cfntral. Building Research Institute (CSIR),Roorkee

88ftI B. S. GUPTA ( AluNI4t, )SHBt B. T. UNWALLA The Concrete Association of India, Bombay

SBRI T. M. MENON (AltmuJl,)DB H. C. VIS.E8VARAVA Cement Research Inatitute of India, New Delhi

DR A. K. MULLICK: ( Allm"d, )

12

Page 17: IS 9013 (1978): Method of making, curing and determining ...IS I 901S • 1978 Indian Standard METHOD OF MAKING, CURING AND DETER MINING COMPRESSIVE STRENGTH OF ACCELERATED-CUREDCONCRETE

BUREAU OF INDIAN STANDARDS

Headquarters:Manak 8havan, 9 Bahadur Shah Zalar Marg, NEW DELHI 110002Telephones: 323 0131,323 3375, 323 9402Fax: 91 11 3234062, 91 11 3239399, 91 11 3239382

32376 17

3378662

60 38 43

235 23 15

8329295

Telegrams : Manaksanstha(Common to all Offices)

Telephone

8-770032

Cen',sl Laboratory:

Plot No. 20/9, Site IV, Sahibabad Industrial Area, Sahibabad 201010

Regional Offices:

C.entral : Manak Bhavan, 9 Bahadur Shah Zafar Marg. NEW DELHl110002

·Eastern : 1/14 CIT Scheme VII M, V.I.~ Road, Maniktola. CALCUTTA 700054

Northern: SeQ 335-336, Sector 34-A, CHANDIGARH 160022

Southern: C.I.T. Campus, IV Cross Road. CHENNAI 600113

tWestern : Manakalaya, E9, Behind Maral Telephone Exchange. Andheri (East),MUMBAI400093

Branch Offices:

'Pushpak', Nurmohamed Shaikh Marg. Khanpur, AHMEDABAD 380001

:tPeenya Industrial Area, 1st Stage, Bangalore-Tumkur Road.BANGALORE 560058

Ganqotri Complex. 5th Floor, Bhadbhada Road, T.T. Nagar, BHOPAL 462003

Plot No. 62-63, Urnt VI. Ganga Nagar. BHUBANESHWAR 75100'

Kalaikathir Buildings. 670 Avinashi Road, COIMBATORE 641037

Plot No. 43. Sector 16 A. Mathura Road. FARIDABAD 121001

Savitri Complex, 116 G.T. Road, GHAZIABAD 201001

53/5 Ward No. 29, R.G. Barua Road, 5th By.. lane, GUWAHATI 781003

5-8-56C, L.N. Gupta Marg. Nampally Station Road, HYDERABAD 500001

E..52, Chitaranjan Marg, C..Scheme, JAIPUR 302001

117/418 B, Sarvodaya Naga~. KANPUR 208005

Seth Shawsn, 2nd Floor, Behind Leela Cinema, Naval Kishore Road,LUCKNOW 226001 .

NIT Building. Second Floor, Gokulpat Market, NAGPUR 440010

Patliputra Industrial Estate. PATNA 800013

Institution of Engineers (India) Building 1332 Shivaji Nagar. PUNE 411005

T.e. No. 14/1421. University ~O. Palayam, THIRUVANANTHAPURAM 695034

550 13 48

8394955

554021

403627

21 01 41

8-288801

8·711996

54 11 37

20 1083

372925

21 68 76

238923

52 51 71

262305

323635

621 17

·Sales Office is at 5 Chowringhee Approach, P.O. Princep Street,CALCUTTA 700072

t Sales Office is at Novelty Chambers, Grant ijoad, MUMBAI 400007