iso-9001 2k requirements 101003 dep
TRANSCRIPT
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
1/95
10/10/2003 ISO-9001:2000 Requirements 1
ISOISO--9001:20009001:2000
Quality Management SystemsQuality Management Systems
REQUIREMENTSREQUIREMENTS
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
2/95
10/10/2003 ISO-9001:2000 Requirements 2
Process Based ApproachProcess Based ApproachMANAGEMENTMANAGEMENT
RESPONSIBILITYRESPONSIBILITY
RESOURCE MANAGEMENTRESOURCE MANAGEMENT
MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS &
IMPROVEMENTIMPROVEMENT
INPUT PROCESSOUTPUT
CC
UU
SS
TT
OO
MM
EE
RR
P
DC
A
PRODUCT REALIZATIONPRODUCT REALIZATION
SatisfactionSatisfaction
C
U
S
T
O
M
E
R
RequirementsRequirements
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
3/95
10/10/2003 ISO-9001:2000 Requirements 3
THETHE
PDCAPDCACYCLECYCLE
PLANPLAN
DODO
IMPLEMENTIMPLEMENT
CHECKCHECK
STUDYSTUDY
ACTACT
EVALUATEEVALUATE
VERIFYVERIFY
VALIDATEVALIDATE
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
4/95
10/10/2003 ISO-9001:2000 Requirements 4
ISOISO--9000:2000 Family Structure9000:2000 Family Structure
Quality Management SystemQuality Management System
PROCESS MODELPROCESS MODEL
QualityQualityManagementManagementSystemsSystems --RequirementsRequirements
ISO 9001ISO 9001
REFERENCEREFERENCESTANDARDSTANDARD
QualityQualityManagementManagementSystemsSystems FundamentalsFundamentals& Vocabulary& Vocabulary
ISO 9000ISO 9000
ISO 9004ISO 9004
GuidelinesGuidelinesForForPerformancePerformanceImprovementsImprovements
SUPPORTING STANDARDSSUPPORTING STANDARDS
ISO 10012ISO 10012
RequirementsRequirementsforforMeasurementMeasurementProcesses &Processes &MeasuringMeasuringEquipmentEquipment
OTHER STANDARDSOTHER STANDARDS ISO 19011ISO 19011GuidelinesGuidelineson Qualityon Quality& EMS& EMSAuditingAuditing
ISO/IEC 17025ISO/IEC 17025
Competence ofCompetence ofTesting &Testing &CalibrationCalibrationLabsLabs
ISO/TS 16949ISO/TS 16949
Quality MgmtQuality MgmtSystemsSystems --AutomotiveAutomotive
ISO 13485ISO 13485MedicalMedicalDevicesDevices --Quality MgmtQuality MgmtSystemsSystems
ISO 14001ISO 14001
EnvironmentalEnvironmentalManagementManagementSystemSystem
ISO 15189ISO 15189
Medical LabsMedical Labs Quality &Quality &CompetenceCompetence
ISO 10013ISO 10013
GuidelinesGuidelinesforforDevelopingDevelopingQMSQMSDocumentsDocuments
ISO 10014ISO 10014GuidelinesGuidelinesManagingManagingthetheEconomicsEconomicsof Qualityof Quality
ISO 10017ISO 10017
GuidanceGuidanceononStatisticalStatisticalTechniquesTechniques
ISO 10005ISO 10005
GuidelinesGuidelinesfor Qualityfor QualityPlansPlans
ISO 10006ISO 10006
GuidelinesGuidelinesin Projectin ProjectMgmtMgmt
ISO 10007ISO 10007
GuidelinesGuidelinesfor Config.for Config.MgmtMgmt
ISO 10015ISO 10015
GuidelinesGuidelinesfor Trainingfor Training
PHILOSOPHICAL GUIDELINESPHILOSOPHICAL GUIDELINES
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
5/95
10/10/2003 ISO-9001:2000 Requirements 5
QMS per ISOQMS per ISO--9001:20009001:2000
4 Quality Management System4 Quality Management System
General RequirementsGeneral Requirements
Documentation RequirementsDocumentation Requirements
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
6/95
10/10/2003 ISO-9001:2000 Requirements 6
QMS per ISOQMS per ISO--9001:20009001:20004.1 General Requirements4.1 General Requirements
Establish, Document, Implement &
Maintain a QMSQMS and Continually ImproveContinually Improve
its Effectivenessits Effectiveness
Identify the ProcessesProcesses and their application
throughout the organization
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
7/95
10/10/2003 ISO-9001:2000 Requirements 7
QMS per ISOQMS per ISO--9001:20009001:2000
4.1 General Rs Continued
Determine the sequence and interaction ofthese processesthese processes;
Determine criteria and methods to ensure
the operation and control ofthesetheseprocessesprocesses are effective;
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
8/95
10/10/2003 ISO-9001:2000 Requirements 8
QMS per ISOQMS per ISO--9001:20009001:20004.1 General Rs Continued
Ensure necessary resources and informa-
tion are available to support the operationand monitoring ofthese processesthese processes;
Monitor, Measure and analyze thesethese
processesprocesses;Implement actions necessary to achieve
planned results and continual improvement
ofthese processesthese processes.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
9/95
10/10/2003 ISO-9001:2000 Requirements 9
QMS per ISOQMS per ISO--9001:20009001:20004.1 General Rs Continued
Outsourced processes shall beshall beidentified and controlledidentified and controlled
Outside processes that affect productOutside processes that affect product
conformity with requirements;conformity with requirements;
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
10/95
10/10/2003 ISO-9001:2000 Requirements 10
QMS per ISOQMS per ISO--9001:20009001:2000
4.2 Documentation Requirements4.2 Documentation Requirements
A QMS documentation shall include:StatementsStatements of a Quality PolicyQuality Policy and QualityQuality
ObjectivesObjectives;
A Quality ManualQuality Manual;ProceduresProcedures required by ISO (6);
RecordsRecords required by ISO (21);
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
11/95
10/10/2003 ISO-9001:2000 Requirements 11
QMS per ISOQMS per ISO--9001:20009001:2000
4.2 Documentation Requirements-Continued
Quality ManualScopeScope of QMS
Detailed ExclusionsExclusions and their justification;
Documented ProceduresDocumented Procedures, or reference tothem; and
A description of the interactionA description of the interaction between the
QMS processes.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
12/95
10/10/2003 ISO-9001:2000 Requirements 12
Exclusions to ISO-9001:20001.2 Application
All Requirements are generic and are intended
to be applicable to all organizations.
Where any requirements cannot be applied
due to the nature of an organization and its
product an exclusion can be considered.Exclusions are limited to requirements within
clause 7 Product Realization.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
13/95
10/10/2003 ISO-9001:2000 Requirements 13
Procedures Required by ISOProcedures Required by ISO4.2.3 Control of DocumentsControl of Documents
4.2.4 Control of RecordsControl of Records8.2.2 Internal AuditsInternal Audits
8.3 Control of Nonconforming ProductControl of Nonconforming Product
8.5.2 Corrective ActionCorrective Action
8.5.3 Preventive ActionPreventive Action
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
14/95
10/10/2003 ISO-9001:2000 Requirements 14
Records Required by ISORecords Required by ISO (21)(21)4.2.4 Records shall be established andRecords shall be established and
maintained to provide evidence of conformity tomaintained to provide evidence of conformity to
requirements and of the effective operation of therequirements and of the effective operation of the
QMS.QMS.
5.6.1 Management Review General, Records fromRecords from
Management ReviewsManagement Reviews shall be maintained ;
6.2.2 (Human Resources) Appropriate records ofrecords of
education, training, skills and experienceeducation, training, skills and experience;
7.1 (Planning of Product Realization) Records to
provide evidence that the realization processes andevidence that the realization processes and
resulting product meet requirementsresulting product meet requirements;
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
15/95
10/10/2003 ISO-9001:2000 Requirements 15
Records Required by ISORecords Required by ISO7.2.2 (Customer Related Processes - Review of
Requirements related to the Product) Records of theRecords of the
results of the review and actions arising from it shall beresults of the review and actions arising from it shall be
maintainedmaintained;7.3.2 (Design & Development Inputs) Inputs relatingInputs relating
to product requirements shall be determined andto product requirements shall be determined and
records maintainedrecords maintained;
7.3.4 (Design & Development Review) Records ofRecords of
the results of the reviews and any necessary actionsthe results of the reviews and any necessary actionsshall be maintainedshall be maintained;
7.3.5 (Design & Development Verification) RecordsRecords
of the results of the verification and any necessaryof the results of the verification and any necessary
actions shall be maintainedactions shall be maintained.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
16/95
10/10/2003 ISO-9001:2000 Requirements 16
Records Required by ISORecords Required by ISO7.3.6 (Design & Development Validation) Records ofRecords of
the results of validation and any necessary actionsthe results of validation and any necessary actions
shall be maintainedshall be maintained;
7.3.7 (Control of Design & Development Changes)Records of the results of the review and any necessaryRecords of the results of the review and any necessary
actions shall be maintainedactions shall be maintained;
7.4.1 (Purchasing Process) Records of the results ofRecords of the results of
evaluations and any necessary actions arising from theevaluations and any necessary actions arising from the
evaluation shall be maintainedevaluation shall be maintained;
7.5.2 ( Validation of Special Processes) The
organization shall establish arrangements for these
processes including requirements for recordsrequirements for records;
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
17/95
10/10/2003 ISO-9001:2000 Requirements 17
Records Required by ISORecords Required by ISO7.5.3 (Identification & Traceability) Where traceability is
a requirement, the organization shall control and
record the unique identification of the productrecord the unique identification of the product;
7.5.4 (Customer Property) If any customer property islost, damaged or otherwise found to be unsuitable for
use, this shall be reported to the customer and recordsthis shall be reported to the customer and records
maintainedmaintained;
7.6 (Control of Monitoring & Measuring Devices)
If calibrated/verified to nonIf calibrated/verified to non--national or international standardsnational or international standards
the basis shall be recorded.the basis shall be recorded.
Equipment found nonEquipment found non--conformingconforming validity of previousvalidity of previous
measurements shall be assessed & recorded;measurements shall be assessed & recorded;
Records of the results of calibration and verification shall beRecords of the results of calibration and verification shall be
maintainedmaintained;
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
18/95
10/10/2003 ISO-9001:2000 Requirements 18
Records Required by ISORecords Required by ISO8.2.2 (Internal Audit) The responsibilities and
requirements for planning and conducting audits and
for reporting results and maintaining recordsand maintaining records;
8.2.4 (Monitoring & Measurement of Product) Evidence
of conformity with the acceptance criteria shall be
maintained. Records shall indicate the person(s)Records shall indicate the person(s)
authorizing release of productauthorizing release of product;
8.3 (Control of Nonconforming Product) Records of theRecords of thenature of nonconformities and any subsequent actionsnature of nonconformities and any subsequent actions
taken, including concessions obtained, shall betaken, including concessions obtained, shall be
maintainedmaintained;
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
19/95
10/10/2003 ISO-9001:2000 Requirements 19
Records Required by ISORecords Required by ISO8.5.2 (Improvement Corrective Action) Records of theRecords of the
results of action takenresults of action taken;
8.5.3 (Improvement Preventive Action) Records ofRecords of
the results of action takenthe results of action taken.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
20/95
10/10/2003 ISO-9001:2000 Requirements 20
QMS per ISOQMS per ISO--9001:20009001:20004.2 Documentation Requirements-Continued
Control of DocumentsControl of Documents
A documented procedure to define the
following controls:
Approve adequacy of documents prior to issueApprove adequacy of documents prior to issue;;
Review and update as necessary & ReReview and update as necessary & Re--approveapprove;
Ensure changes and current revision status ofEnsure changes and current revision status of
documents are identifieddocuments are identified;
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
21/95
10/10/2003 ISO-9001:2000 Requirements 21
QMS per ISOQMS per ISO--9001:20009001:2000Control of Documents-Contd
A documented procedure to define thefollowing controls: - Continued
Ensure relevant versionsrelevant versions of applicable
documents are available at points of useare available at points of use;
Ensure documents remain legible and readilyremain legible and readily
identifiable;identifiable;
Ensure documents ofexternal originexternal origin areidentified and their distribution controlled; and
Prevent the unintended use of obsoletePrevent the unintended use of obsolete
documentsdocuments, AND apply suitable ID if they areapply suitable ID if they are
retained for any purposeretained for any purpose;
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
22/95
10/10/2003 ISO-9001:2000 Requirements 22
QMS per ISOQMS per ISO--9001:20009001:2000
4.2 Documentation Requirements-Continued
Control of RecordsControl of RecordsA documented procedure to define the
controls needed for the identificationidentification,,
storagestorage,, protectionprotection,, retrievalretrieval,, retention timeretention time
andand dispositiondisposition of records.of records.
4.2 Documentation Requirements-Continued
Control of RecordsControl of RecordsA documented procedure to define the
controls needed for the identificationidentification,,
storagestorage,, protectionprotection,, retrievalretrieval,, retention timeretention time
andand dispositiondisposition of records.of records.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
23/95
10/10/2003 ISO-9001:2000 Requirements 23
Process Based ApproachProcess Based ApproachMANAGEMENTMANAGEMENT
RESPONSIBILITYRESPONSIBILITY
RESOURCE MANAGEMENTRESOURCE MANAGEMENT
MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS &
IMPROVEMENTIMPROVEMENT
INPUT PROCESSOUTPUT
CC
UU
SS
TT
OO
MM
EE
RR
P
DC
A
PRODUCT REALIZATIONPRODUCT REALIZATION
SatisfactionSatisfaction
C
U
S
T
O
M
E
R
RequirementsRequirements
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
24/95
10/10/2003 ISO-9001:2000 Requirements 24
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:2000
5 Management Responsibility5 Management Responsibility
Management CommitmentManagement Commitment
Customer FocusCustomer Focus
Quality PolicyQuality Policy
PlanningPlanning
Management ReviewManagement Review
5 Management Responsibility5 Management Responsibility
Management CommitmentManagement Commitment
Customer FocusCustomer Focus
Quality PolicyQuality Policy
PlanningPlanning
Management ReviewManagement Review
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
25/95
10/10/2003 ISO-9001:2000 Requirements 25
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:20005.1 Management Commitment5.1 Management Commitment
Evidence of CommitmentEvidence of Commitment
Communicate to the Organization the
Importance of meeting CustomerCustomer, StatutoryStatutory,
and RegulatoryRegulatory RequirementsRequirements
Establish the Quality PolicyQuality Policy
Ensuring Quality ObjectivesQuality Objectives are Established
Conduct Management ReviewsManagement Reviews
Ensure the Availability of ResourcesAvailability of Resources
5.1 Management Commitment5.1 Management Commitment
Evidence of CommitmentEvidence of Commitment
Communicate to the Organization the
Importance of meeting CustomerCustomer, StatutoryStatutory,
and RegulatoryRegulatory RequirementsRequirements
Establish the Quality PolicyQuality Policy
Ensuring Quality ObjectivesQuality Objectives are Established
Conduct Management ReviewsManagement Reviews
Ensure the Availability of ResourcesAvailability of Resources
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
26/95
10/10/2003 ISO-9001:2000 Requirements 26
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:20005.2 Customer Focus5.2 Customer Focus
Ensure Customer Requirements are determinedand met, with the aim of enhancing customeraim of enhancing customer
satisfactionsatisfaction
5.3 Quality Policy5.3 Quality Policy
Established, Appropriate, Framework for QualityFramework for Quality
ObjectivesObjectives, Communicated & UnderstoodCommunicated & Understood, and
Reviewed for Continued Suitability
5.2 Customer Focus5.2 Customer Focus
Ensure Customer Requirements are determinedand met, with the aim of enhancing customeraim of enhancing customer
satisfactionsatisfaction
5.3 Quality Policy5.3 Quality Policy
Established, Appropriate, Framework for QualityFramework for Quality
ObjectivesObjectives, Communicated & UnderstoodCommunicated & Understood, and
Reviewed for Continued Suitability
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
27/95
10/10/2003 ISO-9001:2000 Requirements 27
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:20005.4 Planning5.4 Planning
Establish Quality ObjectivesEstablish Quality Objectives at relevant levelsat relevant levels
and functions within the Organizationand functions within the Organization
Ensure that the planning of the QMS is carriedEnsure that the planning of the QMS is carried
outout to meet the General Requirementsto meet the General Requirements (4.1)(4.1)
Maintain Integrity of the QMSMaintain Integrity of the QMS when changes arewhen changes areplanned & implementedplanned & implemented
5.4 Planning5.4 Planning
Establish Quality ObjectivesEstablish Quality Objectives at relevant levelsat relevant levels
and functions within the Organizationand functions within the Organization
Ensure that the planning of the QMS is carriedEnsure that the planning of the QMS is carried
outout to meet the General Requirementsto meet the General Requirements (4.1)(4.1)
Maintain Integrity of the QMSMaintain Integrity of the QMS when changes arewhen changes areplanned & implementedplanned & implemented
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
28/95
10/10/2003 ISO-9001:2000 Requirements 28
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:20005.5 Responsibility, Authority and CommunicationResponsibility, Authority and Communication
Ensure that responsibilities & authorities are
defined and communicateddefined and communicated within the
organization
Appoint a Management RepresentativeManagement Representative
Ensure appropriate communication processescommunication processesare established and Communication on the
Effectiveness of the QMS takes placeEffectiveness of the QMS takes place
5.5 Responsibility, Authority and CommunicationResponsibility, Authority and Communication
Ensure that responsibilities & authorities are
defined and communicateddefined and communicated within the
organization
Appoint a Management RepresentativeManagement Representative
Ensure appropriate communication processescommunication processesare established and Communication on the
Effectiveness of the QMS takes placeEffectiveness of the QMS takes place
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
29/95
10/10/2003 ISO-9001:2000 Requirements 29
Management RepresentativeManagement RepresentativeIrrespective of other responsibilities, shall
have the following responsibility & authority
Ensure that processesprocesses needed for the QMS areestablished, implemented & maintained
Reports to Top Management on the performanceperformance
of the QMS and any need for improvementneed for improvement
Ensure the promotion & awarenesspromotion & awareness of Customerrequirements throughout the Organization
Can include being the liaison with external parties
on QMS matters
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
30/95
10/10/2003 ISO-9001:2000 Requirements 30
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:20005.6 Management Review
Review the QMS at planned intervalsat planned intervalsEnsure ContinuedContinued Suitability, Adequacy, &Suitability, Adequacy, &
EffectivenessEffectiveness;
Include Assessing Opportunities forOpportunities for
ImprovementImprovement & the need for changesneed for changes
including the Quality Policy and Quality
Objectives
5.6 Management Review
Review the QMS at planned intervalsat planned intervalsEnsure ContinuedContinued Suitability, Adequacy, &Suitability, Adequacy, &
EffectivenessEffectiveness;
Include Assessing Opportunities forOpportunities for
ImprovementImprovement & the need for changesneed for changes
including the Quality Policy and Quality
Objectives
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
31/95
10/10/2003 ISO-9001:2000 Requirements 31
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:20005.6 Management Review
Review InputReview Input
Results of AuditsResults of Audits
Customer FeedbackCustomer Feedback
Process Performance & Product ConformityProcess Performance & Product Conformity
Status of Corrective & Preventive ActionsStatus of Corrective & Preventive Actions
FollowFollow--up Actions from Previous Reviewsup Actions from Previous Reviews
Changes that could affect the QMSChanges that could affect the QMS
Recommendations for ImprovementRecommendations for Improvement
5.6 Management Review
Review InputReview Input
Results of AuditsResults of Audits
Customer FeedbackCustomer Feedback
Process Performance & Product ConformityProcess Performance & Product Conformity
Status of Corrective & Preventive ActionsStatus of Corrective & Preventive Actions
FollowFollow--up Actions from Previous Reviewsup Actions from Previous Reviews
Changes that could affect the QMSChanges that could affect the QMS
Recommendations for ImprovementRecommendations for Improvement
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
32/95
10/10/2003 ISO-9001:2000 Requirements 32
Management ResponsibilityManagement Responsibility
per ISOper ISO--9001:20009001:20005.6 Management Review
Review OutputReview OutputDecisions & Actions takenDecisions & Actions taken related to:
Improvement on the effectiveness of the QMS & itsImprovement on the effectiveness of the QMS & its
ProcessesProcesses
Improvement of product related to customerImprovement of product related to customerrequirementsrequirements
Resource NeedsResource Needs
5.6 Management Review
Review OutputReview OutputDecisions & Actions takenDecisions & Actions taken related to:
Improvement on the effectiveness of the QMS & itsImprovement on the effectiveness of the QMS & its
ProcessesProcesses
Improvement of product related to customerImprovement of product related to customerrequirementsrequirements
Resource NeedsResource Needs
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
33/95
10/10/2003 ISO-9001:2000 Requirements 33
Process Based ApproachProcess Based ApproachMANAGEMENTMANAGEMENT
RESPONSIBILITYRESPONSIBILITY
RESOURCE MANAGEMENTRESOURCE MANAGEMENT
MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS &
IMPROVEMENTIMPROVEMENT
INPUT PROCESSOUTPUT
CC
UU
SS
TT
OO
MM
EE
RR
P
DC
A
PRODUCT REALIZATIONPRODUCT REALIZATION
SatisfactionSatisfaction
C
U
S
T
O
M
E
R
RequirementsRequirements
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
34/95
10/10/2003 ISO-9001:2000 Requirements 34
Resource ManagementResource Management
per ISOper ISO--9001:20009001:20006 Resource Management6 Resource Management
Provision of ResourcesProvision of Resources
Human ResourcesHuman Resources
InfrastructureInfrastructure
Work EnvironmentWork Environment
6 Resource Management6 Resource Management
Provision of ResourcesProvision of Resources
Human ResourcesHuman Resources
InfrastructureInfrastructure
Work EnvironmentWork Environment
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
35/95
10/10/2003 ISO-9001:2000 Requirements 35
Resource ManagementResource Management
per ISOper ISO--9001:20009001:20006.1 Provision of Resources6.1 Provision of Resources
Determine and ProvideDetermine and Provide Resources needed to:Resources needed to: Implement & Maintain the QMSImplement & Maintain the QMS
Continually Improve Effectiveness of QMSContinually Improve Effectiveness of QMS
Enhance Customer Satisfaction by meetingEnhance Customer Satisfaction by meetingcustomer requirementscustomer requirements
6.1 Provision of Resources6.1 Provision of Resources
Determine and ProvideDetermine and Provide Resources needed to:Resources needed to: Implement & Maintain the QMSImplement & Maintain the QMS
Continually Improve Effectiveness of QMSContinually Improve Effectiveness of QMS
Enhance Customer Satisfaction by meetingEnhance Customer Satisfaction by meetingcustomer requirementscustomer requirements
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
36/95
10/10/2003 ISO-9001:2000 Requirements 36
Resource ManagementResource Management
per ISOper ISO--9001:20009001:20006.2 Human Resources6.2 Human Resources
Personnel performing work affecting productPersonnel performing work affecting product
quality shall be competent on the basis ofquality shall be competent on the basis of
appropriate education, training, skills andappropriate education, training, skills and
experienceexperience
6.2 Human Resources6.2 Human Resources
Personnel performing work affecting productPersonnel performing work affecting product
quality shall be competent on the basis ofquality shall be competent on the basis of
appropriate education, training, skills andappropriate education, training, skills and
experienceexperience
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
37/95
10/10/2003 ISO-9001:2000 Requirements 37
Resource ManagementResource Management
per ISOper ISO--9001:20009001:20006.3 Competence,6.3 Competence,
Awareness and TrainingAwareness and Training
Determine the necessaryDetermine the necessary
competencecompetence
Provide Training or takeProvide Training or take
other actions to satisfyother actions to satisfyEvaluate the EffectivenessEvaluate the Effectiveness
of actions takenof actions taken
6.3 Competence,6.3 Competence,
Awareness and TrainingAwareness and Training
Determine the necessaryDetermine the necessary
competencecompetence
Provide Training or takeProvide Training or take
other actions to satisfyother actions to satisfyEvaluate the EffectivenessEvaluate the Effectiveness
of actions takenof actions taken
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
38/95
10/10/2003 ISO-9001:2000 Requirements 38
Resource ManagementResource Management
per ISOper ISO--9001:20009001:20006.3 Infrastructure6.3 Infrastructure
Determine, provide and maintain theDetermine, provide and maintain the
infrastructure needed to achieve conformity toinfrastructure needed to achieve conformity to
product requirementsproduct requirements
6.3 Infrastructure6.3 Infrastructure
Determine, provide and maintain theDetermine, provide and maintain the
infrastructure needed to achieve conformity toinfrastructure needed to achieve conformity to
product requirementsproduct requirements
Buildings, Workspace &Buildings, Workspace &
associated utilitiesassociated utilities
Process equipmentProcess equipment
(Hardware & Software)(Hardware & Software)
Supporting services (i.e.Supporting services (i.e.
transport ortransport or
communication)communication)
Buildings, Workspace &Buildings, Workspace &
associated utilitiesassociated utilities
Process equipmentProcess equipment
(Hardware & Software)(Hardware & Software)
Supporting services (i.e.Supporting services (i.e.
transport ortransport or
communication)communication)
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
39/95
10/10/2003 ISO-9001:2000 Requirements 39
Resource ManagementResource Management
per ISOper ISO--9001:20009001:20006.4 Work Environment6.4 Work Environment
Determine & Manage the workDetermine & Manage the work
environment needed to achieveenvironment needed to achieveconformity to product requirementsconformity to product requirements
[Factors that influence motivation,[Factors that influence motivation,satisfaction, development andsatisfaction, development and
performance of people.]performance of people.]Psychological FactorsPsychological Factors
Physical FactorsPhysical Factors
6.4 Work Environment6.4 Work Environment
Determine & Manage the workDetermine & Manage the work
environment needed to achieveenvironment needed to achieveconformity to product requirementsconformity to product requirements
[Factors that influence motivation,[Factors that influence motivation,satisfaction, development andsatisfaction, development and
performance of people.]performance of people.]Psychological FactorsPsychological Factors
Physical FactorsPhysical Factors
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
40/95
10/10/2003 ISO-9001:2000 Requirements 40
Resource ManagementResource Management
per ISOper ISO--9001:20009001:2000Work EnvironmentWork Environment -- ContinuedContinued
Psychological FactorsPsychological Factors
Greater Involvement & Understanding ofGreater Involvement & Understanding of
Objectives to be AchievedObjectives to be Achieved
Safety Rules & ProceduresSafety Rules & Procedures
Recognition & Reward for Achievement,Recognition & Reward for Achievement,Improvement & InnovationImprovement & Innovation
Career Planning & DevelopmentCareer Planning & Development
Work EnvironmentWork Environment -- ContinuedContinued
Psychological FactorsPsychological Factors
Greater Involvement & Understanding ofGreater Involvement & Understanding of
Objectives to be AchievedObjectives to be Achieved
Safety Rules & ProceduresSafety Rules & Procedures
Recognition & Reward for Achievement,Recognition & Reward for Achievement,Improvement & InnovationImprovement & Innovation
Career Planning & DevelopmentCareer Planning & Development
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
41/95
10/10/2003 ISO-9001:2000 Requirements 41
Resource ManagementResource Management
per ISOper ISO--9001:20009001:2000Work EnvironmentWork Environment -- ContinuedContinued
Physical FactorsPhysical Factors
ErgonomicsErgonomics
TemperatureTemperature
LightLight
NoiseNoise CleanlinessCleanliness
Work EnvironmentWork Environment -- ContinuedContinued
Physical FactorsPhysical Factors
ErgonomicsErgonomics
TemperatureTemperature
LightLight
NoiseNoise CleanlinessCleanliness
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
42/95
10/10/2003 ISO-9001:2000 Requirements 42
Process Based ApproachProcess Based ApproachMANAGEMENTMANAGEMENT
RESPONSIBILITYRESPONSIBILITY
RESOURCE MANAGEMENTRESOURCE MANAGEMENT
MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS &
IMPROVEMENTIMPROVEMENT
INPUT PROCESSOUTPUT
CC
UU
SS
TT
OO
MM
EE
RR
P
DC
A
PRODUCT REALIZATIONPRODUCT REALIZATION
SatisfactionSatisfaction
C
U
S
T
O
M
E
R
RequirementsRequirements
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
43/95
10/10/2003 ISO-9001:2000 Requirements 43
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:20007 Product Realization7 Product Realization
Planning of Product RealizationPlanning of Product Realization
CustomerCustomer--related Processesrelated Processes
Design & DevelopmentDesign & Development
PurchasingPurchasing
Production and Service ProvisionProduction and Service ProvisionControl of Monitoring and MeasuringControl of Monitoring and MeasuringDevicesDevices
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
44/95
10/10/2003 ISO-9001:2000 Requirements 44
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:20007.1 Planning of Product Realization7.1 Planning of Product Realization
Plan & Develop the processes needed forPlan & Develop the processes needed forProduct RealizationProduct Realization
Planning shall determine the following asPlanning shall determine the following asappropriate:appropriate:
Quality ObjectivesQuality Objectives && RequirementsRequirements for thefor theProduct;Product;
Need to establish processes, documents andNeed to establish processes, documents andprovide resources specific to the product;provide resources specific to the product;
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
45/95
10/10/2003 ISO-9001:2000 Requirements 45
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000Planning shall determine the following:Planning shall determine the following:
ContinuedContinued
RequiredRequired vverification,erification, vvalidation,alidation, mmonitoring,onitoring,
inspection & testinspection & test activities specific to theactivities specific to the
productproduct and the criteria for productand the criteria for product
acceptanceacceptance
RecordsRecords needed to provide evidence thatneeded to provide evidence that
the realization processes and resultingthe realization processes and resulting
product meet requirementsproduct meet requirements
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
46/95
10/10/2003 ISO-9001:2000 Requirements 46
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000TheThe outputoutput of this planning shall be in aof this planning shall be in a formform
suitablesuitable for the organizations method offor the organizations method of
operationsoperations
NOTE 1: A document specifying the QMS processesNOTE 1: A document specifying the QMS processes
(including the product realization processes) can be(including the product realization processes) can be
referred to as a Quality Planreferred to as a Quality Plan
NOTE 2: The Design & Development RequirementsNOTE 2: The Design & Development Requirements
(7.3) may also be applied to the development of the(7.3) may also be applied to the development of the
product realization processesproduct realization processes
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
47/95
10/10/2003 ISO-9001:2000 Requirements 47
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:20007.2 Customer7.2 Customer--related Processesrelated Processes
DeterminationDetermination of requirementsof requirements related to therelated to theproductproduct
ReviewReview of requirementsof requirements related to the productrelated to the product
Customer CommunicationCustomer Communication
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
48/95
10/10/2003 ISO-9001:2000 Requirements 48
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000Determination of requirementsDetermination of requirements related torelated tothe productthe product
RequirementsRequirements specified by the customer,specified by the customer,including delivery & postincluding delivery & post--delivery activities;delivery activities;
RequirementsRequirements necessary for specified ornecessary for specified orintended use, where known;intended use, where known;
Statutory and regulatory requirementsStatutory and regulatory requirements relatedrelatedto the product;to the product;
Any additional requirementsAny additional requirements determined by thedetermined by theOrganization.Organization.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
49/95
10/10/2003 ISO-9001:2000 Requirements 49
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000Review of requirementsReview of requirements related to therelated to the
productproduct
Shall be conducted prior to the commitment toShall be conducted prior to the commitment to
supply a product to the customer;supply a product to the customer;
Ensure that product requirements are defined;Ensure that product requirements are defined;
Ensure contract or order requirements differingEnsure contract or order requirements differingfrom those previously expressed are resolved;from those previously expressed are resolved;
Ensure capable of meting the definedEnsure capable of meting the defined
requirements.requirements.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
50/95
10/10/2003 ISO-9001:2000 Requirements 50
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000Review of requirementsReview of requirements related to the productrelated to the product
ContinuedContinued
Customer Requirements shall beCustomer Requirements shall be confirmedconfirmed by theby the
organizationorganization before acceptancebefore acceptance, where no, where no
documented statement of requirements isdocumented statement of requirements is
provided by the customerprovided by the customer
Where Product Requirements are changed, theWhere Product Requirements are changed, theorganization shallorganization shall ensure that relevant documentsensure that relevant documents
are amended and that relevant personnel areare amended and that relevant personnel are
made aware of the changed requirementsmade aware of the changed requirements
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
51/95
10/10/2003 ISO-9001:2000 Requirements 51
Product Realization
per ISO-9001:2000Customer CommunicationCustomer Communication
Determine and ImplementDetermine and Implement effectiveeffective
arrangements for communicatingarrangements for communicating with customerswith customersin relation to:in relation to:
Product information;Product information;
Enquiries, contracts or order handling, includingEnquiries, contracts or order handling, includingamendments;amendments;
Customer feedback, including customerCustomer feedback, including customercomplaints.complaints.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
52/95
10/10/2003 ISO-9001:2000 Requirements 52
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:20007.3 Design & Development7.3 Design & Development
Design & DevelopmentDesign & Development PlanningPlanning
Design & DevelopmentDesign & Development InputsInputs
Design & DevelopmentDesign & Development OutputsOutputs
Design & DevelopmentDesign & Development ReviewReview
Design & DevelopmentDesign & Development VerificationVerification
Design & DevelopmentDesign & Development ValidationValidation
Control ofControl ofDesign & DevelopmentDesign & Development ChangesChanges
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
53/95
VVerificationerificationVValidationalidation
7.3.5 & 7.3.67.3.5 & 7.3.6
RRevieweviewat Suitableat Suitable
Stages of DesignStages of Design& Development& Development
7.3.47.3.4
VVerificationerificationVValidationalidation
7.3.5 & 7.3.67.3.5 & 7.3.6
DesignOutpu
t7.3.3
Design &Design &
DevelopmentDevelopmentProcessProcess
End ItemProduct
Design
Input7.3.2
Application of DesignControl in Waterfall or Stair
Step Design Process[with ISO-9001 Clauses]
PlanPlanDesign &Design &
DevelopmentDevelopment
Stages, AND theStages, AND the
VerificationVerification
& Validation for& Validation for
each Stage 7.3.1each Stage 7.3.1
UserNeeds
7.3.2
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
54/95
10/10/2003 ISO-9001:2000 Requirements 54
Purchasing in ISOPurchasing in ISO--9001:20009001:20007.4 Purchasing7.4 Purchasing
PurchasingPurchasing ProcessProcess
PurchasingPurchasing InformationInformation
VerificationVerification of Purchased Productof Purchased Product
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
55/95
10/10/2003 ISO-9001:2000 Requirements 55
Purchasing in ISOPurchasing in ISO--9001:20009001:2000PurchasingPurchasing ProcessProcess
Ensure purchased product conforms toEnsure purchased product conforms to
specified requirements.specified requirements.
Type and Extent of control shall be dependentType and Extent of control shall be dependent
upon the effect of the purchased product onupon the effect of the purchased product on
subsequent product realization or the finalsubsequent product realization or the final
product.product.
Suppliers shall be evaluated and selectedSuppliers shall be evaluated and selected
based on their ability to supply product IAW thebased on their ability to supply product IAW the
organizations requirements.organizations requirements.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
56/95
10/10/2003 ISO-9001:2000 Requirements 56
Purchasing in ISOPurchasing in ISO--9001:20009001:2000PurchasingPurchasing ProcessProcess -- ContinuedContinued
Criteria for selection, evaluation, & reCriteria for selection, evaluation, & re--
evaluation shall be established.evaluation shall be established.
Records of the results of evaluations and anyRecords of the results of evaluations and any
necessary actions arising from the evaluationnecessary actions arising from the evaluation
shall be maintainedshall be maintained
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
57/95
10/10/2003 ISO-9001:2000 Requirements 57
Purchasing in ISO-9001:2000PurchasingPurchasing InformationInformation
Shall describe the product to be purchased,Shall describe the product to be purchased,
including where appropriate:including where appropriate:
Requirements for approval of product, procedures,Requirements for approval of product, procedures,
processes and equipment;processes and equipment;
Requirements for qualification of personnel, andRequirements for qualification of personnel, and
Quality Management SystemsQuality Management Systems
The organization shall ensure the adequacy ofThe organization shall ensure the adequacy ofspecified purchase requirementsspecified purchase requirements priorpriorto theirto their
communicationcommunication
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
58/95
10/10/2003 ISO-9001:2000 Requirements 58
Purchasing in ISO-9001:2000VerificationVerification of Purchased Productof Purchased Product
Shall establish and implement the inspection orShall establish and implement the inspection or
other activities necessary for ensuring theother activities necessary for ensuring theproduct meets specified purchaseproduct meets specified purchaserequirements.requirements.
Where the organization or its customer intendsWhere the organization or its customer intendsto perform verification at the suppliersto perform verification at the suppliers
premises, the intended verificationpremises, the intended verificationarrangements and the method of productarrangements and the method of productrelease shall be stated in the purchasingrelease shall be stated in the purchasinginformation.information.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
59/95
10/10/2003 ISO-9001:2000 Requirements 59
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:20007.5 Production and Service Provision7.5 Production and Service Provision
Control of Production & Service ProvisionControl of Production & Service ProvisionValidation of Processes for Product &Validation of Processes for Product &
Service ProvisionService Provision
Identification & TraceabilityIdentification & Traceability
Customer PropertyCustomer Property
Preservation of ProductPreservation of Product
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
60/95
10/10/2003 ISO-9001:2000 Requirements 60
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000Control of Production & Service ProvisionControl of Production & Service Provision
Plan & carry out provisions under controlledPlan & carry out provisions under controlled
conditions, including as applicable:conditions, including as applicable:
Availability of information that describesAvailability of information that describes thetheproduct characteristicsproduct characteristics ;;
Availability ofAvailability ofWork InstructionsWork Instructions, as necessary;, as necessary;
Use ofUse ofsuitable equipmentsuitable equipment;;
Availability & use ofAvailability & use ofMonitoring and MeasuringMonitoring and MeasuringDevicesDevices;;
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
61/95
10/10/2003 ISO-9001:2000 Requirements 61
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000PlanPlan & carry out provisions under controlled& carry out provisions under controlled
conditions, including as applicable:conditions, including as applicable: ContdContd
Implementation ofImplementation ofMonitoringMonitoring andand
MeasurementMeasurement;;
Implementation ofImplementation ofReleaseRelease,, DeliveryDelivery
andand PostPost--Delivery Activities.Delivery Activities.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
62/95
10/10/2003 ISO-9001:2000 Requirements 62
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000Validation of Processes for Product &Validation of Processes for Product &Service ProvisionService Provision
Validate any process for a provision whereValidate any process for a provision wherethe resulting outputthe resulting output cannot be verified bycannot be verified bysubsequent monitoring or measurementsubsequent monitoring or measurementwherewhere deficiencies become apparent onlydeficiencies become apparent only
after the product is in useafter the product is in use or the service hasor the service hasbeen deliveredbeen delivered
ValidationValidation demonstrates the abilitydemonstrates the ability of theof theprocessprocess to achieve planned resultsto achieve planned results
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
63/95
10/10/2003 ISO-9001:2000 Requirements 63
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000Validation of ProcessesValidation of Processes ContdContd
Establish Arrangements for these processes (asEstablish Arrangements for these processes (as
applicable):applicable):DefinedDefined Criteria for Review & ApprovalCriteria for Review & Approval of theof theprocess;process;
Approval ofApproval ofEquipmentEquipment & Qualification of& Qualification of
PersonnelPersonnel;;Use ofUse ofSpecific Methods & ProceduresSpecific Methods & Procedures;;
Requirements forRequirements forRecordsRecords; and; and
RevalidationRevalidation..
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
64/95
10/10/2003 ISO-9001:2000 Requirements 64
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000Identification & TraceabilityIdentification & Traceability
WhereWhere applicableapplicable,, product shall be identifiedproduct shall be identified
by a suitable means throughout itsby a suitable means throughout itsrealization process.realization process.
It shallIt shall identify the product statusidentify the product status withwithrespect torespect to monitoring & measurementmonitoring & measurement
requirements.requirements.WhereWhere traceabilitytraceability is a requirement, theis a requirement, theunique identification of the product shall beunique identification of the product shall becontrolled and recordedcontrolled and recorded..
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
65/95
10/10/2003 ISO-9001:2000 Requirements 65
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000Customer PropertyCustomer Property
Care shall be exercisedCare shall be exercised with customerwith customer
property while under the organizationsproperty while under the organizationscontrol or being used by the organization.control or being used by the organization.
Customer Property shall beCustomer Property shall be identifiedidentified,,verifiedverified,, protected and safeguardedprotected and safeguarded while inwhile in
use or being incorporated into the product.use or being incorporated into the product.IfIflostlost,, damageddamaged or otherwiseor otherwise found to befound to beunsuitableunsuitable, it shall be reported and records, it shall be reported and recordsmaintained.maintained.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
66/95
10/10/2003 ISO-9001:2000 Requirements 66
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:2000Preservation of ProductPreservation of Product
ConformityConformity of the product shall beof the product shall be preservedpreserved
during internal processing and delivery to theduring internal processing and delivery to the
intended destination.intended destination.
PreservationPreservation shall includeshall include identificationidentification,,
handlinghandling,, packagingpackaging andand protectionprotection..
PreservationPreservation also applies to thealso applies to the constituentconstituent
parts of a productparts of a product..
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
67/95
10/10/2003 ISO-9001:2000 Requirements 67
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:20007.6 Control of Monitoring and Measuring7.6 Control of Monitoring and Measuring
DevicesDevices
Determine theDetermine the monitoringmonitoring andand
measurementmeasurement to be undertaken toto be undertaken to
provideprovide evidence of conformityevidence of conformity toto
determined requirements, AND thedetermined requirements, AND themonitoring and measuringmonitoring and measuring devicesdevices
needed to ensure valid results.needed to ensure valid results.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
68/95
10/10/2003 ISO-9001:2000 Requirements 68
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:20007.6 Control of Monitoring and Measuring Devices7.6 Control of Monitoring and Measuring Devices ContdContd
EstablishEstablish processesprocesses to ensure thatto ensure that
monitoring and measurement can bemonitoring and measurement can be
carried out and in a mannercarried out and in a manner
consistent with the monitoring andconsistent with the monitoring and
measurement requirements.measurement requirements.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
69/95
10/10/2003 ISO-9001:2000 Requirements 69
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:20007.6 Control of Monitoring and Measuring Devices7.6 Control of Monitoring and Measuring Devices ContdContd
When necessary, measuring equipmentWhen necessary, measuring equipment
shall:shall:BeBe calibrated or verifiedcalibrated or verified at specified intervals,at specified intervals,
or prior to use,or prior to use, against measurementagainst measurement
standards traceablestandards traceable to international or nationalto international or national
measurement standards;measurement standards;Where no such standards exist, the basis use forWhere no such standards exist, the basis use for
calibration or verification shall be recorded.calibration or verification shall be recorded.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
70/95
10/10/2003 ISO-9001:2000 Requirements 70
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:20007.6 Control of Monitoring and Measuring Devices7.6 Control of Monitoring and Measuring Devices ContdContd
When necessary, measuring equipmentWhen necessary, measuring equipment
shall:shall: -- ContinuedContinuedBeBe adjustedadjusted ororrere--adjustedadjusted as necessary;as necessary;
BeBe identifiedidentified to enable theto enable the calibration statuscalibration status toto
be determined;be determined;
BeBe safeguardedsafeguarded from adjustments that wouldfrom adjustments that would
invalidate the measurement result;invalidate the measurement result;
BeBe protectedprotected from damage and deteriorationfrom damage and deterioration
during handling, maintenance and storage.during handling, maintenance and storage.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
71/95
10/10/2003 ISO-9001:2000 Requirements 71
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:20007.6 Control of Monitoring and Measuring Devices7.6 Control of Monitoring and Measuring Devices ContdContd
When the equipment isWhen the equipment is found not tofound not to
conformconform to requirements, theto requirements, the validity of thevalidity of theprevious measuring resultsprevious measuring results shall beshall beassessed and recorded.assessed and recorded.
Appropriate action shall be taken on theAppropriate action shall be taken on the
equipmentequipment and anyand any product affectedproduct affected..
Records of the results of calibration andRecords of the results of calibration andverification shall be maintained.verification shall be maintained.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
72/95
10/10/2003 ISO-9001:2000 Requirements 72
Product RealizationProduct Realization
per ISOper ISO--9001:20009001:200077.6 Control of Monitoring and Measuring Devices.6 Control of Monitoring and Measuring Devices ContdContd
Computer softwareComputer software to be used in theto be used in the
monitoring and measurement of specifiedmonitoring and measurement of specified
requirements,requirements, shall be confirmedshall be confirmed as to itsas to its
ability to satisfy the intended application.ability to satisfy the intended application.
This confirmation shall be undertaken priorThis confirmation shall be undertaken priorto initial use and reconfirmed asto initial use and reconfirmed as
necessary.necessary.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
73/95
10/10/2003 ISO-9001:2000 Requirements 73
Process Based ApproachProcess Based Approach
MANAGEMENTMANAGEMENT
RESPONSIBILITYRESPONSIBILITY
RESOURCE MANAGEMENTRESOURCE MANAGEMENT
MEASUREMENT, ANALYSIS &MEASUREMENT, ANALYSIS &
IMPROVEMENTIMPROVEMENT
INPUT PROCESSOUTPUT
CC
UU
SS
TT
OO
MM
EE
RR
P
DC
A
PRODUCT REALIZATIONPRODUCT REALIZATION
SatisfactionSatisfaction
C
U
S
T
O
M
E
R
RequirementsRequirements
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
74/95
10/10/2003 ISO-9001:2000 Requirements 74
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8 Measurement, Analysis and Improvement8 Measurement, Analysis and Improvement
GeneralGeneral
Monitoring and MeasurementMonitoring and Measurement
Control of Nonconforming ProductControl of Nonconforming Product
Analysis of DataAnalysis of Data
ImprovementImprovement
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
75/95
10/10/2003 ISO-9001:2000 Requirements 75
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:20008.1 General8.1 General
Plan & Implement the monitoring,Plan & Implement the monitoring,
measurement, analysis and improvementmeasurement, analysis and improvementprocesses needed to :processes needed to :
DemonstrateDemonstrate conformity of the product;conformity of the product;
EnsureEnsure conformity of the QMS;conformity of the QMS;
Continually improveContinually improve the effectiveness of the QMSthe effectiveness of the QMS
Determine the applicable methods, includingDetermine the applicable methods, includingstatistical techniques, and the extent of theirstatistical techniques, and the extent of theiruseuse
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
76/95
10/10/2003 ISO-9001:2000 Requirements 76
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.2 Monitoring and Measurement8.2 Monitoring and Measurement
Customer SatisfactionCustomer Satisfaction
Internal AuditInternal Audit
Monitoring and Measurement of ProcessesMonitoring and Measurement of Processes
Monitoring and Measurement of ProductMonitoring and Measurement of Product
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
77/95
10/10/2003 ISO-9001:2000 Requirements 77
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Customer SatisfactionCustomer Satisfaction
A QMS measurement of performanceA QMS measurement of performanceMonitor information relating toMonitor information relating to customercustomer
perceptionperception as to whether customeras to whether customer
requirements are being met;requirements are being met;Determine the methods for obtaining andDetermine the methods for obtaining and
using this informationusing this information
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
78/95
10/10/2003 ISO-9001:2000 Requirements 78
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Internal AuditInternal Audit
Conduct internal audits at planned intervals toConduct internal audits at planned intervals todetermine whether the QMS:determine whether the QMS:
ConformsConforms to the planned arrangements, toto the planned arrangements, to
the requirements of ISOthe requirements of ISO--9001, and QMS9001, and QMS
requirements established by therequirements established by theorganization;organization;
Is effectively implementedIs effectively implemented and maintainedand maintained
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
79/95
10/10/2003 ISO-9001:2000 Requirements 79
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000Internal AuditInternal Audit ContCont
An audit program shall be planned,An audit program shall be planned, consideringconsidering
the status and importance of the processes andthe status and importance of the processes andareas to be auditedareas to be audited, as well as the results of the, as well as the results of theprevious audits.previous audits.
The auditThe audit criteriacriteria,, scopescope,, frequencyfrequency andand methodsmethodsshall be defined.shall be defined.
Selection of auditors and conduct of the auditsSelection of auditors and conduct of the auditsshallshall ensure objectivity and impartialityensure objectivity and impartiality of theof theaudit processaudit process
Auditors shall not audit their own workAuditors shall not audit their own work
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
80/95
10/10/2003 ISO-9001:2000 Requirements 80
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000Internal AuditInternal Audit ContdContd
TheThe management responsible for themanagement responsible for the
areas being auditedareas being audited shall ensure thatshall ensure thatactions are takenactions are taken without undue delaywithout undue delay totoeliminate detected nonconformities andeliminate detected nonconformities andtheir causes.their causes.
FollowFollow--up activitiesup activities shall include theshall include theverification of the actions taken and theverification of the actions taken and thereporting of verification results.reporting of verification results.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
81/95
10/10/2003 ISO-9001:2000 Requirements 81
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000Monitoring and Measurement of ProcessesMonitoring and Measurement of Processes
Apply suitable methods for monitoring and,Apply suitable methods for monitoring and,
where applicable, measurement of the QMSwhere applicable, measurement of the QMSprocesses.processes.
These methods shall demonstrate the ability ofThese methods shall demonstrate the ability ofthe processes to achieve planned results.the processes to achieve planned results.
When planned results are not achieved,When planned results are not achieved,correction and corrective action shall be takencorrection and corrective action shall be takenas appropriate to ensure conformity of theas appropriate to ensure conformity of theproduct.product.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
82/95
10/10/2003 ISO-9001:2000 Requirements 82
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Monitoring and Measurement of ProductMonitoring and Measurement of Product
Monitor and measure theMonitor and measure the productproductcharacteristicscharacteristics to verify thatto verify that productproduct
requirementsrequirements have been met.have been met.
This is to be carried out at appropriateThis is to be carried out at appropriate
stages of the product realization processstages of the product realization process
IAW the planned arrangementsIAW the planned arrangements
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
83/95
10/10/2003 ISO-9001:2000 Requirements 83
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000Monitoring and Measurement of ProductMonitoring and Measurement of Product ContCont
Evidence of conformityEvidence of conformity with thewith the acceptanceacceptance
criteriacriteria shall be maintainedshall be maintainedRecords shall indicate theRecords shall indicate the person(s)person(s)authorizing release of productauthorizing release of product
Product Release and Service DeliveryProduct Release and Service Delivery shall notshall not
proceedproceed until the planned arrangements haveuntil the planned arrangements havebeen satisfactorily completed, unlessbeen satisfactorily completed, unless otherwiseotherwiseapproved by a relevant authorityapproved by a relevant authority and whereand whereapplicable by the customer.applicable by the customer.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
84/95
10/10/2003 ISO-9001:2000 Requirements 84
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:20008.3 Control of Nonconforming Product8.3 Control of Nonconforming Product
Ensure that product whichEnsure that product which does not conformdoes not conform
to product requirements isto product requirements is identifiedidentified andandcontrolledcontrolled to prevent its unintended use orto prevent its unintended use ordelivery.delivery.
The controls and related responsibilities andThe controls and related responsibilities and
authorities for dealing with nonconformingauthorities for dealing with nonconformingproduct shall be defined in a documentedproduct shall be defined in a documentedprocedure.procedure.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
85/95
10/10/2003 ISO-9001:2000 Requirements 85
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:20008.3 Control of Nonconforming Product8.3 Control of Nonconforming Product ContdContd
Nonconforming product shall be dealt with inNonconforming product shall be dealt with in
one or more of the following ways:one or more of the following ways:TakingTaking action to eliminateaction to eliminate the detectedthe detectednonconformity;nonconformity;
Authorizing its useAuthorizing its use, release or acceptance under, release or acceptance under
concession by a relevant authority and, whereconcession by a relevant authority and, whereapplicable, by the customer;applicable, by the customer;
TakingTaking action to preclude its original intended useaction to preclude its original intended useor applicationor application
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
86/95
10/10/2003 ISO-9001:2000 Requirements 86
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:20008.3 Control of Nonconforming Product8.3 Control of Nonconforming Product ContdContd
When nonconforming productWhen nonconforming product is correctedis corrected itit
shall beshall be subject to resubject to re--verificationverification totodemonstrate conformity todemonstrate conformity to the requirements.the requirements.
When detected after delivery or use hasWhen detected after delivery or use hasstarted,started, actions shall be takenactions shall be taken with thewith the
nonconforming product , appropriate to thenonconforming product , appropriate to theeffects, or potential effects, of theeffects, or potential effects, of thenonconformity.nonconformity.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
87/95
10/10/2003 ISO-9001:2000 Requirements 87
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.3 Control of Nonconforming Product8.3 Control of Nonconforming Product
ContdContd
RecordsRecords of the nature of nonconformitiesof the nature of nonconformities
and any subsequent actions taken,and any subsequent actions taken,
including concessions obtained, shall beincluding concessions obtained, shall be
maintainedmaintained
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
88/95
10/10/2003 ISO-9001:2000 Requirements 88
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:20008.4 Analysis of Data8.4 Analysis of Data
Determine, collect and analyze appropriateDetermine, collect and analyze appropriate
datadata to demonstrateto demonstrate thethe suitabilitysuitability andandeffectivenesseffectiveness of the QMS andof the QMS and to evaluateto evaluatewherewhere continual improvementcontinual improvement of theof theeffectiveness of the QMS can be madeeffectiveness of the QMS can be made
This shall include data generated as a result ofThis shall include data generated as a result ofmonitoring and measurement and from othermonitoring and measurement and from otherrelevant sourcesrelevant sources
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
89/95
10/10/2003 ISO-9001:2000 Requirements 89
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:20008.4 Analysis of Data8.4 Analysis of Data ContdContd
Analysis of Data shall provide informationAnalysis of Data shall provide information
relating to:relating to:Customer satisfaction;Customer satisfaction;
Conformity to product requirements;Conformity to product requirements;
Characteristics and trends of processes andCharacteristics and trends of processes and
products including opportunities for preventiveproducts including opportunities for preventive
action;action;
SuppliersSuppliers
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
90/95
10/10/2003 ISO-9001:2000 Requirements 90
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
8.5 Improvement8.5 Improvement
Continual ImprovementContinual ImprovementCorrective ActionCorrective Action
Preventive ActionPreventive Action
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
91/95
10/10/2003 ISO-9001:2000 Requirements 91
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000Continual ImprovementContinual Improvement
Continually improve the effectiveness of theContinually improve the effectiveness of the
QMS through the use of the:QMS through the use of the:Quality PolicyQuality Policy;;
Quality ObjectivesQuality Objectives;;
Audit ResultsAudit Results;;
Analysis of DataAnalysis of Data;;Corrective & Preventive ActionsCorrective & Preventive Actions
Management ReviewManagement Review
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
92/95
10/10/2003 ISO-9001:2000 Requirements 92
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Corrective ActionCorrective Action
Actions takenActions taken to eliminate the causeto eliminate the cause ofof
nonconformity in order tononconformity in order to preventprevent
recurrencerecurrence
They shall be appropriate to the effects ofThey shall be appropriate to the effects of
the nonconformities encountered.the nonconformities encountered.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
93/95
10/10/2003 ISO-9001:2000 Requirements 93
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000Corrective ActionCorrective Action-- ContdContd
A documented procedure shall be establishedA documented procedure shall be established
to define requirements for:to define requirements for:Reviewing nonconformities (including CustomerReviewing nonconformities (including CustomerComplaints);Complaints);
Determining the causes of nonconformities;Determining the causes of nonconformities;
Evaluating the need for action to ensure thatEvaluating the need for action to ensure that
nonconformities do not recur;nonconformities do not recur;Determining & implementing action needed;Determining & implementing action needed;
Reviewing corrective action taken;Reviewing corrective action taken;
Records of results of action taken.Records of results of action taken.
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
94/95
10/10/2003 ISO-9001:2000 Requirements 94
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000
Preventive ActionPreventive Action
Actions takenActions taken to eliminate the causeto eliminate the cause ofof
potentialpotential nonconformities in order tononconformities in order to
prevent their occurrenceprevent their occurrence
They shall be appropriate to the effects ofThey shall be appropriate to the effects of
thethe potential problemspotential problems..
-
8/3/2019 ISO-9001 2K Requirements 101003 Dep
95/95
Measurement, Analysis &Measurement, Analysis &
Improvement per ISOImprovement per ISO--9001:20009001:2000Preventive ActionPreventive Action ContdContd
A documented procedure shall be establishedA documented procedure shall be established
to define requirements for:to define requirements for:Determining potential nonconformities and theirDetermining potential nonconformities and theircauses;causes;
Evaluating the need for action to prevent occurrenceEvaluating the need for action to prevent occurrence
of nonconformities;of nonconformities;Determining & implementing action needed;Determining & implementing action needed;
Reviewing preventive action taken;Reviewing preventive action taken;
Records of the results of action taken.Records of the results of action taken.