issue 5 delta outflow objective x2 estuarine habitat objective (february-june)

14
SWRCB Public Workshop for Periodic Review January 12, 2005 Slide 1 Issue 5 Issue 5 Delta Outflow Objective Delta Outflow Objective X2 Estuarine Habitat Objective X2 Estuarine Habitat Objective (February-June) (February-June) Richard A. Denton Water Resources Manager Contra Costa Water District

Upload: naomi-melendez

Post on 31-Dec-2015

24 views

Category:

Documents


0 download

DESCRIPTION

Issue 5 Delta Outflow Objective X2 Estuarine Habitat Objective (February-June). Richard A. Denton Water Resources Manager Contra Costa Water District. X2 Provides Some Drinking Water Protection in the Spring. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Issue 5 Delta Outflow Objective X2 Estuarine Habitat Objective (February-June)

SWRCB Public Workshop for Periodic ReviewJanuary 12, 2005 Slide 1

Issue 5Issue 5Delta Outflow ObjectiveDelta Outflow Objective

X2 Estuarine Habitat ObjectiveX2 Estuarine Habitat Objective(February-June)(February-June)

Richard A. DentonWater Resources Manager

Contra Costa Water District

Page 2: Issue 5 Delta Outflow Objective X2 Estuarine Habitat Objective (February-June)

SWRCB Public Workshop for Periodic ReviewJanuary 12, 2005 Slide 2

X2 Provides Some Drinking Water Protection in the Spring

In the absence of a genuine drinking water

objective, the February-June X2 fish protection

objective provides protection of drinking water

beneficial uses that must be maintained

Page 3: Issue 5 Delta Outflow Objective X2 Estuarine Habitat Objective (February-June)

SWRCB Public Workshop for Periodic ReviewJanuary 12, 2005 Slide 3

Location of X2 Stations in Suisun Bay

Port Chicago(64 km)

Chipps Island(75 km)

Collinsville(81 km)

Suisun Bay

San JoaquinRiver

SacramentoRiver

Page 4: Issue 5 Delta Outflow Objective X2 Estuarine Habitat Objective (February-June)

SWRCB Public Workshop for Periodic ReviewJanuary 12, 2005 Slide 4

X2 is Distance from Golden Gate

• X2 is the distance in kilometers from the Golden Gate Bridge of the 2 parts per thousand (ppt) bottom salinity

2 ppt salinity is approximately 2 mg/L total dissolved solids

1995 Plan objective met as an equivalent surface electrical conductivity of 2.64 mmhos/cm, or equivalent Delta outflow

• 1995 Plan allows three ways to comply with X2 Objective: Daily EC of 2.64 mmhos/cm; or,

14-day EC of 2.64 mmhos/cm; or,

3-day Net Delta Outflow Index value

Page 5: Issue 5 Delta Outflow Objective X2 Estuarine Habitat Objective (February-June)

SWRCB Public Workshop for Periodic ReviewJanuary 12, 2005 Slide 5

Requirements for X2 Objective

• X2 only applies in the Spring (February-June)

• X2 objective for Port Chicago is only required (triggered) when 14-day EC at the end of the previous month is 2.64 mmhos/cm or less

• Number of days that X2 has to be met at each location is determined from previous month’s runoff index

• Intent of X2 objective was to provide good habitat conditions for fish (lower salinities) in Suisun Bay

Also protects drinking water quality

Page 6: Issue 5 Delta Outflow Objective X2 Estuarine Habitat Objective (February-June)

SWRCB Public Workshop for Periodic ReviewJanuary 12, 2005 Slide 6

X2 Objective Locations

Compliance Point Location X2

Net Delta Outflow (cfs)

Port Chicago Near Roe Island in Suisun Bay

64 km 29,200

Chipps Island Near Mallard Island EC station

75 km 11,400

Collinsville Near Confluence of Sacramento and San Joaquin Rivers

81 km 7,100

Page 7: Issue 5 Delta Outflow Objective X2 Estuarine Habitat Objective (February-June)

SWRCB Public Workshop for Periodic ReviewJanuary 12, 2005 Slide 7

Very high outflow needed to meetPort Chicago X2

Page 8: Issue 5 Delta Outflow Objective X2 Estuarine Habitat Objective (February-June)

SWRCB Public Workshop for Periodic ReviewJanuary 12, 2005 Slide 8

Smaller X2 better for fish and water quality

Collinsville

Port Chicago

Chipps Island

Page 9: Issue 5 Delta Outflow Objective X2 Estuarine Habitat Objective (February-June)

SWRCB Public Workshop for Periodic ReviewJanuary 12, 2005 Slide 9

Outflows Required to Meet 2.64 EC at Each X2 Objective Location

Page 10: Issue 5 Delta Outflow Objective X2 Estuarine Habitat Objective (February-June)

SWRCB Public Workshop for Periodic ReviewJanuary 12, 2005 Slide 10

X2 Estuarine Habitat Objective Also Protects Delta Drinking Water Quality

Schematic Representation Only

Assumes Outflow held constant for long period (Steady State)

Page 11: Issue 5 Delta Outflow Objective X2 Estuarine Habitat Objective (February-June)

SWRCB Public Workshop for Periodic ReviewJanuary 12, 2005 Slide 11

Port Chicago X2 can impact upstream fish species in some cases• Port Chicago X2 only triggers if 14-day EC on last day of

previous month is 2.64 mmhos/cm or less – not very often

• In some cases when Port Chicago is triggered, there is plenty of natural storm runoff to meet the required number of days

• However, in some cases, additional releases are needed late in the month from Nimbus Dam on the American River and other tributaries.

• Higher flows of American River can result in stranding of steelhead redds and juvenile fish

February 2003 April 2004

Page 12: Issue 5 Delta Outflow Objective X2 Estuarine Habitat Objective (February-June)

SWRCB Public Workshop for Periodic ReviewJanuary 12, 2005 Slide 12

Increased releases to meet Port Chicago X2 can have serious fish impacts

Page 13: Issue 5 Delta Outflow Objective X2 Estuarine Habitat Objective (February-June)

SWRCB Public Workshop for Periodic ReviewJanuary 12, 2005 Slide 13

Summary

• X2 provides protection for drinking water quality in the spring and into the summer

• Any modifications to X2 objectives must not degrade water quality

• Need to consider additional flexibility to Port Chicago X2 requirement to avoid redirected impacts to upstream fish

Stranding of American River fish species

Page 14: Issue 5 Delta Outflow Objective X2 Estuarine Habitat Objective (February-June)

SWRCB Public Workshop for Periodic ReviewJanuary 12, 2005 Slide 14