j c - amazon s3s3.amazonaws.com/iworq-upload/plainfield/601... · prefinished aluminum coping -...

1
TOP OF SLAB 100' - 0" C D E F G A A.2 B C.7 H J C.6 1' - 6" CASTSTONE CAP - LIMESTONE FINISH CULTURED STONE VENNER PREFINISHED ALUMINUM COPING - WHITE FINISH COMPOSITE METAL PANEL - WHITE SPANDREL CURTAIN WALL PANEL 1" INSULATED GLASS BRICK VENEER CASTSTONE CAP - LIMESTONE FINISH CULTURED STONE VENNER TOTAL FACADE AREA: 1,490 SF FACADE AREA WITHOUT WINDOWS AND DOORS: 1,440 SF PRIMARY MATERIAL, BRICK: 1,070 SF - 77% OTHER MATERIAL, CURTAIN WALL: 150 SF - 8% OTHER MATERIAL, COMPOSITE METAL PANEL: 120 SF - 8% OTHER MATERIAL, CULTURED STONE: 100 SF - 7% EAST ELEVATION: FACADE MATERIAL TOP OF SLAB 100' - 0" 1 2 3 4 5 6 2.3 2.4 3.2 3.4 5.6 116' - 0" T.O. MASONRY 108' - 0" B.O. SOLDIER COURSE 119' - 8" T.O. PARAPET 128' - 0" T.O. RADIUS ROOF 4' - 4" 5' - 8" CASTSTONE CAP - LIMESTONE FINISH CULTURED STONE VENNER PREFINISHED ALUMINUM COPING - WHITE FINISH COMPOSITE METAL PANEL - WHITE SPANDREL CURTAIN WALL PANEL 1" INSULATED GLASS BRICK VENEER CASTSTONE CAP - LIMESTONE FINISH CULTURED STONE VENNER BRICK VENEER PREFINISHED ALUMINUM COPING - WHITE FINISH RADIUS STANDING SEAM METAL ROOF - WHITE TOTAL FACADE AREA: 2,500 SF FACADE AREA WITHOUT WINDOWS AND DOORS: 2,375 SF PRIMARY MATERIAL, BRICK: 1,420 SF - 60% OTHER MATERIAL, CURTAIN WALL: 490 SF - 20% OTHER MATERIAL, CULTURED STONE: 240 SF - 10% OTHER MATERIAL, COMPOSITE METAL PANEL: 225 SF - 10% NORTH ELEVATION: FACADE MATERIAL BACK - LIT SIGN PREFINISHED ALUMINUM STOREFRONT WINDOW TOP OF SLAB 100' - 0" 1 2 4 5 6 2.3 2.4 3.2 3.4 5.6 116' - 0" T.O. MASONRY 108' - 0" B.O. SOLDIER COURSE 119' - 8" T.O. PARAPET 111' - 4" B.O. CANOPY CASTSTONE CAP - LIMESTONE FINISH CULTURED STONE VENNER PREFINISHED ALUMINUM COPING - WHITE FINISH COMPOSITE METAL PANEL - WHITE SPANDREL CURTAIN WALL PANEL 1" INSULATED GLASS BRICK VENEER CASTSTONE CAP - LIMESTONE FINISH CULTURED STONE VENNER COMPOSITE METAL PANEL - WHITE TOTAL FACADE AREA: 2,400 SF FACADE AREA WITHOUT WINDOWS AND DOORS: 2,250 SF PRIMARY MATERIAL, BRICK: 1,366 SF - 60% OTHER MATERIAL, CURTAIN WALL: 530 SF - 24% OTHER MATERIAL, CULTURED STONE: 240 SF - 11% OTHER MATERIAL, COMPOSITE METAL PANEL:114 SF - 5% SOUTH ELEVATION: FACADE MATERIAL PREFINISHED ALUMINUM STOREFRONT WINDOW TOP OF SLAB 100' - 0" C D E F G CC DD BB AA A A.2 B C.7 H J C.6 116' - 0" T.O. MASONRY 108' - 0" B.O. SOLDIER COURSE 128' - 0" T.O. HIGH ROOF 119' - 8" T.O. PARAPET 114' - 0" T.O. CANOPY COMPOSITE METAL PANEL - WHITE CASTSTONE CAP - LIMESTONE FINISH CULTURED STONE VENNER COMPOSITE METAL PANEL - WHITE SPANDREL CURTAIN WALL PANEL 1" INSULATED GLASS CASTSTONE CAP - LIMESTONE FINISH CULTURED STONE VENNER PREFINISHED ALUMINUM COPING - WHITE FINISH COMPOSITE METAL PANEL - WHITE SPANDREL CURTAIN WALL PANEL 1" INSULATED GLASS BRICK VENEER CASTSTONE CAP - LIMESTONE FINISH CULTURED STONE VENNER RADIUS STANDING SEAM METAL ROOF - WHITE TOTAL FACADE AREA: 1,640 SF FACADE AREA WITHOUT WINDOWS AND DOORS: 1,520 SF PRIMARY MATERIAL, BRICK: 1,035 SF - 68% OTHER MATERIAL, CURTAIN WALL: 200 SF - 13% OTHER MATERIAL, COMPOSITE METAL PANEL:170 SF - 11% OTHER MATERIAL, CULTURED STONE: 115 SF - 8% WEST ELEVATION: FACADE MATERIAL PREFINISHED ALUMINUM STOREFRONT WINDOW APPROVED: CHECKED: DESIGNED: DESIGN ARCHITECT/ENGINEER DRAWN: DATE PROJECT NUMBER CLIENT PROJECT NUMBER REVISION NO. DATE REMARKS REVISIONS SUSTAINABLE ARCHITECTURE + ENGINEERING N/A OWNER / CLIENT ENGINEERS/ARCHITECTS SEAL PROJECT / ADDRESS GUIDON DESIGN INC. | 905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN 46204 317.800.6388 | WWW.GUIDONDESIGN.COM CONSULTANTS SCHE M ATIC DE S IGN N O T F O R CO N STR UC T I O N COLOR ELEVATIONS 17.1010 A 203 Designer Author Approver Checker P L A I N F I E L D W E S T M E D I C A L O F F I C E B U I L D I N G SCHEMATIC DESIGN 5 3 2 8 E A S T U S H W Y 4 0 P L A I N F I E L D , I N D I A N A SCALE: 3/16" = 1'-0" A 203 1 SCALE: 3/16" = 1'-0" A 203 2 SCALE: 3/16" = 1'-0" A 203 3 SCALE: 3/16" = 1'-0" A 203 4 Hendricks Regional Health Hendricks Regional Health BACK-LIT SIGN BACK-LIT SIGN MECHANICAL SCREEN - THIN BRICK, (MATCHING FIELD BRICK VENEER) OVER SHEATHING AND METAL STUDS MECHANICAL SCREEN - THIN BRICK, (MATCHING FIELD BRICK VENEER) OVER SHEATHING AND METAL STUDS REVISED: 11/14/18 WEST ELEVATION - COLOR SOUTH ELEVATION - COLOR EAST ELEVATION - COLOR NORTH ELEVATION - COLOR

Upload: others

Post on 29-Dec-2019

1 views

Category:

Documents


0 download

TRANSCRIPT

  • TOP OF SLAB100' - 0"

    C

    DEFG

    AA.2B

    C.7

    H

    J C.6

    1' -

    6"

    CASTSTONE CAP - LIMESTONE FINISH

    CULTURED STONE VENNER

    PREFINISHED ALUMINUM COPING -WHITE FINISH

    COMPOSITE METAL PANEL - WHITE

    SPANDREL CURTAIN WALL PANEL

    1" INSULATED GLASS

    BRICK VENEER

    CASTSTONE CAP - LIMESTONE FINISH

    CULTURED STONE VENNER

    TOTAL FACADE AREA: 1,490 SF

    FACADE AREA WITHOUT WINDOWS AND DOORS: 1,440 SF

    PRIMARY MATERIAL, BRICK: 1,070 SF - 77%

    OTHER MATERIAL, CURTAIN WALL: 150 SF - 8%

    OTHER MATERIAL, COMPOSITE METAL PANEL: 120 SF - 8%

    OTHER MATERIAL, CULTURED STONE: 100 SF - 7%

    EAST ELEVATION: FACADE MATERIAL

    TOP OF SLAB100' - 0"

    12

    3

    456 2.3 2.4

    3.23.4

    5.6

    116' - 0"

    T.O. MASONRY

    108' - 0"

    B.O. SOLDIER COURSE

    119' - 8"

    T.O. PARAPET

    128' - 0"

    T.O. RADIUS ROOF

    4' - 4"

    5' -

    8"

    CASTSTONE CAP - LIMESTONE FINISH

    CULTURED STONE VENNER

    PREFINISHED ALUMINUM COPING -WHITE FINISH

    COMPOSITE METAL PANEL - WHITE

    SPANDREL CURTAIN WALL PANEL

    1" INSULATED GLASS

    BRICK VENEER

    CASTSTONE CAP - LIMESTONE FINISH

    CULTURED STONE VENNER

    BRICK VENEER

    PREFINISHED ALUMINUM COPING -WHITE FINISH

    RADIUS STANDING SEAM METAL ROOF- WHITE

    TOTAL FACADE AREA: 2,500 SF

    FACADE AREA WITHOUT WINDOWS AND DOORS: 2,375 SF

    PRIMARY MATERIAL, BRICK: 1,420 SF - 60%

    OTHER MATERIAL, CURTAIN WALL: 490 SF - 20%

    OTHER MATERIAL, CULTURED STONE: 240 SF - 10%

    OTHER MATERIAL, COMPOSITE METAL PANEL: 225 SF - 10%

    NORTH ELEVATION: FACADE MATERIAL

    BACK-LIT SIGNPREFINISHED ALUMINUM

    STOREFRONT WINDOW

    TOP OF SLAB100' - 0"

    1 2 4 5 62.32.4 3.2 3.4 5.6

    116' - 0"

    T.O. MASONRY

    108' - 0"

    B.O. SOLDIER COURSE

    119' - 8"

    T.O. PARAPET

    111' - 4"

    B.O. CANOPY

    CASTSTONE CAP - LIMESTONE FINISH

    CULTURED STONE VENNER

    PREFINISHED ALUMINUM COPING -WHITE FINISH

    COMPOSITE METAL PANEL - WHITE

    SPANDREL CURTAIN WALL PANEL

    1" INSULATED GLASS

    BRICK VENEER

    CASTSTONE CAP - LIMESTONE FINISH

    CULTURED STONE VENNER

    COMPOSITE METAL PANEL - WHITE

    TOTAL FACADE AREA: 2,400 SF

    FACADE AREA WITHOUT WINDOWS AND DOORS: 2,250 SF

    PRIMARY MATERIAL, BRICK: 1,366 SF - 60%

    OTHER MATERIAL, CURTAIN WALL: 530 SF - 24%

    OTHER MATERIAL, CULTURED STONE: 240 SF - 11%

    OTHER MATERIAL, COMPOSITE METAL PANEL:114 SF - 5%

    SOUTH ELEVATION: FACADE MATERIAL

    PREFINISHED ALUMINUM STOREFRONT WINDOW

    TOP OF SLAB100' - 0"

    C

    D E F G

    CC DDBBAA

    A A.2 B C.7

    H

    JC.6

    116' - 0"

    T.O. MASONRY

    108' - 0"

    B.O. SOLDIER COURSE

    128' - 0"

    T.O. HIGH ROOF

    119' - 8"

    T.O. PARAPET

    114' - 0"

    T.O. CANOPY

    COMPOSITE METAL PANEL - WHITE

    CASTSTONE CAP - LIMESTONE FINISH

    CULTURED STONE VENNER

    COMPOSITE METAL PANEL - WHITE

    SPANDREL CURTAIN WALL PANEL

    1" INSULATED GLASS

    CASTSTONE CAP - LIMESTONE FINISH

    CULTURED STONE VENNER

    PREFINISHED ALUMINUM COPING -WHITE FINISH

    COMPOSITE METAL PANEL - WHITE

    SPANDREL CURTAIN WALL PANEL

    1" INSULATED GLASS

    BRICK VENEER

    CASTSTONE CAP - LIMESTONE FINISH

    CULTURED STONE VENNER

    RADIUS STANDING SEAM METAL ROOF- WHITE

    TOTAL FACADE AREA: 1,640 SF

    FACADE AREA WITHOUT WINDOWS AND DOORS: 1,520 SF

    PRIMARY MATERIAL, BRICK: 1,035 SF - 68%

    OTHER MATERIAL, CURTAIN WALL: 200 SF - 13%

    OTHER MATERIAL, COMPOSITE METAL PANEL:170 SF - 11%

    OTHER MATERIAL, CULTURED STONE: 115 SF - 8%

    WEST ELEVATION: FACADE MATERIAL

    PREFINISHED ALUMINUM STOREFRONT WINDOW

    APPROVED: CHECKED:

    DESIGNED:

    DESIGN ARCHITECT/ENGINEER

    DRAWN:

    DATE

    PROJECT NUMBER

    CLIENT PROJECT NUMBER

    RE

    VIS

    ION

    NO

    .D

    AT

    ER

    EM

    AR

    KS

    RE

    VIS

    ION

    S

    SU

    ST

    AIN

    AB

    LE

    AR

    CH

    ITE

    CT

    UR

    E +

    EN

    GIN

    EE

    RIN

    G

    N/A

    OWNER / CLIENT

    ENGINEERS/ARCHITECTS SEAL

    PROJECT / ADDRESS

    GU

    IDO

    N D

    ES

    IGN

    INC

    . |

    905

    N. C

    AP

    ITO

    L A

    VE

    . SU

    ITE

    100

    |

    IN

    DIA

    NA

    PO

    LIS

    , IN

    462

    0431

    7.80

    0.63

    88

    | W

    WW

    .GU

    IDO

    ND

    ES

    IGN

    .CO

    M

    CONSULTANTS

    SCHEM

    ATI

    C D

    ESIG

    N

    NOT

    FOR C

    ONSTR

    UCTI

    ON

    COLOR ELEVATIONS

    17.1010

    A 203

    10.26.2018

    Designer Author

    Approver Checker

    PLAI

    N FIE

    LD W

    EST

    MED

    ICAL

    OFF

    ICE

    BUI L

    DING

    SCHE

    MAT

    IC D

    ESIG

    N

    5328

    EAS

    T US

    HW

    Y 40

    PLA

    INFI

    ELD,

    INDI

    A NA

    SCALE: 3/16" = 1'-0"A 203

    1 EAST ELEVATION - COLOR

    SCALE: 3/16" = 1'-0"A 203

    2 NORTH ELEVATION - COLOR

    SCALE: 3/16" = 1'-0"A 203

    3 SOUTH ELEVATION - COLOR

    SCALE: 3/16" = 1'-0"A 203

    4 WEST ELEVATION - COLOR

    Hendricks Regional Health

    Hendricks Regional Health

    BACK-LIT SIGN

    BACK-LIT SIGN

    MECHANICAL SCREEN - THIN BRICK,(MATCHING FIELD BRICK VENEER)OVER SHEATHING AND METAL STUDS

    MECHANICAL SCREEN - THIN BRICK,(MATCHING FIELD BRICK VENEER)OVER SHEATHING AND METAL STUDS

    REVISED: 11/14/18

    WEST ELEVATION - COLOR

    SOUTH ELEVATION - COLOR

    EAST ELEVATION - COLOR

    NORTH ELEVATION - COLOR

    SheetsA 203 - COLOR ELEVATIONS