Page 1: Jack-up Rig Layout

MUD LAB

MUD PUMP ROOM

COOLIING PUMP

CHILLER

ENGINEROOM

1

ENGINEROOM

2

MUD PIT

COMPRESSORROOM

STORESTORE

BELOW MAIN DECK

Page 2: Jack-up Rig Layout

HPORT BLOCK STARBOARD

DECKMUSTER STATION

MUSTER STATION

MOB-BOATSTATION

MAIN DECK

Page 3: Jack-up Rig Layout

Below main deck:

The rig is equipped with three 7,500 PSI AC driven mud pumps which is placed in the mud pump room. The rig is equipped with an automated mud mixing system, where there is no manual handling is required. There is a mud lab near to the mud pit where lab test on the mud will be held. The mud pit has the capacity of 4,220 bbls. As for the mud treatment tanks have the capacity of 200 bbls. Cooling pump is placed near the mud pit in order to help in the mud treatment

The rig is equipped with two separate engine room. During normal operation, the rig will be able to run on one engine room leaving the other engine room noise-free when performing overhauls and general maintenance. The rig also have a compressor room for emergency cases if there’s problem encountered with the rig’s engine.

Main Deck:

The main deck has 2,500m2 deck space. There is a helideck located near the main deck which is suitable for EH101 helicopter with a maximum weight of 15.4t. Enhanced safety systems consisting of fixed fire fighting system installed in accommodations, machinery spaces and switchboard rooms for rapid activation in case of fire. The accommodation is located in two blocks shaped as “V”, wrapped around the forward leg. Port block is a quiet area with cabins and starboard block holds all offices, recreation rooms and service facilities. It can hold up to 150 people in single bed cabins.