jalgaon river linking project - kolhapur municipal corporationkolhapurcorporation.gov.in › images...

57
Jalgaon River Linking Project

Upload: others

Post on 06-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

Page 2: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

River Linking Project

Why ?

Page 3: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Inter linking of riversInter linking of rivers

�� Channelling the surplus water to underfed areas Channelling the surplus water to underfed areas

will solve the perennial problem of floods and will solve the perennial problem of floods and

droughts and bring a boom in employment.droughts and bring a boom in employment.

�� It was Sir Arthur Cotton who had originallyIt was Sir Arthur Cotton who had originally

proposed the networking of rivers more than aproposed the networking of rivers more than a

century ago.century ago.

�� Inter linking of rivers as a solution for drought Inter linking of rivers as a solution for drought

and flood.and flood.

Page 4: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Dr. A. P. J. Abdul Kalam(ex- President of India)

“Instead of thinking of

interlinking of rivers only at

times of flood and drought,

it’s time that we should

implement this programme

with a great sense of

urgency.”

Page 5: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

River Linking Project

“Of all the social and natural crisis

we face, water crisis lie at the

heart of our survival”- Kochiro Matsuura, Director General of

UNESCO

Page 6: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Map of Maharashtra

Page 7: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Map of Jalgaon District

Page 8: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon District

Jalgaon District: Brief History

• Jalgaon District is located in the north-west

region of the state of Maharashtra

• Bounded by Satpuda mountain ranges in the

north and Ajanta mountain ranges in the south

• Diverse climate

• Exceptionally hot and

dry in summer with temps up to 48°C

Page 9: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon District: Brief History

• Principle natural feature – Tapi River, which flows westward from headwaters in eastern Maharashtra and empties in the Arabian Sea

• The Tapi receives 13 principal tributaries in its course through Khandesh

• Most of Khandesh lies south of the Tapi

• The Tapi is drained by its tributaries: the Girna, Bori and Anjani Rivers

• The Tapi flows in a deep bed, historically making it difficult to use for irrigation

Page 10: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Situation.....

June and July 2005

Lots of clouds – but no rains!

Page 11: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Water Levels Down

July 2005

Water level drastically reduced in wells!

Page 12: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Land Drought

June and July 2005

Lots of clouds – but no rains!

This was the land situation !

July 2005

Page 13: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Stunted Crop Growth

Improper growth of crops due to insufficient rains

July 2005

Page 14: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon: “River Linking Project”

In the Monsoon of 2005, there were insufficient rains in the Jalgaon

district – while the Girna Dam (a major project situated in south

west, adjoining the Nashik district) was overflowing because of

heavy rains in Nashik district. So this water, which was otherwise

going waste in the Arabian Sea through Jalgaon district, was

diverted – it was then the idea of river linking generated...

Idea Generation and Concept:

Necessity is the Mother of Inventions!

Average Rainfall of Jalgaon District: 700.28 MM

Jun-05 8.58% Jul-05 29.74% Aug-05 46.66% Sep-05 72.19%Rainfall at the end of Month

Page 15: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Necessity: Mother of Invention!

Bhokar Bari Medium Project

In the meantime, Girna Dam in the adjoining district of Nashik,

is at the verge of reaching its maximum capacity !

(post 15th July 2005)

We’re thinking about how to solve the problem of drinking water in Parola Tah, Jalgaon

District during this time of insufficient stocks of water...

Page 16: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon: “River Linking Project”

• How to bring the overflowing waters of

Girna River using existing canals, channels, nalas and other links into the Bori, Anjani

and Titur rivers?

• Is it possible to refill Medium Projects, M.I. Projects, percolation tanks, village ponds,

farm ponds, and mines on this route?Planning after discussion with Irrigation Department Officials• Different solutions and ideas were

discussed and compared

• Proposal submitted to Government under scarcity fund

• Government sanctioned Rs. 20 million

• Implementation started immediately as

per planning

Widening Nalla

Page 17: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

• Diversion of surplus flood water into deficient basin:

• 160 villages dependent for drinking water on reservoirs were covered under this, (Bori dam covers the highly drought-prone areas of Dhule and Jalgaon districts)

• Existing canals and other systems were utilised to the maximum capacity with minimum possible modifications

• Existing canal systems (Jamda canals, Titur canals, Lower Girna canals,) with increased capacity and maximum discharge kept on flowing and diverting water to deficient storages

• Use of gravity rather than pumping for diversion of water.

Strategies Adopted

Girna Bori, Girna Titur, Girna Mhasva,Girna Anjani

Page 18: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Strategies Adopted...

• Existing canal capacity was increased by raising canal banks

with earth work; rugosity coefficient was improved by laying PVC

paper of low cost at leaky portions

• Aqueduct and syphons capacity increased by raising wall heights

with B. B. masonry temporarily and PVC paper was laid in the

channels to increase the rugosity coefficient

• Low cost polyethene paper was used at canal apexes and in

aqueduct beds, syphons to improve the rugosity coefficient

(increase carrying capacity in turn with Jamda left Bank Canal,

Panzan left Bank Canal, etc.)

• Short Links – searched

to divert the higher discharges,

i.e., Panzan to Bori

Girna dam

Page 19: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Strategies Adopted...

• New links wherever required were dug immediately – Jamda to Khadakesim, Jamda to Titur

• Existing deficient storages got filled and canal water diverted to wells in command,

• Reservoir capacity was increased to store maximum possible water by putting gunny bags on top of w. w. with calculated risk (i.e., no encroachment beyond high flood level and can be easily pulled down by simply wire rope in a flood situation)

Page 20: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon: “River Linking Project”

1. Providing water for drinking as well as irrigation purposes in

the drought hit areas of Jalgaon district by using diverted

excess overflowing water

2. Increase the efficiency of different water storage structures

3. Conserve the water by taking it through canals ducts, drains,

nallas, natural drains etc. in the drought-prone areas

4. Carry out qualitative and quantitative assessment of water

resource

5. Suggest suitable sites and methods for artificial recharge to

augment ground water recharge in the area.

Project Objectives

Page 21: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

River Connectivity Project

Link Nala

Krushanpuri Minor

Irrigation tank

Link Nala

Bori River

Khonali River

GirnaRiver

Jamda BandharaÉ

Mhasve P.T

Kala Bhandhara

Anjani River

Titur River

Jamda Right Canal

Parola Branch Canal

Girna River

Girna Dam

Lower GirnaLeft

Canal

Link Nala

Jamda Left Canal

Anjani River

Link Nala

Link Nala

Bori Project

BudhgaonBandhara

Dhamangaon Bandhara

HolBandhara

Dahigaon Bandhara

TarwadeChari

Mordad

Chari

Link Nala

Link Nala

Project/ weir

River

Canal

Link/ drain

Panzan Left Canal

District Jalgaon

Page 22: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

River Linking Paths

Girna Dam-Panzan Left Canal – Water Passage (Nala) – Kanoli River – Bori River –Dhamangaon Bandhara – Budhgaon Bandhara- Bori River -Bori Dam. Distance: 68 km

Girna Dam – Girna River-Jamda Bandharas –J amda Left Canal – Parola Branch link cut Canal – Mhasva Minor irrigation pond – Link Cut – Bhokarbari Medium. Project Distance: 132 km

Girna Dam-Girna river-Jamda Bandhara-Jamda Right Canal-Parola Branch Canal –Water Passage (Nala) - Kala Bandhara – Anjani River. Distance: 127 km

Girna Dam-Girna River-Jamda Bandhara-Jamda Right Canal-Water Passage (Nala) – Titur River–Hol Bandhara–Balad Bandhara–Wadgaon Bandhara-Titur River. Distance: 84 km

Girna Dam- Girna River-Jamda Dam-Girna River-Dahigaon Bandhara-Lower Girna left Canal-Water Passage (Nala) -Anjani River-PimriBandhara. Distance: 186 km

Page 23: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

River Linking Project

Work Done !

Page 24: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon District “River Linking Project”

To divert excessive overflowing water,

the work of stone breaking and digging was carried out on war footing to create additional channel

Work Done

Page 25: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon

Work started on war footingResulted in diversion of higher discharge

Page 26: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon District “River Linking Project”

Work DonePVC lining increased rugosity coefficient

Page 27: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon District “River Linking Project”

Work Done

Page 28: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon District “River Linking Project”

Work Done

Page 29: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon District “River Linking Project”

Work Done

Page 30: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon District “River Linking Project”

Work Done

Page 31: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon District “River Linking Project”

Work Done

New Link Dug

Page 32: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon District “River Linking Project”

Work Done

Canal carrying capacity increased by raising its height

Page 33: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon District “River Linking Project”

Work Done

Use of Canals for River Linking

Carrying capacity of existing canals increased by raising bank height – these canals were then used for

linking various rivers

Page 34: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon District “River Linking Project”

Work Done

Panzhan Left Canal was cut here to divert Girna’s water in the Kanholi and then Bori river through Big Nala

(water passage)

Page 35: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon District “River Linking Project”

Work Done

Panzhan Left Canal was cut here to divert Girna’swater in Kanholi and then Bori river through Big Nala

(water passage)

Page 36: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

Post Project Scenario

Page 37: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

Before

After

Page 38: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

Water overflowing the Weir

Page 39: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

Village pond filled up using Girna River water(Rotwad Tal. Dharangaon)

Page 40: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

Water overflowing through Weir (Anjani River)

Page 41: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

Farm pond filled up using Girna River water (Tahsil : Dharangaon)

Page 42: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

Wichkhed Weir, Parola Municipal Council Water Supply Source

Page 43: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

Water overflowing through Weir, Dahiwad Tal. Amalner, Dist. Jalgaon

Page 44: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon District

Page 45: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

Increased water table in some Tahsils (even after less rainfall) –

over 16,000 wells recharged as endorsed by GSDA( Groundwater

Survey Development Agency of Govt), in its report

Helped solve the drinking water problem

of 5 municipal councils and 128 villages(dependent population = 8,23,500)

Benefits Received :

Page 46: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

13000

23000

26000

30000

0

5000

10000

15000

20000

25000

30000

35000

2005 2006 2007 2008

Hecta

res

`

Before River

Linking

Project

After River

Linking Project

Area under irrigation:

Life saver for almost lost crops!

Thousands of hectors of additional land irrigated; highest irrigation in the history of

Jalgaon (about 35% more irrigated area) –even though 30% less than average rain fall

Page 47: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

Total of 4,486 Mcft (127Mm3) excessive

overflowing water of Girna dam brought to use - Cost of this water : Rs. 112 millions

This water filled:

• 2 medium projects,

• 5 M.I. projects, and

• 700 percolation tanks, K.T. weirs, farm ponds, and mines

Saved approximately Rs. 90 million of Water Scarcity Funds

Contd..

Page 48: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

Indirect Benefits

• Improved economic condition of farmers

• Prohibited migration of local & poor people in search of jobs

• Saved huge expenditure which would have been incurred to provide employment under Employment Guarantee Scheme of Govt.

• Repaired canals – which further reduced seepages and other losses

• Total benefits: Rs. 250-300 million, as per rough estimates – in one year only and these benefits are recurring every year.

Page 49: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

Benefits Received:

-2

9

11

25

-5

0

5

10

15

20

25

30

Project Cost Savings in tanker costs Additional Storage Increased benefit to

agriculturists

in R

scrs

Recurring Benefits

Page 50: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

• Irrigation Deptt.: Funds for basic survey repair & maintenance

• Jalgaon Collectorate: Scarcity funds (Head:2245)

• Municipal Corporation/Councils : Internal resources for augmenting water availability for drinking

• MP/MLA Local Area Development Scheme: For various developmental work

• Land-owners, agricultural communities and citizen groups contribution

RESOURCE CONVERGENCE : technical and financial

Following sources of funding were tapped:

Page 51: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

Project Presentation to the H.E. Smt. Pratibhatai Patil (President of India) and

Honorable Sh. Sharad Pawar (Union Minister for Agriculture)

by Vijay Singhal, IAS , Collector Jalgaon

Page 52: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Project Presentation to Hon. Chief Minister and Project Presentation to Hon. Chief Minister and DyDy. Chief Minister. Chief Minister

Jalgaon River Linking ProjectJalgaon River Linking Project

Page 53: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

Comments :

• Unique innovative initiative at district level• Converging resources of different agencies towards the

welfare of people of Jalgaon

• Overwhelming response from the peoples’ representatives

• Villagers contribution & participation in the process

• No addition of water storage structures – only diversion by way of interlinking

• Diligence in planning and focusing on sustainability

• Permissible water used as per Inter-state agreement. So no chances of dispute

Watershed Development = Water Conservation + Diversion of Excess Water

Page 54: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

Contd..

• No deforestation.

• No need for land acquisition – Zero land acquisition cost as land was donated by villagers on their own.

• Use of local technical know-how and their expertise.

• Circulation of water through canals provides additional benefitslike conservation and percolation, which are highly beneficial to ecology w.r.t. temperature, additional greenery, etc.

• Replicability : GoM issued order to implement it in all the districts and approved river linking as planned & regular scheme in DPC.

• Govt of India approved it as MODEL PROJECT for replication in all the states of Country

• Cost-effective, Citizen-friendly & Sustainable.

Page 55: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

• The project outcomes appreciated by President of India H.E. Smt Pratibhatai Patil.

• Appreciation by Hon. Sharad Pawar & Hon. C.M.of Maharashtra.

• Dept of Adm Reforms, GoI identifies it as MODEL PROJECT & directed me to send

copies (350 in all) of this project to Chief Secretaries of all states, all Secretary (Admn

reforms), Parliament Library & 28 ATI,s in the Country for dissemination and replication.

• Govt. of Maharashtra issued order to implement it in all the districts of Maharashtra.

• Attended International River Symposium 2006 at Brisbane, Australia & presented there

“Jalgaon River Linking Project”.

• Delivered a keynote lecture on this project at an International Conference in Macau,

China in 2007.

• Provided lead discussion and presented innovative & pioneer work on Jalgaon River

Linking project at State University of New York, Albany, USA and Pennsylvania State

University, University Park, USA in October, 2009

• Invited by the then Chief Minister of Rajasthan, Hon. Smt Vasundhara Raje to share the

experience. She also appreciated the efforts taken. She also visited Jalgaon to see River

Linking Project.

• Received Dr. Babasaheb Ambedkar National Fellowship Award given by National

Bhartiya Sahitya Academy for river linking project.

Project Recognition :

Page 56: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River Linking Project

• Project is not only successful but also sustainable. Its benefits

are still being enjoyed by the people.

• This project is positively received by all sections of society

• 84.52% are in favour of river linking efforts.

• 53.92% farmers noticed considerable rise in water levels of

their wells.

• 64.64% people have positive approach towards Govt. Agency

• 26.15% households actively participated in execution of the

links contributing to 2142 man-days.

• 42.42% people reported increase in their employment

opportunities

SOCIO-ECONOMIC SURVEY: by JalaSRI, a Watershed Surveillance

and Research Institute (a third party agency)-Conducted survey of 840 households in 42 villages in year 2007

Page 57: Jalgaon River Linking Project - Kolhapur Municipal Corporationkolhapurcorporation.gov.in › images › UN_Award_River_Project.pdf · Jalgaon River Linking Project Indirect Benefits

Jalgaon River linking project

Thank You