january 2018 - · pdf filetsx: ygr 3 randall faminow, vp, land 30+ years of experience in all...

Download January 2018 - · PDF fileTSX: YGR 3 Randall Faminow, VP, Land 30+ years of experience in all aspects of oil and gas land work, including negotiation, acquisitions and divestments,

If you can't read please download the document

Upload: dangcong

Post on 20-Mar-2018

220 views

Category:

Documents


5 download

TRANSCRIPT

  • TSX: YGRTSX: YGR

    Corporate Presentation

    January 2018

  • 2TSX: YGR

    1) Price as at January 12, 2018

    Capitalization Reserves and Locations (2)

    Ticker TSX: YGR

    Shares Outstanding (mm)

    Basic 81.4

    Options (weighted avg. price $1.85) 7.9

    Fully Diluted 89.3

    Market Cap ($mm) (at $5.16 / share)(1) $420

    Q4 2017 Net Debt ($mm) (unaudited) $ 95

    ($120mm credit facility)

    Enterprise Value ($mm) $515

    Insider Ownership

    Basic 14%

    Fully Diluted 21%

    2) Reserves effective as at December 31, 2016 based on the reserve report prepared by Deloitte LLP,

    independent petroleum engineers (the Reserves Report)

    3) NAV = NPV10 Reserve Value less Net Debt and excludes undeveloped land value

    4) As at December 31, 2016

    5) Net Value per Location calculated as (Current Enterprise Value - PDP Reserves value at December

    31, 2016) / Total and Booked net locations, respectively

    December 31, 2016 mmboe

    NPV10

    ($mm)

    NAV(3) / FD

    Share

    Recycle

    Ratio(4)

    Proved Developed 7.9 $139.1 $0.70 2.4x

    Total Proved 36.5 $489.6 $4.68 3.4x

    Proved + Probable 60.6 $734.5 $7.47 3.7x

    Locations as at December 31, 2017

    Based on 1-mile Gross Net

    Booked Cardium Locations 214 150

    Total Cardium Locations 940 740

    Corporate Snapshot

    Majority of reserves bookings based on old well path; last

    well program helped de-risk / delineate the acreage

    Probabilistic risk vs. reserves risk now

    Highly motivated management and board with insiders

    owning 14% of the basic shares and 21% of the fully

    diluted shares

  • 3TSX: YGR

    Randall Faminow, VP, Land 30+ years of experience in all aspects of oil and gas land work,

    including negotiation, acquisitions and divestments, contracts

    and mergers

    James Glessing, CA, CFO 17+ years oil and gas accounting experience

    Executive and financial experience as CFO with North Peace

    Energy Corp

    Controller at BlackRock Ventures,

    Canadian Natural Resources, Shell and Deloitte

    Board of Directors

    Management Team

    Neil Mackenzie Director of various public companies, including Canyon

    Technical Services

    Currently a partner in Blackstone Fluids, an oil and gas drilling

    fluids company

    Ted Morton A former Canadian politician and cabinet minister in the Alberta

    government

    Has held various positions in the Alberta Government including

    Minister of Energy (2011-2012), Minister of Finance and

    Enterprise (2010-2011), and Minster of Sustainable Resources

    (2006-2010)

    Gordon Bowerman Chairman

    President of Cove Resources Ltd

    Founder of several successful private and public oil and gas

    companies

    Robert Weir President of Weir Resource Management Ltd

    Jim Evaskevich President and CEO of Yangarra Resources Ltd

    The Team

    Jim Evaskevich, President & CEO 30+ years extensive executive experience with strong

    operations background

    Lorne Simpson B.Sc., C.E.T., VP, Operations 30+ years experience in the industry

    Supervisor, Drilling Ops with PetroBakken Energy Ltd.

    Engineered, drilled or completed 250 HZ Cardium wells, 200 HZ

    Bakken wells, 2 HZ Duvernay wells, 25 HZ Montney wells, and

    dozens of Blue Sky, Viking, SWS, Glauc, and Rock Creek HZ

    wells

  • 4TSX: YGR

    Top Decile Full Cycle rates of return

    Central Alberta Cardium formation focus

    Low-cost operator, high netbacks

    Q3 2017 Cash costs totaled $10.74/boe

    Operating costs (including transportation) of $6.86/boe

    Royalties of $2.43/boe (8% of revenue)

    G&A costs of $0.74/boe

    Finance and interest costs of $0.71/boe

    Breakeven pricing, including reserve replacement of $20.15/boe

    Operating margins were 80% and cash flow margins were 76%

    2016 F&D costs of $9.41/boe

    Low-cost philosophy, not just a result of current low commodity prices

    Consistent, low risk Cardium economics

    Potential Duvernay upside

    Why Own Yangarra?

  • 5TSX: YGR

    Full Cycle Returns

    1. Half cycle IRR is based on actual drilling and completion costs, production to date and P+P reserves

    2. Full cycle IRR allocates all other capital costs to the wells (i.e. land, G&G, infrastructure)

  • 6TSX: YGR

    Reserves Per Share (boe per share) (2P)

    Gross Reserves (mmboe)

    Reserves GrowthReserves Profile

    Oil/NGL's47%

    Nat. Gas53%

    Volumes (boe)

    Oil/ NGL's82%

    Nat.Gas18%

    NPV10 ($)

    8.712.5

    17.5

    37.440.6

    60.6

    0

    10

    20

    30

    40

    50

    60

    70

    2011 2012 2013 2014 2015 2016

    Re

    se

    rves

    (mm

    bo

    e)

    1P Reserves 2P Reserves

    $0.22

    $0.31 $0.36

    $0.65 $0.60

    $0.76

    $0.00

    $0.10

    $0.20

    $0.30

    $0.40

    $0.50

    $0.60

    $0.70

    $0.80

    2011 2012 2013 2014 2015 2016

    2P

    Reserv

    es /

    sh

    are

  • 7TSX: YGR

    PDP13%

    PUD48%

    PROB39%

    Consistent improvement in, and continued focus

    on, F&D costs and recycle ratios

    Management estimates proven and probable

    Cardium locations have a similar chance of

    success

    Reserve Life Index (RLI)

    37 years with one rig

    18 years with two rigs

    12 years with three rigs

    PDP19%

    PUD48%

    2P33%

    Finding and Development

    NPV10 BT Volumes

    Reserves(1)

    2P Reserves: 60.6 mmboe2P NPV10: $734.5 million

    1. Reserves effective as at December 31, 2016 based on the Reserves Report

    F&D and Recycle RatiosRecycle Ratio vs Added Reserve Volumes

    0

    5

    10

    15

    20

    25

    30

    $0

    $5

    $10

    $15

    $20

    $25

    $30

    2011 2012 2013 2014 2015 2016

    2P

    Re

    se

    rve A

    ddit

    ion

    s (m

    mb

    oe)

    Fin

    din

    g &

    De

    ve

    lop

    men

    t Co

    sts

    * ($

    / b

    oe

    )

    1P F&D / boe 2P F&D / boe 2P Net Reserve Adds

    *Includes changes in future capital

    $0

    $20

    $40

    $60

    $80

    $100

    $120

    $140

    0x

    1x

    2x

    3x

    4x

    5x

    6x

    7x

    2011 2012 2013 2014 2015 2016

    WT

    I ($

    US

    ) / b

    bl

    Re

    cycle

    Rati

    o* (x

    )

    1P Recycle Ratio 2P Recycle Ratio WTI (USD) / bbl

    *Excludes realized gains and losses on hedging

  • Upper Cardium (5-15% Porosity)

    Lower Cardium (3-6% Porosity)

    Bioturbated Zone (20-80% Sand)

    2.5-4.0m

    1.5-3.0m

    3.0-7.0m

    Old

    Well Path

    New

    Well Path

    Old Frac PlaneNew Frac Plane

    Upper Cardium

    Lower Cardium

    BioturbatedZone

    Upper Cardium Bioturbated Lower Cardium

    Deeper Drill Path

    8TSX: YGR

  • Upper ReservoirCore analysis

    Porosity 9-11%Kmax average 0.09md

    BioturbatedInterval not analyzed

    Log Porosity 3-4%

    3%

    OOIP 2,959 MstbOBOEIP 8,218 Mbbl

    OOIP 2,198 MstbOBOEIP 6,105 Mbbl

    10m

    Total PackageOOIP/section 5,157 Mstb

    OBOEIP/section 14,323 Mbbl

    105 API

    Deeper Drill Path

    9TSX: YGR

  • #4 - YGR 100/1-26-37-8W5 2.0 Mile

    101 Stages 1,520 tons

    On Prod: December 5, 2016

    IP30: 395 boe/d (76% liquids)

    #3 - YGR 104/14-19-41-5W5 1.4 mile

    69 Stages 1,056 tons

    On Prod: October 29, 2016

    IP90 Rate: 414 boe/d (77% liquids)

    #2 - YGR 100/1-14-41-6W5 2.0 mile

    74 stages 1,120 tons

    On Prod: October 25, 2016

    IP90 Rate: 120 boe/d (94% liquids)

    #5 - YGR 100/2-26-39-9W5 2.0 mile

    103 stages 1,114 tons

    On Prod: February 2, 2017

    IP35 Rate: 645 boe/d (89% liquids)

    #1 - YGR 103/4-7-41-5W5 1.6 mile

    71 Stages 1,070 tons

    On Prod: October 5, 2016

    IP90 Rate: 480 boe/d (82% liquids)

    #6 - YGR 102/8-14-41-6W5 2.0 mile

    107 stages 1,571 tons

    On Prod: February 3, 2017

    Clean-up phase (Day 1-20): 217 boe/d (93% liquids)

    Production phase (Day 21-35): 534 boe/d (88% liquids)

    #10 - YGR 100/3-23-37-8W5 2.0 mile

    104 stages 1,565 tons

    On Prod: April 6, 2017

    IP37 Rate: 313 boe/d (~69% liquids)

    #8 - YGR 100/1-34-39-8W5 2.0 mile

    105 stage 1,535 tons

    On Prod: April 6, 2017

    IP27 Rate: 1,017 boe/d (~80% liquids)

    #9 - YGR 100/5-19-41-7W5 2.0 mile

    109 stages 1,640 tons

    On Prod: March 1, 2017

    Clean-up phase (Day 1-50): 130 boe/d (98% liquids)

    Production phase (Day 51-65): 173 boe/d (94% liquids)

    #7 - YGR 102/16-15-44-10W5 2.0 mile

    102 stages 1,533 tons

    On Prod: March 23, 2017

    IP35 Rate: 662 boe/d (~38% liquids)

    Well #2 drilled using old well path

    Well #7 restricted due to capacity constraints

    Well #9 on pump, recently started flowing

    Cardium Formation

    10TSX: YGR

  • 11TSX: YGR

    Production Per Share

    Gross Production (boe/d)

    Production GrowthProduction Vintage

    Note: Production volumes include royalty barrels

    Note: Production volumes include royalty barrels

    2015 to 2016 capital spent on efficiency and

    improving IPs and recovery (ball drop to sliding

    sleeve)

    But capital allocation focused on growing

    inventory / land base throughout the Cardium

    Halo at attractive prices

    Q4 2017 production of 6,700