1 /22 JHR – Procurement 23/11/[email protected]
JHR ProjectA high performance Material Testing
Reactor under constructionDaniel Iracane
JHR program director
2 /22 JHR – Procurement 23/11/2008
Technological irradiation reactors
Material Testing Reactor - MTRGenerate high neutron fluxes
Study the behaviour of materials & fuelsTo meet assessment, qualification and safety requirements
Reproduce different environments (in pressurised water, gas or liquid metal loops)
Produce transients for safety studies
OSIRIS
JHRPower 100 MW
3 /22 JHR – Procurement 23/11/2008
JHR
4 /22 JHR – Procurement 23/11/2008
Site preparation – Access road
Closed-off and independent worksite
5 /22 JHR – Procurement 23/11/2008
JHR process
Detailed design studies are completed 2003-2005~ 300 man.years, 70M€Preliminary safety options assessed by Regulatory Body April 2003Preliminary safety analysis report, realised in March 2006
Design confirmed and decision to launch the construction End 2006500M€ at the 2005 economical condition
Good public acceptationPublic consultation, Public enquiry 04/2005,12/2006Construction permit delivery 09/2007
Development studies 2006-2007site preparation, calls for tenders, qualifications …
Construction phase & tests 2008-2013Excavation 2007-June 08Erection and tests 2009-2013
Start of operations 2014
6 /22 JHR – Procurement 23/11/2008
JHR site excavation Spring 2007
at Cadarache
7 /22 JHR – Procurement 23/11/2008Summer 2008
JHR site excavation
8 /22 JHR – Procurement 23/11/2008
Nuclear Island
Reactor pool
RB Hall
Experimentalarea (cubicles, labs)
Cooling circuits
Nuclear Auxiliaries Building (NAB)
Reactor Building (RB)
Hot cells
Laboratories
NAB Hall
Storage pools
Mechanical workshop
Control rooms
Intermediarystorage pool
Transfert hatch
Truck hatch
Aseismic bearingpads
9 /22 JHR – Procurement 23/11/2008
JHR water block3 hot cells + 1 alpha cell + 3 non destructive exams posts
3 storage poolsLarge componentsSpent fuelExperimental devices
10 /22 JHR – Procurement 23/11/2008
20 simultaneous experiments for Gen 2, 3 (PWR & BWR), 4, material & fuel technologiesIn core
Up to 5.5 1014 n/cm².s > 1MeVUp to 1015 n/cm².s > 0.1MeV
In reflectorUp to 5.5 1014 n/cm².s (Φth)
Fixed positions and displacement systems
Fuel studies: up to 600 W/cm with a 1% 235U PWR rod
Fuel experiment
Material ageing(up to 16 dpa/y)
Small locations (Φ~ 32 mm)Large locations (Φ~ 80 mm)
Displacement systems:• To adjust the fissile power• To study transients
Thermal neutron flux
Fast neutron flux
11 /22 JHR – Procurement 23/11/2008
General organisationFinancing for project construction
Consortium bringing together public and private partnersCEA responsible for the JHR constructionMaterials & work estimate: €300 M (2005 economical condition)
PlayersCEA in charge of the JHR project
Programme Director: Daniel Iracane; [email protected] Manager: Jean-Philippe Elie; [email protected]
Prime contractor: AREVA TA in association with AREVA NP & EDF
ProcurementUnder CEA responsibility with the support of the Prime Contractor
12 /22 JHR – Procurement 23/11/2008
Sub-contractors
CONSORTIUM
Construction project team
Simulation tools
Future operator
Inte
rface
s
Starting fuel Qualification (U3Si2)
UMO Development
Experimental Devices (Design and
technological development)
User’s facility interface Manager
JHR Program Director
Construction Project leader
Operation and ServicesProject leader
Project organization
Materials & Fuel Project leader
Engineering support
13 /22 JHR – Procurement 23/11/2008
Project steering schedule
14 /22 JHR – Procurement 23/11/2008
JHR Procurement
Technical information available (French)Electricity systems : http://www-cadarache.cea.fr/fr/entreprises/projets/rjh/index1.phpMechanical systems : http://www-cadarache.cea.fr/fr/entreprises/projets/rjh/index2.phpFluids systems : http://www-cadarache.cea.fr/fr/entreprises/projets/rjh/index3.php
Purchasing information onhttps://marches.cea.fr/ (French)http://www.simap.europa.eu (English, Information system for European public procurement )Tender notices are published on this website, the single official source of public contracts in Europe. Most of public procurement notices are sent for publication through an electronic channel.
15 /22 JHR – Procurement 23/11/2008
JHR FACILITY CANDIDATES – FOLLOW-UP TABLE FOR 2008 -2009
Main contracts STATUS
MECHANICAL PACKAGES
C01b Heavy-duty remote manipulators Publication of candidates call programmed for second quarter 2009
C01c Light-duty remote manipulators Publication of candidates call programmed for last quarter 2009
C01c Shielded windows Publication of candidates call and call for tenders programmed for last quarter 2008
C02 Shielded cells laboratories equipments Publication of candidates call programmed for second quarter 2009
C03 Pool liners Publication of candidates call programmed for last quarter 2008
C04 Cranes for Reactor Building & Nuclear Auxiliaries Building
Publication of candidates call programmed for last quarter 2008
C05 Secondary handling means Publication of candidates call programmed for second quarter 2009
C06 Pool internals & stainless steel mechanically welded equipment
Publication of candidates call programmed for third quarter 2009
C08 Loading machines Publication of candidates call programmed for second quarter 2009
16 /22 JHR – Procurement 23/11/2008
JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009
Main contracts STATUSFLUIDS PACKAGES
D04 Primary pumps Contractualisation in-progress– Notification expected in First Quarter 2009
ELECTRICITY PACKAGES
E01 Electrical systems Publication of candidates call programmed for last quarter 2008
E02 Back-up generators Publication of candidates call programmed for last quarter 2008
D01 Heating Ventilation Air Conditioning Publication of candidates call programmed for last quarter 2008
D02 Fluid Systems Publication of candidates call programmed for last quarter 2008
D03b Primary pipes Publication of candidates call programmed for first quarter 2009
17 /22 JHR – Procurement 23/11/2008
PROJECT PACKAGES & CONTRACT SCHEDULE
Package B01: Civil engineering - buildings Contactualisation in progressPackage C01: Hot cells NRI (Czech Republic)Packages C01 b/c/e : Hot cell equipments Call for tender 2008-2009Package C02: Shielded cells – laboratory equipments Call for tender 2009Package C03: Pool liner Call for tender 2009Package C04: Cranes for Reactor Building & Nuclear Auxiliaries Building Call for tender 2009Package C05: Other tools and handling systems Call for tender 2009Package C06: Pool internals & mechanically-welded equipment Call for tender 2010Package C07: Reactor block AREVA-TA (2009)Package C08: Loading machine Call for tender 2009Package D01: Heating Ventilation Air Conditioning Call for tender 2009Package D02: Fluid Systems Call for tender 2009Package D03a: Primary heat exchangers in shielded cubicle CIEMAT (ESP)Package D03b: Primary pipes Call for tender 2009Package D04: Primary pumps Contactualisation in progress Package E01: Electrical systems Call for tender 2009Package E02: Back-up generators Call for tender 2009Package E03: Centralised control system AREVA-TA (2009)Packages E05 à E07: Radiation protection Call for tender 2009Package F01 to F07: Contracts for finishings Call for tender 2010 -2012
18 /22 JHR – Procurement 23/11/2008
Works schedule
19 /22 JHR – Procurement 23/11/2008
CEA PURCHASING PROCESS
Publication of candidates callCandidates call will be published:
In the European Union Official JournalBy the CEAIn professional journals such as Usine Nouvelle, etc.
General rule for call for tender :Selective calls for tender with advertising
Possible specific procedures :Open calls for tender
20 /22 JHR – Procurement 23/11/2008
MAIN COMPONENTS OF THE JHR FACILITY
Facility designed for experimental programmes:
Reactor: reactor block, primary system, ancillary systems, safety systems, auxiliaries, ventilationA laboratory/plant set-up: cells, pools, laboratories and hot workshopsHandling means for use in air and underwater required for radioactive fuel elements and experimental devicesElectrical systems and control systems
21 /22 JHR – Procurement 23/11/2008
SPECIFIC TECHNICAL CHARACTERISTICS
Nuclear building on seismic pads to limit any seismic loads on equipmentApplication of the French RCC-MX code for mechanical equipment:
RCCM-type rules supplemented by rules applicable to materials not covered by the RCCM: aluminium, ZircaloyUse of European standards
Application of the French Nuclear Pressure Equipment Order (known as the ESPN)