jmf-for-alaskan-hma.pdf
TRANSCRIPT
8/14/2019 JMF-for-Alaskan-HMA.pdf
http://slidepdf.com/reader/full/jmf-for-alaskan-hmapdf 1/7
PI: Jenny
Liu
Project Team: Peng Li and Amy Steiner
March 17, 2011
AUTC Pavement/Asphalt Research Projects Update:
Verification of the Job Mix Formula for Alaskan HMA
8/14/2019 JMF-for-Alaskan-HMA.pdf
http://slidepdf.com/reader/full/jmf-for-alaskan-hmapdf 2/7
2
• Field sites
– Parks Hwy MP 287‐305 Rehab.
– AIA runway 7R_25L Rehab.
• Sample collection
– Lab mix and Lab compacted
– Field mix and field compacted
– Field mix and lab compacted
– Field cores
Verification of
JMF
for
Alaskan
HMA
8/14/2019 JMF-for-Alaskan-HMA.pdf
http://slidepdf.com/reader/full/jmf-for-alaskan-hmapdf 3/7
3
Verification of
JMF
for
Alaskan
HMA
Testing Progress for Anchorage International Airport Project
Sub lot Volumetric Ignition SPT IDT
Lab Mix Lab Compacted
1
2
3
4
1
2
3
4
12
3
4
Anchorage
Field Mix Field Cpmacted
Field Mix Lab compacted
Field Core
Completed:
In Progress:
8/14/2019 JMF-for-Alaskan-HMA.pdf
http://slidepdf.com/reader/full/jmf-for-alaskan-hmapdf 4/7
4
Verification of
JMF
for
Alaskan
HMA
Completed:
In Progress:
Testing Progress for Nenana Project
Sub lot Volumetric Ignition SPT IDT Sub lot Volumetric Ignition SPT IDT
L&L 1
1 2
2 3
3 4
4 5
5 6
6 7
7 8
8 9
9 5
1 6
2 7
3 8
4 9
F&F
Core
F&LF&L
8/14/2019 JMF-for-Alaskan-HMA.pdf
http://slidepdf.com/reader/full/jmf-for-alaskan-hmapdf 5/7
5
Verification of
JMF
for
Alaskan
HMA
1
10
100
1000
10000
100000
0.001 0.01 0.1 1 10 100 1000 10000 100000
Requence (Hz)
D y n a m i c M o d
u l u s ( M P a )
L&L Sublot 1 Sublot 2
Sublot 3 Sublot 4
AIA runway 7R_25L
Rehab.
8/14/2019 JMF-for-Alaskan-HMA.pdf
http://slidepdf.com/reader/full/jmf-for-alaskan-hmapdf 6/7
6
• Literature Review (in progress)
• Development of SPT Testing Plan (completed)
• Materials Collection, Specimen Fabrication and Performance
Tests (in progress)
• Data Processing and Analyses (in progress)
Characterization of
Alaskan
HMA
Mixtures
with
the
SPT