PRODUCTION
Pirquitas
DEVELOPMENT
Pitarrilla San Luis
Diablillos
RESOURCES
Berenguela
Challacollo
San Agustin Veta Colorada Candelaria
Maverick Springs
Sunrise Lake
2 SSRI:NDAQ | SSO: TSX
Our Assets
![Page 3: Joe Phillips - Silver Standar Resources || Latam Ventures, Mining in Mexico PDAC2012](https://reader035.vdocument.in/reader035/viewer/2022081404/5583a646d8b42aff058b463e/html5/thumbnails/3.jpg)
3 SSRI:NDAQ | SSO: TSX 3 SSRI:NDAQ | SSO: TSX
LARGE SCALE OPPORTUNITY DISCOVERED BY SILVER STANDARD
PITARRILLA
![Page 4: Joe Phillips - Silver Standar Resources || Latam Ventures, Mining in Mexico PDAC2012](https://reader035.vdocument.in/reader035/viewer/2022081404/5583a646d8b42aff058b463e/html5/thumbnails/4.jpg)
4 SSRI:NDAQ | SSO: TSX
Mine Design Open-Pit
Plant Design 16,000 tpd with Leach & Flotation Circuits
Resources (M + I) 656M oz Ag Estimated Construction Time ~3 Years
Pitarrilla at a Glance
4 SSRI:NDAQ | SSO: TSX
(2)
![Page 5: Joe Phillips - Silver Standar Resources || Latam Ventures, Mining in Mexico PDAC2012](https://reader035.vdocument.in/reader035/viewer/2022081404/5583a646d8b42aff058b463e/html5/thumbnails/5.jpg)
5 SSRI:NDAQ | SSO: TSX
Pitarrilla: Recent Accomplishments
$25M investment in August 2011
Hired project manager and development team
Baseline environmental survey commenced
Released updated mineral resource estimate Measured + Indicated: 655.7M oz Ag
Inferred: 65.0M oz Ag
Advanced construction and operations camps
5 SSRI:NDAQ | SSO: TSX
![Page 6: Joe Phillips - Silver Standar Resources || Latam Ventures, Mining in Mexico PDAC2012](https://reader035.vdocument.in/reader035/viewer/2022081404/5583a646d8b42aff058b463e/html5/thumbnails/6.jpg)
6 SSRI:NDAQ | SSO: TSX
Pitarrilla: 2012 Feasibility Study
6 SSRI:NDAQ | SSO: TSX
Contracted M3 Engineering for Feasibility study
Scheduled to be completed by mid-year 2012
Design based on:
16,000 tpd open-pit mine
Leach and flotation processing facilities
Producing silver doré and separate zinc and lead concentrates
![Page 7: Joe Phillips - Silver Standar Resources || Latam Ventures, Mining in Mexico PDAC2012](https://reader035.vdocument.in/reader035/viewer/2022081404/5583a646d8b42aff058b463e/html5/thumbnails/7.jpg)
7 SSRI:NDAQ | SSO: TSX
W E
Pitarrilla: Mineralization Zones
7 SSRI:NDAQ | SSO: TSX
Cordon Colorado
Javelina Creek / East South Ridge
Breccia Ridge
Likely Pit Shape
![Page 8: Joe Phillips - Silver Standar Resources || Latam Ventures, Mining in Mexico PDAC2012](https://reader035.vdocument.in/reader035/viewer/2022081404/5583a646d8b42aff058b463e/html5/thumbnails/8.jpg)
8 SSRI:NDAQ | SSO: TSX 8 SSRI:NDAQ | SSO: TSX
San Agustin at a Glance
Resources (M + I)
48M oz Ag 1.59M oz Au
2012 Focus Expand gold resource with drilling program in H2 2012