Joint Content Tiger Team Meeting. December 3, 2012. Agenda. Roll – Tom Introductions - All Context – Eric Heflin and John Donnelly. Introductions. Introductions. John Donnelly and Eric Heflin are the Co-Chairs - PowerPoint PPT PresentationTRANSCRIPT
Joint Content Tiger Team Meeting
December 3, 2012
Agenda
• Roll – Tom• Introductions - All• Context – Eric Heflin and John Donnelly
INTRODUCTIONS
Introductions
• John Donnelly and Eric Heflin are the Co-Chairs• Asked for broad participation including from all eHealth Exchange and IWG members
CONTEXT
Background
Problem
• Many production care summary documents being exchanged today are insufficient
• Current content standards are not implementation ready and are not interoperable due to extreme optionality
• Absence of well defined test cases• Overall: lack of a single “target” for the industry
Impact
• Lack of sufficient structured clinical content can compromise the core value proposition of healthcare information exchange
• Lack of a single target makes it very difficult for vendors to select a viable content strategy
• Virtually impossible for customers to specify and purchase precisely
• Fragmentation is a real danger
Timing
• Recent selection of CCHIT and AEGIS with a Dec 9th target Beta test date
• Shall allow multiple current C-CDA approaches to be leveraged once completed
The Approach
• Will be detailed during the Joint Content Tiger Team kick off discussion
• Exchange participants use C-32 by policy with knowledge about real interop issues
• IWG has created a field-level constrained content implementation specification
• These will be harmonized with a coherent pathway leading to C-CDA
The Approach
• Will be detailed during the Joint Content Tiger Team kick off discussion
• Exchange participants use C-32 by policy with knowledge about real interop issues
• IWG has created a field-level constrained content implementation specification
• These will be harmonized with a coherent pathway leading to C-CDA
MU2 Alignment
The Deliverables
• TBD by the Joint Content Tiger Team• Implementation content specification• Samples• Test cases• Executable test cases if needed• Implementation guide• Longer term: Content roadmap + C-CDA content implementation specification
DRAFT HARMONIZED CONTENT SPEC REVIEW
Next Steps/Timeline
• Today (12/3/12): Review first draft and provide feedback by email prior to next call next week.
• 12/10/12: Review feedback; working session to revised draft if/as needed. Identify any deltas prior to ratification.
• 12/17/12: Straw poll: Is the harmonized specification ready for ratification?
• 12/?/12: Ratification (email vote).