Plan Hillsborough planhillsborough.org
[email protected] 813 – 272 – 5940
601 E Kennedy Blvd 18th floor
Tampa, FL, 33602
Commissioner Lesley “Les” Miller, Jr. Hillsborough County
MPO Chairman
Councilman Harry Cohen City of Tampa
MPO Vice Chairman
Paul Anderson Tampa Port Authority
Commissioner Pat Kemp
Hillsborough County
Wallace Bowers HART
Mayor Kim Leinbach Temple Terrace
Trent Green The Planning Commission
Commissioner Ken Hagan Hillsborough County
Joe Lopano Hillsborough Co. Aviation Authority
Mayor Rick A. Lott City of Plant City
Councilman Guido Maniscalco City of Tampa
Commissioner Sandra Murman Hillsborough County
Cindy Stuart Hillsborough County School Board
Joseph Waggoner Expressway Authority
Commissioner Stacy R. White Hillsborough County
Beth Alden, AICP Executive Director
Joint Meeting of the Bicycle Pedestrian Advisory Committee (BPAC) and the Livable Roadways Committee (LRC) Wednesday, December 14, 2016, 5:30 PM
Plan Hillsborough Committee Room, 18th Floor
I. Call to Order & Pledge of Allegiance
II. Public Comment – 3 minutes per speaker, please
III. Approval of Minutes – November 9, 2016 BPAC and October
19, 2016 LRC and November 16 joint LRC/CTST
IV. Action Items
A. FDOT Annual Work Program and MPO Comments (FDOT
Representative)
V. Status Reports
A. Overview of the Naturalistic Bicycling Behavior Pilot Study (Pei-
Sung Lin, CUTR)
B. Parliamentary Procedures and Government in the Sunshine
Annual Update (Cameron Clark, MPO Legal Counsel)
VI. Old Business & New Business
A. Election of Officers – January 2017
B. Gasparilla Rodeo – January 21, 2017
C. Vision Zero Coalition Workshop-January 31, 2017 9AM, Town n-
Country Regional Library
VII. Adjournment
VIII. Addendum
A. MPO Meeting Summary & Committee Report
Please join us for light holiday refreshments!
The full agenda packet is available on the MPO’s website, www.planhillsborough.org, or by calling (813) 272-5940. The MPO does not discriminate in any of its programs or services. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Learn more about our commitment to non-discrimination.
Persons needing interpreter services or accommodations for a disability in order to participate in this meeting, free of charge, are encouraged to contact Michele Ogilvie, 813-273-3774 x317 or [email protected], three business days in advance of the meeting. Also, if you are only able to speak Spanish, please call the Spanish help line at (813) 273-3774, ext. 211. Si necesita servicios de traducción, el MPO ofrece por gratis. Para registrarse por estos servicios, por favor llame a Michele Ogilvie directamente al (813) 273-3774, ext. 317 con tres días antes, o [email protected] de cerro electronico. También, si sólo se puede hablar en español, por favor llame a la línea de ayuda en español al (813) 273-3774, ext. 211. In accordance with Title 17 U.S.C. Section 107, materials attached are for research and educational purposes, and are distributed without profit to MPO Board members, MPO staff, or related committees or subcommittees the MPO supports. The MPO has no affiliation whatsoever with the originator of attached articles nor is the MPO endorsed or sponsored by the originator. Persons wishing to use copyrighted material for purposes of their own that go beyond ‘fair use’ must first obtain permission from the copyright owner.
1
HILLSBOROUGH COUNTY MEETING OF THE BICYCLE/PEDESTRIAN ADVISORY COMMITTEE (BPAC)
COUNTY CENTER BUILDING 601 EAST KENNEDY BOULEVARD
MEETING of November 9, 2016
MINUTES
I. CALL TO ORDER
Chair Shirk called the meeting was called to order at 5:30 p.m. BPAC Members Present: Jonathan Forbes, John Marsh, Jay Collins, Calvin Thornton, Alain Watson, Jim Shirk, Richard Johnson, Karla Price, Tony Monk, Jason Chilson, Lucy Gonzalez- Barr, Rhonda Triplett Coleman, Faye Miller, Mara Latorre, and Kristy Udagawa. Others Present: Michele Ogilvie, Wade Reynolds, and Wanda West - MPO staff; Christine Acosta, Danielle Joyce, Chris Speese - FDOT. II. PUBLIC INPUT Howard Baskin, Big Cat Recuse addressed the committee on a concern regarding the Upper Tampa Bay Trail and a proposed access crossing that would exposing trail users to automobiles conflicts. Mr. Baskin also reported on an upcoming proposal to address a vacant parcel along the Upper Tampa Bay trail that could provide a trail head opportunity. MOTION: Request that Mr. Baskin bring back the Request for Proposal for BPAC input. The motion was made by Tony Monk and seconded by Calvin Thornton and carried unanimously. MOTION: The BPAC also requested that the MPO send a letter supporting Hillsborough County’s efforts to maintain a trail environment that supports a safe walk-bike environment exclusive of automobiles. The motion was made by Calvin Thornton and seconded by Lucy Gonzalez-Barr, the motion carried with Mr. Collins, Mr. Watson and Mr. Chilson abstaining. III. APPROVAL OF MINUTES Mr. Jay Collins made a MOTION to approve the October 12, 2016 BPAC meeting minutes. The motion was seconded by Mr. Alain Watson and carried unanimously.
IV. ACTION ITEMS
A. 2017 Calendar
Mr. Jay Collins made a MOTION to accept the meeting calendar as presented. The motion was seconded by Mr. Alain Watson and carried unanimously.
V. STATUS REPORTS
2
A. Open streets Initiative Ms. Danielle Joyce, Walk Bike Tampa, made a presentation on “Open Streets for Our City.” Building on successful Cyclovia events, the Walk Bike Tampa group is working with the City of Tampa to offer motorized free spaces along select corridors within the city for cycling, skating, running, walking, jogging, and other activities for the overall benefit of the residents, visitors, and local businesses. The ideal is to start with Bayshore Boulevard and extend the experience north to include Downtown and Ybor City.
Members suggested expanding the support for these events to other advocates including Temple Terrace and Plant City. Messaging and support from the city’s special events staff was also suggested. Members also discussed the need to address how roads accommodate people, siting the inequity between neighborhoods and roads such as Busch Boulevard, in providing safe travel for pedestrians and bicyclists. Following the presentation, Ms. Christine Acosta addressed the committee. Ms. Acosta shared images of ground level median bikeways under overpasses. She suggested that bikeways could be included in the Gandy Corridor with the new expressway project.
B. Multi Use Trail Intersections and Crossings
Mr. Jason Chilson made a presentation on the Citrus Park Overpass. His presentation included proposed improvements to the approach of the overpass to include shrubs and paint.
Following the presentation, there were questions regarding the timing of these improvements.
C. Vision Zero Mr. Wade Reynolds, MPO Staff provided an update on this project. The presentation included an update of the communities who have adopted Vision Zero, an update on the traffic death rates in Hillsborough and the action tracks- Paint Saves Lives, One Message, One Voice, Consistent and Fair and The Future Will Not Be Like the Past. A timeline for the project was included. The committee members discussed how technology can help decrease the fatality rates in our county. The committee members requested that the BPAC receive presentations on how speed is assigned to streets and a presentation on how land use decisions are made for this area.
VI. OLD BUSINESS & NEW BUSINESS
A. Calvin Thornton reported on a meeting with Dale Allen of the Florida Greenways and Trails. MOTION: Place a draft letter of support for additional funding of trails on the BPAC agenda for January. The motion was made by Calvin Thornton and seconded Jay Collins and passed unanimously.
3
B. MOTION: Request that pedestrian issues be more present on the BPAC agenda. The motion was made by Calvin Thornton and seconded Tony Monk and passed unanimously.
C. Jim Shirk made an announcement on CRANKSGIVING. It is a bicycle scavenger hunt and food drive, to be held on November 12th and these events take place across the nation during the month of November to benefit local charities as they prepare for Thanksgiving. The event benefits Metropolitan Ministries. Registration starts at 11AM in the parking lot of New World Brewery.
D. Jonathan Forbes asked that a discussion on 40th Street be placed on the agenda. E. Calvin Thornton announced that an announcement might be coming soon from the League
of Cyclists about the status of the city of Tampa.
VII. ADJOURNMENT
There being no further business Mr. Johnson made a MOTION to adjourn the meeting at 7:20 p.m. The motion was seconded by Mr. Collins and carried.
HILLSBOROUGH COUNTY METROPOLITAN PLANNING ORGANIZATION
LIVABLE ROADWAYS COMMITTEE MEETING OF OCTOBER 19, 2016
CALL TO ORDER Vice Chair, David Hey, called the meeting to order at 9:09 a.m., and the Pledge of Allegiance took place. Councilwoman Lisa Montelione took over as Chair at 9:14 a.m. The meeting was held in the Plan Hillsborough Committee room on the 18th Floor of the County Center Building. Members present: Councilwoman Lisa Montelione, Nina Mabilleau, Ben Money, Lea DelTosto, Mark Hudson, Carlos Ramirez, David Hey, David Horwitz, Laurie Potier-Brown, Karen Kress, Charles White, Justin Begley, Jason Jackman, Anna Quinones, Arizona Jenkins, Sara Hendricks, Chris Weber, and Paula Benway. Member excused: Grayson Silver and Mike Williams. Others present: Lisa Silva, Rich Clarendon, Beth Alden, Wanda West, MPO staff; Rochelle Garrett, Menna Yassin, Kirk Bogan, Chris Speese, FDOT; Elaine Illes, IPI; Anna Quinones, THEA; Brandie Miklus, Jacobs; David Bottomley, WVOC. PUBLIC COMMENT There were no public comments. APPROVAL OF MINUTES (September 21, 2016) Ms. Nina Mabilleau made a motion to approve the September 21, 2016 LRC minutes. The motion was seconded Mr. Chris Weber and carried unanimously. STATUS REPORTS A. District 7 Safety Programs Update and FDOT Strategic Highway Safety Plan In Matt Weaver’s absence, FDOT’s Bike Ped Safety Specialist Alex Hendry, provided an update on FDOT’s safety initiatives. Following the presentation there was discussion, concerns were expressed regarding crossing Busch Boulevard. Discussion was held regarding the use of green pavement markings only being allowed in certain locations. Councilwoman Montelione suggested for Ms. Benway to bring back strategies regarding who to send letters of support, or who to advocate with regarding pedestrian bicycle measures being installed. Ms. Benway stated that she would like to see Vision Zero incorporated with the State’s plan, and would like to see the issues of speed addressed in FDOT’s presentations. Stephen Benson responded to some of the committee members’ concerns during the presentation and made a reference to designs of roadways to assist in controlling drivers’ speed.
Chair Montelione suggested temporary strategies to assist in changing behaviors while working on the roadways that can be done in the interim until funding is received to help save a life. Sara Hendricks
expressed concerns for bicyclist and pedestrians in the work zone area for the widening of Bruce B Downs Blvd, north of Bearss Avenue. Ms. Montelione stated that she has had success in contacting David Vogel the contractor and suggested that Sara contact Mr. Vogel.
B. SR 60/Kennedy Boulevard/Jackson Street Resurfacing and Complete Streets Project Stephen Benson, FDOT Representative, presented information on the resurfacing and complete streets project for SR 60 through downtown, primarily Kennedy Boulevard and Jackson Street. During the presentation, committee members had several questions. David Hey made a motion for the LRC to provide a letter of support to FDOT in support of the project, to soften the roadway and improve pedestrian safety for FDOT’s November 10, 2016 upcoming Public Transportation Workshop. David will work with Lisa Silva on composing the letter. Beth Alden clarified for the committee that the letter of support would have to come from the MPO Board. In addition, Ms. Alden stated that the CAC made a motion for a letter of support for FDOT as well. David Hey amended his motion to recommend adding the LRC to the letter of support for the road diet option. The motion was seconded by Arizona Jenkins, and passed unanimously. Chair Montelione wanted to know if the CRA took any action when this project was presented at their meeting. No action was taken at their meeting. It was an informational item only. Ms. Montelione will bring up at City Council. Chris Speese will send the information regarding the November 10th FDOT meeting to Lisa to forward to the LRC. C. Brandon Corridors and Centers Study Sarah McKinley MPO Staff, provided a status report on the corridors and Mixed-Use Centers Study in a joint pilot project from the MPO and The Planning Commission. The purpose of the study is to better coordinate the envisioned land use pattern with planned transportation improvements along major corridors. Following the presentation, there were a few questions and comments. Members would like to make sure that information is communicated to the community. OLD BUSINESS & NEW BUSINESS
At the last meeting Chair Montelione requested information regarding FDOT’s outreach for their Communication Plan. The information received back was very encouraging. A. Joint CTST-LRC Nov 16, 2016 – Ms. Silva reminded members of the upcoming annual joint meeting. The meeting will be held on the 26th Floor of the County Center. A Vision Zero Update will be presented at this meeting. Also, there will be a Vision Zero Call to Action meeting on October 25, from 9 am to 11 am.
Beth Alden informed members of the Temple Terrace’s City Council approving a resolution to support Vision Zero efforts, and they are now officially members of the coalition. Ms. Alden informed the LRC that the MPO Board will have its election of officers and Planning Commissioner Trent Green expressed interest in Chairing the LRC. B. Recognition of Outgoing Chair, Lisa Montelione – Members recognized Chair Montelione for her service to the LRC. Karen Kress provided information on the Downtowner.
ADJOURNMENT There being no further business, the meeting adjourned at 10:47 a.m.
www.tampabaytrafficsafety.com/CTST/
Minutes – Joint Meeting of Hillsborough CTST and Livable Roadways Committee
November 16, 2016 – 9:00 am County Center, 26th Floor, Conference Room B, 601 E Kennedy Blvd, Tampa, FL 33602
Florida out rates the U.S. in death rates (Hillsborough County is even higher). Julie Bond gets her material from the UF and they are short on funding and not able to get material out for 6 months. Vision Zero webpage with interactive map to list crash sites. There has been a great deal of work done in Ft. Lauderdale that is being used a samples. One Message Many Voices - they are creating a speaker bureau and want groups like the NAACP, AA, other community groups, and churches to be involved. Consistent and Fair Group going to meet somewhere along Nebraska Avenue as it is identified as a high crash area. Families for Safe Streets – they are going to try and get a chapter stared here in the area. Next Vision Zero meetings – Workshop 2, January 21st, Workshop 3, April 25th, and Workshop 4, July 25th (final action plan to be done). LCI seminar for February 10th – 12th is already full. Julie briefly discussed partnership with Rotary Club in Treasure Island and Madeira Beach. Bike Smart classes which take place in the classroom are available via CUTR (1 ½ hours long). On November 28th there will be a big announcement about Bicycle Friendly University’s and USF is involved. Bike Smart class was done at Plant H.S. and there was a questions about this being offered to the Boy Scout troops (Eagle Scouts) by one of the ladies on the board. There were several questions about how to re-educate drivers about bicycle and pedestrian laws, maybe having new driving tests done that include this, make people retake driving test when renewing licenses, etc. Lots of questions and comments about the Kennedy Blvd. presentation. The Livable Roadways Committee passed a motion to have D7 DOT stop the project until it can be reassessed with the Complete Streets Manual that is coming out. They want D7 DOT to find funds to add landscaping that is bicycle and pedestrian friendly in the median and to add landscaping throughout the corridor. They also want to close multiple driveway openings and have the speed reduced to 35mph. The consultant Ms. Snyder and John Foley from D7 tried to answer all the questions.
www.tampabaytrafficsafety.com/CTST/
Paula Benway talked about the work that Billy Hadaway is doing and the fact that the new Complete Streets Manual is coming out in January, This document said to determine speed (target speed) not just using the normal speed study with the 85% study that FDOT currently uses. A gentlemen (Mr. Pages) in the audience who was disabled wanted to know about handicapped parking and possible on street parking along the Kennedy Blvd. project. He also brought up concerns about the area around Moody Road.
Board & Committee Agenda Item
Agenda Item
FDOT Annual Work Program& MPO Comments
Presenter
FDOT Representative
Summary
The Florida Department of Transportation (FDOT) has developed their annual budget for transportation projects. This budget, known as the Tentative Work Program, includes anticipated project funding for the upcoming fiscal year and the four following years. The work program being presented is for the 2017/2018 – 2021/22 Fiscal Years.
Per federal rules and state statutes, the programming of federal funds for transportation projects is to be consistent with priorities adopted by the MPO. The MPO adopted the attached list of project priorities, which were used by FDOT in developing this work program.
For this status report, FDOT will highlight projects receiving funding in Hillsborough County. Additionally, FDOT has scheduled a public hearing on the work program for December 14th from 4 to 6 PM in the Planning Commission Board Room, on the 18th floor of the County Center. The public is encouraged to attend and ask questions or provide comments.
Staff will review the work program and draft a letter of comments for the committees’ approval and forwarding the MPO board in January.
Recommended Action
Approve staff comments on FDOT’s Tentative Work Program, along with any additional comments from the committees, and forward to the MPO.
Prepared By
Rich Clarendon, AICP
Attachments
1. FDOT Tentative Five-Year Work Program Fiscal Years 2018 – 2022 (including maps)
2. Map of Current Turnpike Projects in District 7
3. MPO Project Priorities
4. Courtney Campbell bridge as a mitigation tool
5. Draft letter of comments (to be distributed at the meeting)
Plan Hillsborough planhillsborough.org
[email protected] 813 - 272 - 5940
601 E Kennedy Blvd 18th floor
Tampa, FL, 33602
December 5, 2016
Florida Department of Transportation
District Seven
11201 N. McKinley Drive
Tampa, FL 33612-6456
(813) 975-6000
Tentative Five -Year Work ProgramFiscal Years 2018 - 2022
DRAFT
Projects Funded July 1, 2017 to June 30, 2022
OP60
OP45
OP674
OP600
OP589OP39
OP41OP597
OP580
OP582
OP583
OP599
OP676
OP568
§̈¦75
§̈¦4
§̈¦275
§̈¦275
£¤41
£¤301
£¤92
£¤41
£¤92
£¤41B
OP93A
OP400
OP43
KL574
KL573
KL579
KL579
KL676
OP60
OP45
OP574
OP600
OP60
OP580
KL39
KL582
KL672
KL640
KL579
KL676
§̈¦75
£¤301
OP674
Gulf of Mexico
Tampa Bay
VE
TE
RA
NS
EX
PY
DESCRIPTION: US 41 (SR 685) OVER HILLSBOROUGH RIVER BR #100069
FPN: 4358971SUBSTRUCTURE REPAIR INCL REPLACING EXISTING BROKEN PILECST: 2018
DESCRIPTION: US 92/SR 600 EB FROM OVER OLD TAMPA BAY TO BR #100300FPN: 4396621METHACRYLATE MONOMER APPLICATION ON BRIDGE DECKCST: 2018
DESCRIPTION: SUBSTRUCTURE REPAIR HILLSBOROUGH COUNTY VARIOUS LOCATIONS
FPN: 4375181#100136, 100585 - BRIDGE REPAIR/REHABILITATIONPE: 2018CST: 2019
DESCRIPTION: BRIDGE SUBSTRUCTURE REPAIR FROM HILLSBOROUGH CO TO BRIDGE #100301
FPN: 4387831COURTNEY CAMPBELL CAUSEWAY STRUCTURE CPE: 2018CST: 2020
DESCRIPTION: I-75(SR 93A) OVER CR 574/CSX RR BR #100435 AND #100436
FPN: 4307051FULL DECK REPLACEMENT OF THE EXISTING DECK PANEL BRIDGECST: 2018RRU: 2018
DESCRIPTION: CR 39A/ALEXANDER ST FROM W OF SR 39 TO I-4/SR 400
FPN: 44033814 LANESCST: 2018
DESCRIPTION: USB 41/SR 685 FROM N OF LINEBAUGH AVE TO N OF FLETCHER AVEFPN: 43473014 LANESCST: 2018
DESCRIPTION: I-4/SR 400 FROM E OF 50TH ST TO E OF MCINTOSHFPN: 43658816 LANESCST: 2018
DESCRIPTION: I-75/SR 93A FROM MANATEE COUNTY LINE TO N OF CR 672FPN: 43731216 LANESPE: 2018
CST: 2020
DESCRIPTION: US 41/SR 45 FROM N OF BULLFROG CREEK TO DENVER STFPN: 4348481
4 LANESCST: 2018
DESCRIPTION: US 92/SR 600/HILLS AV FROM E OF N CENTRAL AVE TO W OF SR 583/N 56TH STFPN: 43258416 LANESCST: 2019
DESCRIPTION: SR 674/SUN CITY CENTER BLVDFROM E OF COMMERCIAL CTR DR TO E OF US 301/SR 43FPN: 4364951
4 LANESCST: 2018
DESCRIPTION: SR 580/W BUSCH BLVD FROM E OF N ARMENIA TO W OF FLORIDA AVE
FPN: 43753014 LANESCST: 2019
DESCRIPTION: US 92/SR 39/SR 600 FROM W OF N MOBLEY TO N HOWARD STFPN: 4364201
2 LANESCST: 2018
DESCRIPTION: SR 674/E COLLEGE AVE FROM S US 41/SR 45 TO E OF COLLEGE CHASE DRFPN: 4367341
6 LANESPE: 2018CST: 2020
DESCRIPTION: SR 60/E KENNEDY BLVD FROM W OF N NEBRASKA AVE TO E OF N ASHLEY STFPN: 43649114 LANESCST: 2018
DESCRIPTION: SR 579 (FLETCHER AVE) FROM FLORIDA AVE TO NEBRASKA AVEFPN: 4364811
4 LANESCST: 2019
DESCRIPTION: US 92/SR 600/DALE MABRY FROM S OF W MCKAY AVE TO S OF W CLEVELAND STFPN: 43649414 LANESCST: 2019
DESCRIPTION: US 92/SR 600/W GANDY BLVD
FROM E END OF GANDY BRIDGE TO W OF S BRIDGE STFPN: 43751314 LANESCST: 2019
FLORIDA DEPARTMENT OF TRANSPORTATIONDISTRICT SEVEN
MAP AS OF NOVEMBER 2016
HILLSBOROUGH COUNTY -- RESURFACING PROJECTS
²0 2 4 6 8 10
Miles
PRELIMINARY ENGINEERING CONSTRUCTION
RAILROAD & UTILITIES
(PE)(CST)
(RRU)DRAFT TENTATIVE FIVE-YEAR WORK PROGRAM FOR FY 2018 THROUGH FY 2022
JULY 1, 2017 THROUGH JUNE 30, 2022FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT SEVEN
OP60
£¤301
KL581
KL580
Tampa Bay
VE
TE
RA
N'S
EX
PW
Y
!"#$75
!"#$75 !"#$4
!"#$275
!"#$275
OP589
£¤41
£¤41B
£¤41
£¤92
£¤301
!"#$4OP60
OP597 OP582
OP580
OP60
£¤41B
£¤41
DESCRIPTION: I-275 (SR 93) I-275/SR 60 INTERCHANGE
FPN: 4125312TBX ADV RW FOR SECTION 4ROW: 2018, 2019, 2020, 2021
DESCRIPTION: I-275/SR 93 NB FLYOVER FROM SR 60 EB TO I-275 NBFPN: 4335355
INTERCHANGE IMPROVEMENTS, TBX SECTION 4PE: 2019
DESCRIPTION: I-275 (HOWARD FRKL) FROM N OF HOWARD FRANKLAND TO S OF SR 60
FPN: 4229044BRIDGE REPLACEMENT, TBX SECTION 3DSB: 2019
DESCRIPTION: I-275/SR 93 NB XPR LN FROM N OF HOWARD FRANKLAND TO S OF TRASK STREETFPN: 4335354INTERCHANGE IMPROVEMENTS, TBX SECTION 4PE: 2019
DESCRIPTION: S MAYDELL DR AT PALM RIVERFPN: 4394121REPLACE BRIDGE #105604 OVER PALM RIVERPE: 2020CST: 2022
DESCRIPTION: WESTSHORE BOULEVARD AND GANDY BOULEVARD
FPN: 4370411PROVIDE LEFT TURN LANES ON ALL 4 APPROACHES TO INTERSECTIONCST: 2020
DESCRIPTION: I-4 FROM 1-4/SELMON CONNECTOR TO E OF BRANCH FORBES RD
FPN: 43174626 TO 8 LANES, TBX SECTION 8DSB: 2021
DESCRIPTION: I-275 FROM S OF LOIS AVE TO WILLOW AVEFPN: 43404526 TO 8 LANES/8 TO 10 LANES. TBX SECTION 5DSB: 2022
DESCRIPTION: US 41 @ CSX GRADE SEPARATIONSOUTH OF CAUSEWAY BLVDFPN: 4407491PDE: 2018PE: 2020
ROW: 2022
DESCRIPTION: I-275/SR 93 FROM S OF WILLOW TO N OF MLK; I-4/SR 400 FROM I-275 TO CONNECTORFPN: 4338212DOWNTOWN INTERCHANGE IMPROVEMENT, TBX SECTION 6PE: 2021
DESCRIPTION: MADISON AVENUE FROM US 41 TO 78TH STREET (CR 573)FPN: 4370021CONSTRUCT A 4 LANE DIVIDED ROADWAY (2 TO 4 LANES)CST: 2020
DESCRIPTION: N 62ND STREET FROM CSX INTRMD ENTRANCE TO NORTH OF E COLUMBUS DRIVE
FPN: 4330712CONSTRUCT ASPHALT ROADWAY. OPERATIONAL QUICK FIXROW: 2020CST: 2022
DRAFT TENTATIVE FIVE-YEAR WORK PROGRAM FOR FY 2018 THROUGH FY 2022JULY 1, 2017 THROUGH JUNE 30, 2022
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT SEVEN
FLORIDA DEPARTMENT OF TRANSPORTATIONDISTRICT SEVENMAP AS OF NOVEMBER 2016
HILLSBOROUGH COUNTY -- CAPACITY PROJECTS (INSET) PRELIMINARY ENGINEERING DESIGN-BUILD
RIGHT-OF-WAY CONSTRUCTION
²0 1 2 3 4 5
Miles
(PE)(DSB)
(ROW)(CST)
OP41
KL581
KL580
SU
NC
OA
ST
PK
WY
Gulf of Mexico
Tampa BayV
ET
ER
AN
'S E
XP
WY
DESCRIPTION: APOLLO BEACH EXTENSION
FROM US 41TO PASEO AL MAR BOULEVARD
FPN: 4387521CST: 2021
SEE INSET
DESCRIPTION: US 301 FROM N OF TOM FOLSOM RD TO HILLSBOROUGH/PASCO CO LINE
FPN: 25579622 TO 4 LANESPE: 2019
DESCRIPTION: SR 39 (JL REDMAN PRKWY) & ALEXANDER ST INTERSECTION
FPN: 4407331ADD RIGHT TURN LANES ON SB SR 39 TO WB ALEXANDER STPE: 2022
DESCRIPTION: I-275 (SR 93) FROM N OF MLK TO N OF BUSCH BLVD
FPN: 43182126 TO 8 LANES, TBX SECTION 7DSB: 2021
DESCRIPTION: SR 60 FROM VALRICO RD TO E OF DOVER RD
FPN: 43575014 TO 6 LANESROW: 2022
DESCRIPTION: SR 574 (MLK BLVD) FROM EAST OF KINGSWAY RD TO E OF MCINTOSH RD
FPN: 25589342 TO 4 LANESROW: 2018, 2019, 2020
CST: 2022
DESCRIPTION: ARMENIA AVENUE AT BUSCH BOULEVARDFPN: 4370441INTERSECTION IMPROVEMENTSCST: 2019
DESCRIPTION: CR 580/SAM ALLEN RD FROM W OF SR 39/BUCHMAN HWY TO E OF PARK RDFPN: 2578623
2 TO 4 LANESCST: 2018RRU: 2018
DESCRIPTION: I-75/I-275 CD ROAD FROM S OF COUNTY LINE RD TO COUNTY LINE RD (PHASE II)FPN: 4305733
CONSTRUCT SB CD ROAD SYSTEM TO COMPLEMENT NB CD ROAD SYSTEMPE: 2021
DESCRIPTION: GIBSONTON DR EB FROM NB ON RAMP TO I-75FPN: 4376501
PROVIDE ADDITIONAL EB LEFT TURN LANE AND NB ENTRANCE LANEPE: 2022
DESCRIPTION: PARK RD INTERSECTION AT CORONET AND ALSOBROOK STFPN: 4407341
ADD LEFT TURN LANEPE: 2022
DESCRIPTION: S ALEXANDER ST AND JIM JOHNSON RD
INTERSECTION IMPROVEMENTSFPN: 4407361ADD EB TURN LANESPE: 2022DESCRIPTION: USB 41/SR 685/N FLORIDA AT HILLSBOROUGH RIVER BRIDGE
FPN: 4347292TO ADDRESS FUNCTIONAL OBSOLESCENCE IMPROVEMENTSPE: 2018
DESCRIPTION: I-75 (SR 93A) FROM S OF CSX/BROADWAY AVE TO EB/WB I-4 EXIT RAMP
FPN: 4292511INTERIM INTERCHANGE IMPROVEMENTCST: 2022
RRU: 2019
DESCRIPTION: I-75 @ BIG BEND ROAD SB OFF RAMPFPN: 4245132INTERCHANGE OPERATIONAL IMPROVEMENTCST: 2021
DESCRIPTION: I-75 (SR 93A) SB OFF-RAMP FROM S OF BYPASS CANAL TO EB/WB I-4
FPN: 4289571RAMP MODIFICATION ONLYCST: 2018
DESCRIPTION: I-75 (SR 93A) FROM WB SR 60 ENTRANCE RAMP TO S OF CSX RR/CR 574FPN: 4289531
IMPROVE WB SR 60 TO NB I-75 ENTRANCE RAMP/INCL 2-LANE ENT RAMPCST: 2018
DESCRIPTION: I-75 (SR 93A) FROM S OF SELMON EXP OVERPASS TO N OF SR 60FPN: 4289561
INTERCHANGE ADD LANES - EB SR 60 TO SB I-75 RAMP PLUS ALL SB CD RD WIDENING/NEW CSTCST: 2018
DESCRIPTION: I-75 (SR 93A) & SR 60
FROM S OF SR 60 @ SLIP RAMP TO S OF CSX BRIDGE #100471FPN: 4289551INTERCHANGE ADD LANES - RECONST EB SR 60 TO NB I-75 LOOP RAMP/NEW NB CD RD TO NB I-75CST: 2018
DESCRIPTION: I-4 (SR 400) FROM E OF I-75 (SR 93A)
TO EAST OF WILLIAMS RDFPN: 4303351REALIGN I-4 EB ENT. FOROPERATIONAL IMPROVEMENTPE: 2018CST: 2021
DESCRIPTION: BIG BEND RD FROM E OF DICKMAN ROAD TO W OF WYANDOTTE ROADFPN: 4305022
BRIDGE #100270CST: 2019
DESCRIPTION: SR 60/COURTNEY CAMPBELL CAUSEWAY AT WEST OF BEN T DAVIS BEACHFPN: 4392061
CONSTRUCT BRIDGE FOR ENVIRONMENTAL UPLIFTDSB: 2018
DRAFT TENTATIVE FIVE-YEAR WORK PROGRAM FOR FY 2018 THROUGH FY 2022JULY 1, 2017 THROUGH JUNE 30, 2022
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT SEVEN
FLORIDA DEPARTMENT OF TRANSPORTATIONDISTRICT SEVENMAP AS OF NOVEMBER 2016
HILLSBOROUGH COUNTY -- CAPACITY PROJECTS PRELIMINARY ENGINEERINGDESIGN-BUILD
RIGHT-OF-WAY CONSTRUCTIONRAILROAD & UTILITIES
²0 2 4 6 8 10
Miles
(PE)(DSB)
(ROW)(CST)(RRU)
OP60
OP45
OP674
OP600
OP589OP39
OP41OP597
OP580
OP582
OP583
OP599
OP676
OP568
§̈¦75
§̈¦4
§̈¦275
§̈¦275
£¤41
£¤301
£¤92
£¤41
£¤92
£¤41B
OP93A
OP400
OP43
KL574
KL573
KL579
KL579
KL676
OP60
OP45
OP574
OP600
OP60
OP580
KL39
KL582
KL672
KL640
KL579
KL676
§̈¦75
£¤301
OP674
Gulf of Mexico
Tampa Bay
VE
TE
RA
NS
EX
PY
DESCRIPTION: TAMPA BYPASS CANAL
TRAIL FROM N 34TH ST TO SR 581
(BRUCE B DOWNS).
FPN: 4394821
12' MULTI USE TRAIL PD&E: 2018
DESCRIPTION: SELMON GREENWAY CONNECTOR SR 60 AT 19TH ST
FPN: 4339251
DESIGN AND CONSTRUCT TRAILHEADPE: 2018
CST: 2020
DESCRIPTION: MORT ELEMENTARY SCHOOL
VARIOUS LOCATIONS AROUND SCHOOL
FPN: 4396911
CONSTRUCT 5' SIDEWALK 142ND, 140TH, 139TH,12TH, 19TH, 20THPE: 2018
CST: 2020
DESCRIPTION: TAMPA BYPASS CANAL TRAIL
FROM N 34TH ST TO SR 581 (BRUCE B DOWNS).
FPN: 4394822
ADDITION OF 12' MULTIUSE TRAILPE: 2020
DESCRIPTION: N ROME AVE FROM W KENNEDY BLVD TO W COLUMBUS DR
FPN: 4372431
COMPLETE SIDEWALK GAPS AND BIKE LANESPE: 2019
CST: 2021
DESCRIPTION: SOUTH COAST COUNTY GREENWAY-PH 1A
FROM E SHELL POINT RD TO 19TH AVE NE
FPN: 4394811
CONSTRUCT APPROX 1.7 MILE 12' PAVED TRAILCST: 2021
DESCRIPTION: 46TH STREET FROM SR 580
(BUSCH BLVD) TO SR 582 (FOWLER AVE)
FPN: 4372461
INSTALL LANE MARKINGS ANDSHARED USE PATHPE: 2018
CST: 2020
DESCRIPTION: OLD BIG BEND RD FROM E OF COVINGTON
GARDEN DR TO W OF LINCOLN RD
FPN: 4372481
CONSTRUCT SIDEWALK TO FILL GAPSCST: 2018
DESCRIPTION: US 41/SR 45/50TH ST
FROM DENVER ST TO CAUSEWAY BLVD
FPN: 4390381
CONSTRUCT 5' TO 6' SIDEWALKCST: 2018
DESCRIPTION: FLORIBRASKA AVE FROM N TAMPA ST TO NEBRASKA AVE
FPN: 4366401
CONVERT FROM 4 LANE TO 2 LANE UNDIVIDED, INSTALL BIKE LANESPE: 2022
DESCRIPTION: E COLUMBUS DR FROM N NEBRASKA AVE
(SR45) TO 14TH ST
FPN: 4366391
RECONFIG EXISTING 2 LANE UNDIVIDED ROADWAYPE: 2018
CST: 2020
DESCRIPTION: GREEN SPINE CYCLE TRACK PH 2B FROM WILLOW AVE TO DOYLE CARLTON DR
FPN: 4394761
CONSTRUCT 9' BUFFERED CYCLE TRACK FOR NON MOTORIZED TRAVELCST: 2020
DESCRIPTION: LUTZ LAKE FERN RD TRAIL CON
FROM STILLWOOD DR TO UPPER TAMPA BAY TRAIL
FPN: 4367131
DESIGN AND CONSTRUCT 5' SIDEWALKSPE: 2018
CST: 2020
DESCRIPTION: KENLY ELEMENTARY 21ST AVE
FROM 66TH ST TO 62ND ST
FPN: 4396961
CONSTRUCT 5' SIDEWALK KENLY ELEMENTARYPE: 2018
CST: 2020
DESCRIPTION: STOWERS ELEM SCHOOL
FROM GENTLE WOOD AVE TO S OF
BARRINGTON STOWERS DR
FPN: 4372441
SIDEWALK ON WEST SIDE OF BOYETTE ROADCST: 2018
DESCRIPTION: CYPRESS CREEK ELEM
FROM W OF SALIDA DEL SOL DR TO
BETH SHIELDS WY
FPN: 4372421
CONSTRUCT 5' SIDEWALKCST: 2018
DESCRIPTION: GIBSONTON ELEMENTARY ALAFIA ST & VERN STREET
FROM GIBSONTON DR TO NUNDY
FPN: 4396921
CONTRUCT 5' SIDEWALK FROM GIBSONTON DR TO NUNDY AVENUEPE: 2018
CST: 2020
DESCRIPTION: SUMMERFIELD ELEM SCHOOL
HERITAGE GRN PKWY TO E OF HERITAGE
GRN PKWY
FPN: 4372471
CONSTRUCT 5' SIDEWALKCST: 2018
FLORIDA DEPARTMENT OF TRANSPORTATIONDISTRICT SEVEN
MAP AS OF NOVEMBER 2016
²0 2 4 6 8 10
Miles
PROJECT DEVELOPMENT & ENVIRONMENTPRELIMINARY ENGINEERING CONSTRUCTION
(PD&E)(PE)
(CST)
Bicycle and Pedestrian Stand Alone ProjectsDRAFT TENTATIVE FIVE-YEAR WORK PROGRAM FOR FY 2018 THROUGH FY 2022
JULY 1, 2017 THROUGH JUNE 30, 2022FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT SEVEN
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
HIGHWAYS
34TH ST N FROM COLUMBUS DR TO US 92/E HILLSBOROUGH AVE
4376481
TRAFFIC OPS IMPROVEMENT
4 TO 2 LANES,ADD BIKE LANES,AND ROUNDABOUTS-COMPLETE STREETS
FPN:
DESCRIPTION:
CST HSP 0 1,783,227 0 0 0
CST LF 0 759,700 0 0 0
0 2,542,927 0 0 0Total:
46TH STREET FROM SR 580 (BUSCH BLVD) TO SR 582 (FOWLER AVE)
4372461
BIKE LANE/SIDEWALK
INSTALL LANE MARKINGS AND SHARED USE PATH
FPN:
DESCRIPTION:
CST TALU 0 0 228,102 0 0
PE TALT 20,907 0 0 0 0
PE TALU 57,093 0 0 0 0
78,000 0 228,102 0 0Total:
APOLLO BEACH EXTENSION FROM US 41 TO PASEO AL MAR BOULEVARD
4387521
NEW ROAD CONSTRUCTION
FPN:
DESCRIPTION:
CST CIGP 0 0 0 5,000,000 0
CST LFP 0 0 0 5,000,000 0
0 0 0 10,000,000 0Total:
33
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
ARMENIA AVENUE AT BUSCH BOULEVARD
4370441
ADD TURN LANE(S)
INTERSECTION IMPROVEMENTS
FPN:
DESCRIPTION:
CST CIGP 0 977,691 0 0 0
CST LF 0 442,542 0 0 0
CST LFP 0 977,691 0 0 0
0 2,397,924 0 0 0Total:
BIG BEND RD FROM E OF DICKMAN ROAD TO W OF WYANDOTTE ROAD
4305022
BRIDGE REPLACEMENT
BRIDGE #100270
FPN:
DESCRIPTION:
CST ACBZ 0 907,688 0 0 0
0 907,688 0 0 0Total:
BRIDGE PAINTING HILLSBOROUGH COUNTY VARIOUS LOCATION
4375411
BRIDGE - PAINTING
#100500, 100940, 100021
FPN:
DESCRIPTION:
CST BRRP 0 796,875 0 0 0
CST DIH 0 14,488 0 0 0
PE BRRP 50,000 0 0 0 0
50,000 811,363 0 0 0Total:
34
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
BRIDGE SUBSTRUCTURE REPAIR FROM HILLSBOROUGH CO TO BRIDGE #100301
4387831
BRIDGE-REPAIR/REHABILITATION
COURTNEY CAMPBELL CAUSEWAY STRUCTURE C
FPN:
DESCRIPTION:
CST BRRP 0 0 2,113,707 0 0
CST DIH 0 0 28,309 0 0
PE BRRP 175,000 0 0 0 0
PE DIH 1,000 0 0 0 0
176,000 0 2,142,016 0 0Total:
CITY OF TAMPA DOWNTOWN TAMPA ATMS 191 SIGNALS - PHASE 2
4242133
ATMS - ARTERIAL TRAFFIC MGMT
UPGRADE LEGACY TRAFFIC SIGNAL SYSTEMS
FPN:
DESCRIPTION:
DSB SA 0 0 5,887,045 0 0
DSB SU 0 0 7,020,602 0 0
PE SU 0 0 182,380 0 0
PE SU 0 0 45,595 0 0
0 0 13,135,622 0 0Total:
35
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
CITY OF TAMPA KENNEDY/HYDE PARK/DALE MABRY ATMS 142 SIGNALS- PHASE 3
4242134
ATMS - ARTERIAL TRAFFIC MGMT
UPGRADE LEGACY TRAFFIC SIGNAL SYSTEMS
FPN:
DESCRIPTION:
DSB SA 0 0 3,886,070 0 0
DSB SU 0 0 7,767,265 0 0
PE SU 0 0 41,893 0 0
PE SU 0 0 167,572 0 0
0 0 11,862,800 0 0Total:
CITY OF TAMPA USF AREA/BUSCH BLVD ATMS 119 SIGNALS - PHASE 4
4242136
ATMS - ARTERIAL TRAFFIC MGMT
UPGRADE LEGACY TRAFFIC SIGNAL SYSTEMS
FPN:
DESCRIPTION:
DSB SU 0 0 10,008,961 0 0
PE SU 0 0 37,058 0 0
PE SU 0 0 148,232 0 0
0 0 10,194,251 0 0Total:
36
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
CR 39A/ALEXANDER ST FROM W OF SR 39 TO I-4/SR 400
4403381
RESURFACING
4 LANES
FPN:
DESCRIPTION:
CST DDR 7,410,298 0 0 0 0
CST DIH 102,921 0 0 0 0
7,513,219 0 0 0 0Total:
CR 39A/ALEXANDER ST FROM W OF SR 39 TO I-4/SR 400 - SEGMENT 2
4403382
SIDEWALK
BRING ROADSIDE FEATURES INTO COMPLIANCE FROM SEGMENT 1
FPN:
DESCRIPTION:
PE DIH 1,000 0 0 0 0
PE DS 0 500,000 0 0 0
1,000 500,000 0 0 0Total:
CR 580/SAM ALLEN RD FM W OF SR39/BUCHMAN HWY TO E OF PARK RD
2578623
ADD LANES & RECONSTRUCT
2 TO 4 LANES
FPN:
DESCRIPTION:
CST CM 1,635,115 0 0 0 0
CST SU 22,085,607 0 0 0 0
CST SU 326,155 0 0 0 0
RRU LF 5,150,000 0 0 0 0
29,196,877 0 0 0 0Total:
37
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
CYPRESS CREEK ELEM FROM W OF SALIDA DEL SOL DR TO BETH SHIELDS WY
4372421
SIDEWALK
CONSTRUCT 5' SIDEWALK
FPN:
DESCRIPTION:
CST TALT 1,726 0 0 0 0
CST TALU 113,015 0 0 0 0
114,741 0 0 0 0Total:
DALE MABRY HWY ATMS FROM W SLIGH AVE TO VAN DYKE RD
4384501
ATMS - ARTERIAL TRAFFIC MGMT
FPN:
DESCRIPTION:
DSB DDR 3,243,503 0 0 0 0
DSB DIH 43,134 0 0 0 0
3,286,637 0 0 0 0Total:
E COLUMBUS DR FROM N NEBRASKA AVE (SR45) TO 14TH ST
4366391
BIKE LANE/SIDEWALK
RECONFIG EXISTING 2 LANE UNDIVIDED ROADWAY-COMPLETE STREETS
FPN:
DESCRIPTION:
CST TALU 0 0 200,296 0 0
PE TALU 100,000 0 0 0 0
100,000 0 200,296 0 0Total:
38
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
FLORIBRASKA AVE FROM N TAMPA ST TO NEBRASKA AVE
4366401
BIKE LANE/SIDEWALK
CONVERT FROM 4 LANE TO 2 LANE UNDIVIDED, INSTALL BIKE LANES
FPN:
DESCRIPTION:
PE SU 0 0 0 1,000 77,000
0 0 0 1,000 77,000Total:
GIBSONTON DR EB FROM NB ON RAMP TO I-75
4376501
ADD TURN LANE(S)
PROVIDE ADDITIONAL EB LEFT TURN LANE AND NB ENTRANCE LANE
FPN:
DESCRIPTION:
PE SU 0 0 0 1,000 692,607
0 0 0 1,000 692,607Total:
GIBSONTON ELEMENTARY ALAFIA ST & VERN STREET FR GIBSONTON DR TO NUNDY
4396921
SIDEWALK
CONTRUCT 5' SIDEWALK FROM GIBSONTON DR TO NUNDY AVENUE
FPN:
DESCRIPTION:
CST SR2T 0 0 341,153 0 0
PE SR2T 200,707 0 0 0 0
200,707 0 341,153 0 0Total:
39
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
GREEN SPINE CYCLE TRACK PH 2B FROM WILLOW AVE TO DOYLE CARLTON DR
4394761
BIKE PATH/TRAIL
CONSTRUCT 9' BUFFERED CYCLE TRACK FOR NON MOTORIZED TRAVEL
FPN:
DESCRIPTION:
CST TALU 0 0 543,561 0 0
0 0 543,561 0 0Total:
HENRY CANAL FROM HOOVER BLVD TO ANDERSON RD
4229294
DRAINAGE IMPROVEMENTS
FPN:
DESCRIPTION:
CST DDR 3,714,454 0 0 0 0
CST DIH 325,183 0 0 0 0
4,039,637 0 0 0 0Total:
HENRY CANAL FROM W OF HOOVER BLVD TO HOOVER BLVD
4229293
DRAINAGE IMPROVEMENTS
FPN:
DESCRIPTION:
CST DDR 3,803,366 0 0 0 0
CST DIH 53,070 0 0 0 0
3,856,436 0 0 0 0Total:
40
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
HIMES AVE FROM SR 60/KENNEDY BLVD TO COLUMBUS DR
4376471
TRAFFIC OPS IMPROVEMENT
ADD, EXTEND, WIDEN TRAFFIC SEPARATOR FOR BIKE LANES
FPN:
DESCRIPTION:
CST HSP 1,480,790 0 0 0 0
1,480,790 0 0 0 0Total:
I-275 (HOWARD FRKL) FM N OF HOWARD FRANKLAND TO S OF SR 60
4229044
BRIDGE-REPLACE AND ADD LANES
BRIDGE REPLACEMENT, TBX SECTION 3
FPN:
DESCRIPTION:
DSB ACBR 0 5,122,124 0 0 0
DSB DSB1 0 17,683,490 0 0 0
PE ACBR 0 388,920 0 0 0
PE BRP 200,000 0 0 0 0
200,000 23,194,534 0 0 0Total:
41
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
I-275 (SR 93) FROM N OF MLK TO N OF BUSCH BLVD
4318212
ADD LANES & REHABILITATE PVMNT
6 TO 8 LANES, TBX SECTION 7
FPN:
DESCRIPTION:
DSB ACNP 0 0 0 5,228,823 0
DSB STED 0 0 0 55,040,238 0
ENV DS 222,892 0 0 0 0
PE ACNP 0 0 0 4,407,061 0
PE DI 0 0 0 757,325 0
PE DIH 0 0 0 100,000 0
222,892 0 0 65,533,447 0Total:
I-275 (SR 93) I-275/SR 60 INTERCHANGE
4125312
INTERCHANGE - ADD LANES
TBX ADV RW FOR SECTION 4
FPN:
DESCRIPTION:
ROW BNIR 0 33,333,333 0 45,981,000 0
ROW DDR 0 0 4,827,538 2,164,547 0
ROW DI 85,000,000 0 0 0 0
ROW DIH 0 0 0 20,000 0
ROW DS 0 0 0 300,000 0
ROW DSB1 51,333,333 0 0 0 0
ROW PKED 0 0 25,000,000 25,000,000 0
136,333,333 33,333,333 29,827,538 73,465,547 0Total:
42
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
I-275 FROM S OF LOIS AVE TO WILLOW AVE
4340452
ADD LANES & REHABILITATE PVMNT
6 TO 8 LANES/8 TO 10 LANES. TBX SECTION 5
FPN:
DESCRIPTION:
DSB ACNP 0 0 0 0 17,718,542
DSB STED 0 0 0 0 81,555,942
PE ACNP 0 0 100,000 0 1,068,760
0 0 100,000 0 100,343,244Total:
I-275/SR60/I4 EXPRESS LANES - TAMPA BAY EXPRESS RESERVE BOX FOR DAF
4382581
FUNDING ACTION
FPN:
DESCRIPTION:
CST DDR 0 0 0 78,642,048 69,223,075
CST DS 0 0 0 0 9,418,973
ROW DSB1 0 9,798,057 0 0 0
0 9,798,057 0 78,642,048 78,642,048Total:
I-275/SR93 FM S OF WILLOW TO N OF MLK; I-4/SR400 FM I-275 TO CONNECTOR
4338212
ADD LANES & RECONSTRUCT
DOWNTOWN INTERCHANGE IMPROVEMENT, TBX SECTION 6
FPN:
DESCRIPTION:
PE ACNP 0 0 0 58,007,003 0
0 0 0 58,007,003 0Total:
43
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
I-275/SR93 NB FLYOVER FROM SR 60 EB TO I-275 NB
4335355
INTERCHANGE RAMP (NEW)
INTERCHANGE IMPROVEMENTS, TBX SECTION 4
FPN:
DESCRIPTION:
PE ACNP 0 3,433,000 0 0 0
0 3,433,000 0 0 0Total:
I-275/SR93 NB XPR LN FM N OF HOWARD FRANKLAND TO S OF TRASK STREET
4335354
INTERCHANGE (NEW)
INTERCHANGE IMPROVEMENTS, TBX SECTION 4
FPN:
DESCRIPTION:
PE ACNP 0 5,824,000 0 0 0
0 5,824,000 0 0 0Total:
I-4 (SR 400) FM E OF I-75 (SR 93A) TO EAST OF WILLIAMS RD
4303351
ADD AUXILIARY LANE(S)
REALIGN I-4 EB RAMP ENT. FOR OPERATIONAL IMPROVEMENTS
FPN:
DESCRIPTION:
CST ACNP 0 0 0 1,930,956 0
PE DDR 300,000 0 0 0 0
PE DIH 1,000 0 0 0 0
301,000 0 0 1,930,956 0Total:
44
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
I-4 FROM 1-4/SELMON CONNECTOR TO E OF BRANCH FORBES RD
4317462
ADD LANES & RECONSTRUCT
6 TO 8 LANES, TBX SECTION 8
FPN:
DESCRIPTION:
DSB ACNP 0 0 0 96,870,738 0
DSB DI 0 0 0 58,650,734 0
DSB STED 0 0 0 68,468,218 0
PE ACNP 0 0 0 2,994,098 0
PE DI 0 0 0 2,105,355 0
0 0 0 229,089,143 0Total:
I-4/SR 400 FROM E OF 50TH ST TO E OF MCINTOSH
4365881
RESURFACING
6 LANES
FPN:
DESCRIPTION:
CST ACNP 20,224,658 0 0 0 0
20,224,658 0 0 0 0Total:
45
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
I-75 (SR 93) FROM MANATEE COUNTY LINE TO S OF BIG BEND ROAD
4340251
ITS FREEWAY MANAGEMENT
FPN:
DESCRIPTION:
DSB DIH 154,457 0 0 0 0
DSB DITS 6,752,191 0 0 0 0
PE DITS 146,910 0 0 0 0
7,053,558 0 0 0 0Total:
I-75 (SR 93) FROM S OF BIG BEND ROAD TO S OF PROGRESS BLVD
4340271
ITS FREEWAY MANAGEMENT
FPN:
DESCRIPTION:
DSB DIH 0 163,700 0 0 0
DSB DITS 0 6,761,153 0 0 0
PE DIH 1,000 0 0 0 0
PE DITS 0 141,245 0 0 0
1,000 7,066,098 0 0 0Total:
46
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
I-75 (SR 93A) FM S OF CSX/BROADWAY AVE TO EB/WB I-4 EXIT RAMP
4292511
INTERCHANGE RAMP (NEW)
INTERIM INTERCHANGE IMPROVEMENT
FPN:
DESCRIPTION:
CST ACNP 0 0 0 0 68,043,797
ENV DS 0 17,000 0 0 0
RRU DS 0 450,000 0 0 0
0 467,000 0 0 68,043,797Total:
I-75 (SR 93A) FM S OF SELMON EXP OVRPSS TO N OF SR 60
4289561
INTERCHANGE - ADD LANES
EB SR 60 TO SB I-75 RAMP PLUS ALL SB CD RD WIDENING/NEW CST
FPN:
DESCRIPTION:
CST ACNP 13,833,191 0 0 0 0
ENV DS 17,000 0 0 0 0
13,850,191 0 0 0 0Total:
I-75 (SR 93A) FM WB SR60 ENTRANCE RAMP TO S OF CSX RR/CR 574
4289531
INTERCHANGE - ADD LANES
IMPROVE WB SR 60 TO NB I-75 ENTRANCE RAMP/INCL 2LANE ENT RMP
FPN:
DESCRIPTION:
CST ACNP 22,298,448 0 0 0 0
ENV DS 57,000 0 0 0 0
22,355,448 0 0 0 0Total:
47
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
I-75 (SR93A)& SR 60 FM S OF SR60 @ SLIP RMP TO S OF CSX BRIDGE 100471
4289551
INTERCHANGE - ADD LANES
RECONSTR EB SR60 TO NB I75 LOOP RAMP/NEW NB CD RD TO NB 1-75
FPN:
DESCRIPTION:
CST ACNP 18,999,198 0 0 0 0
ENV DS 17,000 0 0 0 0
19,016,198 0 0 0 0Total:
I-75 @ BIG BEND ROAD SB OFF RAMP
4245132
INTERCHANGE IMPROVEMENT
INTERCHANGE OPERATIONAL IMPROVEMENT
FPN:
DESCRIPTION:
CST LF 0 0 0 3,000,000 0
CST SU 0 0 0 1,500,000 0
CST TRIP 0 0 0 1,500,000 0
0 0 0 6,000,000 0Total:
48
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
I-75(SR93A) OVER CR574/CSX RR BR # 100435 AND 100436
4307051
BRIDGE-REPAIR/REHABILITATION
FULL DECK REPLACEMENT OF THE EXISTING DECK PANEL BRIDGE
FPN:
DESCRIPTION:
CST BRRP 4,603,554 0 0 0 0
CST DIH 63,591 0 0 0 0
ENV BRRP 20,000 0 0 0 0
RRU BRRP 75,000 0 0 0 0
4,762,145 0 0 0 0Total:
I-75(SR93A)SB OFF-RAMP FROM S OF BYPASS CANAL TO EB/WB I-4
4289571
INTERCHANGE - ADD LANES
RAMP MODIFICATION ONLY
FPN:
DESCRIPTION:
CST ACNP 17,771,458 0 0 0 0
CST DI 80,000 0 0 0 0
ENV DS 331,500 0 0 0 0
18,182,958 0 0 0 0Total:
49
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
I75/I275 CD ROAD FM S OF COUNTY LINE RD TO COUNTY LINE RD (PHASE II)
4305733
NEW ROAD CONSTRUCTION
CONSTRUCT SB CD ROAD SYSTEM TO COMPLEMENT NB CD ROAD SYSTEM
FPN:
DESCRIPTION:
PE DDR 0 0 0 1,553,816 0
PE DIH 0 0 1,000 0 0
0 0 1,000 1,553,816 0Total:
I-75/SR 93A FROM BEG OF NB RAMP #10075001 TO END OF NB RAMP
4376381
REST AREA
I-75 NB REST AREA, DESIGN AND CST FOR IMPROVEMENTS/REHAB
FPN:
DESCRIPTION:
DSB DIH 0 183,510 0 0 0
DSB DRA 0 13,702,025 0 0 0
PE DIH 1,000 0 0 0 0
PE DRA 0 240,240 0 0 0
1,000 14,125,775 0 0 0Total:
50
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
I-75/SR 93A FROM BEG OF SB RAMP #10075016 TO BEG OF SB RAMP #10075016
4376371
REST AREA
I-75 SB REST AREA, DESIGN AND CST FOR IMPROVEMENTS/REHAB
FPN:
DESCRIPTION:
CST DIH 70,149 0 0 0 0
CST DRA 5,317,813 0 0 0 0
ENV DDR 50,000 0 0 0 0
5,437,962 0 0 0 0Total:
I-75/SR 93A FROM MANATEE COUNTY LINE TO N OF CR 672
4373121
RESURFACING
6 LANES
FPN:
DESCRIPTION:
CST ACNP 0 0 34,445,576 0 0
PE ACNP 2,501,068 0 0 0 0
2,501,068 0 34,445,576 0 0Total:
I-75/SR93A NB ON-RAMP FROM EB/WB I-4 TO S OF BYPASS CANAL
4289543
LANDSCAPING
BOLD LANDSCAPING
FPN:
DESCRIPTION:
CST DDR 0 0 571,803 0 0
CST DIH 0 0 15,957 0 0
0 0 587,760 0 0Total:
51
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
INTERSECTION LIGHTING - VARIOUS LOCATIONS IN HILLSBOROUGH COUNTY
4398292
LIGHTING
FPN:
DESCRIPTION:
CST HSP 3,388,895 0 0 0 0
3,388,895 0 0 0 0Total:
KENLY ELEMENTARY 21ST AVE FROM 66TH ST TO 62ND ST
4396961
SIDEWALK
CONSTRUCT 5' SIDEWALK KENLY ELEMENTARY
FPN:
DESCRIPTION:
CST SR2T 0 0 257,667 0 0
PE SR2T 242,777 0 0 0 0
242,777 0 257,667 0 0Total:
LUTZ LAKE FERN RD TRAIL CON FROM STILLWOOD DR TO UPPER TAMPA BAY TRAIL
4367131
SIDEWALK
DESIGN AND CONSTRUCT 5' SIDEWALKS
FPN:
DESCRIPTION:
CST TALU 0 0 35,984 0 0
PE TALT 13,750 0 0 0 0
13,750 0 35,984 0 0Total:
52
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
MADISON AVENUE FROM US 41 TO 78TH STREET (CR 573)
4370021
ADD LANES & RECONSTRUCT
CONSTRUCT A 4 LANE DIVIDED ROADWAY (2 TO 4 LANES)
FPN:
DESCRIPTION:
CST CIGP 0 0 3,500,000 0 0
CST LFP 0 0 3,500,000 0 0
0 0 7,000,000 0 0Total:
MORRIS BRIDGE ROAD FROM DAVIS ROAD TO FOWLER AVENUE
4395322
PAVE SHOULDERS
PAVED SHOULDERS AND ROUND ABOUTS
FPN:
DESCRIPTION:
PE HSP 412,118 0 0 0 0
412,118 0 0 0 0Total:
MORRIS BRIDGE ROAD FROM FLETCHER AVE TO FOWLER AVE
4395321
PAVE SHOULDERS
PAVED SHOULDERS AND ROUND ABOUTS
FPN:
DESCRIPTION:
PE HSP 515,312 0 0 0 0
515,312 0 0 0 0Total:
53
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
MORT ELEMENTARY SCHOOL VARIOUS LOCATIONS AROUND SCHOOL
4396911
SIDEWALK
CONSTRUCT 5' SIDEWALK 142ND, 140TH, 139TH, 12TH, 19TH, 20TH
FPN:
DESCRIPTION:
CST SR2T 0 0 453,961 0 0
PE SR2T 297,786 0 0 0 0
297,786 0 453,961 0 0Total:
N 62ND STREET FROM CSX INTRMD ENTRANCE TO NORTH OF E COLUMBUS DRIVE
4330712
ADD TURN LANE(S)
CONSTRUCT ASPHALT ROADWAY. OPERATIONAL QUICK FIX
FPN:
DESCRIPTION:
CST ACNP 0 0 0 0 3,129,926
ROW ACNP 0 0 2,560,700 0 0
0 0 2,560,700 0 3,129,926Total:
N ROME AVE FROM W KENNEDY BLVD TO W COLUMBUS DR
4372431
BIKE LANE/SIDEWALK
COMPLETE SIDEWALK GAPS AND BIKE LANES
FPN:
DESCRIPTION:
CST TALU 0 0 0 692,053 0
PE TALU 1,000 70,263 0 0 0
1,000 70,263 0 692,053 0Total:
54
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
OLD BIG BEND RD FROM E OF COVINGTON GARDEN DR TO W OF LINCOLN RD
4372481
SIDEWALK
CONSTRUCT SIDEWALK TO FILL GAPS
FPN:
DESCRIPTION:
CST TALT 16,066 0 0 0 0
CST TALU 153,385 0 0 0 0
169,451 0 0 0 0Total:
PARK RD INTERSECTION AT CORONET AND ALSOBROOK ST
4407341
ADD LEFT TURN LANE(S)
ADD LEFT TURN LANE
FPN:
DESCRIPTION:
PE SU 0 0 0 1,000 100,000
0 0 0 1,000 100,000Total:
S ALEXANDER ST AND JIM JOHNSON RD INTERSECTION IMPROVEMENTS
4407361
ADD LEFT TURN LANE(S)
ADD EB TURN LANES
FPN:
DESCRIPTION:
PE SU 0 0 0 1,000 100,000
0 0 0 1,000 100,000Total:
55
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
S MAYDELL DR AT PALM RIVER
4394121
BRIDGE REPLACEMENT
REPLACE BRIDGE #105604 OVER PALM RIVER- SUN TRAIL
FPN:
DESCRIPTION:
CST ACBR 0 0 0 0 2,965,264
CST LF 0 0 0 0 5,965,389
PE ACBR 0 1,000 908,198 0 0
PE LF 0 0 302,733 0 0
PE TLWR 0 0 141,680 0 0
0 1,000 1,352,611 0 8,930,653Total:
SELMON GREENWAY CONNECTOR SR 60 AT 19TH ST
4339251
BIKE PATH/TRAIL
DESIGN AND CONSTRUCT TRAIL HEAD
FPN:
DESCRIPTION:
CST TALU 0 0 396,998 0 0
PE TALU 41,048 0 0 0 0
41,048 0 396,998 0 0Total:
56
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
SOUTH COAST COUNTY GREENWAY-PH 1A FROM E SHELL POINT RD TO 19TH AVE NE
4394811
BIKE PATH/TRAIL
CONSTRUCT APPROX 1.7 MILE 12' PAVED TRAIL
FPN:
DESCRIPTION:
CST TALT 0 0 0 1,180,277 0
CST TALU 0 0 0 1,208,402 0
0 0 0 2,388,679 0Total:
SR 39 (JL REDMAN PRKWY) & ALEXANDER ST INTERSECTION
4407331
ADD RIGHT TURN LANE(S)
ADD RIGHT TURN LANES ON SB SR 39 TO WB ALEXANDER ST
FPN:
DESCRIPTION:
PE SU 0 0 0 1,000 100,000
0 0 0 1,000 100,000Total:
SR 39 @ RAILROAD CROSSING 624414-B SOUTH OF US 92
4378201
RAILROAD CROSSING
REPLACE CONCRETE PANEL WITH CONCRETE TUB
FPN:
DESCRIPTION:
PE DIH 0 0 0 1,000 0
PE DS 0 0 0 238,677 0
0 0 0 239,677 0Total:
57
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
SR 573/S DALE MABRY HWY FROM PINEWOOD ST TO GANDY BLVD
4376461
ADD TURN LANE(S)
CONVERT, CLOSE MEDIAN OPENINGS. LENGTHEN CONST TURN LANES
FPN:
DESCRIPTION:
CST HSP 0 0 0 874,536 0
PE HSP 387,798 446,661 0 0 0
387,798 446,661 0 874,536 0Total:
SR 574 (MLK BLVD) FROM EAST OF KINGSWAY RD TO E OF MCINTOSH RD
2558934
ADD LANES & RECONSTRUCT
2 TO 4 LANES
FPN:
DESCRIPTION:
CST DDR 0 0 0 0 15,988,238
CST DIH 0 0 0 0 370,865
CST SU 0 0 0 0 7,782,943
ENV DS 50,000 0 0 0 0
ROW DDR 10,435,138 727,405 0 0 0
ROW DIH 27,533 0 0 0 0
ROW DS 494,397 1,115,286 4,935,923 0 0
11,007,068 1,842,691 4,935,923 0 24,142,046Total:
58
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
SR 579 (FLETCHER AVE) FROM FLORIDA AVE TO NEBRASKA AVE
4364811
RESURFACING
4 LANES
FPN:
DESCRIPTION:
CST SA 0 831,612 0 0 0
ENV DS 20,000 0 0 0 0
20,000 831,612 0 0 0Total:
SR 580/HILLSBOROUGH AVE FROM MEMORIAL HWY/SHELDON RD TO HIMES AVE
4376411
ADD TURN LANE(S)
CONVERT, RELOCATE, CLOSE MEDIAN OPENINGS-SAFETY IMPROVEMENT
FPN:
DESCRIPTION:
CST DIH 0 0 18,227 0 0
CST HSP 0 0 975,288 0 0
PE HSP 831,803 0 0 0 0
831,803 0 993,515 0 0Total:
SR 580/W BUSCH BLVD FROM E OF N ARMENIA TO W OF FLORIDA AVE
4375301
RESURFACING
4 LANES
FPN:
DESCRIPTION:
CST NHRE 0 1,359,783 0 0 0
CST SA 0 135,984 0 0 0
ENV DS 20,000 0 0 0 0
20,000 1,495,767 0 0 0Total:
59
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
SR 582 / FOWLER AVE AT RAINTREE BLVD, GILLETTE AVE, N RIVERHILL DR
4362441
TRAFFIC SIGNAL UPDATE
REBUILD EXISTING DIAGONAL SPAN-WIRE SIGNALS TO BOX
FPN:
DESCRIPTION:
ENV DS 20,000 0 0 0 0
ROW DDR 0 0 284,200 0 0
ROW DIH 0 0 40,000 0 0
20,000 0 324,200 0 0Total:
SR 583 (56TH STREET) AT WHITEWAY DRIVE
4394601
TRAFFIC SIGNALS
REBUILD EXISTING SIGNAL WITH A MAST ARM SIGNAL
FPN:
DESCRIPTION:
CST DIH 0 0 0 5,692 0
CST DS 0 0 0 409,794 0
PE DIH 1,000 0 0 0 0
PE DS 302,626 0 0 0 0
303,626 0 0 415,486 0Total:
60
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
SR 60 (KENNEDY BLVD) FROM W OF ARMENIA AVE TO E OF BREVARD AVE
4168561
TRAFFIC SIGNAL UPDATE
TRAFFIC SIGNALS AT 5 LOCATIONS
FPN:
DESCRIPTION:
CST DIH 0 28,132 0 0 0
CST DS 0 1,906,694 0 0 0
CST LF 0 118,714 0 0 0
ENV DS 0 50,000 0 0 0
RRU DDR 50,000 0 0 0 0
50,000 2,103,540 0 0 0Total:
SR 60 (KENNEDY BLVD) FROM W OF MACDILL AVE TO HILLSBOROUGH RIVER
4347813
DRAINAGE IMPROVEMENTS
DRAINAGE INVESTIGATIVE DESIGN STUDY
FPN:
DESCRIPTION:
PE DIH 1,000 0 0 0 0
PE DS 0 299,205 0 0 0
1,000 299,205 0 0 0Total:
61
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
SR 60 (KENNEDY BLVD) FROM W OF MACDILL AVE TO HILLSBOROUGH RIVER.
4347814
DRAINAGE IMPROVEMENTS
STORMWATER VIDEO INSPECTION
FPN:
DESCRIPTION:
PE DIH 1,000 0 0 0 0
PE DS 0 79,396 0 0 0
1,000 79,396 0 0 0Total:
SR 60 / BRANDON BLVD FROM OF BRANDON TOWN CTR TO GORNTO LAKE RD
4360411
ADD TURN LANE(S)
ADD TURN LANES AND CLOSE EB TURN LANE TO LAKE KATHY
FPN:
DESCRIPTION:
CST HSP 0 0 0 1,130,891 0
ROW HSP 379,200 0 0 0 0
379,200 0 0 1,130,891 0Total:
SR 60 AT RAILROAD CROSSING 624572-B E OF CLARENCE GORDON JR RD
4375491
RAILROAD CROSSING
DESIGN AND CONSTRUCT REPLACEMENT OF CONCRETE PANELS
FPN:
DESCRIPTION:
CST DDR 63,932 0 0 0 0
CST DIH 44,618 0 0 0 0
CST DS 186,068 0 0 0 0
294,618 0 0 0 0Total:
62
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
SR 60 FROM VALRICO RD TO E OF DOVER RD
4357501
ADD LANES & RECONSTRUCT
4 TO 6 LANES
FPN:
DESCRIPTION:
ROW DI 0 0 0 0 9,086,500
ROW DIH 0 0 0 0 160,000
0 0 0 0 9,246,500Total:
SR 60/COURTNEY CAMPBELL CAUSEWAY AT WEST OF BEN T DAVIS BEACH
4392061
NEW BRIDGE CONSTRUCTION
CONSTRUCT BRIDGE FOR ENVIRONMENTAL UPLIFT
FPN:
DESCRIPTION:
DSB DEM 13,310,529 0 0 0 0
DSB DIH 14,380 0 0 0 0
PE DEM 200,835 0 0 0 0
13,525,744 0 0 0 0Total:
63
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
SR 60/E KENNEDY BLVD FROM W OF N NEBRASKA AVE TO E OF N ASHLEY ST
4364911
RESURFACING
4 LANES - INCLUDES PEDESTRIAN SAFETY IMPROVEMENTS
FPN:
DESCRIPTION:
CST DDR 804,885 0 0 0 0
CST DIH 19,205 0 0 0 0
CST HSP 231,550 0 0 0 0
ENV DS 20,000 0 0 0 0
1,075,640 0 0 0 0Total:
SR 60/KENNEDY BLVD FROM WESTSHORE BLVD TO HENDERSON BLVD
4376441
ADD TURN LANE(S)
CONVERT, CLOSE MEDIAN OPENINGS;LENGTHEN AND CONST TURN LANES
FPN:
DESCRIPTION:
CST HSP 0 0 0 1,078,994 0
PE HSP 584,100 467,618 0 0 0
584,100 467,618 0 1,078,994 0Total:
64
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
SR 674/E COLLEGE AVE FROM S US 41/SR 45 TO E OF COLLEGE CHASE DR
4367341
RESURFACING
6 LANES
FPN:
DESCRIPTION:
CST DDR 0 0 1,376,877 0 0
CST DIH 0 0 19,124 0 0
PE DDR 556,500 0 0 0 0
PE DIH 1,000 0 0 0 0
557,500 0 1,396,001 0 0Total:
SR 674/SUN CITY CENTER FROM E OF COMMERCIAL CTR DR TO E OF US 301/SR43
4364951
RESURFACING
4 LANES
FPN:
DESCRIPTION:
CST DDR 5,989,249 0 0 0 0
CST DIH 113,858 0 0 0 0
CST DS 370,337 0 0 0 0
CST HSP 248,355 0 0 0 0
CST LF 1,013,581 0 0 0 0
7,735,380 0 0 0 0Total:
65
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
SR 676 AT RAILROAD CROSSING 624815-B E OF GELMAN PLACE S
4375511
RAILROAD CROSSING
DESIGN AND CONSTRUCT REPLACEMENT OF CONCRETE PANELS
FPN:
DESCRIPTION:
CST DDR 57,542 0 0 0 0
CST DIH 1,155 0 0 0 0
CST DS 198,214 0 0 0 0
256,911 0 0 0 0Total:
SR 685 (FLORIDA AVE) FROM N OF W HUMPHREY ST TO N OF W BUSCH BLVD
4338621
RAILROAD CROSSING
REPLACE CROSSING SURFACE @ NGCN: 626891B (SY-LINE)
FPN:
DESCRIPTION:
CST DDR 192,160 0 0 0 0
CST DIH 10,977 0 0 0 0
203,137 0 0 0 0Total:
SR 685/N FLORIDA AVE @ RAILROAD CROSSING 626298-W @ E POLK ST
4378251
RAILROAD CROSSING
REPLACE ASPHALT/WOOD WITH CONCRETE TUB
FPN:
DESCRIPTION:
PE DIH 0 0 0 1,000 0
PE DS 0 0 0 214,314 0
0 0 0 215,314 0Total:
66
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
STOWERS ELEM SCHOOL FR GENTLE WOOD AVE TO S OF BARRINGTON STOWERS DR
4372441
SIDEWALK
SIDEWALK ON WEST SIDE OF BOYETTE ROAD
FPN:
DESCRIPTION:
CST TALT 11,153 0 0 0 0
CST TALU 97,835 0 0 0 0
108,988 0 0 0 0Total:
SUBSTRUCTURE REPAIR HILLSBOROUGH COUNTY VARIOUS LOCATIONS
4375181
BRIDGE-REPAIR/REHABILITATION
#100136, 100585
FPN:
DESCRIPTION:
CST BRRP 0 391,806 0 0 0
CST DIH 0 5,247 0 0 0
PE BRRP 150,000 0 0 0 0
PE DIH 1,000 0 0 0 0
151,000 397,053 0 0 0Total:
SUMMERFIELD ELEM SCHOOL HERITAGE GRN PKWY TO E OF HERITAGE GRN PKWY
4372471
BIKE LANE/SIDEWALK
CONSTRUCT 5' SIDEWALK
FPN:
DESCRIPTION:
CST TALT 16,579 0 0 0 0
CST TALU 109,275 0 0 0 0
125,854 0 0 0 0Total:
67
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TAMPA BYPASS CANAL TRAIL FROM N 34TH ST TO SR 581 (BRUCE B DOWNS)
4394821
PD&E/EMO STUDY
12' MULTI USE TRAIL
FPN:
DESCRIPTION:
PDE TALT 50,850 0 0 0 0
PDE TALU 700,150 0 0 0 0
751,000 0 0 0 0Total:
TAMPA BYPASS CANAL TRAIL FROM N 34TH ST TO SR 581 (BRUCE B DOWNS).
4394822
BIKE PATH/TRAIL
ADDITION OF 12' MULTI USE TRAIL
FPN:
DESCRIPTION:
PE TALT 0 0 246,970 0 0
PE TALU 0 0 132,030 0 0
0 0 379,000 0 0Total:
THE HEIGHTS MULTI-MODAL VISION & IMPLEMENTATION PLAN
4405111
CORRIDOR/SUBAREA PLANNING
N TAMPA ST & N FLORIDA AVE FROM E TYLER TO W HANNA
FPN:
DESCRIPTION:
PLN DS 0 0 0 0 650,000
0 0 0 0 650,000Total:
68
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
US 301 FROM N OF TOM FOLSOM RD TO HILLSBOROUGH/PASCO CO LINE
2557962
ADD LANES & RECONSTRUCT
2 TO 4 LANES
FPN:
DESCRIPTION:
ENV DS 0 2,413,000 0 0 0
PE DIH 0 50,000 0 0 0
0 2,463,000 0 0 0Total:
US 301/SR 43 AT RIVERVIEW DRIVE
4362431
TRAFFIC SIGNAL UPDATE
REBUILD EXISTING DIAGONAL SPAN-WIRE TO MAST ARM OR BOX
FPN:
DESCRIPTION:
CST DDR 0 0 424,975 0 0
CST DIH 0 0 10,830 0 0
ENV DS 20,000 0 0 0 0
ROW DDR 80,400 0 0 0 0
ROW DIH 20,000 0 0 0 0
120,400 0 435,805 0 0Total:
69
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
US 301/SR 43 FROM FALKENBURG RD TO SLIGH AVENUE
4376401
ADD TURN LANE(S)
RELOCATE MEDIAN OPENINGS, RECONSTRUCT TURN LANES
FPN:
DESCRIPTION:
CST DIH 0 0 23,685 0 0
CST HSP 0 0 1,265,471 0 0
PE HSP 906,492 0 0 0 0
906,492 0 1,289,156 0 0Total:
US 41 (SR 685) OVER HILLSBOROUGH RIVER BR #100069
4358971
BRIDGE-REPAIR/REHABILITATION
SUBSTRUCTURE REPAIR INCL REPLACING EXISTING BROKEN PILE
FPN:
DESCRIPTION:
CST BRRP 203,999 0 0 0 0
CST DIH 3,762 0 0 0 0
207,761 0 0 0 0Total:
70
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
US 41 @ CSX GRADE SEPARATION SOUTH OF CAUSEWAY BLVD
4407491
RAIL CAPACITY PROJECT
FPN:
DESCRIPTION:
PDE DIS 1,500,000 0 0 0 0
PE DIH 0 1,000 0 0 0
PE DIS 0 0 5,370,000 0 0
ROW DIH 0 0 0 0 1,000
ROW DIS 0 0 0 0 15,000,000
1,500,000 1,000 5,370,000 0 15,001,000Total:
US 41 AT GIBSONTON DRIVE
4348482
TRAFFIC SIGNAL UPDATE
REBUILD EXISTING TRAFFIC SIGNAL WITH MAST ARM SIGNAL
FPN:
DESCRIPTION:
CST DIH 0 0 0 5,661 0
CST DS 0 0 0 407,665 0
PE DS 140,320 0 0 0 0
ROW DIH 40,000 0 0 0 0
ROW DS 361,000 0 0 0 0
541,320 0 0 413,326 0Total:
71
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
US 41 GIBSONTON FROM S OF OLD US 41A TO S OF ARCHIE CREEK
4340291
RAILROAD CROSSING
NGCN:624797 CSX TO REPLACE EXISTING CROSSING WITH A PLATFORM
FPN:
DESCRIPTION:
CST DDR 249,391 0 0 0 0
CST DIH 15,559 0 0 0 0
264,950 0 0 0 0Total:
US 41/SR 45 FROM N OF BULLFROG CREEK TO DENVER ST
4348481
RESURFACING
4 LANES
FPN:
DESCRIPTION:
CST DDR 1,596,899 0 0 0 0
CST HSP 2,350,274 0 0 0 0
CST NHRE 2,434,174 0 0 0 0
CST SA 4,557,641 0 0 0 0
ENV DDR 20,000 0 0 0 0
10,958,988 0 0 0 0Total:
US 41/SR 45/50TH ST FROM DENVER ST TO CAUSEWAY BLVD
4390381
SIDEWALK
CONSTRUCT 5' TO 6' SIDEWALK
FPN:
DESCRIPTION:
CST HSP 961,463 0 0 0 0
961,463 0 0 0 0Total:
72
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
US 41/SR 45/NEBRASKA AVE AT E TWIGGS ST
4375351
TRAFFIC SIGNAL UPDATE
UPDATE SIGNALS AND ADD SIGNAL POLES
FPN:
DESCRIPTION:
CST DIH 0 0 0 6,660 0
CST DS 0 0 0 478,918 0
PE DIH 1,000 0 0 0 0
PE DS 242,494 0 0 0 0
243,494 0 0 485,578 0Total:
US 92/SR 39/SR 600 FROM W OF N MOBLEY ST TO N HOWARD ST
4364201
RESURFACING
2 LANES
FPN:
DESCRIPTION:
CST SA 764,622 0 0 0 0
ENV DS 50,000 0 0 0 0
814,622 0 0 0 0Total:
US 92/SR 600 EB FROM OVER OLD TAMPA BAY TO BR# 100300
4396621
BRIDGE-REPAIR/REHABILITATION
METHACRYLATE MONOMER APPLICATION ON BRIDGE DECK
FPN:
DESCRIPTION:
CST BRRP 2,298,257 0 0 0 0
CST DIH 30,512 0 0 0 0
2,328,769 0 0 0 0Total:
73
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
US 92/SR 600/DALE MABRY FROM S OF W MCKAY AVE TO S OF W CLEVELAND ST
4364941
RESURFACING
4 LANES
FPN:
DESCRIPTION:
CST DDR 0 1,602,832 0 0 0
CST DIH 0 27,318 0 0 0
ENV DS 20,000 0 0 0 0
20,000 1,630,150 0 0 0Total:
US 92/SR 600/S DALE MABRY AT EL PRADO BLVD AND INTERBAY BLVD
4362451
TRAFFIC SIGNAL UPDATE
REBUILD EXISTING BOX SPAN-WIRE TO MAST ARM
FPN:
DESCRIPTION:
ENV DS 0 0 20,000 0 0
ROW DDR 0 0 851,381 0 0
ROW DIH 0 0 100,000 0 0
ROW DS 0 0 321,519 0 0
0 0 1,292,900 0 0Total:
74
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
US 92/SR 600/S DALE MABRY HWY FR NEPTUNE STREET TO HENDERSON BLVD
4372491
DRAINAGE IMPROVEMENTS
CONSTRUCT BOX CULVERT
FPN:
DESCRIPTION:
CST DDR 0 0 0 0 3,550,423
CST DIH 0 0 0 0 87,845
CST DS 0 0 0 0 2,774,459
PE DDR 0 0 628,712 0 0
PE DIH 0 0 1,000 0 0
0 0 629,712 0 6,412,727Total:
US 92/SR 600/W GANDY BLVD FR E END OF GANDY BRIDGE TO W OF S BRIDGE ST
4375131
RESURFACING
4 LANES
FPN:
DESCRIPTION:
CST NHRE 0 291,119 0 0 0
CST SA 0 703,885 0 0 0
0 995,004 0 0 0Total:
75
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
US 92/SR600/HILLS AV FROM E OF N CENTRAL AVE TO W OF SR 583/N 56TH ST
4325841
RESURFACING
6 LANES
FPN:
DESCRIPTION:
CST DDR 0 483,093 0 0 0
CST SA 0 5,555,537 0 0 0
ENV DS 50,000 0 0 0 0
50,000 6,038,630 0 0 0Total:
US 92/SR600/HILLS AVE FROM NEBRASKA AVE TO N 15TH ST
4325842
DRAINAGE IMPROVEMENTS
UPSIZE STORMSEWERS AND ADD ADDITIONAL INLETS
FPN:
DESCRIPTION:
CST DDR 0 1,383,314 0 0 0
CST DIH 0 25,872 0 0 0
0 1,409,186 0 0 0Total:
USB 41/SR 685 FROM N OF LINEBAUGH AVE TO N OF FLETCHER AVE
4347301
RESURFACING
4 LANES
FPN:
DESCRIPTION:
CST SA 3,616,204 0 0 0 0
3,616,204 0 0 0 0Total:
76
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
USB 41/SR 685/N FLORIDA AT HILLSBOROUGH RIVER BRIDGE
4347292
PRELIMINARY ENGINEERING
IMPROVEMENTS TO ADDRESS FUNCTIONAL OBSOLESCENCE
FPN:
DESCRIPTION:
PE DS 301,000 0 0 0 0
301,000 0 0 0 0Total:
USB 41/SR 685/N FLORIDA AVE FR S OF E BIRD ST TO N OF W WATERS AVE
4365301
TRAFFIC SIGNAL UPDATE
CONSTRUCT MID-BLOCK CROSSWALK BETWEEN BIRD ST AND WATERS AVE
FPN:
DESCRIPTION:
CST DIH 16,186 0 0 0 0
CST HSP 862,177 0 0 0 0
878,363 0 0 0 0Total:
WESTSHORE BOULEVARD AND GANDY BOULEVARD
4370411
INTERSECTION IMPROVEMENT
PROVIDE LEFT TURN LANES ON ALL 4 APPROACHES TO INTERSECTION
FPN:
DESCRIPTION:
CST CIGP 0 0 1,361,815 0 0
CST LFP 0 0 1,361,815 0 0
0 0 2,723,630 0 0Total:
FLP: AVIATION
77
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
PETER O.KNIGHT AIRPORT - APRON REHABILITATION
4368011
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 203,000 0 0
CAP LF 0 0 87,000 0 0
0 0 290,000 0 0Total:
PETER O.KNIGHT AIRPORT - AWOS REPLACEMENT
4368071
AVIATION SAFETY PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 197,960 0 0
CAP LF 0 0 84,840 0 0
0 0 282,800 0 0Total:
PETER O.KNIGHT AIRPORT - HANGAR S REHABILITATION
4385041
AVIATION REVENUE/OPERATIONAL
FPN:
DESCRIPTION:
CAP DPTO 0 0 0 100,800 0
CAP LF 0 0 0 25,200 0
0 0 0 126,000 0Total:
78
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
PETER O.KNIGHT AIRPORT - HANGER B REHABILITATION
4368031
AVIATION REVENUE/OPERATIONAL
FPN:
DESCRIPTION:
CAP DPTO 0 0 127,470 0 0
CAP LF 0 0 54,630 0 0
0 0 182,100 0 0Total:
PETER O.KNIGHT AIRPORT - REHABILITATE MAINTENANCE FACILITY
4352391
AVIATION REVENUE/OPERATIONAL
FPN:
DESCRIPTION:
CAP DPTO 0 240,000 0 0 0
CAP LF 0 60,000 0 0 0
0 300,000 0 0 0Total:
PETER O.KNIGHT AIRPORT - REPAIR SEAWALL
4352371
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 696,640 0 0 0
CAP LF 0 174,160 0 0 0
0 870,800 0 0 0Total:
79
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
PETER O.KNIGHT AIRPORT - RUNWAY 18/36 REHABILITATION
4329791
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 408,600 0 0 0 0
CAP LF 102,200 0 0 0 0
510,800 0 0 0 0Total:
PETER O.KNIGHT AIRPORT - TAXIWAY B REHABILITATION
4368051
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 175,000 0 0
CAP LF 0 0 75,000 0 0
0 0 250,000 0 0Total:
PETER O.KNIGHT AIRPORT - TAXIWAY D REHABILITATION
4368061
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 163,800 0 0
CAP LF 0 0 70,200 0 0
0 0 234,000 0 0Total:
80
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
PETER O.KNIGHT AIRPORT - TAXIWAY F REHABILITATION
4329801
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 225,920 0 0 0 0
CAP LF 56,480 0 0 0 0
282,400 0 0 0 0Total:
PETER O.KNIGHT AIRPORT - TIE-DOWN AREA E REHABILITATION
4368041
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 23,800 0 0
CAP LF 0 0 10,200 0 0
0 0 34,000 0 0Total:
PLANT CITY AIRPORT - TAXILANE AND APRON REHABILITATION
4368141
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 378,420 0 0
CAP LF 0 0 162,180 0 0
0 0 540,600 0 0Total:
81
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
PLANT CITY AIRPORT - APRON REHABILITATION
4368121
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 394,450 0 0
CAP FAA 0 0 450,000 0 0
CAP LF 0 0 394,450 0 0
0 0 1,238,900 0 0Total:
PLANT CITY AIRPORT - AWOS REPLACEMENT
4368151
AVIATION SAFETY PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 197,960 0 0
CAP LF 0 0 84,840 0 0
0 0 282,800 0 0Total:
PLANT CITY AIRPORT - CONSTRUCT NEW FUEL FARM
4385031
AVIATION REVENUE/OPERATIONAL
FPN:
DESCRIPTION:
CAP DDR 0 0 600,000 0 0
CAP LF 0 0 400,000 0 0
0 0 1,000,000 0 0Total:
82
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
PLANT CITY AIRPORT - EXPAND HANGAR FACILITIES
4352211
AVIATION REVENUE/OPERATIONAL
FPN:
DESCRIPTION:
CAP DDR 0 689,028 0 0 0
CAP DPTO 0 270,172 0 0 0
CAP LF 0 2,717,500 0 0 0
0 3,676,700 0 0 0Total:
PLANT CITY AIRPORT - HANGER E REHABILITATION
4368111
AVIATION REVENUE/OPERATIONAL
FPN:
DESCRIPTION:
CAP DPTO 0 0 155,190 0 0
CAP LF 0 0 66,510 0 0
0 0 221,700 0 0Total:
PLANT CITY AIRPORT - REHABILITATE MAINTENANCE FACILITY
4352361
AVIATION REVENUE/OPERATIONAL
FPN:
DESCRIPTION:
CAP DPTO 0 240,000 0 0 0
CAP LF 0 60,000 0 0 0
0 300,000 0 0 0Total:
83
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
PLANT CITY AIRPORT - RUNWAY 10/28 REILS REPLACEMENT
4405611
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 0 0 147,840
CAP LF 0 0 0 0 36,960
0 0 0 0 184,800Total:
PLANT CITY AIRPORT - RUNWAY REHABILITATION
4405601
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 0 0 153,760
CAP FAA 0 0 0 0 1,729,600
CAP LF 0 0 0 0 38,440
0 0 0 0 1,921,800Total:
TAMPA EXECUTIVE AIRPORT - AWOS REPLACEMENT
4368101
AVIATION SAFETY PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 197,960 0 0
CAP LF 0 0 84,840 0 0
0 0 282,800 0 0Total:
84
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TAMPA EXECUTIVE AIRPORT - FIRE SUPPRESSION SYSTEM REHABILITATION
4352331
AVIATION REVENUE/OPERATIONAL
FPN:
DESCRIPTION:
CAP DPTO 0 120,400 0 0 0
CAP LF 0 30,100 0 0 0
0 150,500 0 0 0Total:
TAMPA EXECUTIVE AIRPORT - FUEL FARM REHABILITATION
4368081
AVIATION REVENUE/OPERATIONAL
FPN:
DESCRIPTION:
CAP DPTO 0 0 28,000 0 0
CAP LF 0 0 12,000 0 0
0 0 40,000 0 0Total:
TAMPA EXECUTIVE AIRPORT - HANGAR 3700/A REHABILITATION
4385171
AVIATION REVENUE/OPERATIONAL
FPN:
DESCRIPTION:
CAP DPTO 0 0 0 200,000 0
CAP LF 0 0 0 50,000 0
0 0 0 250,000 0Total:
85
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TAMPA EXECUTIVE AIRPORT - HANGAR 3800/B REHABILITATION
4385071
AVIATION REVENUE/OPERATIONAL
FPN:
DESCRIPTION:
CAP DPTO 0 0 0 200,000 0
CAP LF 0 0 0 50,000 0
0 0 0 250,000 0Total:
TAMPA EXECUTIVE AIRPORT - REHABILITATE MAINTENANCE FACILITY
4352351
AVIATION REVENUE/OPERATIONAL
FPN:
DESCRIPTION:
CAP DPTO 0 240,000 0 0 0
CAP LF 0 60,000 0 0 0
0 300,000 0 0 0Total:
TAMPA EXECUTIVE AIRPORT - REHABILITATE SERVICE ROAD
4352321
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 170,240 0 0 0
CAP LF 0 42,560 0 0 0
0 212,800 0 0 0Total:
86
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TAMPA EXECUTIVE AIRPORT - REHABILITATE TERMINAL BUILDING
4352341
AVIATION REVENUE/OPERATIONAL
FPN:
DESCRIPTION:
CAP DPTO 0 284,240 0 0 0
CAP LF 0 71,060 0 0 0
0 355,300 0 0 0Total:
TAMPA EXECUTIVE AIRPORT - RUNWAY 18/36 PAPI LIGHT REPLACEMENT
4385051
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 0 12,320 0
CAP FAA 0 0 0 137,900 0
CAP LF 0 0 0 3,080 0
0 0 0 153,300 0Total:
TAMPA EXECUTIVE AIRPORT - RUNWAY 18/36 REIL LIGHT REPLACEMENT
4385061
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 0 16,080 0
CAP FAA 0 0 0 180,200 0
CAP LF 0 0 0 4,020 0
0 0 0 200,300 0Total:
87
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TAMPA EXECUTIVE AIRPORT - RUNWAY 5/23 AND ASSOCIATED TAXIWAY
4329841
AVIATION PRESERVATION PROJECT
LIGHTING REHABILITATION
FPN:
DESCRIPTION:
CAP DPTO 415,000 0 0 0 0
CAP LF 415,000 0 0 0 0
830,000 0 0 0 0Total:
TAMPA EXECUTIVE AIRPORT - RUNWAY 5/23 MALSR LIGHT POLE REPLACEMENTS
4329861
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 127,900 0 0 0 0
CAP LF 32,000 0 0 0 0
159,900 0 0 0 0Total:
TAMPA EXECUTIVE AIRPORT - RUNWAY 5/23 PAPI REPLACEMENT
4329871
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 166,000 0 0 0 0
CAP LF 41,600 0 0 0 0
207,600 0 0 0 0Total:
88
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TAMPA EXECUTIVE AIRPORT - RUNWAY 5/23 REHABILITATION
4329881
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 72,800 0 0 0 0
CAP FAA 2,619,600 0 0 0 0
CAP LF 218,300 0 0 0 0
2,910,700 0 0 0 0Total:
TAMPA EXECUTIVE AIRPORT - RUNWAY 5/23 REILS REPLACEMENT
4329891
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 84,300 0 0 0 0
CAP LF 84,300 0 0 0 0
168,600 0 0 0 0Total:
TAMPA EXECUTIVE AIRPORT - RUNWAY PROTECTION ZONE TREE TRIMMING
4405631
AVIATION SAFETY PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 0 0 441,360
CAP LF 0 0 0 0 110,340
0 0 0 0 551,700Total:
89
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TAMPA EXECUTIVE AIRPORT - RUNWAY PROTECTION ZONE TREE TRIMMING.
4352311
AVIATION SAFETY PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 407,600 0 0 0
CAP LF 0 101,900 0 0 0
0 509,500 0 0 0Total:
TAMPA EXECUTIVE AIRPORT - TAXIWAY C REHABILITATION
4330011
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 385,360 0 0 0 0
CAP LF 96,340 0 0 0 0
481,700 0 0 0 0Total:
TAMPA EXECUTIVE AIRPORT - TAXIWAY D REHABILITATION
4329811
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 172,480 0 0 0 0
CAP LF 43,120 0 0 0 0
215,600 0 0 0 0Total:
90
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TAMPA EXECUTIVE AIRPORT - TAXIWAY E REHABILITATION
4329821
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DDR 825,490 0 0 0 0
CAP DPTO 23,950 0 0 0 0
CAP LF 212,360 0 0 0 0
1,061,800 0 0 0 0Total:
TAMPA EXECUTIVE AIRPORT - TAXIWAY F REHABILITATION
4329831
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 575,118 0 0 0 0
CAP LF 148,020 0 0 0 0
723,138 0 0 0 0Total:
TAMPA EXECUTIVE AIRPORT - TERMINAL CHILLER SYSTEM REPLACEMENT
4368091
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 335,300 0 0
CAP LF 0 0 143,700 0 0
0 0 479,000 0 0Total:
91
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TAMPA INTERNATIONAL AIRPORT - ACCESS CONTROL SYSTEM REPLACEMENT
4259202
AVIATION SECURITY PROJECT
FPN:
DESCRIPTION:
CAP DDR 1,541,869 0 0 0 0
CAP LF 1,541,869 0 0 0 0
3,083,738 0 0 0 0Total:
TAMPA INTERNATIONAL AIRPORT - AERIAL SURVEY OF RUNWAY APPROACHES
4387161
AVIATION PRESERVATION PROJECT
AIPORT AERIALS - TPA, PCA, POK, TEA
FPN:
DESCRIPTION:
CAP DPTO 0 0 0 107,280 0
CAP LF 0 0 0 107,280 0
0 0 0 214,560 0Total:
TAMPA INTERNATIONAL AIRPORT - AIRFIELD SLAB REPLACEMENT
4405641
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 0 0 1,500,000
CAP LF 0 0 0 0 1,500,000
0 0 0 0 3,000,000Total:
92
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TAMPA INTERNATIONAL AIRPORT - AIRFIELD SLAB REPLACEMENT.
4352261
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 275,000 0 0 0
CAP FAA 0 1,650,000 0 0 0
CAP LF 0 275,000 0 0 0
0 2,200,000 0 0 0Total:
TAMPA INTERNATIONAL AIRPORT - AIRPORT OPERATIONS DATA BASE
4387151
AVIATION REVENUE/OPERATIONAL
SYSTEMS UPGRADE
FPN:
DESCRIPTION:
CAP DPTO 0 0 0 852,000 0
CAP LF 0 0 0 852,000 0
0 0 0 1,704,000 0Total:
TAMPA INTERNATIONAL AIRPORT - AIRSIDE A BOARDING BRIDGES
4368341
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DDR 0 0 956,865 0 0
CAP DPTO 0 0 6,522,640 0 0
CAP LF 0 0 7,962,815 0 0
0 0 15,442,320 0 0Total:
93
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TAMPA INTERNATIONAL AIRPORT - AIRSIDE A ROOF REPAIR
4296021
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DDR 0 0 321,519 0 0
CAP DPTO 0 0 1,748,481 0 0
CAP LF 0 0 3,105,000 0 0
0 0 5,175,000 0 0Total:
TAMPA INTERNATIONAL AIRPORT - AIRSIDE F ROOF REPAIR
4388331
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 109,078 0 0 0
CAP LF 0 3,900,000 0 0 0
0 4,009,078 0 0 0Total:
TAMPA INTERNATIONAL AIRPORT - BAGGAGE HANDLING SYSTEMS SERVERS
4387111
AVIATION PRESERVATION PROJECT
UPGRADE/ENHANCEMENT
FPN:
DESCRIPTION:
CAP DDR 0 0 0 735,425 0
CAP DPTO 0 0 0 353,725 0
CAP LF 0 0 0 1,089,150 0
0 0 0 2,178,300 0Total:
94
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TAMPA INTERNATIONAL AIRPORT - CARGO PARKING LOT REHABILITATION
4352241
AVIATION REVENUE/OPERATIONAL
FPN:
DESCRIPTION:
CAP DPTO 0 307,500 0 0 0
CAP LF 0 307,500 0 0 0
0 615,000 0 0 0Total:
TAMPA INTERNATIONAL AIRPORT - CONSTRUCT CROSSFIELD TAXIWAY M
4407171
AVIATION CAPACITY PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 4,473,088 0 0 0
CAP LF 0 54,253,000 0 0 0
0 58,726,088 0 0 0Total:
TAMPA INTERNATIONAL AIRPORT - EMPLOYEE SURFACE PARKING EXPANSION
4329681
AVIATION REVENUE/OPERATIONAL
FPN:
DESCRIPTION:
CAP DDR 802,700 0 0 0 0
CAP LF 2,820,600 0 0 0 0
3,623,300 0 0 0 0Total:
95
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TAMPA INTERNATIONAL AIRPORT - LANDSIDE ELEVATOR REPLACEMENTS
4387091
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 0 2,875,250 0
CAP LF 0 0 0 2,875,250 0
0 0 0 5,750,500 0Total:
TAMPA INTERNATIONAL AIRPORT - LANDSIDE FIRE SUPPRESSION SYSTEM REFURB
4387141
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 0 750,000 0
CAP LF 0 0 0 750,000 0
0 0 0 1,500,000 0Total:
TAMPA INTERNATIONAL AIRPORT - LONG TERM PARKING GARAGE REHAB
4329731
AVIATION REVENUE/OPERATIONAL
LEVEL 4 REHABILITATION
FPN:
DESCRIPTION:
CAP DPTO 434,000 0 0 0 0
CAP DPTO 420,000 0 0 0 0
CAP LF 435,600 0 0 0 0
CAP LF 420,000 0 0 0 0
1,709,600 0 0 0 0Total:
96
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TAMPA INTERNATIONAL AIRPORT - PHASE 2 AND 3 MASTER PLAN PROJECTS
4387531
AVIATION CAPACITY PROJECT
FPN:
DESCRIPTION:
CAP GMR 0 0 0 28,000,000 0
CAP LF 0 0 0 38,000,000 0
CAP SIWR 0 0 0 10,000,000 0
0 0 0 76,000,000 0Total:
TAMPA INTERNATIONAL AIRPORT - RAMP A CONCRETE JOINT AND SLAB REHAB
4387121
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 0 1,062,700 0
CAP LF 0 0 0 1,062,700 0
0 0 0 2,125,400 0Total:
TAMPA INTERNATIONAL AIRPORT - RAMP BLUE (US AIR) CONCRETE/SLAB REHAB
4329661
AVIATION PRESERVATION PROJECT
CONCRETE JOINT AND SLAB REHABILITATION
FPN:
DESCRIPTION:
CAP DPTO 330,000 0 0 0 0
CAP LF 330,000 0 0 0 0
660,000 0 0 0 0Total:
97
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TAMPA INTERNATIONAL AIRPORT - RAMP FEDEX/EMORY AND TAXIWAY K
4329691
AVIATION PRESERVATION PROJECT
CONCRETE JOINT AND SLAB REHABILITATION
FPN:
DESCRIPTION:
CAP DDR 82,286 0 0 0 0
CAP DPTO 402,714 0 0 0 0
CAP LF 485,000 0 0 0 0
970,000 0 0 0 0Total:
TAMPA INTERNATIONAL AIRPORT - RAMP RED (DELTA) CONCRETE/SLAB REHAB
4329711
AVIATION PRESERVATION PROJECT
CONCRETE JOINT AND SLAB REHABILITATION
FPN:
DESCRIPTION:
CAP DPTO 350,000 0 0 0 0
CAP LF 350,000 0 0 0 0
700,000 0 0 0 0Total:
TAMPA INTERNATIONAL AIRPORT - REHAB RUNWAY 10/28 E OF RUNWAY 19L
4368321
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DDR 0 0 1,349,920 0 0
CAP FAA 0 0 826,500 0 0
CAP LF 0 0 2,024,880 0 0
0 0 4,201,300 0 0Total:
98
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TAMPA INTERNATIONAL AIRPORT - STRUCTURAL AND PAVEMENT INSPECTION
4405621
AVIATION PRESERVATION PROJECT
AND DESIGN
FPN:
DESCRIPTION:
CAP DPTO 0 0 0 0 260,300
CAP LF 0 0 0 0 260,400
0 0 0 0 520,700Total:
TAMPA INTERNATIONAL AIRPORT - STRUCTURAL AND PAVEMENT REPAIRS
4387131
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 0 0 931,500 0
CAP LF 0 0 0 931,500 0
0 0 0 1,863,000 0Total:
TAMPA INTERNATIONAL AIRPORT - TAXIWAY B SHOULDER REHABILITATION
4352251
AVIATION PRESERVATION PROJECT
FPN:
DESCRIPTION:
CAP DPTO 0 95,500 0 0 0
CAP FAA 0 573,000 0 0 0
CAP LF 0 95,500 0 0 0
0 764,000 0 0 0Total:
99
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TAMPA INTERNATIONAL AIRPORT - TAXIWAY T AND CORPORATE ROAD
4352151
AVIATION PRESERVATION PROJECT
REALIGNMENT AND ASPHALT SERVICE ROAD REPLACEMENT
FPN:
DESCRIPTION:
CAP DDR 0 3,916,030 0 0 0
CAP LF 0 3,916,030 0 0 0
0 7,832,060 0 0 0Total:
TAMPA INTERNATIONAL AIRPORT GATEWAY CENTER - AUTOMATED PEOPLE MOVER
4357221
AVIATION CAPACITY PROJECT
FROM RENTAL CAR FACILITY TO TERMINAL
FPN:
DESCRIPTION:
CAP GMR 20,000,000 20,000,000 0 0 0
CAP LF 20,000,000 20,000,000 0 0 0
40,000,000 40,000,000 0 0 0Total:
TAMPA INTERNATIONAL AIRPORT -STRUCTURAL AND PAVEMENT INSPECT & DESIGN
4329701
AVIATION PRESERVATION PROJECT
INSPECTION AND DESIGN
FPN:
DESCRIPTION:
CAP DPTO 234,000 0 0 0 0
CAP LF 234,100 0 0 0 0
468,100 0 0 0 0Total:
100
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TAMPA INTERNATIONAL AIRPORT-GEORGE BEAN PARKWAY/BESSIE COLEMAN SRV RD
4329741
AVIATION REVENUE/OPERATIONAL
FROM POST OFFICE NORTH TO AS/F ASPHALT PAVEMENT OVERLAY
FPN:
DESCRIPTION:
CAP DDR 1,223,996 0 0 0 0
CAP LF 2,885,000 0 0 0 0
4,108,996 0 0 0 0Total:
FLP: MULTIMODAL FACILITY
MULTIMODAL TERMINALS
4153482
INTERMODAL HUB CAPACITY
FPN:
DESCRIPTION:
ROW DI 510,919 0 0 0 0
510,919 0 0 0 0Total:
FLP: SEAPORT
PORT TAMPA BAY - EASTPORT BERTH DEVELOPMENT
4332401
SEAPORT CAPACITY PROJECT
TAMPA PORT AUTHORITY
FPN:
DESCRIPTION:
CAP GMR 5,000,000 0 0 0 0
CAP LF 5,000,000 0 0 0 0
10,000,000 0 0 0 0Total:
101
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
PORT TAMPA BAY - EASTPORT UPLAND CARGO IMPROVEMENTS
4403181
SEAPORT CAPACITY PROJECT
EASTPORT DEVELOPMENT -PHASE II
FPN:
DESCRIPTION:
CAP GMR 0 10,000,000 0 0 0
CAP LF 0 10,000,000 0 0 0
0 20,000,000 0 0 0Total:
PORT TAMPA BAY - HOOKERS POINT CARGO BERTH IMPROVEMENTS
4407101
SEAPORT CAPACITY PROJECT
BERTH 219 NORTHWARD EXTENTION
FPN:
DESCRIPTION:
CAP LF 1,016,667 0 0 0 0
CAP PORT 3,050,000 0 0 0 0
4,066,667 0 0 0 0Total:
PORT TAMPA BAY - HOOKERS POINT INTERMODAL IMPROVEMENTS
4403351
SEAPORT CAPACITY PROJECT
FPN:
DESCRIPTION:
CAP DDR 0 1,499,908 0 0 0
CAP LF 0 1,499,908 0 0 0
0 2,999,816 0 0 0Total:
102
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
PORT TAMPA BAY - PORT SUTTON INTERMODAL IMPROVEMENTS
4403361
SEAPORT CAPACITY PROJECT
FPN:
DESCRIPTION:
CAP DDR 1,349,246 0 0 0 0
CAP DPTO 84,695 0 0 0 0
CAP LF 1,433,941 0 0 0 0
2,867,882 0 0 0 0Total:
PORT TAMPA BAY- -PORT SUTTON CARGO BERTH IMPROVEMENTS
4407111
SEAPORT CAPACITY PROJECT
FPN:
DESCRIPTION:
CAP LF 383,333 0 0 0 0
CAP PORT 1,150,000 0 0 0 0
1,533,333 0 0 0 0Total:
FLP: TRANSIT
EAST-WEST BRT CORRIDOR STUDY
4407421
PTO STUDIES
PROJECT DEVELOPMENT-METRO RAPID
FPN:
DESCRIPTION:
PDE DDR 2,285,300 0 0 0 0
PDE DS 214,700 0 0 0 0
2,500,000 0 0 0 0Total:
103
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
HART - FHWA SURFACE TRANSPORTATION PROGRAM
4149632
PURCHASE VEHICLES/EQUIPMENT
SURFACE TRANSPORTATION: BUS REPLACEMENTS
FPN:
DESCRIPTION:
CAP SU 6,300,000 5,220,000 4,000,000 4,000,000 4,000,000
6,300,000 5,220,000 4,000,000 4,000,000 4,000,000Total:
HART - FHWA SURFACE TRANSPORTATION PROGRAM.
4366771
CAPITAL FOR FIXED ROUTE
CAPITAL ASSISTANCE: REGIONAL FARE COLLECTION SYSTEM
FPN:
DESCRIPTION:
CAP LF 226,407 0 0 0 0
CAP SU 850,000 1,000,000 0 0 0
CAP TRWR 623,593 1,000,000 0 0 0
1,700,000 2,000,000 0 0 0Total:
HART - FHWA SURFACE TRANSPORTATION PROGRAM..
4351411
FIXED GUIDEWAY IMPROVEMENTS
TECO STREETCAR CAPITAL MAINTENANCE
FPN:
DESCRIPTION:
CAP SU 0 880,006 0 0 0
0 880,006 0 0 0Total:
104
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
HART - PREMIUM TRANSIT FEASIBILTY STUDY
4378041
PTO STUDIES
TAMPA BAY REGIONAL INTERCOUNTY SERVICE EVALUATION
FPN:
DESCRIPTION:
PDE DS 1,000,000 0 0 0 0
1,000,000 0 0 0 0Total:
HART - TRANSIT CORRIDOR.
4303221
TRANSIT IMPROVEMENT
REGIONAL INTERCOUNTY SVC. HILLSBOROUGH OPERATING (20X)
FPN:
DESCRIPTION:
OPS DPTO 241,000 252,407 248,000 285,915 0
241,000 252,407 248,000 285,915 0Total:
HART PUBLIC TRANSIT BLOCK GRANT PROGRAM- OPERATING
4022511
OPERATING FOR FIXED ROUTE
HART - STATE TRANSIT BLOCK GRANT
FPN:
DESCRIPTION:
OPS DDR 3,114,607 4,457,681 4,844,460 5,086,682 5,341,018
OPS DPTO 1,656,753 471,198 330,864 347,407 364,776
OPS LF 4,771,360 4,928,879 5,175,323 5,434,089 5,705,794
9,542,720 9,857,758 10,350,647 10,868,178 11,411,588Total:
105
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
HART SECTION 5307
4081091
CAPITAL FOR FIXED ROUTE
FTA SECTION 5307 CAPITAL ASSISTANCE
FPN:
DESCRIPTION:
CAP FTA 16,528,240 16,528,240 16,528,240 16,528,240 16,528,240
16,528,240 16,528,240 16,528,240 16,528,240 16,528,240Total:
HART TRANSIT CORRIDOR PROGRAM 51X-OPERATING
4207411
URBAN CORRIDOR IMPROVEMENTS
INTER-COUNTY SERVICE BETWEEN PASCO & HILLSBOROUGH OPERATING
FPN:
DESCRIPTION:
OPS DPTO 412,225 435,040 240,000 285,915 0
412,225 435,040 240,000 285,915 0Total:
HILLSBOROUGH CTY MPO TRANSIT PLANNING SECTION 5305
4022551
PTO STUDIES
SECTION 5305 MPO TRANSPORTATION PLANNING
FPN:
DESCRIPTION:
PLN DDR 38,940 38,940 40,109 41,238 0
PLN DPTO 0 0 0 0 42,476
PLN DU 311,523 311,523 320,869 329,907 339,804
PLN LF 38,940 38,940 40,109 41,238 42,476
389,403 389,403 401,087 412,383 424,756Total:
106
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
NEW NORTH TRANSPORTATION ALLIANCE - COMMUTER ASSISTANCE
4240931
COMMUTER TRANS. ASSISTANCE
(NNTA)
FPN:
DESCRIPTION:
OPS DPTO 39,000 0 0 0 0
OPS LF 39,000 0 0 0 0
78,000 0 0 0 0Total:
NEW NORTH TRANSPORTATION ALLIANCE (NNTA)
4406891
COMMUTER TRANS. ASSISTANCE
NEIGHBORHOOD2GO
FPN:
DESCRIPTION:
OPS DPTO 395,000 0 0 0 0
OPS LF 395,000 0 0 0 0
790,000 0 0 0 0Total:
NEW NORTH TRANSPORTATION ALLIANCE PROJECT
4406871
COMMUTER TRANS. ASSISTANCE
COMMUTER ASSISTANCE DEVELOPMENT PROGRAM
FPN:
DESCRIPTION:
OPS DPTO 189,000 0 0 0 0
OPS LF 189,000 0 0 0 0
378,000 0 0 0 0Total:
107
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
RURAL MAP 21 ADA
4299251
TRANSIT IMPROVEMENT
MAP 21-5310 ADA EXTENSIONS, EXPANSION, VOUCHERS TRANSIT
FPN:
DESCRIPTION:
OPS DU 285,132 0 0 0 0
OPS LF 285,132 0 0 0 0
570,264 0 0 0 0Total:
SMALL URBAN MAP 21 ADA
4299261
OPERATING/ADMIN. ASSISTANCE
MAP 21-5310 MOBILITY MANAGEMENT ACTIVITY
FPN:
DESCRIPTION:
OPS DU 142,715 0 0 0 0
OPS LF 142,715 0 0 0 0
285,430 0 0 0 0Total:
TBARTA - FHWA SURFACE TRANSPORTATION PROGRAM
4082052
COMMUTER TRANS. ASSISTANCE
TRAVEL DEMAND MGT/OUTREACH AND EDUCATION; COMMUTER SERVICES
FPN:
DESCRIPTION:
OPS SU 0 350,000 0 0 0
0 350,000 0 0 0Total:
108
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
TBARTA - FHWA SURFACE TRANSPORTATION PROGRAM.
4301751
PURCHASE VEHICLES/EQUIPMENT
TRAVEL DEMAND/OUTREACH & EDUCATION
FPN:
DESCRIPTION:
CAP SU 800,000 800,000 0 0 0
800,000 800,000 0 0 0Total:
TRANSPORTATION MANAGEMENT ORGANIZATION COORDINATING GROUP
4125331
COMMUTER TRANS. ASSISTANCE
OPERATING ASSISTANCE
FPN:
DESCRIPTION:
OPS DDR 0 0 0 600,545 603,161
OPS DPTO 430,000 469,000 509,170 0 0
430,000 469,000 509,170 600,545 603,161Total:
TRANSPORTATION PLANNING
HILLSBOROUGH COUNTY FY 2016/2017-2017/2018 MPO
4393361
TRANSPORTATION PLANNING
FPN:
DESCRIPTION:
PLN PL 1,189,530 0 0 0 0
PLN SU 204,000 0 0 0 0
1,393,530 0 0 0 0Total:
109
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
Facility Item No. Phase Fund 2017/18 2018/19 2019/20 2020/21 2021/22
DRAFT Tentative Five-Year Work Program for FY 2018 through FY 2022
July 1, 2017 Through June 30, 2022
Florida Department of Transportation District Seven
HILLSBOROUGH
December 5, 2016
HILLSBOROUGH COUNTY FY 2018/2019-2019/2020 UPWP
4393362
TRANSPORTATION PLANNING
FPN:
DESCRIPTION:
PLN PL 0 1,223,428 1,260,967 0 0
PLN SU 0 400,000 400,000 0 0
0 1,623,428 1,660,967 0 0Total:
HILLSBOROUGH COUNTY FY 2020/2021-2021/2022 UPWP
4393363
TRANSPORTATION PLANNING
FPN:
DESCRIPTION:
PLN PL 0 0 0 1,260,967 1,260,967
PLN SU 0 0 0 400,000 400,000
0 0 0 1,660,967 1,660,967Total:
HILLSBOROUGH PLANNING MODEL STUDIES
4387471
PLANNING MODELS/DATA UPDATE
CONDUCT SURVEYS TO UPDATE PLANNING MODELS/DATA
FPN:
DESCRIPTION:
PLN D 196,000 196,000 196,000 196,000 0
PLN DU 214,954 0 0 0 0
PLN SU 196,000 0 0 0 0
606,954 196,000 196,000 196,000 0Total:
110
PDE-Project Development Environment; PE-Preliminary Engineering; ROW-Right of Way; CST-Construction; RRU-Rail Road/Utilities; INC-Incentive; ENV-Environmental Mitigation; CAP-Capital Grant; OPS-Operations Grant; LAR-Local Advance Reimbursement; DSB-Design Build; PLN-Planning; RPY-SIB Loan Repayment
6 Anderson Plaza
11 Sugarwood Plaza
HILLSBOROUGH
VeteransExpressway
SuncoastParkway
TAMPA
Express Lanes - Memorial Highway to Gunn HighwayConstruction Funding: $161,800,000Segment will open in late 2017*
Express Lanes - Gunn Highway to Dale Mabry HighwayProject is part of the Sugarwood to Van Dyke Road ProjectSegment will open in mid 2018*
Widening - Sugarwood Toll Point to Van Dyke Road3 Northbound Lanes open in Late 2017*3 Southbound Lanes open in Mid 2018*Construction Funding: $51,000,000Project Completion: Mid 2018*
Widening - Gunn Highway to Sugarwood Toll Point3 Northbound Lanes open in Mid 2017*3 Southbound Lanes currently open
Construction Funding: $42,700,000Project Completion: Mid 2017*
New Construction - Suncoast Parkway 2From US 98 to Hernando/Citrus County LineConstruction Funding: $39,921,000Construction scheduled for 2017*
New Construction - Suncoast Parkway 2From Hernando/Citrus County Line to South of West Grover Cleveland Blvd.
Construction Funding: $93,418,000Construction scheduled for 2017*
New Construction - Suncoast Parkway 2From South of West Grover Cleveland Blvd. to State Road 44Construction Funding: $63,424,000Construction scheduled for 2017*
PASCO
HERNANDO
CITRUS
21 Anclote Toll Plaza
31 Spring Hill Toll Plaza
53 Oak Hammock Toll Plaza
All Electronic Tolling ConversionFrom Van Dyke Road to US 98
Construction Funding: $44,058,000Project Completion: April 2019*
GULFOF
MEXICO
Last Update: 11/22/2016
Sources: NAVTEQ 2016Florida's Turnpike Enterprise, 2016
Current Turnpike Projects within FDOT District 7Current Turnpike Projects within FDOT District 7* - Schedule subject to change
0 5 10Miles
Interchange
Toll Plaza
Existing Turnpike System Facility
Other Toll Road
Interstate Highway
County Boundary
Other Road
Arterial
2015 Priority
FPN2040 LRTPProject/ Ref
Project Limits Project Description Project Sponsor Project Status / Request Candidate for Funding Type
Latest Steps
Federal Metro 0.62
1 259285 1Systems & Corridor Planning
MPOOngoing planning need: $400,000 per year
SUPreviously funded project cut in half, to $204k/yr for FY17‐21. Restoration requested in FY20 to support LRTP update.
2 438747 1District 7 Travel Behavior Surveys
FDOT Ongoing survey efforts: $196,000 SU Added $196k FY17 and $392k per yr FY18‐21
Federal Metro State Highways 49.6
TRIPFuel Tax Local 14.0
Other Local RevTransit Funds 6.4
3 414963 2Preserve System
MAINTAIN CURRENT BUS SERVICE Bus Replacement HART Priority #7 $17.5 million requested for FY22 SUAdded $4 million in FY21. Request continues for FY 22.
Federal Metro 3.3State Highways 11.9
TRIPFuel Tax Local 16.4
Other Local Rev 4.6Transit Funds
1. Stowers Elem ‐ $155,0002. Summerfield Elem ‐ $164,0003. Eisenhower Middle ‐ $227,0005. Cypress Crk, Shields ‐ $170,000
Construction in FY 18 for:1. Stowers ‐ $97,8352. Summerfield ‐ $109,2753. Eisenhower ‐ $153,385
5 Cypress Crk ‐ $113 0156. Nelson Elem ‐ $83,0007. Riverview Elem ‐ $112,000
Funding requested for the next projects on the list; county preparing applications w/SDHC
5 436639 1Reduce Crashes
COLUMBUS DRIVE FROM NEBRASKA AVE TO 14TH STREET
Walk/Bike Safety Tampa$99,000 needed for design and $556,000 for construction
Elig & Feas for TA; prioritized by TMA
Added $100k for PE in FY18, $217k for CST in FY20
6 437246 1Reduce Crashes
46TH STREET FROM BUSCH BLVD TO FOWLER AVE
Walk/Bike Safety Tampa$77,000 needed for design and $442,000 for construction
Elig & Feas for TA; prioritized by TMA
Added $78k for PE in FY18, $228k for CST in FY20
7 437243 1Reduce Crashes
ROME AVE FROM KENNEDY BLVD TO COLUMBUS DR
Walk/Bike Safety Tampa$213,000 needed for design and $1,223,000 for construction
prioritized by TMAAdded $71k for PE in FY18 & 19, $532k for CST in FY21
8 436640 1Reduce Crashes
FLORIBRASKA AVE FROM FLORIDA AVE TO NEBRASKA AVE
Walk/Bike Safety Tampa$77,000 needed for design and $441,000 for construction
Elig & Feas for TA Project being coordinated with TBX design
9Reduce Crashes
Sidewalk Improvements at Bryan Elem/Tomlin MS, Jackson Elem, Lincoln Elem, & Wilson Elem
Walk/Bike Safety Plant City $1.663M requestedTA Application received, needs typ sec, ROW map
Safe Routes to School applications are in progress
10Reduce Crashes
Morris Bridge Rd Bike Lanes/Paved Shoulders, Fowler to Fletcher
Walk/Bike Safety FDOT Temple Terrace request TA, HSIP Funding package in progress but not yet final
2040 Plan Annual Funding Est. ($m)
2040 Plan Annual Funding Est. ($m)
Hillsborough MPO List of Priority Projects2017/2018 Transportation Improvement Program
Table 2: CANDIDATES FOR NEW FUNDING
METROPOLITAN TRANSPORTATION PLANNING
METROPOLITAN TRANSPORTATION PLANNING
Metropolitan Transportation Planning
Goals by 2040Resurface major roads every 14‐17 years,
local roads every 20‐25 yearsReplace buses every 10‐12 years
Replace deficient bridges
Preserve the System
Reduce Crashes & Vulnerability
Goals by 2040Reduce crashes 21‐50%, to levels
comparable to peer citiesProtect low‐lying major roads from flooding,
cutting recovery time in half
437243 1437244 1437248 1437242 1
4
2040 Plan Annual Funding Est. ($m)
1‐5 are Elig & Feas for TA; all were
prioritized by TMACounty Priority
Sidewalks and Intersection Improvements
SAFE ROUTES TO SCHOOL CANDIDATE PROJECTS, HILLSBOROUGH COUNTY
Reduce Crashes
Adopted: August____, 2016 Page 1 Printed: 7/27/2016
2015 Priority
FPN2040 LRTPProject/ Ref
Project Limits Project Description Project Sponsor Project Status / Request Candidate for Funding Type
Latest Steps
Hillsborough MPO List of Priority Projects2017/2018 Transportation Improvement Program
Table 2: CANDIDATES FOR NEW FUNDING
11Reduce Crashes
GREEN SPINE: CASS ST FROM HOWARD TO RIVER, NUCCIO PKWY FROM NEBRASKA TO PALM, 15TH ST FROM PALM TO 21ST
Walk Bike Emphasis Corridor
Tampa Priority #3$300,000 requested for PD&E; total project cost estimate $2,454,197
SU, TA
Request broken into phases; TA application submitted for Phase 2b ‐ Cass St from Willow Ave to Doyle Carlton ‐ $566,500. Next:* Phase 3a ‐ Nuccio Pkwy from Nebraska to 7th Ave ‐ $861,000* Phase 3b ‐ Nuccio Pkwy from 7th Ave to 13th Ave ‐ $630,000* Phase 2a ‐ Cass St from Howard to Willow ‐ $493,400* Phase 3c ‐ 15th St from 13th Ave to 21st Ave ‐ $396,700
12 437642 1Reduce Crashes
SR 39 / S COLLINS STREET FROM Merrick St to E Laura St
Complete Street Enhancements
Plant City Priority #1$690,000 requested for streetscaping & lane re‐config.
DDR Added $700k for CST in FY17
Federal Metro 0.8State Highways 3.0
TRIP 0.2Fuel Tax Local 8.5
Other Local Rev 4.5Transit Funds
13 438450 1Minimize Traffic
DALE MABRY HWY FROM SLIGH TO VAN DYKE RD
ATMS ‐ Signalization County Priority$2.8 Million for design and implementation
DDR Added $3.6M for CST in FY18
14 437640 1Minimize Traffic
US 301 From Falkenberg to Sligh Av Operational Improvements
FDOT Port Tampa Bay request Hwy SafetyAdded $841k for PE in FY17&18, $1.2M for CST in FY20
15Minimize Traffic
US 41 FROM CAUSEWAY BLVD TO I‐4 Operational Improvements
FDOT (tent.) Port Tampa Bay request OperationsPort requests intersection improvements at Causeway, Madison, and rail crossings
16Minimize Traffic
Big Bend Rd @ I‐75Interchange Improvements
FDOT/CountyFunding needed to add EB left turn lane & NB entrance lane
SU, SIS, TRIPTRIP application submitted by County and prioritized at TBARTA/CCC meeting
17Minimize Traffic
Gibsonton Dr @ I‐75Interchange Improvements
FDOTFunding needed to extend SB dual left turn lanes
SU, SIS
18Minimize Traffic
Alexander St @ SR 39Intersection Improvements
Plant City Priority #3 $2M for construction SU
19Minimize Traffic
Alexander St @ Jim Johnson RdIntersection Improvements
Plant City Priority #7 $2M for construction SU
20Minimize Traffic
S Park Rd @ Coronet RdIntersection Improvements
Plant City Priority #8 $2M for construction SU
2040 Plan Annual Funding Est. ($m)
Manage Congestion for Drivers & Shippers
Goals by 2040Traffic flow 17% better on non‐freeways
with ATMS and 640 intersections improvedTraffic flow 10% better on freewaysPlus truck quick fixes & RR overpasses
Adopted: August____, 2016 Page 2 Printed: 7/27/2016
2015 Priority
FPN2040 LRTPProject/ Ref
Project Limits Project Description Project Sponsor Project Status / Request Candidate for Funding Type
Latest Steps
Hillsborough MPO List of Priority Projects2017/2018 Transportation Improvement Program
Table 2: CANDIDATES FOR NEW FUNDING
Federal Metro 9.4State Highways
TRIP 0.2Fuel Tax Local 12.4
Other Local Rev 19.0Transit Funds 71.4
21Real
ChoicesEAST‐WEST METRORAPID
New Expanded Transit Service
HART (Priority #1) $30 million constructionNew Starts, Small Starts
Local match not identified
1. TIA/ Kennedy Blvd ‐ $2.5 m $2.5M in FY18 for TIA/Kennedy PD&E2. Brandon‐Downtown ‐ $2.5 m3. New Tampa‐USF ‐ $1.5 m4. Dale Mabry/ MacDill ‐ $3.5 m5. Busch Blvd/ Gunn Hwy ‐ $2.5 m
Funding requested for the next corridor study on the list
23Real
ChoicesUPPER TAMPA BAY TRAIL (UTBT) PHASE IV‐A and IV‐B
Multi‐Use Trail County$2,582,000 to construct A$1,562,000 to construct B
Prioritized by CCC; Elig & Feas for TA
Alignment to be determined by County
24Real
ChoicesSOUTH TAMPA GWY FROM MAN‐HATTAN AVE TO PICNIC ISL. PARK
Multi‐Use Trail Tampa Priority #12$50,000 requested for PD&E ($1,800,000 total cost estimate)
Prioritized by CCC; TA application needs addl info
Need agreement with MacDill AFB for ROW use for 25 years post‐construction
25Real
ChoicesTAMPA BYPASS CANAL TRAIL from Harney Rd to Fletcher Ave
Multi‐Use Trail County Priority$750,000 requested for PD&E$378,000 requested for designTotal cost $6.5M
Prioritized by CCCTA application under review by FDOT, requesting $750,000 for PD&E study
26Real
ChoicesTAMPA BYPASS CANAL TRAIL from Harney Rd to US 301
Multi‐Use Trail Temple TerracePrioritized by CCC;
TA ‐ need application
To be included in PD&E study for priority #25
27 436713 1Real
ChoicesUTBT CONNECTOR: LUTZ LAKE FERN SIDEWALK
Sidewalk County$84,250 needed for design and construction
Elig & Feas for TA Added $13,750 for PE in FY18, $37,995 for CST in FY20
28Real
Choices
Selmon Greenway Next Phases ‐ SR 60 between 19th St & Channelside Dr, extension to Nuccio Pkwy
Multi‐Use Trail THEA
1) $329,602 ‐ Trailhead constr2) $138,614 ‐ Safety & Sec Signage3) $214,338 ‐ Constr Connection to Nuccio Pkwy
TA application received
TA application submitted for Project 1 – Trailhead
29Real
ChoicesWEST RIVER GWY ‐ BAYSHORE BLVD TO MLKING RECREATION COMPLEX
Multi‐Use Trail Tampa Priority #11$132,000 requested for Design ($982,000 total cost estimate)
TA 2013 application needs
Waiting for TA application with revised limits
30Real
ChoicesI‐275 GWY EXTENSION FROM WEST OF DALE MABRY TO MACFARLANE PK
Multi‐Use Trail FDOT (tent.) Feasibility study of pedestrian overpassPlanning; SUNTrail
corridorMPO UPWP study in FY 16/17
31Real
ChoicesSOUTH COAST GREENWAY (PHASES I and III‐VI)
Multi‐Use Trail CountyFunding needed for PD&E and Design for Ph III‐IV
TA, SUNTrail
SUNTrail application submitted for Maydell Bridge over Palm River. TA application for Rusckin area phase needs documentation of easements.
32Real
ChoicesMcIntosh Tract Trail Off‐Road Bicycle Trail Plant City $105,500 for des & const Not eligible for TA
Review/revise in Plant City Walk‐Bike Plan (MPO UPWP study in FY 16/17)
2040 Plan Annual Funding Est. ($m)
Real Choices When Not Driving
Goals by 2040Wide paved trails & sidepaths within walking distance of
1/4 of residentsFrequent bus service within walking distance of nearly half
of people & jobs Outside bus service area, Sunshine Line services grow with
senior population growth
22 DDRHART Priorities
#2‐4, 6New Expanded Transit Service
PD&E/ Design Phase for an additional MetroRapid Corridor
Real Choices
438794 1
Adopted: August____, 2016 Page 3 Printed: 7/27/2016
2015 Priority
FPN2040 LRTPProject/ Ref
Project Limits Project Description Project Sponsor Project Status / Request Candidate for Funding Type
Latest Steps
Hillsborough MPO List of Priority Projects2017/2018 Transportation Improvement Program
Table 2: CANDIDATES FOR NEW FUNDING
412531‐2 1002, 1093 I‐275 @ SR 60 INTERCHANGE Modify Interchange FDOT Funding needed for constructionSIS; prioritized by
TMAROW and Engineering through out the 5 years, $ 327 million
258643 1 1003 I‐275 FROM SR 60 TO NORTH BLVD TBX with Exp. Bus FDOTFunding needed for design and construction
SIS; prioritized by TMA
TMA prioritized express bus
n/a** I‐275 FROM 4TH ST TO GANDY BLVD TBX with Exp. Bus FDOTFunding needed for des & constr, + PD&E for Gateway Transit Center
SIS; prioritized by TMA
433821 2258643 1
1005I‐275 @ I‐4 (DOWNTOWN INTERCHANGE)
Modify Interchange FDOTFunding needed for design and construction
SIS; prioritized by TMA
FY2017: $493,000 for ROW, $5,000 for design, FY2021: $58 million for design
431821 2 1006I‐275 FROM JEFFERSON/ORANGE ST TO N OF BEARSS AVE
TBX with Exp. Bus FDOTFunding needed for des & constr, + PD&E for Fletcher Transit Center
SIS; prioritized by TMA
$67 million Design Build in FY2021
431746 1 1008I‐4 FROM I‐4/SELMON CONNECTOR TO POLK PKWY
TBX with Exp. Bus FDOTFunding needed for design and construction
SIS; prioritized by TMA
$235 million Design Build in FY2021
415235 3 1010 I‐75 FROM FOWLER AVE TO US 301 TBX with Exp. Bus FDOTFunding needed for design and construction
SIS; prioritized by TMA
419235 2 I‐75 FROM SR 674 TO US 301 TBX with Exp. Bus FDOTFunding needed for design and construction
SIS; prioritized by TMA
415348 1 83WESTSHORE REGIONAL INTERMODAL CENTER
Intermodal Center FDOTFunding needed for design & construction
SIS; prioritized by TMA
ROW acquired in FY2016
62CONNECTION TO AIRPORT PEOPLE MOVER
Transit Connection FDOT/Aviation Auth No request this year
61 MODERN STREETCAR EXTENSION Transit Connection TampaFunding needed for design to extend to Marion Transit Center
FDOT transit programs;
prioritized by TMA
Port requests re‐design of streetcar stations, potential new fourth station at Selmon Expy, and Channelside intermodal station (on Port Property)
35 437804 1 60 US 41 RAIL CORRIDOR JOINT USE Commuter Transit FDOTFunding needed for corridor study/PD&E
FDOT transit programs;
HART Premium transit study funded $1.5M FY17 & 18
36 436677 1Real
ChoicesRegional Farebox Rev. Collection & Inter‐Jurisdictional Mobility
Regional Transit Fare Collection
HART Priority #8Partially funded; balance of $8.9M needed
TRIP, TIGER, FDOT transit; prioritized
Partially funded, $3.7M in FY18 & 19, TIGER grant submitted
37 n/a** Duke Energy Trail ‐ North & South Gaps Multi‐Use Trail Pinellas CountyPartially funded; funding needed for design and construction
TIGER; prioritized by TMA
Prioritized by the TMA
38 1100 US 41 @ Causeway BlvdGrade Separated Intersection
FDOT (tent.) Port Tampa Bay requestOther Arterials,
IntermodalSee operational improvement request (Priority 15)
39 438997 1 1043US 92 FROM US 301/I‐4 TO CR 579 (MANGO RD)
Widen 2 lanes to 4 lanes divided
FDOT Funding needed for design Other Arterials PE added $1.25M in FY17
40 438998 1 1045 US 92 from Park Rd to Polk County Widen to 4LDFDOT; Plant City
Priority #4Funding needed for design Other Arterials PE added: $1.8M in FY17
41 E+C mapW Sam Allen Rd from N Alexander St to SR 39
Widen to 4LD Plant City Priority #2 $2.464M for Construction SU
42 439413 1 9996Davis Rd Ext from Harney Rd to Maislin Dr
New 2LU Rd Temple Terrace$300,000 for PD&E / Design ($7.8M total cost)
SU Partially funded with $1M special appropriation; $6.8M total needed
Major Investments for Economic Growth
33
34
Adopted: August____, 2016 Page 4 Printed: 7/27/2016
2015 Priority
FPN2040 LRTPProject/ Ref
Project Limits Project Description Project Sponsor Project Status / Request Candidate for Funding Type
Latest Steps
Hillsborough MPO List of Priority Projects2017/2018 Transportation Improvement Program
Table 2: CANDIDATES FOR NEW FUNDING
43 1038, 1040SAM ALLEN RD FROM PARK TO POLK COUNTY
New 4 Lane roadway Plant City Priority #6 $4.5M request for PD&E SU
44Minimize Traffic
US 41 @ SR 60Grade Separated Intersection
FDOT (tent.) Port Tampa Bay request Other Arterials
45Minimize Traffic
US 41 @ CSX 'A' LINE TO CSX 'S' LINE Grade Separated Intersection
FDOT (tent.) Port Tampa Bay request Other Arterials
46*Need beyond
Rice Rd from Coronet Rd to Polk Co New 2LU Rd Plant City Priority #5 $3.757M requested for PD&E SU
* Project not listed in the Cost‐Affordable Long Range Transportation Plan** Project in neighboring county, reflected as a Transportation Management Area priority
Denotes new projectDenotes project funded in the past year
Adopted: August____, 2016 Page 5 Printed: 7/27/2016
Out-of-the-box mitigation efforts may include a bridge not astormwater pond
baysoundings.com/out-of-the-box-mitigation-efforts-may-include-a-bridge-not-a-stormwater-pond/
Stormwater retention ponds have been the easy alternative for developers ever since stormwater treatment ruleswere enacted in the mid-1980s. As parts of the region are redeveloped, though, ponds that require large amounts ofspace are no longer first choice for reducing nutrient loads in stormwater.
Legislation passed in 2012 encourages FDOT to look at out-of-the-box approaches that offer similar or greater waterquality improvements. Recognizing that Old Tampa Bay is still considered to be the bay’s “problem child,” the FloridaDepartment of Transportation is proposing to build a 200-foot bridge, replacing part of the Courtney CampbellCauseway just west of the Ben T. Davis Beach to restore tidal flows and improve water quality.
“Even though roadways don’t generate nitrogen loads, they collect them,” notes Dave Tomasko, principal associateat ESA, one of FDOT’s environmental consultants. “Wet stormwater ponds only remove 30% to 40% of the nitrogenloads coming into them. The only thing close (to 100% removal) is dry retention but FDOT would have to build anelevated dry retention pond with a bottom so high that we’d need to pump the water up to separate the pond fromthe water table.”
FDOT’s consultants were able to show that the reduced coverage of seagrass north of the Courtney Campbell ismostly due to variations in the saltiness of the water and not from pollutants carried in runoff. “The issue here isn’tas much nitrogen as it is salinty,” Tomasko said. Most of the seagrasses growing in the section furthest away fromthe bridge is wigeon grass (Ruppia maritima), a pioneer species highly tolerant of lower salinity that probably wasn’tthe dominant species there in the past. it} More productive seagrasses are denser in the areas closer to the bridgewhere tidal flow is more consistent.
A series of studies indicates that the opening will improve water quality and potentially restore enough tidal flow tosupport another 80 acres of desirable seagrass species, as seagrasses from nearby areas expand, Tomasko adds.
1/3
Ongoing studies have consistently shown higher densities of more productive seagrasses in areas where tidal flow is not restricted.This water quality data supports the theory that increasing tidal flow by breaching the causeway could create an additional 80 acres of
seagrasses in the areas where current densities are lowest. Photos courtesy ESA.
The Southwest Florida Water Management District, which will make the final decision on whether a permit should begranted, supports the concept in theory. “The legislature is pushing for flexibility so we’re taking the idea to thecommunity for vetting,” notes Dave Kramer, the district’s surface water regulation manager. “It will be the firstmitigation of its kind in the state.”
While some stormwater retention ponds are still planned to allieviate flooding and collect oil and trash from theroadway, addressing nutrient pollution in highly developed areas would require “literally buying office buildings tobuild ponds,” Kramer adds.
2/3
Constructing this restoration project in the receiving waterbody will allow FDOT to reduce pond sizes associatedwith future projects and realize a cost savings on right-of-way purchases, say FDOT officials.
Historic problem
Old Tampa Bay has lagged behind other bay segments in seagrass recovery. The lack of seagrasses north of theCourtney Campbell has been documented since 1948. “We found that the abundance and density of seagrassesnorth of the causeway is directly related to how far away the area is from open water,” Tomasko said.
The Tampa Bay Estuary Program calls Old Tampa Bay its “problem child” because of its persistent nutrient andcirculation woes.
Seagrasses have been documented 13 times in the Rocky Point area north of the causeway but defined as“persistent” less than five times in the areas furthest away from tidal flows.
FDOT agreed to consider a bridge rather than additional stormwater ponds because the results will be moresignificant within the ecosystem – and significantly less expensive for taxpayers. “The FDOT is responsible formitigating their impacts, so we didn’t conduct this study in a vaccuum,” Tomasko adds. “If we found a benefit waslikely, that was fine, but they would have been fine if we hadn’t. We all know if the system doesn’t respond, they’llhave to do more.”
Tomasko points to successful seagrass recruitment in the Florida Keys after a causeway built by Henry Flager wasreplaced with a bridge in 2008. Re-opening the lake to tidal flows improved water quality and seagrass growth inabout 200 to 300 acres, he said.
Closer to home, Pinellas County created an additional 100 acres of seagrasses by replacing part of the maincauseway into Fort DeSoto Park with a bridge in 2004. The effort, partially funded through FDOT was so successfulthat a second causeway has been breached to allow tidal flow into another lagoon.
Many questions about the proposed bridge still remain but experts at a recent meeting of the Agency on BayManagement and TBEP Technical Advisory Committee support the concept in general.
“I’m all for it,” said Penny Hall, the Florida Fish and Wildlife Research Institute’s seagrass expert. “ Ruppia doesn’thold sediment in place because it only has a surface root system.”
“It does fit neatly into our focus area and I like the idea of looking at different ways to achieve those long-term goals,”adds Holly Greeening, executive director of the TBEP.
But as important as the results may be for the Rocky Point area, it may not become a trend in Tampa Bay, Tomaskosaid. “We can’t just assume a bridge is necessary, and I’m not sure that salinity is all that much a problem in otherareas, even on the west side of the Courtney Campbell.”
Go to top
3/3
6/1/2016USER: john8903 \\tpafs07\tampa\GeoMatics\Survey\Courtney_Campbell_Bridge\CADD\DRMPRD01.dgn5:01:15 PM
439206-1-52-01HILLSBOROUGH 60
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEETSTATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
SHAYNE PAYNTER, P.E. # 58136
FBPE CERTIFICATE OF AUTHORIZATION NO. 24
(813) 282-7275
TAMPA, FLORIDA 33607
4030 WEST BOY SCOUT BLVD., STE. 700
ATKINS NORTH AMERICA, INC.
on any ele
ctronic copie
s
XX/
XX/
XX usin
g a S
HA-1 authentic
atio
n code;
Printed copie
s of this docu
ment are not consid
ered sig
ned and seale
d and the S
HA-1 authentic
atio
n code
must be verifie
d
Shayne Paynter State of Florid
a,
Professio
nal
Engin
eer,
Lic
ense
No.5
8136.
This ite
m has been ele
ctronic
all
y sig
ned and seale
d by S
hayne Paynter,P
E on
405
410
415
-10
0
10
-10
0
10
401 402 403 404 405 406 407 408 409 410 411 412 413 414 415
Feet
100200
SCALE: 1" = 10" VERT.
SCALE: 1" = 100' HORIZ.
STA. 408+00
BEGIN BRIDGE
STA. 410+20
END BRIDGE
STA. 408+00
BEGIN BRIDGE
STA. 410+20
END BRIDGE
N
30'-0"
BARRIER1'-0"
BARRIER"211'-6
EXISTING GROUND LINE
MTL EL -0.125'
MHW EL +.814'
EL. -7.60'
CHANNEL BOTTOM
1320'
1320'
EXISTING R/W
UPPER OLD TAMPA BAY
UPPER OLD TAMPA BAY
¡ CONST. S.R. 60
PERSONNEL WITH DRAINAGE CONCERNS.
FOR DOCUMENTATION AND TO ASSIST CONSTRUCTION
CONSTRUCTION PURPOSES. THIS SHEET IS IN THE PLANS
DO NOT USE THE INFORMATION ON THIS SHEET FOR
NOTE:
2
DRAINAGE MAP
MLW EL -1.065
EXISTING R/W
LOW MEMBER EL. 3.6'
VERTICAL DATUM NAVD88
AERIAL DATE: JANUARY 2014
STA. 408+00
BEGIN PED. BRIDGE
STA. 410+20
END PED. BRIDGE
(COURTNEY CAMPBELL CAUSEWAY)
S.R. 60
Plan Hillsborough planhillsborough.org
[email protected] 813 - 272 - 5940
601 E Kennedy Blvd 18th floor
Tampa, FL, 33602
Board & Committee Agenda Item
Agenda Item
Overview of the Naturalistic Bicycling Behavior Pilot Study
Presenter
Pei-Sung Lin, CUTR
Summary
Many factors influence how and where bicyclists ride their bicycles, including facilities, environmental conditions, and interactions with other roadway users.
A naturalistic bicycling behavior study is an effective approach to understand bicycling behaviors via analyzing naturalistic bicycling behavior data collected via cameras and sensors installed on participants’ bicycles over a specific period of time.
This presentation will provide an overview of the naturalistic bicycling behavior pilot study conducted by CUTR at the University of South Florida and sponsored by the Florida Department of Transportation. It will cover project background, objectives, research questions, development of a bicycle data acquisition system, project tasks, and progress update.
Recommended Action
Review and comment as needed
Prepared By
Michele Ogilvie
Attachments
None
Board & Committee Agenda Item
Agenda Item
Parliamentary Procedure & Govt. in Sunshine Annual Review/Q&A
Presenter
Cameron Clark, MPO County Attorney
Summary
It would be helpful for all MPO committee members to be familiar with Robert’s Rules of Order particularly as they apply to taking action on agenda items. A few highlights of these Parliamentary Procedures are attached. MPO committees are also subject to the requirements outlined in the Sunshine Law. In general, the law is in place to ensure transparency in government and does so by requiring meetings are open to the public, notice is given, and minutes are taken. There is also guidance on committee members discussing topics that could come before their board for action. The MPO’s attorney will provide insight on both of these topics/ Recommended Action
None. For information only.
Prepared By
Gena Torres, MPO Staff
Attachments
Parliamentary Procedure highlights
Plan Hillsborough planhillsborough.org
[email protected] 813 - 272 - 5940
601 E Kennedy Blvd 18th floor
Tampa, FL, 33602
Parliamentary procedure Keep in mind that business meetings are measured in terms of things done
rather than by the exactness in parliamentary procedure. The use of good
form in business meetings should enable a group to get things done easily
and smoothly. Use parliamentary procedure to help your meetings run
logically and reduce noisy chaos, but don't be a slave to it. Following the
proper rules of order ensures the fairness of and gives validity to committee actions.
A motion is in order
Always address the chairperson by saying, "Madame Chairperson, or Mr. Chairperson,
Chairperson James, or Chairperson Betty." The chairperson then says, "John" or "Susan."
A member may not make a motion until recognized by the chair person.
State your motion as follows: "I move that...."
Motions must be seconded or they will be lost for want of a second. It is not necessary to
rise to second a motion.
After being seconded, the motion must be stated in full by the chairperson as follows: "It
has been moved and seconded that (such and such be done). Is there any discussion?"
After the discussion, the vote is taken.
If there is a motion before the committee, no other motion can be entertained except its
amendment, the previous question, or a motion to adjourn, until the one before the
committee has been voted upon. Only members are entitled to make motions, to vote or
hold office. In cases of a tie vote, the chairperson votes and decides the motion.
Five ways of voting
By acclamation (or by voice). The chairperson says, "All in favor of the motion say 'aye',
opposed 'no'."
By standing.
By raising of hand.
By ballot - distributing slips of paper and allowing each member to write "yes" or "no" or
a name upon a ballot.
By calling the roll or ordering the "yeas" and "nays". Acclamation is used for ordinary
motions. Do not permit absent members to have someone else vote for them by proxy.
To amend a motion a motion may be completed or changed when the chairman calls for discussion by means of an
amendment. A motion may be amended in three ways:
1. By inserting or adding a word or phrase
2. By striking out a word or phrase
3. By substituting a word, phrase or entire statement.
For example, this motion is before the house for discussion. "I move that a committee be
appointed to arrange the canned food exhibits at our local Achievement Day." It might be
amended in any of these ways:
1. I move to amend by inserting 'of five' after committee.
2. I move to amend by striking out 'canned foods'.
3. I move to amend by substituting this statement 'that a standing committee be
appointed to arrange the committee exhibits' for 'all events this year'.
The amendment to a motion, if seconded, must be voted upon before the original motion. If the
amendment to the motion is carried, the original motion must be voted upon as amended. On the
other hand, if the amendment is defeated, the motion is voted upon as originally stated.
In case of an amendment to an amendment, the last amendment is always voted on first. If it is
carried, the preceding amendment is then voted upon as amended.
Withdrawal of a motion Occasionally a member may wish to withdraw his motion. This may be done at any time before a
vote is taken on the motion. Such a request needs no second and is not debatable. It may be done
simply by stating, "I ask leave to withdraw my motion." If the motion has been seconded, the
maker of the motion should ask the consent of the one seconding to withdraw.
Abstaining from voting
It's your duty to vote when you have an opinion about a matter being decided. By failing to vote,
you allow others to make the decision, which is the same as having voted for the prevailing side.
Whether you vote or not, you're still in some way responsible for the decision that's made.
On the other hand, you can't be forced to vote, and in fact, should not vote in certain situations.
According to Robert's Rules, you should abstain from voting whenever you have an interest in
the outcome that directly affects you personally (or monetarily) in a manner not shared by the
other members of your group
Adapted from Carol Gehrs, Cass Co. 4-H Youth Specialist, November, 1999
Plan Hillsborough planhillsborough.org
[email protected] 813 - 272 - 5940
601 E Kennedy Blvd 18th floor
Tampa, FL, 33602
Committee Reports
Citizens Advisory Committee (CAC) Meeting of November 9, 2016
The CAC approved:
The calendar of meetings for 2017
A TIP amendment for HART bus replacements The CAC spent almost an hour hearing from FDOT and discussing the TBX project. Members voiced concerns about the lanes on the Howard Frankland Bridge, community impacts that are only now being addressed, and FDOT’s position regarding transit. Several members expressed a desire to see FDOT take a stronger lead in developing a regional transit system. The committee will consider taking a position on this at their January meeting. The CAC also received a status report on Lithia Pinecrest Rd and related projects, as well as a briefing on the Brandon Corridors and Centers land use and transportation study. Members questioned the cost of widening Lithia Pinecrest Rd, as well as what could be done to encourage more infill and redevelopment.
Technical Advisory Committee (TAC) Meeting of November 21, 2016
The committee approved:
The calendar of meetings for 2017
A TIP amendment for HART bus replacements
The MPO State of the System Report, which was updated based on comments from the TAC at their October meeting.
There were also well-received presentations on CUTR’s Social Justice in Transportation Study, MPO’s Vision Zero, and HART’s Regional Fare Collection. Policy Committee Meeting of November 29, 2016
Nine citizens spoke against the widening of Lithia Pinecrest Road. MPO staff summarized this project’s cost, potential funding sources, and prioritization in the Imagine 2040 Transportation Plan, where the widening is identified as a “need beyond 2040.” Hillsborough County staff discussed identifying new local funds for this and other transportation improvements in the next ten years; a schedule for such improvements is to be considered by the county commission in January. The committee approved:
The calendar of meetings for 2017
A TIP amendment for HART bus replacements
A UPWP amendment to close out the fiscal year and true-up the grants Amending the MPO’s agreement with Hillsborough County for legal services Amending the MPO’s consultant contract with Renaissance Planning A new Waze Connected Citizens Program agreement with Google, to share data
They also were briefed on this year’s update of the FDOT Work Program, which includes new funding for many MPO priority projects, and heard from the Department of Health about the next steps towards a Health in All Policies Resolution. The December 20 Policy Committee meeting is cancelled, and the January 31 meeting will be held as a Vision Zero Coalition Workshop.
Bicycle Pedestrian Advisory Committee (BPAC) Meeting of November 9, 2016
The BPAC received a presentation on “Open Streets for Our City.” Building on successful Cyclovia events, the Walk Bike Tampa group is working with the City of Tampa to offer motorized free spaces along select corridors within the city for cycling, skating, running, walking, jogging, and other activities for the overall benefit of the residents, visitors, and local businesses. The ideal is to start with Bayshore Boulevard and extend the experience north to include Downtown and Ybor City.
The BPAC also requested that the MPO send a letter supporting Hillsborough County’s efforts to maintain a trail environment that supports a safe walk-bike environment exclusive of automobiles (see the Consent Agenda).
Livable Roadways Committee (LRC) Meeting of November 16, 2016
The November meeting was a joint meeting with the FDOT Community Traffic Safety Committee. The committee approved the annual calendar and noted that December’s meeting will be a joint meeting with BPAC. heard reports on the MPO’s Vision Zero, Bike/Walk Tampa Bay’s successes, and the School Transportation Working Group. Kennedy Blvd Access Management - The committee supported many safety improvements of the study, but would like the project to go further, and consider reduced speeds, driveway closures, and the context of this older urban corridor. The LRC moved to ask FDOT to consider delaying design and construction of Kennedy Blvd while the 2013 study is refreshed to include a more comprehensive access management scope and FDOT’s new complete street policies.
School Transportation Working Group (STWG) meeting of November 30, 2016
An update will be provided at the board meeting. TBARTA MPO Staff Directors Meeting of November 18, 2016
The Staff Directors finalized the agenda for the December 2nd TBARTA MPOs CCC Board Meeting. An action item was added to the agenda asking the CCC to write a letters of support for the MPO Regional Coordination Structure Research and Best Practices for the Tampa Bay Region study. A public hearing will also be conducted on December 2nd for the 2017 TBARTA MPOs CCC Regional Priority projects, the Future Regional Priority Projects, and the Regional Multi-Use Trail Priority Projects. A change was made to the Regional Priority Project list to group together HART, PSTA, PCP’s Regional Express Bus Service (Pilot Projects). This includes HART’s Airporter Express Bus Service, PSTA’s Clearwater Beach to TIA Express Service, and a PCPT Veterans Expressway Express Bus Pilot project.
There was also discussion about the MPO Regional Coordination Structure Research and Best Practices for the Tampa Bay Region study scope of services. Hillsborough County and Pinellas MPO has received board approval for the scope while Pasco, Manatee, Citrus, and Hernando County is awaiting approvals in December. The FDOT will be funding the study which is expected to take 6-9 months. A consultant has not been identified for the study. Finally, it was announced that a Gulf Coast Regional Trail Summit will be held on January 23, 2017 in Venice, FL. The Sarasota/Manatee MPO, Florida Greenways & Trails Foundation, Office of Greenways & Trails, and Lee Health have partnered to host the Summit with a targeted audience of elected officials, government agencies & organizations, transportation planners, non-profits, private companies, and the general public. The goal of this Summit will be to bring the greater region together, find the "right route", and develop brand and marketing overlay concepts for the Southwest Coastal Regional Trail.
Tampa Bay Transportation Management Area (TMA) Leadership Group
Representing the MPOs in Pasco, Pinellas, & Hillsborough Counties
Executive Summary of Nov. 4, 2016 Meeting
Based on the importance and reach of the conversations that happen at the TMA Leadership Group, we are looking to keep our stakeholders aware of the outcomes of these meetings. The following is a summary of the Nov. 4 meeting highlights; you can find the full agenda online.
The group discussed ways to strengthen and enhance the profile of the TMA Leadership group as a forum for discussions about regional transportation
o The group decided to act on a few suggestions now: asking a representative from the Tampa Bay Partnership and Tampa Bay Regional Planning Council and the Citrus-Hernando MPO to participate in the group, create a tri-county mobility-data sharing committee, use the TMA LG as the forum for reviewing best regional practices and guiding development of the 2040 update to the Regional Long Range Transportation Plan
o The group agreed to move forward with the scope of the upcoming independent best practices study (which the Forward Pinellas Board also approved at its November meeting). The work plan included three components:
Collaborative workshop 1 to set guiding principles and expectations Best practices/case studies research from around the country Collaborative workshop 2 to develop recommendations to strengthen the regional
transportation planning process o The group agreed that a six- to nine-month timeframe for the study was ideal after
concerns about the conversation moving too slowly o Hillsborough MPO and TBARTA expressed reservations that these discussions not occur
at the expense of coordination as an eight-county region TBARTA executive director discussed funding the eight-county region received for SUN
Trail projects through FDOT o $11.1 million for this fiscal year for gaps in the Southwest Coastal Regional Trail o 40 percent of the state’s discretionary funding went to the TBARTA region, attributed to a
unified region and vision A consultant presented on the Tampa Bay Premium Transit Study
o The study will be organized over the next two years into three phases: Phase 1 (months 0-6) will focus on markets, corridors and vision Phase 2 (months 7-14) will focus on Benefits Return on Investment, costs,
feasibility and technology Phase 3 (months 15-24) will focus on funding and how to implement the study’s
findings o The group asked that an update on the study be provided at every meeting. o HART CEO Katharine Eagan confirmed cable-propelled transit will be an option explored
in the study PSTA and HART CEOs discussed innovative transportation programs
o PSTA’s partnerships with Uber, Lyft, and taxi services offering discounted fares to bus routes and supplementation of service for transportation disadvantaged
HART will be starting its own rideshare program with their own service, as rideshare services are currently not legal in Hillsborough County