joseph piccinnini - desig 6 portfolio - nyit - professor: andrew heid
DESCRIPTION
Design 6 NYIT Manhattan Portfolio / Spring 2012TRANSCRIPT
ENVIRONMENTAL
BUILDING
STRUCTURE
SOCIAL JOSEPH PICCINNINIDESIGN 6 PORTFOLIOPROFESSOR: ANDREW HEID
NEW de YOUNG MUSEUMGOLDEN STATE PARK - HERZOG and de MEURON 2005
CALIFORNIA ACADEMY OF SCIENCEGOLDEN STATE PARK - RENZO PIANO 2008
WEAVING SYNTHESIS
F
G
F
G
F
G
F
G
West Elevation
Plan: Level 3 Plan: Level 4
Plan: Level 1 Plan: Roof
East Elevation
!"#$
%&
'$()*
(+,(+
%-#
$'./(
'$%
&+-
0#,+
1(!"
#$%
&-
!"#$%&'$()*(+,(+%-#$'./('$%&+-0#,+1(!"#$%&-
!"#$%&
'$()*(+,(+%-#$'./('$%
&+-0#,+1(!"#$%
&-
!"#$%&'$()*(+,(+%-#$'./('$%&+-0#,+1(!"#$%&-
Front Section
Heating / Cooling
Exterior shades
Green roof
Operable vents and skylights
Glass canopy with photovoltaics
Radiant Floors
Heating / Cooling
Front Section
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
21
3
5
4
35
EMBOSSED AND PERFORATED COPPEERCLADDING PLANELS
EMBOSSED COPPERCLADDING PANELS
FOLDED COPPERLOUVER SCREEN
GLAZING ONTO 2ND LEVEL GALLERIES
ADJUSTABLE SHADINGSCREEN
CONCRETE
STEEL1 COPPER RIB2 COPPER ROOF PANEL3 COPPER PANEL PERFORATED4 COPPER PANEL SOLID5 SHADE
21
3
5
4
35
EMBOSSED AND PERFORATED COPPEERCLADDING PLANELS
EMBOSSED COPPERCLADDING PANELS
FOLDED COPPERLOUVER SCREEN
GLAZING ONTO 2ND LEVEL GALLERIES
ADJUSTABLE SHADINGSCREEN
CONCRETE
STEEL1 COPPER RIB2 COPPER ROOF PANEL3 COPPER PANEL PERFORATED4 COPPER PANEL SOLID5 SHADE
21
3
5
4
35
EMBOSSED AND PERFORATED COPPEERCLADDING PLANELS
EMBOSSED COPPERCLADDING PANELS
FOLDED COPPERLOUVER SCREEN
GLAZING ONTO 2ND LEVEL GALLERIES
ADJUSTABLE SHADINGSCREEN
CONCRETE
STEEL1 COPPER RIB2 COPPER ROOF PANEL3 COPPER PANEL PERFORATED4 COPPER PANEL SOLID5 SHADE
CANILEVER
BACKSPAN
HAT TRUSS
CANTILEVER DIAGRAM
INTERIOR COLUMN SUPPORT POINT
VIERENDEEL TRUSS
VIERENDEEL TRUSS
Operable skylight/roofhatch assemply Fixed skylight assembly
Fall protection line assemblySemi rigid board insulationGreen roof assembly
Sprinkler system
Light ballist beyond
Exterior lighting
Fixed skylightPld steel support bracket
Pld steel offset hinge
Acoustic ceiling
Curved structure beam
Concrete roof deck
Primary Circulation
Secondary Circulation
PublicPrivate
Weather AnalysisCalifornia Academy of Sciences
JAN
67 DEGREES ROOM TEMPERATURE50
60
DEC
JULY
West Wind
whole house fan usually in hall ceiling exhausts into attic and out vents
cool night air is drawn in across slab or other high mass elements
natural cross ventilation
ceiling fans can make it feel at least 5degrees cooler in rooms
direct solor gain through glazing
transmission due to solar gain on exterior surfaces
ventilation of hot and humid air
in�ltration of hot and moist airlatent heat from plants appliances
sensible & latent heat from people
New York City : Swimming PoolSpring St. / Washington St.
Concept: Creating a lightweight structure with overlapping program. Cross and stack ventilation allows cooling.
Plan: Level 1 Plan: Level 2
Plan: Level 3 Plan: Level 4
Water Collecting Facade That Heats Pool Water
Plan: Level 1 Plan: Level 2
Plan: Level 3 Plan: Level 4
Plan: Level 1 Plan: Level 2
Plan: Level 3 Plan: Level 4
January
May
August
November
10:00 AM 12:00 PM 3:00 PM 5:00 PMDiagram of Air Movement
Front Elevation
Plan: Level 1
Plan: Level 2
Concept: Separating the program into different zones. Bridges connect the zones. They also connect vertically and rotate around the pool. Some zones have buffers to separate the program depending if it’s a wet or dry area.
Plan: Level 3
read
exersise
swimming
class / study
sauna / jacuzzi
Daily Life
Final Concept: Using environmental, building, structure and social activities to create a new typology of architecture. The structure cre-ates programmatic differentiation by separating the program with the structure. The overlapping structure allows program to be separate into different zones and environmental buffers. The heights of the columns create different spaces for social activities to collect.
structure lifted
Summer Cooling - Building Opens
structure on level 2 brought down
Winter - Building Closes
structure working in tension and compression structure with enclosure
Plan: Level 1
Open to Below
Open to Below
Open to Below
Open to Below
Plan: Level 2
Plan: Level 3
Side Section
Front Section
West Elevation
South Elevation
Detail Wall SectionCross Ventilation
Stack Ventilation
Egress / Elevators
Open to Below
Open to Below
Open to Below
Open to Below
Summer: Blocked Sun
Shading / Sun Diagram
Winter: Allows Sun