STRATEGIC ACTIONS PLAN
Concepts for the Future and for the Present
Distributed Generation Renewable Energy
With the JouleBox® Hybrid Generators
Confidential Proprietary Material Presented by ECO-GEN Energy, Inc. © 2012 All Rights Reserved
Green Is GoodAffordable
Available 24/7/365 Reliable
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved
STRATEGIC ACTIONS PLAN
Concepts for the Future and for the Present
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved
Board of Advisors&
Inventors
Woodrow W. Clark II MA3, PhD Qualitative Economist
Dr. Clark was one of the contributing scientists to the work of the United Nations Intergovernmental Panel on Climate Change (UNIPCC) which as an organization was awarded the Nobel Peace Prize in December 2007.
DR. WILLIAM A. BURKE AQMD Governing Board Chairman
Dr. Burke has served as Chairman of the California Air Quality Management District and during his tenure the quality of air in CA has improved over 600%.
Glen Roberts John Walker Department of Commerce Co-Founder Energy StarSpecialist in Import/Export
InventorTeam The JouleBox® Inventor Team is pleased to work with the Advisor Board
STRATEGIC ACTIONS PLAN
Concepts for the Future and for the Present
ECO-GEN Energy, Inc. and our financial partners are prepared to enter into Long Term 20 year PPA’s to provide 100% clean, green energy.
We will provide ‘Firm Power’ 24/7/365 using a hybrid system of solar, wind and lithium ion batteries.
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved
Renewable Energy is Needed Now!
STRATEGIC ACTIONS PLAN
Concepts for the Future and for the Present
Traditional EnergyExpensive, Pollution, Not Sustainable
Fossil Fuels Nuclear Power Plants Renewables
Coal, Natural Gas, San Onofre – Shut down produce 4-8 Hours per dayAll fossil fuels have Fukushima – problems solar, wind, hydrofuel costs and Environmental damage expensive Carbon footprint that transmission costsis not sustainable.
Now there is a Better Way
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved
STRATEGIC ACTIONS PLAN
Concepts for the Future and for the Present
Traditional Renewable EnergyIntermittent Power 4-12 Hours per day – AT BEST
Solar panels Concentrated Solar Wind
Not enough room Large land footprint 8 Hours per daywhere the power Environmental damage Environmental damage is needed. High Transmission costs High Transmission costs4-6 Hours per day
Now there is a Better Way
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved
STRATEGIC ACTIONS PLAN
Concepts for the Future and for the Present
The JouleBox™
Produces Clean, Green Energy 24/7/365 using solar, wind and lithium ion batteries.
5 Proven Technologies have been combined in one box to generate electricity.
JouleBox™
Hybrid Generator
60 kW
Annual kWh produced
525,600
Annual kWh’s are estimated as unit size (60 kW) X 24 hours per day X 365 days in year. Actual production may vary slightly (+ 5%).
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved
STRATEGIC ACTIONS PLAN
Concepts for the Future and for the Present
The JouleBox™Hybrid Generator
Understanding The Technology
5 Proven Technologies have been combined to generate electricity.
1. Solar Panels and DC Generators to constantly charge the batteries.2. Lithium Ion Battery Brick with patented Serial and Parallel wiring to Charge and Discharge. By
not using the 15,000 charge/discharge life cycles, the batteries will last 20 years plus. 3. Vortex Reduction Chamber (VRC). High Pressure Manufactured Wind is sent through a VRC to
increase Force with reduced energy to turn the Power Turbine. The Power Turbine turns an AC Generator.
4. High Efficiency Speed Control DC Motors and DC Blower Motors and controllers for greater durability and reliability. We use electronic controllers to maximize efficiency. Our motors use less than 1/3rd the energy of conventional motors. Recycle back EMF.
5. Power Q – controls the power quality output to sync with the grid and maintain proper harmonics. Clean sine waves, stable Hz and harmonics, no power surges.
We have protected the Intellectual Property (IP) with layers of use patents, copyrights and other IP. The software is burned into the chips which eliminates the risk of reverse engineering. All units are GPS equipped with licensing agreements for installation at a specified location. Location modification is allowed under the licensing agreement with notification.
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved
STRATEGIC ACTIONS PLAN
Concepts for the Future and for the Present
Installations
By Installing next to the Substations you avoid Transmission Costs. We work with the Grid to stabilize existing energy generation or we can work off-Grid.
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved
New facilit
y
STRATEGIC ACTIONS PLAN
Concepts for the Future and for the Present
Distributed GenerationECO-GEN and our financial partners are prepared to invest and build
Micro Grid Distributed Generation Power Facilities
Next to the sub-stations, Where the energy is needed! Clusters of 60 kW units – from 3 MW to 50 MW plants or
more Makes the Grid Safer and more Secure
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved
Why pay high transmission costs?Why suffer losses in transmission?
Scalable in sizeDependable “Firm Power”
We will lease/buy “Right-of-Way” land under transmission lines next to the sub-station where power is needed.
STRATEGIC ACTIONS PLAN
Concepts for the Future and for the Present
Installations Next to Substations
By determining the capacity of the Substation we can build multiple installations in varying sizes. This strengthens the overall Grid. The above shows 82.08 MW total.
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved
New JouleBox facility
6.48 MW
New JouleBox facility
50.4 MW
New JouleBo
x facility
2.88 MW
New JouleBo
x facility
10.8 MW
New JouleBox facility7.2 MW
New JouleBox facility
4.32 MW
STRATEGIC ACTIONS PLAN
Concepts for the Future and for the Present
Installations
All JouleBox ® Units are installed inside a safe and secure pre-fab building.
Can be sized from 2.88 MW building to multiple buildings with 50.4 MW EACH. Install next to Sub-station where energy is needed (must be in groups of 12 JouleBoxes®).
24/7/365 Satellite communications monitoring.
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved
Feet 17 10.00 10.00 10.00 10.00 10.00 10.00 10.00 4 30.00
Unit 1/2 10' X 7.5'
Unit 3/4 10' X 7.5'
Unit 5/6 10' X 7.5'
Unit 7/8 10' X 7.5'
Units 9/10 10' X 7.5'
Unit 11/12
10' X 7.5'
Unit 13/14
10' X 7.5'
15 -16 17-18 19-20Switchgear 12
JouleBoxes Top/Bottom
21-22 23-24 25-26
Front Main Access Door
27-28 29-30 31-32 33-34 35-36 37-38 39-40
41-42 43-44 45-46Switchgear 12
JouleBoxes Top/Bottom
47-48 49-50
Satellite Pad 4'X4'
Mega Watts Units Building S.F. Solar Panels
Shop 23.5' X 32' 12' Door Storage
11.5' x 32' 12' Door
3 50 8,636 200 Office Note: Stair ways on each end nextTotal Land for Security 21,276 60 x 120
51,000 Watts
19'X 25' All sides must have emergency man doors
Height 22' IT 8'X30' NOTE: Air-lock front door
Posts Cat Walk100 2
3 MW Project
1 Over Head
Access Door &
Emergency Exit
4' Maintenance and Catwalk (Bus is run under Catwalk)
17' Access
20' Access for Installation and Safety Code
4' Maintenance and Catwalk (Bus is run under Catwalk)
20' Access for Installation and Safety Code
20' Access for Installation and Safety Code
Racking25
10,000lb. Capacity 78'
Height 8'"
Electrical Room
Break Room
Offi
ce & Security
19' X 21'
Air-lock
IT Room 10' X 17'
Storage Room9' X 21'
Shop 23.5' X 24' 12' Door
Bus to Switchgear
Toilet
Installations are Modular: Building, Racking, Sound & Solar Module Electrical Intertie & Protection Module Communications, IT & Security Module
STRATEGIC ACTIONS PLAN
Concepts for the Future and for the Present
Building, Racking,Sound & Solar
Module
Can be sized from 2.88 MW building to multiple buildings with 50.4 MW EACH. Install next to Sub-station where energy is needed (must be in groups of 12 JouleBoxes®).
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved
Feet 17 10.00 10.00 10.00 10.00 10.00 10.00 10.00 4 30.00
Unit 1/2 10' X 7.5'
Unit 3/4 10' X 7.5'
Unit 5/6 10' X 7.5'
Unit 7/8 10' X 7.5'
Units 9/10 10' X 7.5'
Unit 11/12
10' X 7.5'
Unit 13/14
10' X 7.5'
15 -16 17-18 19-20Switchgear 12
JouleBoxes Top/Bottom
21-22 23-24 25-26
Front Main Access Door
27-28 29-30 31-32 33-34 35-36 37-38 39-40
41-42 43-44 45-46Switchgear 12
JouleBoxes Top/Bottom
47-48 49-50
Satellite Pad 4'X4'
Mega Watts Units Building S.F. Solar Panels
Shop 23.5' X 32' 12' Door Storage
11.5' x 32' 12' Door
3 50 8,636 200 Office Note: Stair ways on each end nextTotal Land for Security 21,276 60 x 120
51,000 Watts
19'X 25' All sides must have emergency man doors
Height 22' IT 8'X30' NOTE: Air-lock front door
Posts Cat Walk100 2
3 MW Project
1 Over Head
Access Door &
Emergency Exit
4' Maintenance and Catwalk (Bus is run under Catwalk)
17' Access
20' Access for Installation and Safety Code
4' Maintenance and Catwalk (Bus is run under Catwalk)
20' Access for Installation and Safety Code
20' Access for Installation and Safety Code
Racking25
10,000lb. Capacity 78'
Height 8'"
Electrical Room
Break Room
Offi
ce & Security
19' X 21'
Air-lock
IT Room 10' X 17'
Storage Room9' X 21'
Shop 23.5' X 24' 12' Door
Bus to Switchgear
Toilet
STRATEGIC ACTIONS PLAN
Concepts for the Future and for the Present
Electrical Intertie & Grid Protection Module
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved
G GG G G G G G GG G G
LV Switchboard (UL891)Collector Bus and Master Breaker
Aggregated GeneratorMaster Breaker
12 Generators; 720kW; 480V
60kW480V
60kW480V
60kW480V
60kW480V
60kW480V
60kW480V
60kW480V
60kW480V
60kW480V
60kW480V
60kW480V
60kW480V
4 X 12 Generators; 2,880kW; 480V
LV Switchboard (UL891)Collector Bus and Master Breaker
To Other LVSBs with 12 GeneratorsTo Other LVSB with 12 Generators
To LV/MV Step-Up Transformer
DG Interconnection Relay
3Y
3Y
1
DG Interconnection Relay
3Y
3Y
1
12 Units are Combined
Power Q (Power Quality Box) regulates sine waves, harmonics, voltage spikes
Woodward EasYgenBeckwith Intertie Protection
Designed by a Senior Member, IEEE• IEEE Power Systems Relaying Committee (PSRC), Main Committee• IEEE PSRC Rotating Machinery Protection Subcommittee, Chair
Emeritus• IEEE PSRC Rotating Machinery Protection Subcommittee, Committee
Member
ABB Switchgear
We make the Grid stronger
Power Plant Communications, IT & Security Module
Generator Control & Monitoring of all units and component parts 24/7
IT & Satellite Hub
Facility Access Control
Uplink to Control Center
Site-wide Video Surveillance
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2014
Network Provided By
Cinetcomm’s global networks provide all back office support, systems monitoring and control via satellite communications for ECO-GEN Energy’s operations.
Generator Control & Monitoring of all units and component parts 24/7
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2014
Insurance Module
The Insurance Needs of Global Generation Projects Requires Special Expertise:
Property Insurance Political Risk Insurance Currency Risk Hedging (if applicable) Production Insurance Liability insurance Hurricane, flooding and earthquake insurance
(where applicable)
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2014
STRATEGIC ACTIONS PLAN
Concepts for the Future and for the Present
PPAPower Purchase Agreements
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2014
Advantages No Capital Cost to install or maintain equipment. 100% turn key operation.
Firm Power, 24/7/365
Satellite Monitoring for safety and guaranteed production at no additional cost..
Maintenance Free – All PPAs include maintenance and repairs.
High Quality Power, Clean electricity, stable Hz, synced sine waves, and harmonics, no power surges.
No pollution – Clean, Green Electricity!
No Fuel Costs. Lower per kWh costs than all other forms of energy generation .
Fixed 20 yr. rate per kWh of electricity produced. No escalator for inflation.
Rates from US$0.12 - $0.32 per kWh depending on credit, sovereign guarantee and escalator clauses. Also Switchgear and transformer requirements
Scalable. 3 MW to multiple 50 MW Buildings. Energy is produced next to sub-stations - where the energy is needed!
All PPAs are owned by a local Special Purpose Entity (SPE). ECO-GEN retains a 25% interest in all SPEs to compensate for IP.
Reliable Energy Produces Jobs Faster Than Anything Else. Factories Can Operate 24/7
The Power Q in the JouleBox™ controls harmonics, sine waves, Hz, voltage, power surges and auto cut-off for safety. Units
can be satellite monitored remotely.
STRATEGIC ACTIONS PLAN
Concepts for the Future and for the Present
Good For Country
Local Construction Jobs Local Sourcing of Building Material The Owner of the Facility is a local SPE Jobs in the Facility 24/7/365
Management Engineers Maintenance Security
Secure, Reliable, Green ENERGY CREATES JOBS More Anything Else!
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2014
STRATEGIC ACTIONS PLAN
Concepts for the Future and for the Present
Good For Country
NOTHING CREATES MORE JOBSthan
Secure, Reliable, Green ENERGY!
Factories Can Hire More People People Create New Businesses
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2014
STRATEGIC ACTIONS PLAN
Concepts for the Future and for the Present
© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved
ECO-GEN commits to give 10% of all profitsBack to the CommunitiesOf the Projects We Build
Thank You
ECO-GEN’s Charitable Commitment
STRATEGIC ACTIONS PLAN
Concepts for the Future and for the Present
72,000 CFM© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved
Contactwww.ECO-GENenergy.com
7247 Hayvenhurst Ave. #A-6 Van Nuys CA 91406818-756-4700
Green Energy