Page 1: Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER

Journyx Projectlink™

Timesheet™ integration with Microsoft Project®

ENTERENTER

Page 2: Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER
Page 3: Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER

Journyx Journyx Projectlink™Projectlink™

Page 4: Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER

Journyx Projectlink™Journyx Projectlink™

Projectlink™, the Journyx Timesheet™ integration for Microsoft Project® and Microsoft Project Server®, provides your team members with an interface for tracking detailed project actuals at any time from any location. Projectlink™ provides your managers with accurate, up-to-date status for project coordination and cost control.

Page 5: Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER

• Project/TasksProject/Tasks• Project Estimates/ StatusProject Estimates/ Status• ResourcesResources• AssignmentsAssignments

• Actual Hours Actual Hours

ProjectlinkProjectlinkTM

From MS ProjectFrom MS Project®®……

From Timesheet™…From Timesheet™…

Page 6: Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER

Here we are looking at a sample Microsoft Project® file.

Journyx Projectlink™ is a plug-in

for Microsoft Project ®, and since it works through a XML interface,

there is no import and exporting, only a bi-directional

synchronization.

Page 7: Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER

Simply go to your tools menu, where you will

see a selection for ‘Journyx Integration’

Page 8: Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER

By selecting that, you will bring up your

integration information.

There are three options for

‘Task Loggability’

Page 9: Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER

Use Exact MSP Schedule –

Tasks will be loggable within Timesheet between the start and end dates only.

Task Grace Period –

Task will be loggable a certain number of days before and after their start and end

dates.

Always open –

All tasks are always open within Timesheet.

Page 10: Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER

You will then see a progress bar indicating how many Tasks,

Resources, and Resource Assignments are going to be

synchronized.

Indicating both the number of new and modified items.

Page 11: Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER

This will show the progress of the synchronization.

Page 12: Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER

And that’s it. All of the resources, projects, and tasks along with their

appropriate information were just passed over to Journyx Timesheet™. As hours are worked to these tasks, those hours will be

passed back over to MS Project®.

Page 13: Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER

Here is the project with the extended work break down structure

populated into Journyx Timesheet™.

Page 14: Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER

From the employee’s perspective, only those tasks that are assigned and loggable will

show up on their time sheet. The employee can then enter additional information and

then enter the amount of time.

Time sheet data will then go through the appropriate

approval process and ultimately be synchronized

back to MS Project® as actual hours worked.

Page 15: Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER

Collect

Process

Report/Integrate Project / Project /

AccountingAccounting

InterfaInterfacece

WorkflowWorkflowRulesRules

ReportsReports

Web or Web or DisconnectedDisconnected

Master File Master File ImportImport

Page 16: Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER

InterfacesInterfaces

• Easy install – part of Journyx• Proven – thousands of installations• Flexible – hundreds of templates

• Hours • Codes • Project/GLA

• Project/Employee Data• Project Estimates/ Assignments

Accounting

Project Management

Page 17: Journyx Projectlink™ Timesheet™ integration with Microsoft Project ® ENTER

EXITEXIT