juliana garcia sample work
DESCRIPTION
Juliana Garcia Sample workTRANSCRIPT
This project proposes the creation of urban
environments that create memorable
experiences based on lighting and interaction.
punto.
The city must be something to be recognized and remembered. The quality of sensations and perceptions of any urban environment should increase the level of satisfaction so that, the man will easily recognize, react and act in the city.
punto.bogota
punto.bogota
punto.bogota
Motivation/Information: It informs users about the project, including purposes and objectives. And also invites them to be part of the project, participating actively in it.
Development/Participation: This stage is divided in two: 1. Experience with the light: Changing the people’s routine, and generating different scenarios in the city. 2. Allow users to interact with the light: Playing with the graduation of light colour and projecting message from their cell phones to the luminaire, in real time.
Extension/Memory creation: Seeks to give continuity and meaning to the experience. A Web page that records all messages projected in the luminaire, in order to create history and to prolong the experience. This stage will also promote the project through social networks.
Ilumina tu ciudad, dándole protagonismo a tus ideas y mostrando lo mejor de Bogota.
Para participar solo debes encontrar una de las luminarias interactivas ubicadas en los puntos más representativos de Bogota. Envía un mensaje que quieras compartir y contempla el grandioso ambiente que genera las luminarias puntobogotaEntra a la pagina acá podrás encontrar todos los mensajes compartidos con la ciudad. Puedes buscar, taggear, votar o compartir por tus favoritos, o encontrar información adicional, como locación, fecha u hora de la creación del mensaje.
Participa y compartamos lo mejor de Bogota.
punto.bogotaBOGOTA
una gran c_
BOGOTA
una gran
The project proposes an experience, which involves three main stages: Motivation - Information, Development –
Participation; Extension - Memory creation.
The first is the flexibility, is in terms of distribution, taking into account that it is raised to four different spaces.
After this the ambientadota and emotional, to be achieved by generating a variety of color effects, creating atmosphere and encouraging different users with different experiences.The first is the flexibility, is in terms of distribution, taking
into account that it is raised to four different spaces.After this the ambientadota and emotional, to be achieved by generating a variety of color effects, creating atmosphere and encouraging different users with different experiences.The first is the flexibility, is in terms of distri-bution, taking into account that it is raised to four different
..information
memory creation..
..participation
������
�����
���������
����
�����
�����
�����
�����
�����
����
�����
����
��02'
�',$0
!���
�5���
��02'�',$0
!���
��02'�',$0!����
��02'�',$0!����
��02'�',$0!������02'�',$0!����
��02'�',$0!����
��02'�',$0!����
��02'
�',$0!
����
��02'�',$
0!����
��02'�',$0!����
��02'�',$0!����
��02'�',$0!����
��02'�',$0!����
�������
�����
�������
���
$
������
�����
�����
�5���
��02'�',$0!����
�5���
�5���
����
������02'�',$0!����
��02'�',$0!������02'�',$0!����
��02'�',$0!����
��02'�',$0!����
��02'�',$0!����
��02'�',$0!����
������
����
����
����
�������
�������
���
'(7$//(�$�(6&$/$������
HQVDPEOH�FRPSOHWR3(62��
$�
+2-$���'(��(6&$/$�����
1���'(�',%8-2
7Ì78/2�
5(9,6,Ð112�&$0%,(�/$�(6&$/$
0$7(5,$/�
)(&+$),50$120%5(
5(%$5%$5�<�5203(5�$5,67$6�9,9$6
$&$%$'2�6,�12�6(�,1',&$�/2�&2175$5,2�/$6�&27$6�6(�(;35(6$1�(1�00$&$%$'2�683(5),&,$/�72/(5$1&,$6����/,1($/����$1*8/$5�
&$/�
)$%5�
$352%�
9(5,)�
',%8-�
1���'(�(/(0(172 1���'(�3,(=$ '(6&5,3&,Ð1 &$17,'$'
� WXER�FHQWUDO �� DVSDV �� VRSRUWH �� EDVH �� VRSRUWH�
VXSHULRU �
� SURWHFWRU�/(' �
� 7$3$�683(5,25 �
� 5HIOHFWRU �� GLIXVRU �
&
� �� �
%
$
'
(
)
(6&$/$������
��02'�',$0!����
�����
��02'�',$0!����
����
����
������
���
���������
���������
��02'
�',$0!
����5���
�����
��02'�',$0!����
����
��02'�',$0!�����02'�',$0!���
����
����
����
����
%
%
6(&&,Ð1�%�%
VRSRUWH�VXSHULRU $�
punto.bogota
Work ngOnWork ngOnLUMINARIA MODULAR PARA OFICINAS
WorkingOn is a modular and
suspended illumination system that
provides a continuous flow of light
to guarantee high quality of
illumination in working areas. Work ngOn
Wor
k ng
On
LUM
INAR
IA M
OD
ULA
R PA
RA O
FICI
NAS
Work ngOnWork ngOnLUMINARIA MODULAR PARA OFICINAS
This flexible system allows direct the flow of light in areas where it is required, without affecting the overall light.
Additionally, intensity of light and color temperature can also be graduated depending on the time of day in which
the system is being used.
Distibution options
B B
A
A
SECCIÓN B-B ESCALA 1 : 10
SECCIÓN A-A ESCALA 1 : 10
VISTA DE PLANTA
VISTA ALZADO
EMPRESA DE LUMINARIAS MODULARES
Esc: Acot: mm Fecha:
Empresa:
FotOn
MÁQUINA YHERRAMIENTA
WorkingOnDETALLES
8/8Plancha:
3 Junio 2010
Nombre de la pieza: Luminaria (detalles)
Sistema deproyección
A
B
C
D
DETALLE A ESCALA 1 : 1
DETALLE B ESCALA 1 : 1
DETALLE C ESCALA 1 : 2
DETALLE D ESCALA 1 : 1
EMPRESA DE LUMINARIAS MODULARES
Esc: Acot: mm Fecha:
Empresa:
FotOn
MÁQUINA YHERRAMIENTA
WorkingOnDETALLES
8/8Plancha:
3 Junio 2010
Nombre de la pieza: Luminaria (detalles)
Sistema deproyección
20,2
93
60 120
R3
R15
771,
915
1116,800
33,945
1200
,041
8020
37,4
64
30
7
41,6
4119
0
EMPRESA DE LUMINARIAS MODULARES
Esc: Acot: mm Fecha:
Empresa:
FotOn
MÁQUINA YHERRAMIENTA
WorkingOnENSAMBLE LUMINARIA
1/8Plancha:
3 Junio 2010
Nombre de la pieza: Luminaria
Sistema deproyección
1:12
1
2
3
4
5
6
7
8
9
N.º DE ELEMENTO N.º DE PIEZA DESCRIPCIÓN CANTIDAD
1 AISLANTE PVC 12 REFLECTOR ALUMINIO 3mm 13 BOMBILLA T5 24 SOCKET PARA LÁMPARAS T5 45 BALASTRO 26 DIFUSOR POLICARBONATO TRASLUCIDO 17 UNIÓN NEOPRENO 18 CUERPO DIFUSOR POLICARBONATO 19 SUJECIÓN POLIESTIRENO 2
EMPRESA DE LUMINARIAS MODULARES
Esc: Acot: mm Fecha:
Empresa:
FotOn
MÁQUINA YHERRAMIENTA
WorkingOnTABLA DE MATERIALES
7/8Plancha:
3 Junio 2010
Nombre de la pieza: Luminaria (despiece)
Sistema deproyección
1:12
Technical drawings
The final design with the suggested materials, was also tested in Solid Works Simulation Xpress to determine effects of force and
pressure.
Product tests
is the process chosen to produce the product, due to the low production costs, no material wastage, and not weld lines or
joints.
WorkingOnLuminaria modular para oficina
Production
Work ngOnWork ngOnLUMINARIA MODULAR PARA OFICINAS Work ngOnWork ngOn
LUMINARIA MODULAR PARA OFICINAS
Project developed with the assistance and support of Tecnolyte Colombia
ENSAMBLE LUMINARIAS
MONTAJE
SUSPENDIDO
EMPOTRADOORGANIZACION MODULOSCOMPOSICION SEGUN ESPACIO
INSTALACION CONTROLADORCENTRAL
INSTALACION SWITCHS YCONECCIONES
MONTAJE LAMPARAS
Instalation
1 2 3 4 5 6 7 8 9 10
definicion de producto
investigacion y diseño deprototipo
investigacion de mercado y diseño final
prueba piloto 500und
lanzamiento de producto produccion produccion produccion produccion
TOTAL COSTOS EN 10 SEMANS PRODUCCION DE 10000 UNIDADES
UNIDADES PRODUCIDAS
UNIDADES PRODUCIDAS
UNIDADES PRODUCIDAS
UNIDADES PRODUCIDAS
UNIDADES PRODUCIDAS
UNIDADES PRODUCIDAS
UNIDAD DE VENTA COSTO UNITARIO COSTO TOTAL 2.500,00 1.500,00 1.500,00 1.500,00 1.500,00 1.500,00 LaminaPolicrab
onato solido
translucido Opal
3mm 2,05 X 2.90mts $ 600.000,00 $ 75.000,00 187.500.000,00 $ 112.500.000,00 $ 112.500.000,00 $ 112.500.000,00 $ 112.500.000,00 $ 112.500.000,00 $ 750.000.000,00
LaminaPolicrab
onato solido
translucido Opal 2,05 X 2.90mts $ 550.000,00 $ 9.166,67 $ 22.916.666,67 $ 13.750.000,00 $ 13.750.000,00 $ 13.750.000,00 $ 13.750.000,00 $ 13.750.000,00 $ 91.666.666,67 Lamina de PVC
flexible 2.10 X 2.97 $ 120.000,00 $ 6.000,00 $ 15.000.000,00 $ 9.000.000,00 $ 9.000.000,00 $ 9.000.000,00 $ 9.000.000,00 $ 9.000.000,00 $ 60.000.000,00 Lamina De
aluminio 2,5mm 2.00 X 1.00 $ 160.000,00 $ 3.200,00 $ 8.000.000,00 $ 4.800.000,00 $ 4.800.000,00 $ 4.800.000,00 $ 4.800.000,00 $ 4.800.000,00 $ 32.000.000,00 Lamina de
PMMA 1.20 X1.80mts $ 163.000,00 $ 8.150,00 $ 20.375.000,00 $ 12.225.000,00 $ 12.225.000,00 $ 12.225.000,00 $ 12.225.000,00 $ 12.225.000,00 $ 81.500.000,00 Neopreno $ 120.000,00 $ 2.000,00 $ 5.000.000,00 $ 3.000.000,00 $ 3.000.000,00 $ 3.000.000,00 $ 3.000.000,00 $ 3.000.000,00 $ 20.000.000,00 Pintura
electrolitica 1 $ 15.000,00 $ 300,00 $ 750.000,00 $ 450.000,00 $ 450.000,00 $ 450.000,00 $ 450.000,00 $ 450.000,00 $ 3.000.000,00 Tubos
Florescentes
luz blanca 22W 1 $ 4.100,00 $ 8.200,00 $ 20.500.000,00 $ 12.300.000,00 $ 12.300.000,00 $ 12.300.000,00 $ 12.300.000,00 $ 12.300.000,00 $ 82.000.000,00 Balastro 1 $ 6.000,00 $ 12.000,00 $ 30.000.000,00 $ 18.000.000,00 $ 18.000.000,00 $ 18.000.000,00 $ 18.000.000,00 $ 18.000.000,00 $ 120.000.000,00 Sockets 1 $ 1.100,00 $ 4.400,00 $ 11.000.000,00 $ 6.600.000,00 $ 6.600.000,00 $ 6.600.000,00 $ 6.600.000,00 $ 6.600.000,00 $ 44.000.000,00 Guaya 1m $ 400,00 $ 800,00 $ 2.000.000,00 $ 1.200.000,00 $ 1.200.000,00 $ 1.200.000,00 $ 1.200.000,00 $ 1.200.000,00 $ 8.000.000,00 Insumos 1 $ 20.000,00 $ 800,00 $ 2.000.000,00 $ 1.200.000,00 $ 1.200.000,00 $ 1.200.000,00 $ 1.200.000,00 $ 1.200.000,00 $ 8.000.000,00 TOTAL MP $ 325.041.666,67 $ 195.025.000,00 $ 195.025.000,00 $ 195.025.000,00 $ 195.025.000,00 $ 195.025.000,00
INVRERSIÓN GASTO MENSUAL GASTO SEMANAL Maquina
Inyectora $ 18.500.000,00 $ 308.333,33 $ 77.083,33 $ 77.083,33 $ 77.083,33 $ 77.083,33 $ 77.083,33 $ 77.083,33 $ 77.083,33 $ 77.083,33 $ 77.083,33 $ 77.083,33 $ 77.083,33 $ 770.833,33 Maquina
rotomoldeo $ 12.500.000,00 $ 208.333,33 $ 52.083,33 $ 52.083,33 $ 52.083,33 $ 52.083,33 $ 52.083,33 $ 52.083,33 $ 52.083,33 $ 52.083,33 $ 52.083,33 $ 52.083,33 $ 52.083,33 $ 520.833,33 Molde
Rotomoldeo $ 13.000.000,00 $ 216.666,67 $ 54.166,67 $ 54.166,67 $ 54.166,67 $ 54.166,67 $ 54.166,67 $ 54.166,67 $ 54.166,67 $ 54.166,67 $ 54.166,67 $ 54.166,67 $ 54.166,67 $ 541.666,67
Molde Inyeccion $ 7.650.000,00 $ 127.500,00 $ 31.875,00 $ 31.875,00 $ 31.875,00 $ 31.875,00 $ 31.875,00 $ 31.875,00 $ 31.875,00 $ 31.875,00 $ 31.875,00 $ 31.875,00 $ 31.875,00 $ 318.750,00 Mantenimieto $ 1.200.000,00 $ 300.000,00 $ 300.000,00 $ 300.000,00 $ 300.000,00 $ 300.000,00 $ 300.000,00 $ 300.000,00 $ 300.000,00 $ 300.000,00 $ 300.000,00 $ 300.000,00 $ 3.000.000,00 TOTAL M&H $ 515.208,33 $ 515.208,33 $ 515.208,33 $ 515.208,33 $ 515.208,33 $ 515.208,33 $ 515.208,33 $ 515.208,33 $ 515.208,33 $ 515.208,33
GASTO MENSUAL GASTO SEMANAL Servicios
Publicos $ 2.500.000,00 $ 625.000,00 $ 120.000,00 $ 120.000,00 $ 120.000,00 $ 625.000,00 $ 120.000,00 $ 625.000,00 $ 625.000,00 $ 625.000,00 $ 625.000,00 $ 625.000,00 $ 4.230.000,00
TOTAL ADMON $ 120.000,00 $ 120.000,00 $ 120.000,00 $ 625.000,00 $ 120.000,00 $ 625.000,00 $ 625.000,00 $ 625.000,00 $ 625.000,00 $ 625.000,00
SALARIO MENSUAL SALARIO SEMANAL
Diseñador
Industrial $ 2.000.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 5.000.000,00 Ingeniero
Mecanico $ 2.000.000,00 $ 500.000,00 $ 500.000,00 $ - $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 3.000.000,00 Ingeniero
Electronico $ 1.500.000,00 $ 375.000,00 $ 375.000,00 $ - $ 375.000,00 $ 375.000,00 $ 375.000,00 $ 375.000,00 $ 375.000,00 $ 2.250.000,00 Operario $ 553.350,00 $ 138.337,50 $ 138.337,50 $ - $ 138.337,50 $ 138.337,50 $ 138.337,50 $ 138.337,50 $ 138.337,50 $ 830.025,00 Gerente
Produccion $ 2.000.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 500.000,00 $ 5.000.000,00 Gerente
Comercial $ 1.500.000,00 $ 375.000,00 $ 375.000,00 $ 375.000,00 $ 750.000,00 TOTAL MO $ 1.000.000,00 $ 1.000.000,00 $ 1.375.000,00 $ 2.013.337,50 $ 1.375.000,00 $ 2.013.337,50 $ 2.013.337,50 $ 2.013.337,50 $ 2.013.337,50 $ 2.013.337,50
$ 1.635.208,33 $ 1.635.208,33 $ 2.010.208,33 $ 328.195.212,50 $ 2.010.208,33 $ 198.178.545,83 $ 198.178.545,83 $ 198.178.545,83 $ 198.178.545,83 $ 198.178.545,83 $ 1.326.378.775,00
COSTOS POR 10000 UNIDADES
PRECIO DE VENTA POR UNIDAD
UTILIDAD ANTES DE IMPUESTOS IMPUESTO DE RENTA UTILIDAD NETA
$ 1.326.378.775,00 $ 350.000,00 $ 2.173.621.225,00 $ 652.086.367,50 $ 1.521.534.857,50
$ 132.637,88
COSOTOS TOTALES POR SEMANA
COSTOS MANO DE OBRA
FASE DE PRODUCCION Y DESARROLLO
TIEMPO DE DESARROLLO DEL PROYECTO (semanas)
COSTOS MAQUINARIA Y HERRAMIENTAS
COSTOS ADMINISTRATIVOS
CENTRO DE COSTOS
COSTOS DE MATERIALES
Costs Estimations
f i g l i o...el carro de mama