julien lafitte portfolio 2012
DESCRIPTION
Julien Lafitte. Licensed Architect.TRANSCRIPT
cont
ents
po
rtfo
lio
22master projects
6selected works
38professional works
48extra
58informations
medi ta t ion
tubular house
puppet theat re
c i ty house
ehib i t ion por te t s/ garonne
exhib i t ion v i l leneuvet te
c i ty houses I I
shar ing l iv ing meet ing extending
glac ier hote l + solar rock
inhabi ted park + t roglodytes
habi table sk ins
muck petzet arch i tek ten
dubosc and assoc iates shanghai
drawings and render ings
captures
mater ia l ise sound
outdoor l iv ingroom
cur r icu lum v i tae
medi ta t ion
Toulouse 2006
indéterminé
Concevoir dans un plan carré de 4mètres de côté, un espace qui sera dédié à la méditation. Un soin particulier a été apporté à la gestion des ouvertures et des apports de lumière.Un dispositif de diffusion de la lumière du sud a été mis en place pour avoir une lumière indirecte tout au long de la journée sans éblouissement. De plus, on ne perçoit que très peu l’extérieur depuis l’intérieur, ce qui donne un caractère introverti à cet espace de méditation.
deta
ils Project
Location
selected works6
Design a space, in 4x4 meters square that would only be dedicated to meditation.The openings had to be carefully managed and the income of natural light needed to be subtle. I have developed a way to filter natural light and bring it into the meditation space without allowing to see the outside from the center of the square. The hidden entrance also contributes to making this space introverted enough to encourage meditation.
section
model picturelight
|
Toulouse 2006
undetermined
tubular
house
Concevoir un logement pour une famille de quatre personnes à l’intérieur d’une portion de tunnel de dix mètres de long.Une contrainte : permettre aux habitants de profiter au maximum de la voûte dans tous les espaces composant la maison.Autonomie du tunnel :une boîte dans un cylindre.
8
We had to design an appartement for a family composed of four people in a section of tunnel.We also had to allow the people that were to live in this house to enjoy the sight of the whole vaulted surface.Therefore, I decided to design a box in this tunnel that would contain four bedrooms and two bathrooms, leave the kitchen, dining room and living room open to take full advantage of this unusual space.
parallel projection
|
section
deta
ils Project
Location
selected works
Toulouse 2007
Park Toulouse
Compans Caf fare l l i
puppet
theat re
Conception d’un théâtre de marionnettes à Toulouse dans un parc très fréquenté, à proximité de l’entrée et d’un lac.Les contraintes : adopter une structure légère pour la salle, pouvoir accueillir cent personnes et clore la salle si nécessaire, aménager un local pour les artistes avec une place pour leur véhicule.
10
We had to design a puppet theatre in a park in Toulouse.The structure of the public part had to be light. We had to be able to welcome a hundred people and close the room if necessary.We also had to design a closed space for the artists with a parking spot.
photo montagemodel on site
sketch circulation
|
deta
ils Project
Location
selected works
Toulouse 2007
ToulouseSaint Sern in
c i ty house
Habiter la verticale : Création d’une maison de ville à proximité de Saint Sernin.Les contraintes : la maison ne doit pas dépasser six mètres de largeur, et accueillir une famille de quatre personnes.Ce projet a un jardin suspendu visible en façade, une façade dynamique grâce à un jeu de panneaux coulissants, et la verticalité est accentuée par la mise en valeur des escaliers de la façade sud.
12
Live vertically : The house we had to design is near Saint Sernin, a famous cathedral in Toulouse. The house is six meters wide, has four stories and houses a family of four people. A garden on top of the garage, behind the red pannel. This narrow house has a dynamic facade with two sliding panels that hide or reveal certain parts of the inside.On the south facade, you can see how verticality is emphasised by the staircase.In the corner of the back garden hides a pavilion in which 2 people can stay.
masterplan
dynamic facade
|
deta
ils Project
Location
selected works
Toulouse 2008
Por te t sur Garonne
exhib i t ion
portet s/garonne
Concevoir en une semaine un bâtiment public c o m p r e n a n t un espace d’exposition, une cafétéria et des bureaux.Les différentes parties du programme sont lisibles depuis l’extérieur par le traitement en volumes distincts. Le bâtiment est traité comme un pavé évidé.
Bureaux
Exposition
Accueil
Cafeteria
14
This is a public building we had to design forPortet-sur-Garonne, a little town close to Toulouse. It houses an exhibition space, a restaurant and a few offices. The building is like a rectangular prism that has been hollowed out, and every space can be seen from the outside.
circulation
volume study
section
plan
|
deta
ils Project
Location
exhibition porter s/ garonne
exhib i t ion
villeneuvette
Proposer un bâtiment public à Villeneuvette (Hérault) qui comprendra une salle d’exposition, une cafétéria, deux bureaux, un stock et un local technique.La difficulté était de traiter le projet sur un site à fort dénivelé. Nous avons donc créé une entrée en enjambement pour permettre d’entrer depuis la rue principale du village et d’accéder par dessous au bloc de services.
15
This is also a public building, but this time in Villeneuvette, a village close to Montpellier.The site was sloping, and we decided to build a bridge-like entrance to allow people to come in from the main street, and also to walk under the entrance to reach the service block.The exhibition is developped on three platforms, and each one has its own lighting, its own ceiling height, and a kind of fountain makes a sound at the beginning of each platform.We really paid attention to the amount of natural light, because it is one of the most important things in an exhibition space.
masterplan
west facade
exhibition villeneuvette |
Toulouse 2009
Vi l leneuvet teHéraul t
exhib i t ion
villeneuvette
16
plan entrance
planexhibition space
Nous avons traité la salle d’exposition en trois palliers différenciés par leur altitude, leur ambiance lumineuse, et l’intervention de l’eau à l’entrée de chacun.Un soin tout particulier a également été apporté au traitement des apports de lumière car la lumière est un des aspects primordiaux d’ une salle d’exposition.
|
deta
ils Project
Location
selected works
Toulouse 2009
Cahors
city houses II
Salle de bains
Rangements
Salle de bains
Accès RDC
Accès Jardin
Chambre
WC
Rangements
Accès RDCWC
0 1 2 5 10
Julien LAFITTE - 28/04/09
Surfaces T4 :
R +1 :
Chambre - Salle de bains : 14,3 m2WC : 7 m2Circulations - Bureau : 22,4 m2
RDC :
Circulations - Cellier : 28 m2Cuisine - Repas : 14,6 m2Salon : 19,4 m2Chambre + Salle de bains: 24,1 m2
RDJ :
Circulations - Rgts : 19,1 m2Chambre - Salle de bains : 18 m2
AUTRE : Patio : 18,5 m2Garage : 22,3 m2Terrasse : 22,3 m2
TOTAL :
Hors Garare et esp. ext. : 166,8 m2Avec Garage et esp.ext. : 229,9 m2
Accès R+1Accès RDJCellier
Salle de bains
Chambre
Accès R+1Accès RDJCellier
Garage
Rangements
Salle de bains
Accès RDC
WC
Rangements
Bureau
Accès RDC
WC
Rangements
Bureau
ChambreSalle de bains
Terrasse
Ce projet est le premier projet qui comprenait de vraies contraintes. Tout d’abord, le site en pente dans le centre de Cahors. Ensuite, le choix du procédé de construction : tout devait être réalisé en bois. Le processus de conception a là aussi été précisément défini. Nous avons navigué d’échelle en échelle, d’abord à l’échelle de la parcelle, puis à l’échelle de la maison, puis à l’échelle de la cuisine et du salon, et enfin, nous sommes revenus sur le plan de masse. Nous avons travaillé entre le 1/500 et le 1/10, en prenant en compte toutes les choses qui ne nous importaient pas en premier lieu comme les trottoirs, les éclairages extérieurs, les plans électriques et de plomberie.
18
detailled plans L.4
roof plan
L.2
L.1
B.1
This project is the very first one for which we had many constraints. First the site was sloping and right in the city centre of Cahors. Then, the choice of the process of construction : everything had to be made out of wood except for the underground structures. The conception process had also been precisely defined. We went from a scale to another quite quickly. In fact, to develop the project, we jumped from the masterplan to the plan of a single house then to the scale of the kitchen and living room and we finally jumped back to the masterplan to make the necessary adjustments for the whole project to be consistent. By doing so, we worked from the scale of 1/500 to the scale of 1/10. I also designed things that I never even had to think about in all of my previous projects, such as electricity and plumbing networks, exterior lighting, walkways in the street. This project showed me how important the details are in a project, and I have been looking for details in every project ever since.
|
deta
ils Project
Location
selected works
Salle de bains
Salle de bains
Accès RDC
Accès Jardin
WC RDCEUEFEC EFEF
EF
ECEU
EU EU
Surface Salle de bains :7,1 m2
Surface Chambre :17,9 m2
Surface Circulations :12,7 m2
VMC
VMC
Accès RDCWC RDCEUEFEC EFEFEU EU
Surface Salle de bains :7,1 m2
Surface Circulations :12,7 m2
VMC
VMC
Surfaces T4 :R +1 :
Chambre - Salle de bains : 14,3 m2WC : 7 m2Circulations - Bureau : 22,4 m2
RDC :
Circulations - Cellier : 28 m2Cuisine - Repas : 14,6 m2Salon : 19,4 m2Chambre + Salle de bains: 24,1 m2
RDJ :
Circulations - Rgts : 19,1 m2Chambre - Salle de bains : 18 m2
AUTRE : Patio : 18,5 m2Garage : 22,3 m2Terrasse : 22,3 m2
TOTAL :
Hors Garare et esp. ext. : 166,8 m2Avec Garage et esp.ext. : 229,9 m2
CuisineEF EC
EPEP Frig.Prises sous rgt ht
EU
VMC
VMC
Accès R+1Accès RDJCellier
EFEFEC EU
WC R+1
EFEU
EU
VMC
VMC
VMC
Salle de bains
Chambre
Accès R+1Accès RDJCellier
Garage
Rangements
Cuisine
Repas
Salon
EF EC
EF
EPEP
EFEC EU
WC R+1
Frig.Prises sous rgt ht
Prises sous rgt ht
EU
EP
EFEU
EU
Surface Circulation-Cellier :28 m2
Surface Salon :19,4 m2
Surface Chambre-Salle de bains :24,1 m2
Surface Garage :22,3 m2
SurfacePatio :18,5 m2
VMC
VMC
VMC
VMC
VMC
VMC
Surface Cuisine - Repas14,6m2
Hotte
EF
EC
EU
VMC
Accès RDCWC
Rangements
BureauEF
VMC
Accès RDCWC
Rangements
Bureau
Chambre Salle de bains
Terrasse
Hotte
EF
EF
EC
EU
Surface Chambre-Salle de bains :14,3 m2
SurfaceCirculation-Bureau :22,4 m2
SurfaceTerrasse :22,3 m2
VMC
VMC
Total étage : 43,7m2
Total étage : 86,1m2
Total étage : 37,7m2
Total surface : 167,5m2
!"#$%&'()*+%,*%-(.*/*0+1%2%345('1% % 67-8*0%!9:;<<=%
% 3*%>'()*+%*1+%?(/>(1@%,*%,8A%-(.*/*0+1%*0%-408B'*C%?*%1(0+%,*1%-(.*/*0+1%
80,8D8,7*-1%.'(7>@1C%?*%E78%.4'40+8+%70*%,*018+@%'*-4+8D*/*0+%@-*D@*F%!*%>'()*+%?(/>'*0,%
,*1%-(.*/*0+1%>(7D40+%4--*'%,7%<G%47%<HC%?*%E78%>*'/*+%,I*0+'*+*08'%70*%?*'+480*%/8A8+@%
17'%-4%>4'?*--*C%,401%-*%1*01%(J%8-1%>*7D*0+%4??7*8--8'%,*1%>*'1(00*1%K.@*1C%,*1%?(7>-*1%
1401%*0L40+1C%,*1%L4/8--*1%4M40+%70%*0L40+%*+%,*1%L4/8--*1%0(/N'*71*1F%
%
% !*%>'()*+%*1+%>(7'%14%+'B1%.'40,*%/4)('8+@%'@4-81@%*0%1+'7?+7'*%N(81C%-4%L8-8B'*%1B?5*%
*1+%,(0?%+'B1%-4'.*/*0+%L4D('81@*F%!*%/4+@'847%N(81%4>>('+*%70%4D40+4.*%?*'+480%>4'%1*1%
>'(>'8@+@1%>5M18E7*1C%+40+%1+'7?+7'*--*1%E7*%+5*'/8E7*1F%O*7-1%-*1%L(0,4+8(01C%-*%1(-%,*1%
.4'4.*1%*+%-*1%1(7N411*/*0+1%,*1%-(.*/*0+1%0*%1(0+%>41%'@4-81@1%*0%N(81C%>(7'%,*1%
'481(01%,*%>@'*008+@F%!*%?5(8A%,I70%N4',4.*%D*'+8?4-%L4?8-8+*%-*%'7811*--*/*0+%,*1%*47A%,*%
>-78*C%?*%E78%4117'*%70*%/*8--*7'*%-(0.@D8+@%47A%@-@/*0+1%,*%N4',4.*F%!*%?(P+%2%-4%
'@4-814+8(0%1*'4%-8/8+@%>4'%-4%'4>8,8+@%,*%-4%/81*%*0%Q7D'*C%/481%8-%1*'4%47./*0+@%>4'%
-I*11*0?*%,*%N(81%7+8-81@C%E78%-8/8+*'4%>4'%48--*7'1%-*1%?(P+1%@D*0+7*-1%,I*0+'*+8*0%>4'%14%
.'40,*%'@181+40?*%47A%80+*/>@'8*1F%
%
% R401%?*%>'()*+C%-*%>4'+8%7'N480%*1+%?-48'F%;-%@+48+%0@?*1148'*%,*%?(0?*D(8'%70%>'()*+%
E78%,401%14%.-(N4-8+@%47'48+%70*%@?5*--*%,*%547+*7'%1*018N-*/*0+%@.4-*%47A%/481(01%E78%
-78%L(0+%L4?*F%!4%17??*118(0%,*%?*1%L4S4,*1%?(01+8+7*%70%L'(0+%NK+8C%E78%'*?'@*C%*+%?(0+8*0+%
-4%'7*F%;-%@+48+%*11*0+8*-%,*%/@04.*'%70%?(0+4?+%*0+'*%-4%'7*%*+%?54?70%,*1%,8A%-(.*/*0+1%
,81>(1@1%17'%-4%>4'?*--*C%1401%(7N-8*'%,*%?(0+'T-*'%?54?70%,*%?*1%?(0+4?+1F%98018C%47%'*U%
,*%?54711@*%1*%+'(7D*0+%-*1%*0+'@*1%>8@+(00*1%*+%47+(/(N8-*1C%*+%-*1%?(0+4?+1%D817*-1%1(0+%
-8/8+@1F%$0%)*7%,*%'*+'48+1%*+%,*%148--8*%48018%E7*%-I8/>-40+4+8(0%,401%-4%>*0+*%4>>('+*0+%70%
,M04/81/*%2%-I*01*/N-*C%*+%-*1%D4'84N8-8+@1%>(118N-*1%@D8+*0+%+(7+%*LL*+%@D*0+7*-%,*%
/(07/*0+4-8+@F%O7'%-*1%L4S4,*1%17'%'7*C%(0%>*7+%*0%(7+'*%-8'*%-*%>'80?8>*%,I('.40814+8(0%
80+*'0*C%4D*?%70%D(-7/*%1*'D40+%*+%70*%>4'+8*%1*'D8*%0*++*/*0+%8,*0+8L8@1F%%
%
% !I('.40814+8(0%80+*'0*%,*1%-(.*/*0+1%'@>(0,%47%>'80?8>*%,7%1*'D40+%1*'D8F%98018%
>*7+V(0%(N1*'D*'%70*%N40,*%1*'D40+*%47%W(',%'411*/N-40+%-I*11*0+8*-%,*1%?8'?7-4+8(01%
5('8U(0+4-*1%*+%D*'+8?4-*1C%,*1%'40.*/*0+1%*+%,*1%>8B?*1%,I5M.8B0*F%3*++*%.'40,*%
?8'?7-4+8(0%-(0.8+7,804-*%,*11*'+%,*%.'40,1%*1>4?*1%1*'D81C%,(0+%-4%+'401D*'14-8+@%*1+%
4LL8'/@*%>4'%-*%?540.*/*0+%,*%1*01%,*1%-4/*1%,*%>-40?5*'%*+%,7%1*01%,*%>('+@*%,*1%
>(7+'*1%1(7+*040+%-*1%>-40?5*'1F%&(7'%-*1%<XC%+'(81%*1>4?*1%*A+@'8*7'1%1(0+%/81%2%
,81>(18+8(0%,*1%54N8+40+1C%70%>4+8(%47%'*UV,*V?54711@*C%70%)4',80%*0%L(0,%,*%>4'?*--*%47%
'*UV,*V)4',80C%*+%70*%+*''411*%47%>'*/8*'%@+4.*F%<(7+*1%-*1%>8B?*1%E78%-*%0@?*118+*0+%
N@0@L8?8*0+%,I70%4>>('+%,*%-7/8B'*%04+7'*--*C%*+%70%,81>(18+8L%,*%>'(+*?+8(0%1(-48'*%*1+%
/81%*0%>-4?*%-('1E7*%?I*1+%0@?*1148'*F%
%
+500-150-200
-100
-100
-50
0
+50
+100
+200
+350
+400
+450
+500
+550
+50
+100
+150
+200
-100
Garage
RangementsEP
Surface Circulation-Cellier :28 m2
Surface Garage :22,3 m2
VMC
VMC
VMC
Cellier
Garage
Rangements
WC R+1
EP
EFEU
EU
Surface Circulation-Cellier :28 m2
Surface Garage :22,3 m2
VMC
VMC
VMC
VMC
VMC
Cellier
Rangements
WC R+1
EP
EFEU
EU
Surface Circulation-Cellier :28 m2
Surface Garage :22,3 m2
VMC
VMC
VMC
Ombres Hiver
9h
12h
12h
17h
17h
9h
12h
12h
17h
17h
Ombres Été
Accès R+1Cellier
19
perspective section
city houses II |
street view
interior visuals
parallel projection L.1
Munich 2009
Sendl ingMünchen
shar ing
l iv ing
meet ing
extending
Le but de ce projet était d’explorer de nouvelles pistes pour le logement collectif qui ont émergé en Suisse et dans d’autres pays européens, et traduire le besoin de plus en plus de personnes agées et de familles de se sentir en communauté tout en ayant leur intimité. Nous avons alors conçu un salon en premier, puis nous y avons connecté de manière subtile tous les espaces privés autour. Le corps de bâtiment comprend aussi une extension de l’école se trouvant sur la parcelle voisine.
A2A1
S2
A2
S2
S1
A1
S1
S3
S3
KDI
K
DI
A2A1
S2
A2
S2
S1
A1
S1
S3
S3
KDI
K
DI
A4A3
S5
A4
S5
S4
A3
S4
ST
BAG
ST
BA
G
1:200 1:200
22
The aim of this semester was to explore the condition of collective living through the concept of the ‘satellite apartment’ which has been emerging from switzerland and other countries in the last few years. The introduction of this concept from forward thinking Housing Associations, reflects a growing demand of individuals of a mature age or of family groups for a shared living environment which provides both a degree of privacy and of community within a non-familial household. Independence is achieved through a set of small private spaces which are separate but in close proximity to larger shared spaces. We had to design a building combining two functions : public facility and collective housing. We went to visit the site and decided to design a building for children including a reading area, a sleeping area, classrooms and areas for outdoor activities. The appartments also had to have something special, therefore we started by designing the living room in the centre of the apartment and then we connected the private spaces all around it.
plan L.3
plan L.4
site model picture
master projects|
deta
ils Project
Location
23sharing living meeting extending |
street view
model picture /dining room visual
model picture /living room visual
Munich 2010
Siss imiutGroënland
glac ier
hote l
Le projet de départ était de concevoir un hôtel pour le glacier Russel à l’est de Sissimiut (Groënland). L’institut dans lequel Nous avons été encouragés à développer de petites cellules servant de chambre d’hôtel et à les assembler ensuite dans un plan global. Nous avons décidé de placer les chambres des employés et celles des clients de part et d’autre d’un bâtiment commun que nous devions aussi concevoir.
24
The goal of this project was to design a hotel and set it in front of the Russel Glacier, East of Sissimiut in Greenland. The institute we had to design this project for was specialised in micro-structures. This is one of the reasons why we were encouraged to develop micro homes to serve as hotelrooms. We then organised them on each side of a communal building that uses the same design concept and houses a restaurant, a reception office and a lounge. The urban planning was very important to us, we designed pathways that seem to be floating over the ice and the basic shape represented by the masterplan is a crack in an iceberg.
masterplan
|
deta
ils Project
Location
master projects
Munich 2010
Siss imiutGroënland
solar rock
Solar Rock est la cellule de vie qui compose le projet glacier hotel. La forme a été choisie parce qu’elle est la forme la plus efficace à une latitude comme celle de Sissimiut pour tirer profit de l’ensoleillement. La dimension des faces est elle aussi dictée par les dimensions des panneaux: huit panneaux de 0,8x1.6m. Quatres fonctions sont indentifiées et clairement séparées : préparation de la nourriture, travail, hygiène, sommeil. Ici, la fonction sommeil vient s’installer au dessus des fonctions hygiène et travail.
plan cut at 1,92m
plan cut at 1,92m
26
Solar Rock was the micro home we designed to be used as a hotelroom in the glacier hotel project. This shape was chosen because we wanted to cover the volume with solar panels, and this cube tilted on an angle is the most efficient shape to take advantage of the all-day sun in Greenland. The size of the faces is also related to the solar panels’ dimensions as each face is composed of eight 0.8x1.6m panels. Moreover, considering the extremely small size of the inside space, we had been told that this surface of solar panels would be more than enough to make this hotelroom self sufficient.Technical spaces have also been managed under the seats, and they are accessible from the outside as well as from the inside, to welcome a water tank, and other technical features. Four functions are clearly identified : sleep, hygiene, food prep and work. Here, the sleep function sits on top of the work and hygiene functions. It was the first time I achieved such a level of precision in a design.
skin insulation detail
interior visual
|
deta
ils Project
Location
master projects
plan cut at 1,92m
plan cut at 1,92m
27
interior visual
solar rock |
composition concept support system
detail
photo montage model on site
model picture
Toulouse 2010
Ponts JumeauxToulouse
inhabited park
Le site donné était la ZAC Ponts Jumeaux à Toulouse. Après analyse et recherche, nous avions trouvé une photo satellite montrant ce que nous avons interprété comme étant trois plateaux. Nous avons alors décidé d’accentuer ces reliefs supposés et d’en faire trois vrais plateaux. Une fois ces plateaux érigés, nous avons décidé de ne plus toucher à la surface afin de faire de ce parc un vrai espace public en trois temps. Une faille a également été ménagée dans les plateaux pour rendre visible l’épaisseur, et l’activité qui y prend vie.
28
masterplan
The site was at Ponts Jumeaux, a famous area in Toulouse. The first thing we found when we gathered documents about this area was a satellite picture on which we saw something we interpreted as three different levels. We then decided to emphasise these levels and to inhabit these platforms. The surface becomes a park on which we put nothing but trees, grass and places for people to meet. There is also a line that breaks the two upper platforms open and allows you to measure the thickness of the platforms and to see the activity that takes place in it.
|
deta
ils Project
Location
master projects
BOULEVARD de L'EMBOUCHURE
C e l l i e r
C e l l i e r
L o c a l technique
L o c a l technique
Le plan souterrain a été une grande partie de mon travail individuel. J’ai placé les patios de manière à ce que leur disposition paraisse aléatoire, mais qu’elle réponde quand même à un ordre global, une trame prédéfinie. Tous les éléments du projet s’insèrent dans cette grille de départ, et toutes les dimensions en sont issues, que ce soit les circulations souterraines principales, secondaires, les patios, les places ou les excavations. Sur les limites des plateaux, nous avons également mis en place un procédé de déplacement de volumes visible ci-dessus.
29
underground organisation plan
The underground plan has been the best part of my work in this project, and the difficulty was for the organisation to look random and organic, while being part of a well organised grid system. All the elements of this project fit the grid, and all the dimensions are sub-divisions of the grid, like parking spaces, patios, main and secondary underground circulations and plazas.On the edges of the platforms, we adopted a concept of material displacement to manage public spaces and a staircase to connect the different levels.
inhabited park |
materialdisplacementconcept
Toulouse 2010
Ponts JumeauxToulouse
t roglodytes
Ce projet de logements est lié au projet urbain de parc habité. Il était important de concevoir des logements bien pensés, adaptés à la grille utilisée dans le placement des patios. Six versions d’appartements ont été développées, deux de cinq mètres de côté, deux de sept, deux de dix. Pour chaque dimension, deux modèles sont disponibles, un de plain pied et un duplex. Les rangements, pièces humides et circulations verticales sont disposés en périphérie, les différentes pièces viennent se greffer à ces éléments, et le tout est disposé en retrait de la façade afin d’apporter de la lumière en profondeur dans les appartements.
30
Living underground. This project is related to the urban project presented on the previous page. It was necessary to design apartments that got natural light only from one side and are located underground. Everything had to be consistent with the global concept of the inhabited park. Six different apartments are available. Two are five meters long, two are seven meters long and two are ten meters long. There are two versions of each length because one has only one storey and the other has two stories. Storage areas and humid spaces are located on the perimeter of the apartments, while the other spaces are attached to them and separated from the facade to let more daylight in the depth of the living area.
underground plan
|
deta
ils Project
Location
master projects
Sanit
Sanit
2142
9924
Sanit.
Sanit
1320
930041
041
0300300
Sanit
Sanit
133
255
133
255
300300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300
560
560
200
Sanit
Sanit
Sport
Toulouse 2010
B-18 bui ld ingUnivers i té Bordeaux1
Talence
habi table
sk in
32 |
section
plan L.3
The B18 is a building dedicated to scientific research. Since its construction, technology has evolved, and so have needs and expectations. A coat is most of the time quite expensive, but it seems even more expensive if it doesn’t have any pockets. The purpose of the research programme “enveloppe habitable” was to make the building more energy efficient, but to offer more than just a new layer of insulation and a beautiful pattern on the facade. I wanted to give more space to the people working in the B18, give the building a new usable thickness to meet the new identified needs and complete the activity taking place in the offices and research labs.
deta
ils Project
Location
master projects
enveloppehabitable
(Trans)Formation Universitaire
33habitable skin |
Le B18 est un édifice dédié à la recherche. Depuis sa construction, la technologie a évolué, les attentes et les besoins aussi. L’objet de la recherche Enveloppe Habitable est d’offrir plus qu’un simple plaquage d’isolant et de beaux motifs de façade, et de répondre aux nouveaux besoins observables. Il s’agit d’offrir aux usagers quelque chose en plus, une épaisseur utile pour que les activités qui y prennent place nourrissent le travail effectué dans les bureaux.
have lunchhave a snack
see and be seenoccupy space
34 |
L’idée était de transformer les espaces de travail de manière à offrir de plus grandes possibilités aux chercheurs et étudiants qui travaillent dans le B18.La circulation périphérique à l’existant permet de faire des espaces de travail de véritables îlots, et tout en gardant le découpage des bureaux, on les ouvre vers l’extérieur. Sur la façade Sud, de nouvelles fonctions viennent se loger dans l’épaisseur de la façade,
My work was about multiplying the possibilities in this workspace. The circulation around the existing area defines working plots. We kept the existing organisation of the offices because it was suitable for the function but opened them towards the outside, in order for them to see what is happening outside and enjoy the activity. On the south facade, new functions are taking place in the new thickness of the skin to meet the new needs of a work in the field of research in a university.
main facade rendering
main facade section
envelope concept
master projects
enveloppehabitable
(Trans)Formation Universitaire
35enveloppe habitable |
avec des espaces dont les fonctions sont différentes, mais complémentaires avec le travail des chercheurs et étudiants. On compte parmi ces espaces des espaces de stockage, d’affichage, de détente, de repos, des cuisines, des salles à manger, des jardins intérieurs et extérieurs, des terrasses extérieures, et on distingue également des espaces qui sont liés à l’ajout du nouveau dispositif d’enveloppe : les espaces de ventilation.
These activities are for example storage areas, cooking areas, places to relax, indoor and outdoor gardens, and most importrantly, place to hang one’s work to share informations. All these new cells include integrated furniture, and contribute to making workspaces more enjoyable and more efficient at the same time.The whole process also includes ventilation spaces, that are very important to regulate the temperature of the whole building while creating new interesting views.
accessible roofrendering
Muck Petzet
Arch i tek ten
Munich
38 professional works|
Tagk l in ik fü r
Psychiat r ie
backyard rendering
deta
ils Project
Location
39muck petzet architekten |
Lors de mon stage chez Muck Petzert Architekten à Munich, j’ai contribué au développement du projet d’une clinique de jour pour des patients atteints de troubles mentaux.Le volume est façonné pour communiquer au mieux avec la rue principale et le jardin arrière. La façade est composée de modules disposés aléatoirement pour donner un caractère aléatoire au tout, tout en minimisant les coûts d’exécution. Le chantier de la clinique est en cours.
When I was an intern at Muck Petzet Architekten in Munich, I contributed to the development of a day clinic for patients with a mental condition. The volume is shaped to communicate best with the main street and the back yard. There is also a patio in the building that gives the patients a safer exterior space. The facade is composed of modules, to minimize the costs, but we decided to arrange them randomly to make the main facade more dynamic.The clinic is currently under construction.
concept scheme
cross section
view on the patio
DingXi , Gansu, China
600 000 m2
dingxi
new city center
La mission qui nous a été confiée était de développer un projet à Dingxi, près de Lanzhou. Le projet se compose d’immeubles de logement, de deux tours de bureau et une tour d’hôtel, d’une école et d’un grand centre commercial. Le site est relié à une parcelle qui sera à l’avenir une grande place du peuple, c’est pourquoi nous devions la relier à notre projet. La haute densité du projet reflète l’activité croissante de cette partie de la ville. Les trois tours bordent la rue principale, lui donnent un rythme et une dimension verticale. L’espace créé entre ces trois zones commerciales est un espace public sur deux niveaux, rez-de-chaussée et sous sol.
D&A Shanghai 2012
40 |
masterplan
aerial view
view on the heart of the project
details Project
Location
Total area
professional works
41dubosc and associates shanghai |
The client assigned us with the design of a project in Dingxi, a city near Lanzhou in the Gansu Province. The project is composed of housing buildings, two office towers and a hotel tower, a school and a big commercial center. An empty space next to our site is soon to be the new people’s square, so we decided to consider it as such from the beginning, and connect it to our project as well as possible. The high density proposal we made reflects the increasing dynamic of this area.The three towers are set along the main street, giving it an interesting rhythm as well as a great vertical scale. The commercial center is split in three parts, one constitutes the pedestal of the three towers, while the two others constitute the northern and southern wings. The space created in between is a public space on two levels, the ground floor and the first underground floor. Housing buildings are both located in the north and south, and the school is on the western end of the site. The meticulous care we treated the parks and the public commercial spaces with, makes them extremely pleasant spaces for people to experience.
main facade rendering
D&A Shanghai 2012
Huiyuan,ChengDu
China
huiyuan
logistic park
42 |
Le programme du projet de Huiyuan est très riche et complexe. Il comprend des bureaux modulaires, des tours de bureau, des bureaux pour l’administration du parc logistique, un hôtel, un centre commercial, des ateliers de recherche et de développement pour Volkswagen, ainsi que des immeubles de logement. Le plan de masse est simple mais dynamique, adoptant une trame orthogonale légèrement inclinée par rapport aux limites du projet, ce qui donne une plus grande singularité aux îlots. La place centrale est un pole d’activité, avec son parc, les bureaux de l’administration et ses services et installations sportives pour les usagers. Elle donne de plus une échelle plus humaine au projet.
ground floor plan
central plaza
global view
800 000 m2
deta
ils Project
Location
Total area
professional works
The clients’ needs for the Huiyuan project were as interesting as they were complex. The complexity of the proposal is brought by the fact that we had to combine modular offices, office towers,offices for the administration of the area, a hotel tower, a commercial center, research and development workshops for Volkswagen as well as housing buildings on the same plot.The master plan is simple but very dynamic. It follows a slightly tilted orthogonal grid that gives each space thus created its own particularity. In spite of the density of our proposal we wanted the core of the project to have a very human scale.The Volkswagen workshops are located on the south part of the site, the housing area on the west ; the commercial center, the hotel tower and the three office towers punctuate the main street, showing the strength of the project while giving the project an interesting vertical rhythm. The modular offices occupy the remaining space around the center of the plot. The space created in the center becomes a very active node with its public park, administration offices, service areas and sport facilities for people working on site.
43dubosc and associates shanghai |
central plazarendering
D&A Shanghai 2012
Lanzhou,Gansu, China
Lanzhou
Yindaruqin
Located near Lanzhou (Gansu, China), this project is Yindaruqin’s headquarters. This project contains nonetheless many other elements, for instance a hotel, a restaurant, laboratories and apartments for experts, a shopping center, an exhibition space and dwellings.The housing area is on the northern part of the site. The commercial center and the laboratories are located on the south-western part, the south eastern part is occupied by the exhibition space and the experts’ apartments while the main building stands right in between. The main building contains the hotel, the restaurant and the company’s offices. The pattern on the facade is an interpretation of the course of water, the glass as a symbol for water interacts with the mineral character of the local stone. A subtle proportion between opacity and transparency gives the facade a greater dynamic.
44 |
Situé près de Lanzhou (Chine), ce projet est le siège social de la compagnie des eaux Yindaruqin. Le projet comporte cependant bien d’autres éléments comme un hôtel, un restaurant, des laboratoires et des résidences d’experts, un centre commercial, une salle d’exposition et du logement. Le chemin matérialisé sur la façade reprend l’idée d’un parcours de l’eau, et le verre le symbolisant interagit avec l’aspect minéral de la pierre locale. Le jeu de plein et de vides sur la façade donne à ce siège social une dynamique évidente.
facadealternatives
deta
ils Project
Location
professional works
D&A Shanghai 2012
J iayuguan,Gansu, Chine
deta
ilsProject
Location
jiayuguan
city extension
The city of Jiayuguan is planning to develop towards the south of the existing city. Our assignment was to organize five plots with different functions. From west to east you can find : a plot with dwellings and a commercial center, a plot with offices, a plot with citizen facilities including a new City Hall, a plot open to the public with public spaces, an exhibition center and a people’s square, and the last plot is an administrative plot with a court house, archives and a police station. The buildings fit a grid that we developed on the site, whereas a great curved line interacts with the orthogonal grid while outlining the main pedestrian pathway. We took particularly good care of the design of the administration buildings to give Jiayuguan’s new district a neat and powerful image, and also give the citizens a better environment.
45dubosc et associes shanghai |
La ville de Jiayuguan planifie son développement au sud de la ville existante. L’aménagement de cinq parcelles nous a été confié. Chaque parcelle est un rectangle mesurant en moyenne 350x250m. On trouve du logement, un centre commercial, des bureaux, des espaces publics, et une parcelle admin istrat ive. Nous avons mis en place une trame, et une grande ligne courbe vient interagir avec cette trame pour dessiner le parcours principal pour les piétons. Une attention particulière a été accordée aux bâtiments administratifs pour donner une image puissante à la nouvelle ville de Jiayuguan.
global aerial view
T ls_Mch 2006_2011
Ecole d’archi ToulouseTUMünchen
Muck Petzet Architekten
drawings and
renderings
!"#$%&'()*+%,*%-(.*/*0+1%2%345('1% % 67-8*0%!9:;<<=%
% 3*%>'()*+%*1+%?(/>(1@%,*%,8A%-(.*/*0+1%*0%-408B'*C%?*%1(0+%,*1%-(.*/*0+1%
80,8D8,7*-1%.'(7>@1C%?*%E78%.4'40+8+%70*%,*018+@%'*-4+8D*/*0+%@-*D@*F%!*%>'()*+%?(/>'*0,%
,*1%-(.*/*0+1%>(7D40+%4--*'%,7%<G%47%<HC%?*%E78%>*'/*+%,I*0+'*+*08'%70*%?*'+480*%/8A8+@%
17'%-4%>4'?*--*C%,401%-*%1*01%(J%8-1%>*7D*0+%4??7*8--8'%,*1%>*'1(00*1%K.@*1C%,*1%?(7>-*1%
1401%*0L40+1C%,*1%L4/8--*1%4M40+%70%*0L40+%*+%,*1%L4/8--*1%0(/N'*71*1F%
%
% !*%>'()*+%*1+%>(7'%14%+'B1%.'40,*%/4)('8+@%'@4-81@%*0%1+'7?+7'*%N(81C%-4%L8-8B'*%1B?5*%
*1+%,(0?%+'B1%-4'.*/*0+%L4D('81@*F%!*%/4+@'847%N(81%4>>('+*%70%4D40+4.*%?*'+480%>4'%1*1%
>'(>'8@+@1%>5M18E7*1C%+40+%1+'7?+7'*--*1%E7*%+5*'/8E7*1F%O*7-1%-*1%L(0,4+8(01C%-*%1(-%,*1%
.4'4.*1%*+%-*1%1(7N411*/*0+1%,*1%-(.*/*0+1%0*%1(0+%>41%'@4-81@1%*0%N(81C%>(7'%,*1%
'481(01%,*%>@'*008+@F%!*%?5(8A%,I70%N4',4.*%D*'+8?4-%L4?8-8+*%-*%'7811*--*/*0+%,*1%*47A%,*%
>-78*C%?*%E78%4117'*%70*%/*8--*7'*%-(0.@D8+@%47A%@-@/*0+1%,*%N4',4.*F%!*%?(P+%2%-4%
'@4-814+8(0%1*'4%-8/8+@%>4'%-4%'4>8,8+@%,*%-4%/81*%*0%Q7D'*C%/481%8-%1*'4%47./*0+@%>4'%
-I*11*0?*%,*%N(81%7+8-81@C%E78%-8/8+*'4%>4'%48--*7'1%-*1%?(P+1%@D*0+7*-1%,I*0+'*+8*0%>4'%14%
.'40,*%'@181+40?*%47A%80+*/>@'8*1F%
%
% R401%?*%>'()*+C%-*%>4'+8%7'N480%*1+%?-48'F%;-%@+48+%0@?*1148'*%,*%?(0?*D(8'%70%>'()*+%
E78%,401%14%.-(N4-8+@%47'48+%70*%@?5*--*%,*%547+*7'%1*018N-*/*0+%@.4-*%47A%/481(01%E78%
-78%L(0+%L4?*F%!4%17??*118(0%,*%?*1%L4S4,*1%?(01+8+7*%70%L'(0+%NK+8C%E78%'*?'@*C%*+%?(0+8*0+%
-4%'7*F%;-%@+48+%*11*0+8*-%,*%/@04.*'%70%?(0+4?+%*0+'*%-4%'7*%*+%?54?70%,*1%,8A%-(.*/*0+1%
,81>(1@1%17'%-4%>4'?*--*C%1401%(7N-8*'%,*%?(0+'T-*'%?54?70%,*%?*1%?(0+4?+1F%98018C%47%'*U%
,*%?54711@*%1*%+'(7D*0+%-*1%*0+'@*1%>8@+(00*1%*+%47+(/(N8-*1C%*+%-*1%?(0+4?+1%D817*-1%1(0+%
-8/8+@1F%$0%)*7%,*%'*+'48+1%*+%,*%148--8*%48018%E7*%-I8/>-40+4+8(0%,401%-4%>*0+*%4>>('+*0+%70%
,M04/81/*%2%-I*01*/N-*C%*+%-*1%D4'84N8-8+@1%>(118N-*1%@D8+*0+%+(7+%*LL*+%@D*0+7*-%,*%
/(07/*0+4-8+@F%O7'%-*1%L4S4,*1%17'%'7*C%(0%>*7+%*0%(7+'*%-8'*%-*%>'80?8>*%,I('.40814+8(0%
80+*'0*C%4D*?%70%D(-7/*%1*'D40+%*+%70*%>4'+8*%1*'D8*%0*++*/*0+%8,*0+8L8@1F%%
%
% !I('.40814+8(0%80+*'0*%,*1%-(.*/*0+1%'@>(0,%47%>'80?8>*%,7%1*'D40+%1*'D8F%98018%
>*7+V(0%(N1*'D*'%70*%N40,*%1*'D40+*%47%W(',%'411*/N-40+%-I*11*0+8*-%,*1%?8'?7-4+8(01%
5('8U(0+4-*1%*+%D*'+8?4-*1C%,*1%'40.*/*0+1%*+%,*1%>8B?*1%,I5M.8B0*F%3*++*%.'40,*%
?8'?7-4+8(0%-(0.8+7,804-*%,*11*'+%,*%.'40,1%*1>4?*1%1*'D81C%,(0+%-4%+'401D*'14-8+@%*1+%
4LL8'/@*%>4'%-*%?540.*/*0+%,*%1*01%,*1%-4/*1%,*%>-40?5*'%*+%,7%1*01%,*%>('+@*%,*1%
>(7+'*1%1(7+*040+%-*1%>-40?5*'1F%&(7'%-*1%<XC%+'(81%*1>4?*1%*A+@'8*7'1%1(0+%/81%2%
,81>(18+8(0%,*1%54N8+40+1C%70%>4+8(%47%'*UV,*V?54711@*C%70%)4',80%*0%L(0,%,*%>4'?*--*%47%
'*UV,*V)4',80C%*+%70*%+*''411*%47%>'*/8*'%@+4.*F%<(7+*1%-*1%>8B?*1%E78%-*%0@?*118+*0+%
N@0@L8?8*0+%,I70%4>>('+%,*%-7/8B'*%04+7'*--*C%*+%70%,81>(18+8L%,*%>'(+*?+8(0%1(-48'*%*1+%
/81%*0%>-4?*%-('1E7*%?I*1+%0@?*1148'*F%
%
+500-150-200
-100
-100
-50
0
+50
+100
+200
+350
+400
+450
+500
+550
+50
+100
+150
+200
-100
Garage
RangementsEP
Surface Circulation-Cellier :28 m2
Surface Garage :22,3 m2
VMC
VMC
VMC
Cellier
Garage
Rangements
WC R+1
EP
EFEU
EU
Surface Circulation-Cellier :28 m2
Surface Garage :22,3 m2
VMC
VMC
VMC
VMC
VMC
Cellier
Rangements
WC R+1
EP
EFEU
EU
Surface Circulation-Cellier :28 m2
Surface Garage :22,3 m2
VMC
VMC
VMC
Ombres Hiver
9h
12h
12h
17h
17h
9h
12h
12h
17h
17h
Ombres Été
L’image est aujourd’hui quelque chose de très important en architecture. Et même si j’ai également énormément travaillé sans image, avec simplement des textes pour développer un projet, les images sont un très bon moyen de communiquer et restent plus faciles à sortir de leur contexte et à présenter. Alors voici quelques images extraites de différents travaux, pour l’Ecole d ’A r c h i t e c t u r e mais aussi pour l’agence Muck Petzet Architekten.
48
3D street viewSketchUp
photomontage model on sitePhotoshop
plan streetVectorWorks
Images are very important to communicate. And even if I learned how to communicate without them, with only texts to explain and develop a project, they are still easily understandable and easy to take out of their context. So here are a few samples of images I made for the School of Architecture and for Muck Petzet Architekten München.
extra|
deta
ils Project
Location
49
interior visualSketchUpArtlantisPhotoshop
curtain renderingSketchUp Artlantis
sketch viewSketchup
cafeteriaSketchupArtlantis
drawings and renderings |
Personnal 2009_2011
MunichSiss imiut `
X iTang 西塘Copenhague
captures
BMW WeltBMW TurmBMW MuseumMunich
iceberg betweenSissimiut andDisko Bay
50 |
deta
ils Project
Location
extra
Munich 2009
Kar lsp la tz TUMunichKönigsaal
materialise
a sound
52
sculpturesKönigsaal
Bildnerisches Gestalten is an optional course I took when I was studying in Munich. It litterally means design in image. We had to express the atmosphere of a famous place in Munich : Karlsplatz (Stachus). We were first asked to draw what the sounds meant to us, then we worked in teams on a sculpture and in the end we had to make a sculpture individually.All of the works we did for this course meant exactly the same thing. You can distinguish a grid, for the repetitive and mechanical noises like tramways, busses, cars and subways, and then transparent tights to express the unpredictable noises, made by birds, people walking or cycling.These two materials interact, disturb and hold each other together.
|
deta
ils Project
Location
extra
Bildnerisches Gestalten est un cours d’arts plastiques que j’ai suivi à la TU Munich, et signifie littéralement : concevoir en images. Le but était de transcrire en image l’ambiance sonore d’une place connue dans Munich : Karlsplatz (Stachus). Dans un premier temps, nous avons produit des dessins. Dans un second temps, nous avons effectué une “sculpture” en équipe. Les matériaux choisis pour cette sculpture : grillage pour la structure sonore très réglée et immuable, puis des collants pour les sons aléatoires. L’intérêt est que les deux matériaux i n t é r a g i s s e n t , et se tiennent mutuellement.
53
sound cageKönigsaal
materialise a sound |
Munich 2010
TUMunichKönigsaal
K l in ikum Großhadern
outdoor
l i v i n g r o o m
Toujours dans le cadre de Bildnerisches Gestalten, nous devions travailler sur un terminus du métro munichois. Nous avons choisi Klinikum Großhadern, car à la sortie, on peut remarquer un parc plutôt agréable que personne n’utilise ou ne traverse. Les gens ne s’arrêtent quasiment jamais dans ces zones de Terminus et vont simplement à un autre moyen de transport (vélo, voiture, bus). Nous avons décidé de disposer des meubles de salon avec un tapis pour les inviter à vivre cette transition autrement. Nous avons également filmé cette performance, et nombreux sont ceux qui ont été étonnés du succès rencontré par ce salon de plein air.
54
satellite viewKlinikumGroßhadern
living room pictures
This was another project for Bildnerisches Gestalten. We had to work on an Ausgangspunkt, or a last stop of a subway line in Munich. We chose to work on the station Klinikum Großhadern (on line U6) because there is a park that nobody uses or even walks through even though it is really pleasant.People also usually run from the subway to their car bus or bicycle. We therefore decided to invite them to, as the postcard I made says, learn to stop before they move on. We bought armchairs, a table, a lamp and a carpet to set a living room in the middle of this unused park, and live this change of transportation a different way. We made a movie out of our performance, and when we set this living room in the Königsaal to play the movie, many people were impressed by the success our outdoor living room had.
|
deta
ils Project
Location
extra
[ausgangspunkt endstation] Julien Lafitte / Yvonne
Blindtext Blindtext
O
55
screenshotsfrom the movie
outdoor living room |
postcardlast stop
curr iculum
v i t ae
conta
ct julien lafitte
phone
+33 (0) 6 70 10 10 18
Education
Skills and Interests
Academic year 2011-2012 : HMONP training at the School of Architecture of Paris La Villette
Academic year 2010-2011 : Student at the school of Architecture of Toulouse - Masters degree in september 2011
Academic year 2009-2010 : Student at the Technische Universität München.
Academic years 2006-2009 : Student at the school of Architecture of Toulouse - Bachelor degree in september 2009.
academic year 2005-2006 : Baccalauréat with distinction. Speciality physics and chemistry
- Softwares mastered : Vectorworks, ArchiCAD, AutoCAD, SketchUp, Artlantis, Photoshop, Illustrator, InDesign, Word, Excel, Powerpoint.
- Languages mastered : french (native), english (TOEIC) , german (B2 Level), mandarin (basics).
58 Personal informations|
Professional experience
- February 2012 : Internship at Dubosc and Associates Shanghai. (7 months)
- April 2010 : Internship at Muck Petzet Architekten, architect in Munich. (2 months)
- September 2008 : Intrenship in the service for architecture of the City of Toulouse. (1 month)
- September 2007 : Internship with M.Bordes, carpenter. (2 weeks)
- February 2007 : Intenship at Atelier Beauvisage, with S.Beauvisage, DPLG architect in Dax. (1 week)
- Sport : Swimming (champion of France ,17 y.o. 2005), tennis.
- Cinema, music, travel (Netherlands, Sweden, Spain, England, Germany, Greenland, Iceland, Austria, Denmark, China, Hong-Kong), photography.
59curriculum vitae |