LHC 1 st shutdown K. Foraz, CERN Accelerator Reliability Workshop 2015

Upload: others

Post on 05-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

LHC 1st shutdown K. Foraz, CERN Accelerator Reliability Workshop 2015

Page 2: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

Contents

• Life-cycle of the CERN accelerator complex • Goal of Long Shutdown 1 (LS1) • Phases

• Scoping • Preparation • Implementation • Closure

• Conclusions

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 2

Page 3: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

Life-cycle of CERN accelerator complex

Run 2 Run 3 LS 2

Beam com.

Technical stop

Shutdown Physics

EYETS YETS YETS YETS

LS 3

LHC b b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o

Injectors o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o

t

LHC o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o

Injectors o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o

2015 2016 2017 2018 2019Q4 Q1 Q2

2020 2021Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q3 Q4

2022 2023 2024 2025 2026 2027 2028

Q1 Q2 Q3 Q4 Q1 Q2Q3 Q4 Q1 Q2 Q3 Q4Q1 Q2 Q3

Q1 Q2 Q3 Q4Q1 Q2 Q3 Q4 Q1 Q2 Q1 Q2 Q3 Q4Q3 Q4 Q1 Q2 Q3 Q4Q1 Q2 Q3 Q4 Q1 Q2Q3 Q4

LS2

LS3

• Run2 ► 30fb-1

• LS2 ► LIU • Run3 ► 300fb-1

• LS3 ► HL-LHC • Run4&5&6 ► 3000fb-1

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 3

Page 4: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

LHC LS1 goal

• Take all measures for a safe and reliable operation of LHC @ 6.5TeV/beam Consolidate superconducting magnets and circuits SMACC See M. Solfaroli’s presentation

Relocate radiation sensitive electronics R2E Perform full maintenance of all equipment's Consolidate and upgrade the equipment

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 4

Page 5: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

LHC LS1 – R2E project

R2E: Radiation to Electronics • Relocate and protect the SEE

sensitive equipment • More than 100 racks relocated,

Additional shielding

UJ76

UJ56 RR5s

US85

UX45

~250 hours Downtime ~400 hours

Downtime

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 5

Courtesy of M. Brugger & A.-L-Perrot

Page 6: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

LHC LS1 a huge amount of activities

Before After

18 kV & 3.3 kV circuit breakers

Vacuum UPS-RE82

Pumping station

Cryo plant P7 enclosure

Helium spill test

ACS transport

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 6

Page 7: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

LS1 phases

Page 8: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

LS1 Scoping phase • LS1 concerned not only the LHC, but all the accelerator complex

• Activities to be prioritized and approved according to the following

priorities: • P0: Safety • P1: Beam to 7TeV, nominal performance • P2: Reliable operation improvement • P3: CERN approved projects • P4: CERN non approved projects

• Arbitration between requests w.r.t resources & priorities plan.cern.ch

• Results presented during LS1 day

General Projects, priorities, goal, impact if not done /postponed

Schedule

Resources and budget

Group contributions

Details and resources

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

Page 9: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

Preparation phase

"By failing to prepare you are preparing to fail.“ B. Franklin

For the 1st time in my life I’m feeling I should've done something about my weight

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 9

Page 10: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

LS1 Preparation phase - What

• Integration studies • Mandatory step for any change

of the external envelopes of underground equipment.

• Procedures

• Engineering Change Requests, Engineering Specifications…

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 10

Page 11: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

LS1 Preparation phase - How

• Work Package Analysis meetings

• Reviews • External review of SMACC • Internal reviews

• Safety

• General safety: procedures, prevention plans, joint inspections

• ALARA (As Low As Reasonably Achievable) • Optimization of interventions to optimize the dose

received reduction of doses by at least a factor 3

Items covered: Description Conditions prior to start Schedule Perimeter of worksites Storage areas Logistics Risks and compensatory measures Radiological management

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 11

Page 12: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

• Main projects • SMACC project: 4 years of preparation • R2E: 3 years of preparation

• Contracts: ~ 9 months

• Organize human resources • ~ 800 additional collaborators contracts or collaboration • Training, equipment, logistics • Temporary detachment within CERN

LS1 Preparation phase - When

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 12

Page 13: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

LS1 Preparation phase – baseline schedule

From big blocks to detailed schedules

RE18

RE22

RE28

UJ32

RE38

RE42

RE48

RE52

RE58

RE62

RE68

RE72

RE78

RE82

RE88

RE12

JULY

AUG

SEPT

OCT

FEB

MARCH

APR

AUG

SEPT

MAY

JUNE

NOV

OCT

NOV

DEC

JAN

DEC

MAR

APR

MAY

JUNE

JULY

APR

MAR

MAY

JAN

2015

FEB

2015

FEB

MAR

APR

MAY

DEC

NOV

OCT

SEPT

AUG

JULY

JUNE

MAY

APR

MAR

FEB

2014

JAN

FEB

JAN

2014

DEC

NOV

2013

2013

LSSPt 8

LSS Arc 81 LSSR2E R2E R2E

LSS LSSPt 7

LSS Arc 78LSS

LS1 schedule in the LHC machine

Pt 1LSS Arc 12 LSS Pt 2 LSS Arc 23 LSS Pt 3

Pt 5LSS Arc 56 LSS Pt 6LSS Arc 34 LSS Pt 4 LSS Arc 45

R2EArc 67

FEB

MARCH

APR

MAY

JUNE

JULY

AUG

SEPT

OCT

beam

vac

uum

UPS

Cabl

ing§

ELQAValidation of internal helium circuit

EE

WCC

Cool-down

Flushing

Powering tests

ELQA

Validation of internal helium circuit

ELQA

IC total

Warm-up

Leak test

ELQALeak test

Flushing

ELQAValidation of internal helium circuit

IC total

Cabl

ing

Cabl

ing

Prep

a. W

orks

Prep

a. W

orks

ELQA

theLargeHadronColliderproject

Dism

antli

ng

Cabl

ing§

Cabl

ing§

WCC

WCC

CSCM

IC total

QRL leak repair

IC total

IC total

Dism

antli

ng

Civil eng.

Automated

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 13

Page 14: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

LS1 Implementation phase

• Coordination • Weekly Coordination meetings • Dedicated project meetings (SMACC, R2E) • Long Shutdown Committee

• Progress of works • Additional activities & impact on resources • Issues: delay, safety, logistics….

• Strong field coordination

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 14

Page 15: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

LS1 Implementation phase

IMPACT system • Intervention Management Planning And Coordination Tool • Mandatory for any intervention at CERN • Integrated with existing systems: access system, location

database, Radio Protection database, InforEAM…

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 15

Page 16: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

LS1 Implementation phase

IMPACT system

1841

7670

13053

15710

0

4000

8000

12000

16000

20000

2011 2012 2013 2014

Total Activities per year

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 16

Page 17: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

LS1 Implementation phase

• Access … sinew of war • 100m underground machine • Peak of entries & exits per day in

LHC (incl. experiments) : 4’434

• 10 surface access points, 2 critical systems • Material Access Devices • Lifts

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 17

Page 18: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

LS1 Implementation phase

Additional activities • Inherent to such a Shutdown … there were

• Those unexpected : • LHC QRL leaks, 15%► 50% of splices…

• Those who «somebody» knew but forgot to inform the community !! induced additional workload to the usual support groups

• Schedule was reviewed accordingly and

resources reallocated • A 2nd baseline was edited in September 2014,

and few weeks were added

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 18

Page 19: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

LS1 Closure phase

• LS1 Debriefing day held in March 31st • key intervening teams have presented their feedback,

especially in terms of safety, access conditions, support given and obtained, infrastructure. This accumulated experience will be useful to prepare the LS2 and identify possible bottlenecks and critical issues.

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 19

Page 20: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

LS1 – 1st feedbacks on organization

• Scoping phase - Plan tool Unique repository, useful for communication between groups To be reviewed regularly

• Preparation & Implementation phase

Work Package Analysis ALARA as low as Reasonably Achievable Activities scheduled as Late as possible….no margin = stress General Organization: Long Shutdown Committee and coordination meetings Additional activities and resources reshuffling … effects on other facilities

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 20

Page 21: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

Conclusions

• Thanks to the tremendous effort of each from the preparation phase to the closure phase, LS1 was a success.

• Nevertheless, as we can always improve ourselves, strong and weak points are being analysed

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 21

Page 22: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

Thank you for your attention

Page 23: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8
Page 24: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

2015 version 1.4 Phase Days Initial Commissioning 57 Scrubbing 23 Special physics run 1 (LHCf/VdM) 5 Proton physics 50 ns 9 + 21 Proton physics 25 ns 70 Special physics run 2 (TOTEM/VdM) 7 MD 15 Technical stops 15 Technical stop recovery 3 Ion setup/Ion run 4 + 24 Total 253 (36

weeks)

April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 24

Page 25: K. Foraz, CERN Accelerator Reliability Workshop 2015 - Foraz - LHC... · Group contributions Details and resources April 29th, 2105 K. Foraz - Accelerator Reliabiity Workshop 8

Safety Performance: Accidents

K. Foraz - Accelerator Reliabiity Workshop 25

• Approximately 3.4 million hours of LS1 work • 64 minor accidents (no absence) • 31 accidents with 273 days of absence

Frequency rate Severity rate

Year MPE Contractor MPE Contractor

2009 4.78 29 0.1 0.53

2010 2.93 23.33 0.05 0.52

2011 2.5 21.33 0.04 0.45

2012 2.86 24.62 0.08 0.60

2013 4.9 17.67 0.17 0.38

2013-14 (LS1) 9.1 0.08

April 29th, 2105