  • 8/12/2019 KAJANG ITS PROJECT

    1/52

    MOHD ROZAIDI BIN ISMAIL P72431

    SAIF MOHAMMED THABET P71067

    AFAQ AHMED KAREEM P71060

    PROF.IR.DR.RIZA ATIQ ABDULLAH BIN O.K.RAHMAT

    INTELLIGENT URBAN TRAFFIC CONTROL SYSTEM

    KKKA6424

    DEVELOPING KAJANG TRANSPORTATIONSYSTEM

    http://ifolio.ukm.my/user/3603/riza-atiq-abdullah-bin-o-k-rahmathttp://ifolio.ukm.my/user/3603/riza-atiq-abdullah-bin-o-k-rahmat
  • 8/12/2019 KAJANG ITS PROJECT

    2/52

    INTRODUCTION

    DATA ANALYSIS

    PROPOSAL

    CONCLUSION

    PRESENTATION OUTLINE

  • 8/12/2019 KAJANG ITS PROJECT

    3/52

    Intelligent Transport Systems (ITS)

    Application of information technologies (computers,sensors, and wired and wireless communications, Data

    base, etc.)ITS is one of Knowledge Economy

    Economy comes to place a great importance on the role

    of Knowledge which is seen as an important production

    factor along with labor and capital (e.g. electronic

    money)

    INTRODUCTION

  • 8/12/2019 KAJANG ITS PROJECT

    4/52

    CLASSIFICATION OF ITS IN THE TOOLKIT

    Traveler InformationTraffic/Road ManagementDemand ManagementElectronic Financial TransactionsCommercial Vehicle Management

    Public Transport ManagementIncident and Hazard Response

  • 8/12/2019 KAJANG ITS PROJECT

    5/52

    also known as traffic signals, traffic lamps, signal lights,stop lights and robots, and also known technically as

    traffic control signals are signalling devices positioned

    at road intersections, pedestrian crossings and other

    locations to control competing flows of traffic.

    Traffic lights were first installed in 1868 in London and

    are now used all over the world Traffic lights alternate

    the right of way accorded to road users by displaying

    lights of a standard color (red, orange/amber, andgreen) following a universal color code In the typical

    sequence of color phases

    TRAFFIC LIGHTS

  • 8/12/2019 KAJANG ITS PROJECT

    6/52

    Intersections are an important part of

    the highway system. the operationalefficiency, capacity, safety, and cost of

    the overall system are largely

    dependent upon its design, especially

    in urban areas.

    the primary objective ofintersection design is to provide for

    the convenience, ease, comfort, and

    safety of those traversing the

    intersection while reducing potentialconflicts between vehicles, bicycles,

    and pedestria

    INTERSECTIONS

  • 8/12/2019 KAJANG ITS PROJECT

    7/52

    Kajangtown has grown rapidly in the past severaldecades. New suburban areas and satellite townships have

    radiated out of the old Kajang town. Continuous trafficgrowth through developed areas and difficulties in building

    new transportation infrastructure have caused a need for

    careful monitoring of operating conditions on existing

    transportation facilities. New strategies for traffic control

    must be developed in order to manage the increase in

    traffic volume in Kajang.

  • 8/12/2019 KAJANG ITS PROJECT

    8/52

    STUDY AREA

    This study shall be conducted along the arterial routes of Kajangcity, (consisting of 4 signalized intersections) as shown in Figure

  • 8/12/2019 KAJANG ITS PROJECT

    9/52

    Queues

    Wastage Cost - loosestime and ,increase fuel

    consumption

    PROBLEM STATEMENT

  • 8/12/2019 KAJANG ITS PROJECT

    10/52

    STUDY OBJECTIVE

    The main objective of the study is to propose solution totraffic congestion in Kajang by optimizing traffic flows along

    a few selected arterial routes. The solution shall include:

    To upgrade current situation of traffic flow in Kajang town

    To ensure the safety of the traffic users

    To give real time information to the users

    To propose mechanism of action during

    incident/breakdown

    To have batter service of traffic in Kajang town

  • 8/12/2019 KAJANG ITS PROJECT

    11/52

    SCOPE OF WORK

    The scope of work of this study consists of the followings

    Site Visit

    Traffic Surveys and Analyses

  • 8/12/2019 KAJANG ITS PROJECT

    12/52

  • 8/12/2019 KAJANG ITS PROJECT

    13/52

  • 8/12/2019 KAJANG ITS PROJECT

    14/52

  • 8/12/2019 KAJANG ITS PROJECT

    15/52

  • 8/12/2019 KAJANG ITS PROJECT

    16/52

  • 8/12/2019 KAJANG ITS PROJECT

    17/52

  • 8/12/2019 KAJANG ITS PROJECT

    18/52

  • 8/12/2019 KAJANG ITS PROJECT

    19/52

  • 8/12/2019 KAJANG ITS PROJECT

    20/52

  • 8/12/2019 KAJANG ITS PROJECT

    21/52

  • 8/12/2019 KAJANG ITS PROJECT

    22/52

  • 8/12/2019 KAJANG ITS PROJECT

    23/52

  • 8/12/2019 KAJANG ITS PROJECT

    24/52

  • 8/12/2019 KAJANG ITS PROJECT

    25/52

  • 8/12/2019 KAJANG ITS PROJECT

    26/52

    OFFSET AND GREEN TIME SPLIT DETERMINATION

  • 8/12/2019 KAJANG ITS PROJECT

    27/52

  • 8/12/2019 KAJANG ITS PROJECT

    28/52

  • 8/12/2019 KAJANG ITS PROJECT

    29/52

  • 8/12/2019 KAJANG ITS PROJECT

    30/52

    TRAFFIC CONTROLSYSTEM

    T traffic control system, developed by Rhythm Engineering,is an intelligent transportation system that enables traffic

    signals to adapt to actual traffic demand..

    Proposed to be located at the Kajang Town Municipal Council Building

  • 8/12/2019 KAJANG ITS PROJECT

    31/52

    Housed Various Components Of Traffic Management(Signals, Control Boxes, Real Time Video And Simulations

  • 8/12/2019 KAJANG ITS PROJECT

    32/52

    The smart surveillance system consists of the smart cameras and themicroprocessors which are connected to the control room computer

    The integration of these advanced image sensors with high-

    performance processors such as smart cameras .The basic

    component of the image processing system for the smartsurveillance system comprises of the smart surveillance camera,

    multiplexer, image grabber and a Windows based computer.

    PROPOSED SMART SURVEILLANCE SYSTEM

    Traficon Smart Video Camera

  • 8/12/2019 KAJANG ITS PROJECT

    33/52

    The optimization procedure includes individual

    controller setting and offset timing to minimize

    stopping and maximize flows that give progressive

    flows with maximum bandwidth. Optimizing existing

    traffic controllers are relatively easy although it

    requires surveys and on site setting. However to

    maintain optimum operation, constant monitoring isneeded especially if power supply is not stable. It is

    undeniable that setting up a ITS system in this Kajang

    town area would be a very wise decision as it will help

    to lessen the congestion in Kajang and also willbenefits the town here as has smoother traffic flow.

  • 8/12/2019 KAJANG ITS PROJECT

    34/52

    Traficon is one of the video detection systems available ,

    Traficon's continuous research has resulted in solutions for

    traffic applications and make the perfect traffic measurementsystem for traffic applications, including ramp metering, travel

    time calculation, dynamic speed indication, queue tail

    monitoring, congestion monitoring, tunnel access control,

    ventilation control, rerouting, VMS-control

  • 8/12/2019 KAJANG ITS PROJECT

    35/52

  • 8/12/2019 KAJANG ITS PROJECT

    36/52

    Services to improve the convenience and performance of public

    transport such as schedule management and common fare payingmechanisms

    Public Transport Management:

    Vehicle-mounted system(GPS and communication

    display, etc.)

    Cellular phone (radio, satellitecommunications), etc.

    Public transport control center(communications/information

    management and control system)

    GPS

  • 8/12/2019 KAJANG ITS PROJECT

    37/52

    Tracking of public transportation

    Prague (Czech Republic)

    Ploiesti (Romania)Quito (Ecuador)

    Bogota (Colombia

    Example

    Electronic Ticket

    public transport service

    using GPS, ETC, and other

    methods(Colombia

    methods(Colombia

  • 8/12/2019 KAJANG ITS PROJECT

    38/52

    Logical Architecture

  • 8/12/2019 KAJANG ITS PROJECT

    39/52

    User Services

    Physical Architecture

    Logical Architecture

    Logical Architecture (Distributed Control Architecture

    System Architecture

  • 8/12/2019 KAJANG ITS PROJECT

    40/52

    Physical Architecture

  • 8/12/2019 KAJANG ITS PROJECT

    41/52

    A variable message sign is an electronic sign often used

    on roadway to give travellers information about special

    events. Such signs warn of traffic congestion, accidents,roadwork ones, or speed limits on a specific highway and

    road segment.

    Also provide the user to take alternative routes, limittravel speed, warn of duration and location of the

    incidents or just inform the traffic conditions.

    A complete message on a panel generally includes a

    problem statement indicating incident, roadwork, stalled

    vehicle, a location statement indicating where the

    incident located, an effect statement indicating lane

    closure, delay and action statement giving suggestion

    what to do traffic conditions ahead.

  • 8/12/2019 KAJANG ITS PROJECT

    42/52

    Site visit & Data

    Collection

    Determination of

    Phasing

    Sequences

    Determination of

    Green Time Split

    & Cycle Time

    Determination ofOffset

    ProposedSolution

    Conclusion &Recommendation

    STUDY METHODOLOGY

  • 8/12/2019 KAJANG ITS PROJECT

    43/52

    For K-MITS, propose medium sized display with character height of

    25cm (legibility distance 150m away at 60km/hr)

  • 8/12/2019 KAJANG ITS PROJECT

    44/52

    Communication system

    In the present wireless digital world, it is now possible to provide

    integrated communications for Kajang Councils. With their physicalinfrastructure, Kajang Councils are in a very commanding position

    to install digital systems with a wireless infrastructure. With the

    beginning of Urban Traffic Management and Control systems

    (UTMC), there is a need to provide information from the traffic light

    controller back to the Central Server. Either this is an existingsystem, based on serial communications which requires

    replacement, or a new communications connection. For UTMC

    connected traffic lights, a communications path must exist back to

    the control centre.

    This can be accomplished by the use of Mesh4GTM Network

    clusters. Traffic lights are connected via Mesh Nodes to each

    other,and then via an Access Point back to the Network Control

    Centre

  • 8/12/2019 KAJANG ITS PROJECT

    45/52

    Wireless Communication System

  • 8/12/2019 KAJANG ITS PROJECT

    46/52

    Laying copper or fiber optic cable for this purpose is relatively very

    expensive and involves road digging. Renting existing commercial

    telecommunication cable also involves high operating cost.

    Power cable as the communication line

  • 8/12/2019 KAJANG ITS PROJECT

    47/52

    PROPOSED COST OF INSTALLATION

  • 8/12/2019 KAJANG ITS PROJECT

    48/52

    Item Unit Cost/unit (RM) Cost (RM)

    Traffic Light new

    System, smart

    camera etc

    4 30,000 120,000

    infrastructure 1 50,000 50,000

    Call

    Centre/traffic

    control centre

    1 100,000 100,000

    VMS 8 250,000 2000000

    Subtotal (Project Cost) 2180000Operation Cost 1 100000 100,000

    Maintenance

    Cost

    1 200000 200,000

    Subtotal Operation and Maintenance/Year 300,000

    Total Cost (RM) 2480000

    In this section, we will list out the typical costing for installation of all

    the four intersection with ITS.

  • 8/12/2019 KAJANG ITS PROJECT

    49/52

    Initial and maintenance works to optimize existing traffic

    controllers consume a greatdeal of time and energy. If this operation can be automated

    intelligently, the traffic flows could be optimized in real

    time automatically. For this reason, the study team

    Recommends that:

    Upgrade the existing controllers to controllers with

    microprocessors

    Install advanced sensors

    Install communication system to facilitate data

    exchanges between traffic controllers which are necessaryin optimizing traffic flows.

    RECOMMENDATIONS

  • 8/12/2019 KAJANG ITS PROJECT

    50/52

  • 8/12/2019 KAJANG ITS PROJECT

    51/52

    The system could not be coordinated to optimize agroup of traffic controllers because its actions are

    unpredictable. Multi-plan timing system could be set

    based on computed timing that gives

    It is undeniable that setting up a ITS system in this

    Kajang town area would be a very wise decision as it

    will help to lessen the congestion in Kajang and also

    will benefits the town here as has smoother traffic

    flow.

  • 8/12/2019 KAJANG ITS PROJECT

    52/52